Similar Documents at Salem |
---|
Category:Letter type:LR
MONTHYEARLR-N23-0079, Special Report 23-02-00 Pursuant to the Requirements of Salem Unit 1 Technical Specification 3.3.3.7, Action 10, for the Unit 1 Main Steam Line Rad Monitor Inoperable for Greater than Seven Days2023-12-0707 December 2023 Special Report 23-02-00 Pursuant to the Requirements of Salem Unit 1 Technical Specification 3.3.3.7, Action 10, for the Unit 1 Main Steam Line Rad Monitor Inoperable for Greater than Seven Days LR-N23-0077, Loss of Coolant Accident Peak Cladding Temperature Margin Tracking - Annual Report 2023 & 30 Day Report for Salem Unit 1 Upflow Conversion2023-11-29029 November 2023 Loss of Coolant Accident Peak Cladding Temperature Margin Tracking - Annual Report 2023 & 30 Day Report for Salem Unit 1 Upflow Conversion LR-N23-0072, Core Operating Limits Report Cycle 302023-11-0101 November 2023 Core Operating Limits Report Cycle 30 LR-N23-0045, and Peach Bottom Atomic Power Station, Units 2 and 3 - Notice of Proposed Amendment to Decommissioning Trust Agreement2023-09-0808 September 2023 and Peach Bottom Atomic Power Station, Units 2 and 3 - Notice of Proposed Amendment to Decommissioning Trust Agreement LR-N23-0055, Special Report 272/23-01-00, Pursuant to the Requirements of Technical Specification 3.3.3.1, Action 23, for the Vent Noble Gas Rad Monitor Inoperable for Greater than Seven Days2023-08-0303 August 2023 Special Report 272/23-01-00, Pursuant to the Requirements of Technical Specification 3.3.3.1, Action 23, for the Vent Noble Gas Rad Monitor Inoperable for Greater than Seven Days LR-N23-0054, In-Service Inspection Activities2023-07-26026 July 2023 In-Service Inspection Activities LR-N23-0046, Emergency Plan Document Revisions Implemented June 28, 20232023-07-10010 July 2023 Emergency Plan Document Revisions Implemented June 28, 2023 LR-N23-0005, License Amendment Request to Amend Technical Specifications (TS) 6.8.4.f for Permanent Extension of Type a and Type C Leak Rate Test Frequencies2023-06-23023 June 2023 License Amendment Request to Amend Technical Specifications (TS) 6.8.4.f for Permanent Extension of Type a and Type C Leak Rate Test Frequencies LR-N23-0035, 2022 Annual Radioactive Effluent Release Report (ARERR)2023-04-27027 April 2023 2022 Annual Radioactive Effluent Release Report (ARERR) LR-N23-0034, 2022 Annual Radiological Environmental Operating Report (AREOR) - Salem Nuclear Generating Station, Unit Nos. 1 and 2 and Hope Creek Generating Station2023-04-27027 April 2023 2022 Annual Radiological Environmental Operating Report (AREOR) - Salem Nuclear Generating Station, Unit Nos. 1 and 2 and Hope Creek Generating Station LR-N23-0033, Core Operating Limits Report Cycle 272023-04-26026 April 2023 Core Operating Limits Report Cycle 27 LR-N23-0010, License Amendment Request Revision of Technical Specification (TS) to Delete TS Section 5.5 - Meteorological Tower Location2023-04-21021 April 2023 License Amendment Request Revision of Technical Specification (TS) to Delete TS Section 5.5 - Meteorological Tower Location LR-N23-0006, Report on Status of Decommissioning Funding for Reactors and Independent Spent Fuel Storage Installations2023-03-24024 March 2023 Report on Status of Decommissioning Funding for Reactors and Independent Spent Fuel Storage Installations LR-N23-0019, and Salem Generating Station, Units 1 and 2 - Guarantees of Payment of Deferred Premiums2023-03-21021 March 2023 and Salem Generating Station, Units 1 and 2 - Guarantees of Payment of Deferred Premiums LR-N23-0016, and Salem Generating Station, Units 1 and 2 - Report of Changes, Tests, and Experiments2023-02-28028 February 2023 and Salem Generating Station, Units 1 and 2 - Report of Changes, Tests, and Experiments LR-N23-0012, Annual Property Insurance Status Report2023-02-24024 February 2023 Annual Property Insurance Status Report LR-N23-0014, Stations Submittal of 2022 Annual Report of Fitness for Duty Performance Data Per 10 CFR 26.203(e) and 10 CFR 26.7172023-02-23023 February 2023 Stations Submittal of 2022 Annual Report of Fitness for Duty Performance Data Per 10 CFR 26.203(e) and 10 CFR 26.717 LR-N23-0003, Response to Requests for Additional Information Salem Unit 2 Relief Request S2-I4R-2112023-02-0101 February 2023 Response to Requests for Additional Information Salem Unit 2 Relief Request S2-I4R-211 LR-N22-0096, and Salem Generating Station, Units 1 and 2 - Request for Threshold Determination2023-01-0505 January 2023 and Salem Generating Station, Units 1 and 2 - Request for Threshold Determination LR-N22-0095, Loss of Coolant Accident Peak Cladding Temperature Margin Tracking - Annual Report 20222022-12-20020 December 2022 Loss of Coolant Accident Peak Cladding Temperature Margin Tracking - Annual Report 2022 LR-N22-0094, Emergency Plan Document Revisions Implemented November 21, 20222022-12-14014 December 2022 Emergency Plan Document Revisions Implemented November 21, 2022 LR-N22-0092, Response to Final Iolb Request for Additional Information for Salem LAR to Revise TS to Extend Allowed Outage Time for Inoperable EDG2022-12-0909 December 2022 Response to Final Iolb Request for Additional Information for Salem LAR to Revise TS to Extend Allowed Outage Time for Inoperable EDG LR-N22-0091, Independent Spent Fuel Storage Installation, Report of 10 CFR 72.48 Changes, Tests, and Experiments2022-12-0202 December 2022 Independent Spent Fuel Storage Installation, Report of 10 CFR 72.48 Changes, Tests, and Experiments LR-N22-0084, Response to Final Request for Additional Information for Salem LAR to Revise TS to Extend Allowed Outage Time for Inoperable EDG (EPID L- 2022-LLA-0095)2022-11-17017 November 2022 Response to Final Request for Additional Information for Salem LAR to Revise TS to Extend Allowed Outage Time for Inoperable EDG (EPID L- 2022-LLA-0095) LR-N22-0090, Supplement to Submittal of Salem Generating Station Updated FSAR, Revision 33, 10 CFR 71.106 Review Results and 10 CFR 54.37(b) Review Results for Salem2022-11-10010 November 2022 Supplement to Submittal of Salem Generating Station Updated FSAR, Revision 33, 10 CFR 71.106 Review Results and 10 CFR 54.37(b) Review Results for Salem LR-N22-0065, Submittal of Relief Request Associated with the Fourth Inservice Inspection (ISI) Interval Limited Examinations2022-09-27027 September 2022 Submittal of Relief Request Associated with the Fourth Inservice Inspection (ISI) Interval Limited Examinations LR-N22-0074, Emergency Plan Evacuation Time Estimate2022-09-15015 September 2022 Emergency Plan Evacuation Time Estimate LR-N22-0066, License Amendment Request (LAR) to Relocate Technical Specifications (TS) Requirements for Reactor Head Vents to the Technical Requirements Manual (TRM)2022-08-31031 August 2022 License Amendment Request (LAR) to Relocate Technical Specifications (TS) Requirements for Reactor Head Vents to the Technical Requirements Manual (TRM) LR-N22-0063, Spent Fuel Cask Registration2022-08-10010 August 2022 Spent Fuel Cask Registration LR-N22-0068, In-Service Inspection Activities - 90-Day Report2022-08-10010 August 2022 In-Service Inspection Activities - 90-Day Report LR-N22-0012, License Amendment Request to Amend the Technical Specifications to Revise and Relocate the Reactor Coolant System Pressure and Temperature Limits and Pressurizer Overpressure Protection System Limits to a Pressure and Temperature2022-08-0707 August 2022 License Amendment Request to Amend the Technical Specifications to Revise and Relocate the Reactor Coolant System Pressure and Temperature Limits and Pressurizer Overpressure Protection System Limits to a Pressure and Temperature LR-N22-0062, Spent Fuel Cask Registration2022-07-21021 July 2022 Spent Fuel Cask Registration LR-N22-0006, License Amendment Request (LAR) to Amend Salem Unit 1 and Unit 2 Technical Specifications (TS) to Extend the Allowed Outage Time for an Inoperable Emergency Diesel Generator from 72 Hours to 14 Days2022-06-29029 June 2022 License Amendment Request (LAR) to Amend Salem Unit 1 and Unit 2 Technical Specifications (TS) to Extend the Allowed Outage Time for an Inoperable Emergency Diesel Generator from 72 Hours to 14 Days LR-N22-0051, License Amendment Request to Relocate Technical Specification Facility/Unit Staff Qualification Requirements to Quality Assurance Topical Report2022-06-22022 June 2022 License Amendment Request to Relocate Technical Specification Facility/Unit Staff Qualification Requirements to Quality Assurance Topical Report LR-N22-0044, Emergency Plan Document Revisions Implemented November, 20212022-05-19019 May 2022 Emergency Plan Document Revisions Implemented November, 2021 LR-N22-0043, Core Operating Limits Report - Cycle 292022-05-0909 May 2022 Core Operating Limits Report - Cycle 29 LR-N22-0041, 2021 Annual Radioactive Effluent Release Report (Rerr)2022-04-28028 April 2022 2021 Annual Radioactive Effluent Release Report (Rerr) LR-N22-0040, 2021 Annual Radiological Environmental Operating Report2022-04-28028 April 2022 2021 Annual Radiological Environmental Operating Report LR-N22-0039, Emergency Plan Document Revisions Implemented March 24, 20222022-04-21021 April 2022 Emergency Plan Document Revisions Implemented March 24, 2022 LR-N21-0052, Request for Relief from ASME Code Defect Removal for Service Water Buried Piping2022-04-0707 April 2022 Request for Relief from ASME Code Defect Removal for Service Water Buried Piping LR-N22-0023, Guarantees of Payment of Deferred Premiums2022-03-21021 March 2022 Guarantees of Payment of Deferred Premiums LR-N22-0022, Response to Request for Additional Information Relief Request S1-14R-210, Alternative Examination of Welds2022-03-21021 March 2022 Response to Request for Additional Information Relief Request S1-14R-210, Alternative Examination of Welds LR-N22-0017, Submittal of 2021 Annual Report of Fitness for Duty (FFD) Performance Data2022-02-25025 February 2022 Submittal of 2021 Annual Report of Fitness for Duty (FFD) Performance Data LR-N22-0016, Radiological Survey of Site Property to Be Used for Offshore Wind Port Facility2022-02-24024 February 2022 Radiological Survey of Site Property to Be Used for Offshore Wind Port Facility LR-N22-0013, In-Service Inspection Activities - 90-Day Report2022-02-10010 February 2022 In-Service Inspection Activities - 90-Day Report LR-N22-0007, Request for Exemption from Specific Requirements of 10 CFR Part 26, Fitness for Duty Programs2022-01-0505 January 2022 Request for Exemption from Specific Requirements of 10 CFR Part 26, Fitness for Duty Programs LR-N21-0061, Annual Report of Specific Activity Analysis - TS 6.9.1.5c2021-12-0909 December 2021 Annual Report of Specific Activity Analysis - TS 6.9.1.5c LR-N21-0083, Loss of Coolant Accident Peak Cladding Temperature Margin Tracking - Annual Report 2021 & 30 Day Report for Salem Unit 2 Upflow Conversion2021-11-24024 November 2021 Loss of Coolant Accident Peak Cladding Temperature Margin Tracking - Annual Report 2021 & 30 Day Report for Salem Unit 2 Upflow Conversion LR-N21-0078, Hope and Creek Generating Station, Supplement to License Amendment Request to Revise Technical Specifications (TS) to Delete Definitions Found in 10 CFR Part 20 and Delete Figures of the Site and Surrounding Areas from TS2021-11-18018 November 2021 Hope and Creek Generating Station, Supplement to License Amendment Request to Revise Technical Specifications (TS) to Delete Definitions Found in 10 CFR Part 20 and Delete Figures of the Site and Surrounding Areas from TS LR-N21-0066, Submittal of Relief Request Associated with the Fourth Inservice Inspection (ISI) Interval Limited Examinations2021-11-10010 November 2021 Submittal of Relief Request Associated with the Fourth Inservice Inspection (ISI) Interval Limited Examinations 2023-09-08
[Table view] Category:License-Application for Facility Operating License (Amend/Renewal) DKT 50
MONTHYEARLR-N23-0045, and Peach Bottom Atomic Power Station, Units 2 and 3 - Notice of Proposed Amendment to Decommissioning Trust Agreement2023-09-0808 September 2023 and Peach Bottom Atomic Power Station, Units 2 and 3 - Notice of Proposed Amendment to Decommissioning Trust Agreement ML23249A2612023-09-0606 September 2023 License Amendment Request to Modify the Salem and Hope Creek Exclusion Area Boundary LR-N23-0005, License Amendment Request to Amend Technical Specifications (TS) 6.8.4.f for Permanent Extension of Type a and Type C Leak Rate Test Frequencies2023-06-23023 June 2023 License Amendment Request to Amend Technical Specifications (TS) 6.8.4.f for Permanent Extension of Type a and Type C Leak Rate Test Frequencies ML23096A1842023-05-0909 May 2023 Issuance of Amendment No. 328 Revise and Relocate Reactor Coolant System Pressure and Temperature Limits and Pressurizer Overpressure Protection System Limits to Pressure and Temperature Limits Report LR-N23-0010, License Amendment Request Revision of Technical Specification (TS) to Delete TS Section 5.5 - Meteorological Tower Location2023-04-21021 April 2023 License Amendment Request Revision of Technical Specification (TS) to Delete TS Section 5.5 - Meteorological Tower Location LR-N22-0066, License Amendment Request (LAR) to Relocate Technical Specifications (TS) Requirements for Reactor Head Vents to the Technical Requirements Manual (TRM)2022-08-31031 August 2022 License Amendment Request (LAR) to Relocate Technical Specifications (TS) Requirements for Reactor Head Vents to the Technical Requirements Manual (TRM) LR-N22-0012, License Amendment Request to Amend the Technical Specifications to Revise and Relocate the Reactor Coolant System Pressure and Temperature Limits and Pressurizer Overpressure Protection System Limits to a Pressure and Temperature2022-08-0707 August 2022 License Amendment Request to Amend the Technical Specifications to Revise and Relocate the Reactor Coolant System Pressure and Temperature Limits and Pressurizer Overpressure Protection System Limits to a Pressure and Temperature LR-N22-0006, License Amendment Request (LAR) to Amend Salem Unit 1 and Unit 2 Technical Specifications (TS) to Extend the Allowed Outage Time for an Inoperable Emergency Diesel Generator from 72 Hours to 14 Days2022-06-29029 June 2022 License Amendment Request (LAR) to Amend Salem Unit 1 and Unit 2 Technical Specifications (TS) to Extend the Allowed Outage Time for an Inoperable Emergency Diesel Generator from 72 Hours to 14 Days LR-N22-0051, License Amendment Request to Relocate Technical Specification Facility/Unit Staff Qualification Requirements to Quality Assurance Topical Report2022-06-22022 June 2022 License Amendment Request to Relocate Technical Specification Facility/Unit Staff Qualification Requirements to Quality Assurance Topical Report ML22061A0302022-04-0404 April 2022 Issuance of Amendment Nos. 343 and 324 Revise Technical Specifications Surveillance Requirements for Auxiliary Feedwater ML21277A1932021-11-16016 November 2021 Enclosure 2, Draft Conforming License Amendments ML21230A0182021-10-0808 October 2021 Issuance of Amendment No. 339 Revise and Relocate Reactor Coolant System Pressure and Temperature Limits and Pressurizer Overpressure Protection System Limits to Pressure and Temperature Limits Report LR-N21-0065, License Amendment Request - Revision of Salem and Hope Creek Generating Station Technical Specification (TS) to Delete Definitions Found in 10 CFR Part 20 and Delete Figures of the Site and Surrounding Areas from TS2021-09-29029 September 2021 License Amendment Request - Revision of Salem and Hope Creek Generating Station Technical Specification (TS) to Delete Definitions Found in 10 CFR Part 20 and Delete Figures of the Site and Surrounding Areas from TS LR-N21-0048, One-Time License Amendment Request to Revise Unit 2 Technical Specification Action for Rod Position Indicators2021-06-18018 June 2021 One-Time License Amendment Request to Revise Unit 2 Technical Specification Action for Rod Position Indicators LR-N21-0043, Supplement to License Amendment Request to Adopt TSTF-490, Delete Ebar Definition and Revision to RCS Specific Activity Tech Spec2021-06-0909 June 2021 Supplement to License Amendment Request to Adopt TSTF-490, Delete Ebar Definition and Revision to RCS Specific Activity Tech Spec RS-21-039, Supplemental Information Regarding Application for Order Approving Transfers and Proposed Conforming License Amendments2021-03-25025 March 2021 Supplemental Information Regarding Application for Order Approving Transfers and Proposed Conforming License Amendments LR-N21-0026, Supplement to License Amendment Request to Amend the Technical Specifications to Revise and Relocate the Reactor Coolant System Pressure and Temperature Limits and Pressurizer Overpressure Protection System2021-03-17017 March 2021 Supplement to License Amendment Request to Amend the Technical Specifications to Revise and Relocate the Reactor Coolant System Pressure and Temperature Limits and Pressurizer Overpressure Protection System ML21057A2732021-02-25025 February 2021 Application for Order Approving License Transfers and Proposed Conforming License Amendments LR-N21-0006, Application to Revise Technical Specifications to Adopt TSTF-569 Revision of Response Time Testing Definitions2021-02-16016 February 2021 Application to Revise Technical Specifications to Adopt TSTF-569 Revision of Response Time Testing Definitions LR-N20-0003, License Amendment Request to Adopt TSTF-490, Deletion of E-Bar Definition and Revision to RCS Specific Activity Tech Spec2020-09-17017 September 2020 License Amendment Request to Adopt TSTF-490, Deletion of E-Bar Definition and Revision to RCS Specific Activity Tech Spec LR-N20-0027, Supplement to License Amendment Request: Revise Minimum Required Channels, Mode Applicability and Actions for the Source Range and Intermediate Range Neutron Flux Reactor Trip System Instrumentation Technical Specifications2020-05-11011 May 2020 Supplement to License Amendment Request: Revise Minimum Required Channels, Mode Applicability and Actions for the Source Range and Intermediate Range Neutron Flux Reactor Trip System Instrumentation Technical Specifications LR-N20-0010, License Amendment Request to Exclude the Dynamic Effects of Specific Postulated Pipe Ruptures from the Design and Licensing Basis Based on Leak-Before-Break Methodology2020-04-24024 April 2020 License Amendment Request to Exclude the Dynamic Effects of Specific Postulated Pipe Ruptures from the Design and Licensing Basis Based on Leak-Before-Break Methodology LR-N19-0055, License Amendment Request: Revise Minimum Required Channels, Mode Applicability and Actions for the Source Range and Intermediate Range Neutron Flux Reactor Trip System Instrumentation Technical Specifications2019-10-23023 October 2019 License Amendment Request: Revise Minimum Required Channels, Mode Applicability and Actions for the Source Range and Intermediate Range Neutron Flux Reactor Trip System Instrumentation Technical Specifications LR-N19-0064, License Amendment Request - Deletion of Facility Operating License Conditions Related to Decommissioning Trust Provisions and License Transfer2019-07-29029 July 2019 License Amendment Request - Deletion of Facility Operating License Conditions Related to Decommissioning Trust Provisions and License Transfer LR-N19-0065, License Amendment Request for Approval of Changes to Emergency Plan Staffing Requirements2019-07-0808 July 2019 License Amendment Request for Approval of Changes to Emergency Plan Staffing Requirements LR-N19-0006, Application to Revise Technical Specifications to Adopt TSTF-563, Revise Instrument Testing Definitions to Incorporate the Surveillance Frequency Control Program2019-04-0808 April 2019 Application to Revise Technical Specifications to Adopt TSTF-563, Revise Instrument Testing Definitions to Incorporate the Surveillance Frequency Control Program LR-N18-0129, License Amendment Request to Revise Technical Specifications to Adopt TSTF-547, Clarification of Rod Position Requirements.2019-02-0404 February 2019 License Amendment Request to Revise Technical Specifications to Adopt TSTF-547, Clarification of Rod Position Requirements. LR-N18-0116, Response to Request for Additional Information, License Amendment Request: Inverter Allowed Outage Time (AOT) Extension2018-10-30030 October 2018 Response to Request for Additional Information, License Amendment Request: Inverter Allowed Outage Time (AOT) Extension LR-N18-0113, Supplement to License Amendment Request: Revise Reactor Trip System Instrumentation, Engineered Safety Feature Actuation System Instrumentation, Main Steam Isolation Valves and Add Main Feedwater Isolation Technical Specification2018-10-27027 October 2018 Supplement to License Amendment Request: Revise Reactor Trip System Instrumentation, Engineered Safety Feature Actuation System Instrumentation, Main Steam Isolation Valves and Add Main Feedwater Isolation Technical Specification LR-N18-0059, Application to Revise Technical Specifications to Adopt TSTF-529, Clarify Use and Application Rules2018-06-29029 June 2018 Application to Revise Technical Specifications to Adopt TSTF-529, Clarify Use and Application Rules LR-N18-0038, License Amendment Request (LAR) to Amend the Salem Technical Specifications (TS) to Extend the Refueling Water Storage Tank (RWST) Allowed Outage Time2018-06-29029 June 2018 License Amendment Request (LAR) to Amend the Salem Technical Specifications (TS) to Extend the Refueling Water Storage Tank (RWST) Allowed Outage Time LR-N17-0144, License Amendment Request: Revise Reactor Trip System Instrumentation, Engineered Safety Feature Actuation System Instrumentation, Main Steam Isolation Valves and Add Main Feedwater Isolation Technical Specification2018-06-29029 June 2018 License Amendment Request: Revise Reactor Trip System Instrumentation, Engineered Safety Feature Actuation System Instrumentation, Main Steam Isolation Valves and Add Main Feedwater Isolation Technical Specification LR-N18-0067, Supplement to License Amendment Request for Vital Instrument Bus Inverter Allowed Outage Time (AOT) Extension2018-06-14014 June 2018 Supplement to License Amendment Request for Vital Instrument Bus Inverter Allowed Outage Time (AOT) Extension ML18136A8662018-05-16016 May 2018 License Amendment Request: Vital Instrument Bus Inverter Allowed Outage Time (AOT) Extension LR-N18-0022, License Amendment Request to Revise Technical Specification Actions for Rod Position Indicators2018-02-0808 February 2018 License Amendment Request to Revise Technical Specification Actions for Rod Position Indicators LR-N17-0135, License Amendment Request for Implementation of WCAP-14333 and WCAP-15376, Reactor Trip System Instrumentation and Engineered Safety Feature Actuation System Instrumentation Test Times and Completion Times2017-12-18018 December 2017 License Amendment Request for Implementation of WCAP-14333 and WCAP-15376, Reactor Trip System Instrumentation and Engineered Safety Feature Actuation System Instrumentation Test Times and Completion Times LR-N17-0121, License Amendment Request to Relocate the Reactor Coolant System Pressure Isolation Valve Table from the Technical Specifications to the Technical Requirements Manual2017-09-27027 September 2017 License Amendment Request to Relocate the Reactor Coolant System Pressure Isolation Valve Table from the Technical Specifications to the Technical Requirements Manual LR-N17-0058, License Amendment Request to Revise the Implementation Period for License Amendment No. 2942017-03-13013 March 2017 License Amendment Request to Revise the Implementation Period for License Amendment No. 294 LR-N16-0173, License Amendment Request: Containment Fan Cooler Unit (Cfcu) Allowed Outage Time (AOT) Extension2017-03-0606 March 2017 License Amendment Request: Containment Fan Cooler Unit (Cfcu) Allowed Outage Time (AOT) Extension LR-N16-0003, License Amendment Request to Amend the Accident Monitoring Instrumentation Technical Specifications2016-11-17017 November 2016 License Amendment Request to Amend the Accident Monitoring Instrumentation Technical Specifications LR-N16-0175, License Amendment Request - Administrative Controls2016-10-17017 October 2016 License Amendment Request - Administrative Controls LR-N16-0114, License Amendment Request to Revise Technical Specifications to Adopt TSTF-545, Revision 3, TS Lnservice Testing Program Removal & Clarify SR Usage Rule Application to Section 5.5 Testing Using the Consolidated Line .2016-08-30030 August 2016 License Amendment Request to Revise Technical Specifications to Adopt TSTF-545, Revision 3, TS Lnservice Testing Program Removal & Clarify SR Usage Rule Application to Section 5.5 Testing Using the Consolidated Line . LR-N16-0093, License Amendment Request to Extend the Implementation Period for Salem, Unit 1 License Amendment No. 311 and Salem, Unit 2 License Amendment No. 2922016-05-10010 May 2016 License Amendment Request to Extend the Implementation Period for Salem, Unit 1 License Amendment No. 311 and Salem, Unit 2 License Amendment No. 292 LR-N16-0057, Supplement for License Amendment Request Regarding Replacement of Source Range and Intermediate Range Neutron Monitoring Systems2016-03-0404 March 2016 Supplement for License Amendment Request Regarding Replacement of Source Range and Intermediate Range Neutron Monitoring Systems LR-N16-0044, Emergency License Amendment Request to Modify Technical Specification Requirements for One Inoperable Subcooling Margin Monitor Channel2016-02-11011 February 2016 Emergency License Amendment Request to Modify Technical Specification Requirements for One Inoperable Subcooling Margin Monitor Channel LR-N16-0015, Supplemental Information for License Amendment to Revise Technical Specification 3/4.3.1, Reactor Trip System Instrumentation2016-02-0303 February 2016 Supplemental Information for License Amendment to Revise Technical Specification 3/4.3.1, Reactor Trip System Instrumentation LR-N15-0084, License Amendment Request Modifying Chilled Water System Requirements2015-09-11011 September 2015 License Amendment Request Modifying Chilled Water System Requirements LR-N15-0189, Supplemental Information Needed for Review of Emergency License Amendment Request to Remove Pressurizer Power Operated Relief Valve Position Indication Instrumentation from Accident Monitoring Instrumentation Technical Specifications2015-09-0202 September 2015 Supplemental Information Needed for Review of Emergency License Amendment Request to Remove Pressurizer Power Operated Relief Valve Position Indication Instrumentation from Accident Monitoring Instrumentation Technical Specifications LR-N15-0187, Emergency License Amendment Request to Remove Pressurizer Power Operated Relief Valve (PORV) Position Indication Instrumentation from the Accident Monitoring Instrumentation Technical Specifications2015-08-31031 August 2015 Emergency License Amendment Request to Remove Pressurizer Power Operated Relief Valve (PORV) Position Indication Instrumentation from the Accident Monitoring Instrumentation Technical Specifications LR-N15-0021, License Amendment Request Regarding Replacement of Source Range and Intermediate Range Neutron Monitoring Systems2015-04-0303 April 2015 License Amendment Request Regarding Replacement of Source Range and Intermediate Range Neutron Monitoring Systems 2023-09-08
[Table view] Category:Technical Specification
MONTHYEARLR-N23-0005, License Amendment Request to Amend Technical Specifications (TS) 6.8.4.f for Permanent Extension of Type a and Type C Leak Rate Test Frequencies2023-06-23023 June 2023 License Amendment Request to Amend Technical Specifications (TS) 6.8.4.f for Permanent Extension of Type a and Type C Leak Rate Test Frequencies ML22270A3172022-09-27027 September 2022 Submittal of Technical Specification Bases Changes, Amendment No. 201 LR-N22-0078, Submittal of Technical Specification Bases Changes, Amendment No. 2152022-09-27027 September 2022 Submittal of Technical Specification Bases Changes, Amendment No. 215 LR-N21-0078, Hope and Creek Generating Station, Supplement to License Amendment Request to Revise Technical Specifications (TS) to Delete Definitions Found in 10 CFR Part 20 and Delete Figures of the Site and Surrounding Areas from TS2021-11-18018 November 2021 Hope and Creek Generating Station, Supplement to License Amendment Request to Revise Technical Specifications (TS) to Delete Definitions Found in 10 CFR Part 20 and Delete Figures of the Site and Surrounding Areas from TS LR-N21-0048, One-Time License Amendment Request to Revise Unit 2 Technical Specification Action for Rod Position Indicators2021-06-18018 June 2021 One-Time License Amendment Request to Revise Unit 2 Technical Specification Action for Rod Position Indicators LR-N21-0045, Submittal of Changes to Technical Specifications Bases2021-06-16016 June 2021 Submittal of Changes to Technical Specifications Bases LR-N21-0006, Application to Revise Technical Specifications to Adopt TSTF-569 Revision of Response Time Testing Definitions2021-02-16016 February 2021 Application to Revise Technical Specifications to Adopt TSTF-569 Revision of Response Time Testing Definitions LR-N20-0072, License Amendment Request to Amend Tech Specs to Revise and Relocate the Reactor Coolant System Pressure & Temperature Limits & Pressurizer Overpressure Protection System Limits to a Pressure & Temperature Limits Report2020-12-0606 December 2020 License Amendment Request to Amend Tech Specs to Revise and Relocate the Reactor Coolant System Pressure & Temperature Limits & Pressurizer Overpressure Protection System Limits to a Pressure & Temperature Limits Report LR-N20-0003, License Amendment Request to Adopt TSTF-490, Deletion of E-Bar Definition and Revision to RCS Specific Activity Tech Spec2020-09-17017 September 2020 License Amendment Request to Adopt TSTF-490, Deletion of E-Bar Definition and Revision to RCS Specific Activity Tech Spec ML17157B2652017-05-0909 May 2017 Submittal of Hope Creek Generating Station Updated Final Safety Analysis Report, Revision 22, Hope Creek Technical Specification Bases Changes, 10CFR54.37(b) Review Results for Hope Creek and PSEG Nuclear LLC Quality Assurance Topical Repor LR-N17-0088, Submittal of Hope Creek Generating Station Updated Final Safety Analysis Report, Revision 22, Hope Creek Technical Specification Bases Changes, 10CFR54.37(b) Review Results for Hope Creek and Pseg Nuclear LLC Quality Assurance Topical Re2017-05-0909 May 2017 Submittal of Hope Creek Generating Station Updated Final Safety Analysis Report, Revision 22, Hope Creek Technical Specification Bases Changes, 10CFR54.37(b) Review Results for Hope Creek and Pseg Nuclear LLC Quality Assurance Topical Repor LR-N17-0034, Salem Generating Station, Units 1 & 2, Submittal of Revision 29 to Updated Final Safety Analysis Report, and Technical Specification Bases Changes and Quality Assurance Topical Report, NO-AA-10, Rev. 852017-01-30030 January 2017 Salem Generating Station, Units 1 & 2, Submittal of Revision 29 to Updated Final Safety Analysis Report, and Technical Specification Bases Changes and Quality Assurance Topical Report, NO-AA-10, Rev. 85 ML17046A2292017-01-30030 January 2017 Submittal of Revision 29 to Updated Final Safety Analysis Report, and Technical Specification Bases Changes and Quality Assurance Topical Report, NO-AA-10, Rev. 85 LR-N16-0003, License Amendment Request to Amend the Accident Monitoring Instrumentation Technical Specifications2016-11-17017 November 2016 License Amendment Request to Amend the Accident Monitoring Instrumentation Technical Specifications LR-N16-0114, License Amendment Request to Revise Technical Specifications to Adopt TSTF-545, Revision 3, TS Lnservice Testing Program Removal & Clarify SR Usage Rule Application to Section 5.5 Testing Using the Consolidated Line .2016-08-30030 August 2016 License Amendment Request to Revise Technical Specifications to Adopt TSTF-545, Revision 3, TS Lnservice Testing Program Removal & Clarify SR Usage Rule Application to Section 5.5 Testing Using the Consolidated Line . LR-N15-0187, Emergency License Amendment Request to Remove Pressurizer Power Operated Relief Valve (PORV) Position Indication Instrumentation from the Accident Monitoring Instrumentation Technical Specifications2015-08-31031 August 2015 Emergency License Amendment Request to Remove Pressurizer Power Operated Relief Valve (PORV) Position Indication Instrumentation from the Accident Monitoring Instrumentation Technical Specifications LR-N15-0021, License Amendment Request Regarding Replacement of Source Range and Intermediate Range Neutron Monitoring Systems2015-04-0303 April 2015 License Amendment Request Regarding Replacement of Source Range and Intermediate Range Neutron Monitoring Systems LR-N15-0020, License Amendment Request to Revise Technical Specification 3/4.3.1, Reactor Trip System Instrumentation2015-03-27027 March 2015 License Amendment Request to Revise Technical Specification 3/4.3.1, Reactor Trip System Instrumentation ML14210A4842014-07-28028 July 2014 License Amendment Request to Revise Technical Specifications to Adopt TSTF-510, Revision 2, Revision to Steam Generator Program Inspection Frequencies and Tube Sample Selection Using the Consolidated Line Item Improvement Process ML1118615602011-07-28028 July 2011 and Salem Nuclear Generating Station, Unit Nos. 1 and 2, License Amendment, Issuance of Amendments Approval of Cyber Security Plan LR-N11-0056, Supplement to Application for Technical Specification Change Regarding Risk-Informed Justification for the Relocation of Specific Surveillance Frequency Requirements to a Licensee Controlled Program2011-02-23023 February 2011 Supplement to Application for Technical Specification Change Regarding Risk-Informed Justification for the Relocation of Specific Surveillance Frequency Requirements to a Licensee Controlled Program LR-N10-0355, Attachment 3 to LR-N10-0355, Hope Creek Generating Station, Emergency Action Level Comparison Matrix2010-10-14014 October 2010 Attachment 3 to LR-N10-0355, Hope Creek Generating Station, Emergency Action Level Comparison Matrix LR-N10-0355, Attachment 1 to LR-N10-0355, Hope Creek Generating Station, Emergency Action Level Technical Bases Document (Strike-out Version)2010-10-14014 October 2010 Attachment 1 to LR-N10-0355, Hope Creek Generating Station, Emergency Action Level Technical Bases Document (Strike-out Version) ML1100503982010-10-14014 October 2010 Attachment 3 to LR-N10-0355, Hope Creek Generating Station, Emergency Action Level Comparison Matrix LR-N10-0355, Hope Creek, CY-AA-170-500, Revision 0, Meteorological Monitoring System Calibration and Maintenance2010-10-14014 October 2010 Hope Creek, CY-AA-170-500, Revision 0, Meteorological Monitoring System Calibration and Maintenance ML1100504152010-10-14014 October 2010 Hope Creek, CY-AA-170-500, Revision 0, Meteorological Monitoring System Calibration and Maintenance LR-N10-0355, Attachment 2 to LR-N10-0355, Hope Creek Generating Station, Emergency Action Level Technical Bases Document (Clean Version)2010-10-14014 October 2010 Attachment 2 to LR-N10-0355, Hope Creek Generating Station, Emergency Action Level Technical Bases Document (Clean Version) LR-N10-0355, Attachment 4 to LR-N10-0355, Hope Creek Generating Station, Emergency Action Level Technical Bases Supporting Documents (Cd with Paper Index)2010-10-14014 October 2010 Attachment 4 to LR-N10-0355, Hope Creek Generating Station, Emergency Action Level Technical Bases Supporting Documents (Cd with Paper Index) ML1100503992010-10-14014 October 2010 Attachment 4 to LR-N10-0355, Hope Creek Generating Station, Emergency Action Level Technical Bases Supporting Documents (Cd with Paper Index) ML1100503752010-10-14014 October 2010 Attachment 1 to LR-N10-0355, Hope Creek Generating Station, Emergency Action Level Technical Bases Document (Strike-out Version) ML1100504022010-10-14014 October 2010 Attachment 2 to LR-N10-0355, Hope Creek Generating Station, Emergency Action Level Technical Bases Document (Clean Version) ML1025802412010-09-0808 September 2010 License Amendment Request S10-01 Application for Technical Specification Change Regarding Risk-Informed Justification for the Relocation of Specific Surveillance Frequency Requirements to a Licensee Controlled Program ML1100505182010-08-24024 August 2010 Hope Creek, HC.OP-AB.ZZ-0150(Q), Rev. 6, 125VDC System Malfunction LR-N10-0355, Hope Creek, HC.OP-AB.ZZ-0150(Q), Rev. 6, 125VDC System Malfunction2010-08-24024 August 2010 Hope Creek, HC.OP-AB.ZZ-0150(Q), Rev. 6, 125VDC System Malfunction LR-N10-0355, Hope Creek, HC.OP-AB.HVAC-0002(Q), Rev. 7, Control Room Environment2010-07-13013 July 2010 Hope Creek, HC.OP-AB.HVAC-0002(Q), Rev. 7, Control Room Environment ML1100505002010-07-13013 July 2010 Hope Creek, HC.OP-AB.HVAC-0002(Q), Rev. 7, Control Room Environment LR-N10-0355, Hope Creek, HC.OP-AB.RPV-0009(Q), Rev. 7, Shutdown Cooling2010-06-24024 June 2010 Hope Creek, HC.OP-AB.RPV-0009(Q), Rev. 7, Shutdown Cooling ML1100505162010-06-24024 June 2010 Hope Creek, HC.OP-AB.RPV-0009(Q), Rev. 7, Shutdown Cooling LR-N10-0355, Hope Creek, HC.OP-AB.CONT-0002(Q), Rev. 9, Containment2010-05-0303 May 2010 Hope Creek, HC.OP-AB.CONT-0002(Q), Rev. 9, Containment ML1100504772010-05-0303 May 2010 Hope Creek, HC.OP-AB.CONT-0002(Q), Rev. 9, Containment LR-N10-0355, Hope Creek, HC.OP-AB.RPV-0003(Q), Rev. 21, Recirculation System/Power Oscillations2010-04-21021 April 2010 Hope Creek, HC.OP-AB.RPV-0003(Q), Rev. 21, Recirculation System/Power Oscillations ML1100505052010-04-21021 April 2010 Hope Creek, HC.OP-AB.MISC-0002(Q), Rev. 10, Crids/Overhead Annunciators/Ppc Computer LR-N10-0355, Hope Creek, HC.OP-AB.MISC-0002(Q), Rev. 10, Crids/Overhead Annunciators/Ppc Computer2010-04-21021 April 2010 Hope Creek, HC.OP-AB.MISC-0002(Q), Rev. 10, Crids/Overhead Annunciators/Ppc Computer ML1100505062010-04-21021 April 2010 Hope Creek, HC.OP-AB.RPV-0003(Q), Rev. 21, Recirculation System/Power Oscillations LR-N10-0355, Hope Creek, Offsite Dose Calculation Manual, Revision 252010-04-16016 April 2010 Hope Creek, Offsite Dose Calculation Manual, Revision 25 ML1100504172010-04-16016 April 2010 Hope Creek, Offsite Dose Calculation Manual, Revision 25 ML1100504742010-03-17017 March 2010 Hope Creek, HC.IC-GP.BB-0003(Q) - Rev. 17, Nuclear Boiler - Nondivisional Channel L-11683/B21-N027 Rx Cavity Flood Up Level/Rx Shutdown Range Level Setup LR-N10-0355, Hope Creek, HC.IC-GP.BB-0003(Q) - Rev. 17, Nuclear Boiler - Nondivisional Channel L-11683/B21-N027 Rx Cavity Flood Up Level/Rx Shutdown Range Level Setup2010-03-17017 March 2010 Hope Creek, HC.IC-GP.BB-0003(Q) - Rev. 17, Nuclear Boiler - Nondivisional Channel L-11683/B21-N027 Rx Cavity Flood Up Level/Rx Shutdown Range Level Setup LR-N10-0355, Hope Creek, HC.OP-AB.MISC-0001(Q), Rev. 15, Acts of Nature2010-03-0505 March 2010 Hope Creek, HC.OP-AB.MISC-0001(Q), Rev. 15, Acts of Nature ML1100505022010-03-0505 March 2010 Hope Creek, HC.OP-AB.MISC-0001(Q), Rev. 15, Acts of Nature 2023-06-23
[Table view] Category:Amendment
MONTHYEARLR-N23-0005, License Amendment Request to Amend Technical Specifications (TS) 6.8.4.f for Permanent Extension of Type a and Type C Leak Rate Test Frequencies2023-06-23023 June 2023 License Amendment Request to Amend Technical Specifications (TS) 6.8.4.f for Permanent Extension of Type a and Type C Leak Rate Test Frequencies LR-N21-0048, One-Time License Amendment Request to Revise Unit 2 Technical Specification Action for Rod Position Indicators2021-06-18018 June 2021 One-Time License Amendment Request to Revise Unit 2 Technical Specification Action for Rod Position Indicators LR-N21-0006, Application to Revise Technical Specifications to Adopt TSTF-569 Revision of Response Time Testing Definitions2021-02-16016 February 2021 Application to Revise Technical Specifications to Adopt TSTF-569 Revision of Response Time Testing Definitions LR-N20-0072, License Amendment Request to Amend Tech Specs to Revise and Relocate the Reactor Coolant System Pressure & Temperature Limits & Pressurizer Overpressure Protection System Limits to a Pressure & Temperature Limits Report2020-12-0606 December 2020 License Amendment Request to Amend Tech Specs to Revise and Relocate the Reactor Coolant System Pressure & Temperature Limits & Pressurizer Overpressure Protection System Limits to a Pressure & Temperature Limits Report LR-N15-0020, License Amendment Request to Revise Technical Specification 3/4.3.1, Reactor Trip System Instrumentation2015-03-27027 March 2015 License Amendment Request to Revise Technical Specification 3/4.3.1, Reactor Trip System Instrumentation ML1118615602011-07-28028 July 2011 and Salem Nuclear Generating Station, Unit Nos. 1 and 2, License Amendment, Issuance of Amendments Approval of Cyber Security Plan LR-N09-0034, License Amendment Request to Relocate Communications, Manipulator Crane, and Crane Travel Requirements from Technical Specifications2009-04-0909 April 2009 License Amendment Request to Relocate Communications, Manipulator Crane, and Crane Travel Requirements from Technical Specifications LR-N08-0046, Request for Changes to Technical Specifications Refueling Operations - Decay Time, License Amendment Request (LAR) S08-012008-03-11011 March 2008 Request for Changes to Technical Specifications Refueling Operations - Decay Time, License Amendment Request (LAR) S08-01 ML0715901852007-06-0606 June 2007 Units, 1 and 2, Tech Spec Pages for Amendment 265 Relocation of Technical Specification Requirements for the Movable Incore Detectors and Radioactive Gaseous Effluent Oxygen Monitoring Instrumentation LR-N07-0030, License Change Request S06-010, Steam Generator Feedwater Pump Trip, Feedwater Isolation Valve Response Time Testing and Containment Cooling System2007-03-16016 March 2007 License Change Request S06-010, Steam Generator Feedwater Pump Trip, Feedwater Isolation Valve Response Time Testing and Containment Cooling System ML0701900942007-01-11011 January 2007 License Amendment Request 07-01, Revision to Technical Specifications to Support Steam Generator Replacement LR-N06-0201, Request for Change to Technical Specifications to Eliminate Requirements for Hydrogen Recombiners and Hydrogen Analyzers Using the Consolidated Line Item Improvement Process2006-06-0707 June 2006 Request for Change to Technical Specifications to Eliminate Requirements for Hydrogen Recombiners and Hydrogen Analyzers Using the Consolidated Line Item Improvement Process LR-N06-0055, Request for Change to Technical Specifications to Add Requirements for Steam Generator Tube Integrity, Steam Generator Program and Steam Generator Tube Inspection Report and to Revise Reactor Coolant System Operational Leakage Requiremen2006-04-0606 April 2006 Request for Change to Technical Specifications to Add Requirements for Steam Generator Tube Integrity, Steam Generator Program and Steam Generator Tube Inspection Report and to Revise Reactor Coolant System Operational Leakage Requirements ML0601300252006-01-11011 January 2006 Technical Specifications Deletion of Reactor Coolant System Volume ML0525600402005-09-0909 September 2005 Units, 1 and 2 - Tech Spec Pages for Amendments 265 and 247 to Extend the Inspection Interval for Reactor Coolant Pump Flywheels LR-N05-0377, Revision to Request for Changes to Technical Specifications Containment Systems - Containment Cooling System2005-08-11011 August 2005 Revision to Request for Changes to Technical Specifications Containment Systems - Containment Cooling System LR-N05-0018, Request for Change to Technical Specifications to Add Requirements for Steam Generator Tube Integrity, Steam Generator Program, & Steam Generator Tube Inspection Report & to Revise Reactor Coolant System Operational.2005-02-23023 February 2005 Request for Change to Technical Specifications to Add Requirements for Steam Generator Tube Integrity, Steam Generator Program, & Steam Generator Tube Inspection Report & to Revise Reactor Coolant System Operational. LR-N04-0021, Units I and 2 - Implementation of Alternative Source Term (AST) Request for Changes to Technical Specifications and Updated Final Safety Analysis Report2004-04-26026 April 2004 Units I and 2 - Implementation of Alternative Source Term (AST) Request for Changes to Technical Specifications and Updated Final Safety Analysis Report ML0400804432004-01-0707 January 2004 Tech Spec Pages for License Amendment, Request for Changes to License Condition 2.C.(10) LR-N03-0092, Request for Change to TSs Explosive Gas Mixture2003-06-0606 June 2003 Request for Change to TSs Explosive Gas Mixture LR-N03-0022, Revision to Request for Change to Technical Specifications2003-02-14014 February 2003 Revision to Request for Change to Technical Specifications LR-N03-0014, Request for Change to Technical Specifications Administrative and Editorial Changes2003-01-29029 January 2003 Request for Change to Technical Specifications Administrative and Editorial Changes LR-N02-0344, Request for Change to Technical Specifications Revise Section 6.12, High Radiation Area.2002-10-23023 October 2002 Request for Change to Technical Specifications Revise Section 6.12, High Radiation Area. ML0200702422002-01-0404 January 2002 TS Pages to Amendment 249 & 229 Change to Technical Specifications 28 Volt D.C. Distribution 2023-06-23
[Table view] |
Text
10 CFR 50.90 LR-N21-0006 LAR S19-06 February 16, 2021 U. S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, DC 20555-0001 Salem Generating Station, Units 1 and 2 Renewed Facility Operating License Nos. DPR-70 and DPR-75 NRC Docket Nos. 50-272 and 50-311
Subject:
Application to Revise Technical Specifications to Adopt TSTF-569 Revision of Response Time Testing Definitions In accordance with the provisions of 10 CFR 50.90, PSEG Nuclear LLC (PSEG) is submitting a request for an amendment to the Technical Specifications (TS) for Salem Generating Station (Salem) Units 1 and 2.
PSEG requests adoption of TSTF-569, "Revise Response Time Testing Definition," into the Salem Units 1 and 2 TS. The proposed amendment revises the TS Definitions for Engineered Safety Feature (ESF) Response Time and Reactor Trip System (RTS) Response Time.
The enclosure provides a description and assessment of the proposed changes. Attachment 1 provides the existing TS pages marked up to show the proposed changes. Attachment 2 provides existing TS Bases pages marked to show the proposed changes for information only.
PSEG requests approval of this license amendment request (LAR) in accordance with standard NRC approval process and schedule. Once approved, the amendment will be implemented within 60 days from the date of issuance.
In accordance with 10 CFR 50.91, a copy of this application, with attachments, is being provided to the designated State of New Jersey Official.
There are no regulatory commitments contained in this letter.
If you have any questions or require additional information, please contact Mr. Michael Wiwel at 856-339-7907.
LR-N21-0006 10 CFR 50.90 Page 2 I declare under penalty of perjury that the foregoing is true and correct.
Executed on __),--1/_1Iftv2----+-(
(Date)
Respectfully,
])J David Sharbaugh Site Vice President Salem Generating Station
Enclosure:
Description and Assessment Mark-up of Proposed Technical Specification Pages Mark-Up of Proposed Technical Specification Bases Pages - For Information Only cc: Administrator, Region I, NRC NRC Project Manager NRC Senior Resident Inspector, Salem Mr. P. Mulligan, Chief, NJBNE PSEG Corporate Commitment Tracking Coordinator Station Compliance Commitment Tracking Coordinator
LR-N21-0006 LAR S19-06 Enclosure Description and Assessment Table of Contents
1.0 DESCRIPTION
.................................................................................................................. 1 2.0 ASSESSMENT .................................................................................................................. 1 2.1 Applicability of Safety Evaluation ................................................................................ 1 2.2 Variations .................................................................................................................... 1
3.0 REGULATORY ANALYSIS
............................................................................................... 2 3.1 No Significant Hazards Consideration Determination ................................................. 2 3.2 Conclusions ................................................................................................................. 3 4.0 ENVIONMENTAL EVALUATION ...................................................................................... 3 ATTACHMENTS:
- 1. Mark-up of Proposed Technical Specification Pages
- 2. Mark-up of Proposed Technical Specification Bases Pages - For Information Only
LR-N21-0006 LAR S19-06 Enclosure
1.0 DESCRIPTION
PSEG Nuclear LLC (PSEG) requests adoption of TSTF-569, "Revise Response Time Testing Definition," which is an approved change to the Improved Standard Technical Specifications (ISTS), into the Salem Units 1 and 2 Technical Specifications (TS). The proposed amendment revises the TS Definitions for Engineered Safety Feature (ESF) Response Time and Reactor Trip System (RTS) Response Time.
2.0 ASSESSMENT 2.1 Applicability of Safety Evaluation PSEG has reviewed the safety evaluation for TSTF-569 provided to the Technical Specifications Task Force (TSTF) in a letter dated August 14, 2019. This review included a review of the NRC staffs evaluation, as well as the information provided in TSTF-569. As described herein, PSEG has concluded that the justifications presented in TSTF-569 and the safety evaluation prepared by the NRC staff are applicable to Salem Units 1 and 2 and justify this amendment for the incorporation of the changes to the Salem TS.
2.2 Variations The current Salem TS DEFINITIONS for Engineered Safety Function (ESF) Response Time and Reactor Trip System (RTS) Response Time do not encompass the full text found in the Standard Improved Technical Specifications in NUREG-1431 for these DEFINITIONS. The text in the NUREG-1431 DEFINITIONS pertaining to verification of response times for selected components and measurement by means of any series of sequential or overlapping steps is also being added to the Salem TS definition in addition to the change associated with implementing TSTF-569.
Inclusion of the additional NUREG-1431 DEFINITION text for the ESF and RTS RESPONSE TIME aligns the Salem TS DEFINITION with the Salem Licensing Basis relative to the TS response time surveillance for RTS (SR 4.3.1.1.3) and ESF (SR 4.3.2.1.3). The allowance to demonstrate response time by any series of sequential, overlapping or total channel test measurements was provided in the initial TS Bases issued with Salem Facility Operating Licenses. The SRs, and the associated TS Bases, were changed per Amendments 260 and 241 for Salem Unit 1 and 2 respectively (Reference ML033010379) to allow verification of response time in lieu of demonstration through physical testing. The changes implemented by these TS Amendments conformed to the changes approved in WCAP-13632-P-A, Revision 2 which contains the technical basis and methodology for eliminating Response Time Testing requirements on selected pressure sensing instruments.
The Model Application contained in TSTF-569 contains the final, camera-ready, version of the revised TS change along with a markup of the affected TS. PSEG has elected to withhold this final version of the TS change to avoid any potential implementation conflicts.
1
LR-N21-0006 LAR S19-06 Enclosure
3.0 REGULATORY ANALYSIS
3.1 No Significant Hazards Consideration Determination PSEG requests adoption of TSTF-569, "Revise Response Time Testing Definition," which is an approved change to the Improved Standard Technical Specifications (ISTS), into the Salem Unit 1 and Unit 2 Technical Specifications (TS). The proposed amendment revises the TS Definitions for Engineered Safety Feature (ESF) Response Time and Reactor Trip System (RTS) Response Time.
PSEG has evaluated whether a significant hazards consideration is involved with the proposed amendment by focusing on the three standards set forth in 10 CFR 50.92, "Issuance of amendment," as discussed below:
- 1. Does the proposed amendment involve a significant increase in the probability or consequences of an accident previously evaluated?
Response: No The proposed change revises the TS Definition of RTS and ESF instrumentation response time to permit the licensee to evaluate using an NRC-approved methodology and apply a bounding response time for some components in lieu of measurement. The requirement for the instrumentation to actuate within the response time assumed in the accident analysis is unaffected.
The response time associated with the RTS and ESF instrumentation is not an initiator of any accident. Therefore, the proposed change has no significant effect on the probability of any accident previously evaluated.
The affected RTS and ESF instrumentation are assumed to actuate their respective components within the required response time to mitigate accidents previously evaluated.
Revising the TS definition for RTS and ESF instrumentation response times to allow an NRC-approved methodology for verifying response time for some components does not alter the surveillance requirements that verify the RTS and ESF instrumentation response times are within the required limits. As such, the TS will continue to assure that the RTS and ESF instrumentation actuate their associated components within the specified response time to accomplish the required safety functions assumed in the accident analyses. Therefore, the assumptions used in any accidents previously evaluated are unchanged and there is no significant increase in the consequences.
- 2. Does the proposed amendment create the possibility of a new or different kind of accident from any accident previously evaluated?
Response: No The proposed change revises the TS Definition of RTS and ESF instrumentation response time to permit the licensee to evaluate using an NRC-approved methodology and apply a bounding response time for some components in lieu of measurement. The proposed change does not involve a physical alteration of the plant (i.e., no new or different type of equipment will be installed). The proposed change does not alter any assumptions made 2
LR-N21-0006 LAR S19-06 Enclosure in the safety analyses. The proposed change does not alter the limiting conditions for operation for the RTS or ESF instrumentation, nor does it change the Surveillance Requirement to verify the RTS and ESF instrumentation response times are within the required limits. As such, the proposed change does not alter the operability requirements for the RTS and ESF instrumentation, and therefore, does not introduce any new failure modes.
Therefore, the proposed change does not create the possibility of a new or different kind of accident from any accident previously evaluated.
- 3. Does the proposed amendment involve a significant reduction in a margin of safety?
Response: No The proposed change revises the TS Definition of RTS and ESF instrumentation response time to permit the licensee to evaluate using an NRC-approved methodology and apply a bounding response time for some components in lieu of measurement. The proposed change has no effect on the required RTS and ESF instrumentation response times or setpoints assumed in the safety analyses and the TS requirements to verify those response times and setpoints. The proposed change does not alter any Safety Limits or analytical limits in the safety analysis. The proposed change does not alter the TS operability requirements for the RTS and ESF instrumentation. The RTS and ESF instrumentation actuation of the required systems and components at the required setpoints and within the specified response times will continue to accomplish the design basis safety functions of the associated systems and components in the same manner as before. As such, the RTS and ESF instrumentation will continue to perform the required safety functions as assumed in the safety analyses for all previously evaluated accidents.
Therefore, the proposed change does not involve a significant reduction in a margin of safety.
Based on the above, PSEG concludes that the proposed change presents no significant hazards consideration under the standards set forth in 10 CFR 50.92(c), and, accordingly, a finding of "no significant hazards consideration" is justified.
3.2 Conclusions In conclusion, based on the considerations discussed above, (1) there is reasonable assurance that the health and safety of the public will not be endangered by operation in the proposed manner, (2) such activities will be conducted in compliance with the Commissions regulations, and (3) the issuance of the amendment will not be inimical to the common defense and security or to the health and safety of the public.
4.0 ENVIRONMENTAL EVALUATION The proposed change would change a requirement with respect to installation or use of a facility component located within the restricted area, as defined in 10 CFR 20, or would change an inspection or surveillance requirement. However, the proposed change does not involve (i) a significant hazards consideration, (ii) a significant change in the types or significant increase in the amounts of any effluents that may be released offsite, or (iii) a significant increase in 3
LR-N21-0006 LAR S19-06 Enclosure individual or cumulative occupational radiation exposure. Accordingly, the proposed change meets the eligibility criterion for categorical exclusion set forth in 10 CFR 51.22(c)(9).
Therefore, pursuant to 10 CFR 51.22(b), no environmental impact statement or environmental assessment need be prepared in connection with the proposed change.
4
LR-N21-0006 LAR S19-06 Attachment 1 Mark-up of Proposed Technical Specification Pages The following Technical Specifications pages for Renewed Facility Operating License DPR-70 are affected by this change request:
Technical Specification Page DEFINITION 1.12 - ENGINEERED SAFETY FEATURE RESPONSE TIME 1-3 DEFINITION 1.26 - REACTOR TRIP SYSTEM RESPONSE TIME 1-6 The following Technical Specifications pages for Renewed Facility Operating License DPR-75 are affected by this change request:
Technical Specification Page DEFINITION 1.12 - ENGINEERED SAFETY FEATURE RESPONSE TIME 1-3 DEFINITION 1.26 - REACTOR TRIP SYSTEM RESPONSE TIME 1-6
The response time may be measured by means of any series of sequential, overlapping, or total steps so that the entire response time is measured. In lieu of measurement, response time may be verified for selected components provided that the components and methodology for verification have been previously reviewed DEFINITIONS and approved by the NRC, or the components have been evaluated in accordance with an NRC approved methodology.
E - AVERAGE DISINTEGRATION ENERGY 1.11 E shall be the average (weighted in proportion to the concentration of each radionuclide in the reactor coolant at the time of sampling) of the sum of the average beta and gamma energies per disintegration (in MeV) for isotopes, other than iodines, with half-lives greater than 15 minutes, making up at least 95% of the total non-iodine activity in the coolant.
ENGINEERED SAFETY FEATURE RESPONSE TIME 1.12 The ENGINEERED SAFETY FEATURE RESPONSE TIME shall be that time interval from when the monitored parameter exceeds its ESF actuation setpoint at the channel sensor until the ESF equipment is capable of performing its safety function (i.e., the valves travel to their required positions, pump discharge pressures reach their required values, etc.). Times shall include diesel generator starting and sequence loading delays where applicable.
FREQUENCY NOTATION 1.13 The FREQUENCY NOTATION specified for the performance of Surveillance Requirements shall correspond to the intervals defined in Table 1.2.
FULLY WITHDRAWN 1.13a FULLY WITHDRAWN shall be the condition where control and/or.shutdown banks are at a position which is within the interval of 222 to 230 steps withdrawn, inclusive. FULLY WITHDRAWN will be specified in the current reload analysis.
GASEOUS RADWASTE TREATMENT SYSTEM 1.14 A GASEOUS RADWASTE TREATMENT SYSTEM is any system designed and installed to reduce radioactive gaseous effluents by collecting primary coolant system offgases from the primary system and providing for delay or holdup for the purpose of reducing the total radioactivity prior to release to the environment.
IDENTIFIED LEAKAGE 1.15 IDENTIFIED LEAKAGE shall be:
- a. Leakage (except Reactor Coolant Pump Seal Water Injection) into closed systems, such as pump seal or valve packing leaks that are captured and conducted to a sump or collecting tank, or SALEM - UNIT 1 1-3 Amendment No.292
DEFINITIONS REACTOR TRIP SYSTEM RESPONSE TIME RTS 1.26 The REACTOR TRIP SYSTEM RESPONSE TIME shall be the time interval from when the monitored parameter exceeds its trip setpoint at the channel sensor until loss of stationary gripper coil voltage.
REPORTABLE EVENT 1.27 A REPORTABLE EVENT shall be any of those conditions specified in Section 50.73 to 10CFR Part 50.
SHUTDOWN MARGIN 1.28 SHUTDOWN MARGIN shall be the instantaneous amount of reactivity by which the reactor is subcritical or would be subcritical from its present condition assuming all full length rod cluster assemblies (shutdown and control) are fully inserted except for the single rod cluster assembly of highest reactivity worth which is assumed to be FULLY WITHDRAWN.
SITE BOUNDARY 1.29 The SITE BOUNDARY shall be that line beyond which the land is not owned, leased, or otherwise controlled by the licensee, as shown in Figure 5.1-3 and which defines the exclusion area as shown in Figure 5.1-1.
SOLIDIFICATION The response time may be measured by means of any series of sequential, overlapping, or total steps so that the entire response time is measured. In lieu 1.30 Not Used of measurement, response time may be verified for selected components SOURCE CHECK provided that the components and methodology for verification have been previously reviewed and approved by the NRC, or the components have been 1.31 SOURCE CHECK evaluated shall be in accordance the withassessment qualitative an NRC approved methodology.
of channel response when the channel sensor is exposed to either {a) an external source of increased radioactivity, or(b) an internal source o f radioactivity (keep-alive source), or (c) an equivalent electronic source check.
STAGGERED TEST BASIS 1.32 A STAGGERED TEST BASIS shall consist of:
- a. A test schedule for (n) systems, subsystems, trains, or other designated components obtained by dividing the specified test interval into (n) equal subintervals.
SALEM - UNIT 1 1-6 Amendment No. 280
The response time may be measured by means of any series of sequential, overlapping, or total steps so that the entire response time is measured. In lieu of measurement, response time may be verified for selected components provided that the components and methodology for verification have been previously DEFINITIONS reviewed and approved by the NRC, or the components have been evaluated in accordance with an NRC approved methodology.
E - AVERAGE DISINTEGRATION ENERGY 1.11 E shall be the average (weighted in proportion to the concentration of each radionuclide in the reactor coolant at the time of sampling) of the sum of the average beta and ganuna energies per disintegration (in MeV) for isotopes, other than iodines, with half-lives greater than 15 minutes, making up at least 95% of the total non-iodine activity in the coolant.
ENGINEERED SAFETY FEATURE RESPONSE TIME 1.12 The ENGINEERED SAFETY FEATURE RESPONSE TIME shall be that time interval from when the monitored parameter exceeds its ESF actuation setpoint at the channel sensor until the ESF equipment is capable of performing its safety function (i.e., the valves travel to their required positions, pump discharge pressures reach their required values, etc.). Times shall include diesel generator starting and sequence loading delays where applicable.
FREQUENCY NOTATION 1.13 The FREQUENCY NOTATION specified for the performance of Surveillance Requirements shall correspond to the intervals defined in Table 1.2.
FULLY WITHDRAWN l.13a FULLY WITHDRAWN shall be the condition where control and/or shutdown banks are at a position which is within the interval of 222 to 230 steps withdrawn, inclusive. FULLY WITHDRAWN will be specified in the current reload analysis.
GASEOUS RADWASTE TREATMENT SYSTEM 1.14 A GASEOUS RADWASTE TREATMENT SYSTEM is any system designed and installed to reduce radioactive g aseous effluents by collecting primary coolant system offgases from the primary system and providing for delay or holdup for the purpose of reducing the total radioactivity prior to release to the environment.
IDENTIFIED LEAKAGE 1.15 IDENTIFIED LEAKAGE shall be:
- a. Leakage (except Reactor Coolant Pump Seal Water Injection) into closed systems, such as pump seal or valve packing leaks that are captured and conducted to a sump or collecting tank, or SALEM - UNIT 2 1-3 Amendment No. 276
DEFINITIONS REACTOR TRIP SYSTEM RESPONSE TIME RTS 1.26 The REACTOR TRIP SYSTEM RESPONSE TIME shall be the time interval from when the monitored parameter exceeds its trip setpoint at the channel sensor until loss of stationary gripper coil voltage.
REPORTABLE EVENT 1.27 A REPORTABLE EVENT shall be any of those conditions specified in Section 50.73 to 10CFR Part 50.
SHUTDOWN MARGIN 1.28 SHUTDOWN MARGIN shall be the instantaneous amount of reactivity by which the reactor is subcritical or would be subcritical from its present condition assuming all full length rod cluster assemblies (shutdown and control) are fully inserted except for the single rod cluster assembly of highest reactivity worth which is assumed to be FULLY WITHDRAWN.
SITE BOUNDARY 1.29 The SITE BOUNDARY shall be that line beyond which the land is not owned, leased, or otherwise controlled by the licensee, as shown in Figure 5.1-3, and which defines the exclusion area as shown in Figure 5.1-1.
The response time may be measured by means of any series of sequential, SOLIDIFICATION overlapping, or total steps so that the entire response time is measured. In lieu of 1.30 Not Used measurement, response time may be verified for selected components provided that the components and methodology for verification have been previously SOURCE CHECK reviewed and approved by the NRC, or the components have been evaluated in accordance with an NRC approved methodology.
1.31 SOURCE CHECK shall be the qualitative assessment of channel response when the channel sensor is exposed to either (a) an external source of increased radioactivity, or(b) an internal source of radioactivity (keep alive source), or (c) an equivalent electronic source check .
STAGGERED TEST BASIS 1.32 A STAGGERED TEST BASIS shall consist of:
- a. A test schedule for (n) systems, subsystems, trains, or other designated components obtained by dividing the specified test interval into (n) equal subintervals.
SALEM - UNIT 2 1-6 Amendment No. 263
LR-N21-0006 LAR S19-06 Attachment 2 Mark-up of Proposed Technical Specification Bases Pages For Information Only The following Technical Specifications Bases pages for Renewed Facility Operating License DPR-70 are affected by this change request:
Technical Specification Page 3/4.3 Instrumentation B 3/4 3-1b The following Technical Specifications Bases pages for Renewed Facility Operating License DPR-75 are affected by this change request:
Technical Specification Page 3/4.3 Instrumentation B 3/4 3-1b
BASES of the channel response time for specific sensors identified in the WCAP. Response time verification for other sensor types, and other components that do not have plant-specific NRC approval to use alternate means of verification, must be demonstrated by test. The allocation for sensor response times must be verified prior to placing the component in operational service and re-verified following maintenance that may adversely affect response time. In general, electrical repair work does not impact response time provided the parts used for repair are of the same type and value. One example where response time could be affected is replacing the sensing assembly of a transmitter. INSERT Channel testing in a bypassed condition shall be performed without lifting leads or jumpering bistables.
The CHANNEL CALIBRATION surveillance for the Power Range Neutron Flux Function instrumentation is modified by Note 17. Note 17 states that in MODES 1 and 2 the SSPS input relays are excluded from this Surveillance when the installed bypass test capability is used to perform this surveillance. When the installed bypass test capability is used, the channel is tested in bypass versus tripped condition. To preclude placing the channel in a tripped condition, the SSPS input relays are excluded from this surveillance. The exclusion of the SSPS input relays from this test is intended to reduce the potential for an inadvertent reactor trip during surveillance testing. Therefore, the exclusion of the SSPS input relays from the surveillance is only applicable in MODES 1 and 2. The SSPS input relays must be included in the CHANNEL CALIBRATION surveillance at least once every 18 months.
The CHANNEL FUNCTIONAL TEST surveillances for the Power Range Neutron Flux and Power Range Neutron Flux High Positive Rate Function Instrumentation are modified by Note
- 18. Note 18 states that the SSPS input relays are excluded from this surveillance when the installed bypass test capability is used to perform this surveillance. When the installed bypass test capability is used, the channel is tested in a bypassed versus tripped condition. To preclude placing the channel in a tripped condition, the SSPS input relays are excluded from this surveillance. The exclusion of the SSPS input relays from this test is intended to reduce the potential for an inadvertent reactor trip during surveillance testing. The SSPS input relays must be included in the CHANNEL CALIBRATION surveillance at least once every 18 months.
The Intermediate Range (IR) Neutron Flux trip Function ensures that protection is provided against an uncontrolled RCCA bank rod withdrawal accident from a subcritical condition during startup. This trip Function provides redundant protection to the Power Range (PR) Neutron Flux
- Low Setting trip Function. In MODE 1 below the P-10 setpoint, and in MODE 2 above the P-6 setpoint, when there is a potential for an uncontrolled RCCA bank rod withdrawal accident during reactor startup, the IR Neutron Flux trip must be OPERABLE. Above the P-10 setpoint, the PR Neutron Flux - High Setpoint trip function provides core protection for a rod withdrawal accident. In MODE 2 below the P-6 setpoint, the Source Range (SR) Neutron Flux Trip provides core protection for reactivity accidents. In MODE 3, 4, or 5, the IR Neutron Flux trip does not have to be OPERABLE because the control rods must be fully inserted and only the shutdown rods may be withdrawn. The reactor cannot be started up in this condition.
The 24 hour2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> Action times for one inoperable IR channel allow for a slow and controlled power adjustment above P-10 or below P-6 and take into account the redundant capability afforded by the OPERABLE IR channel and its low probability of failure during this period.
SALEM - UNIT 1 B 3/4 3-1b Amendment No. 335 (PSEG Issued)
INSTRUMENTATION BASES measurements, or (3) utilizing vendor engineering specifications. WCAP-13632-P-A, Revision 2, Elimination of Pressure Sensor Response Time Testing Requirements provides the basis and methodology for using allocated sensor response times in the overall verification of the channel response time for specific sensors identified in the WCAP. Response time verification for other sensor types, and other components that do not have plant-specific NRC approval to use alternate means of verification, must be demonstrated by test.
The allocation for sensor response times must be verified prior to placing the component in operational service and re-verified following maintenance that may adversely affect response time. In general, electrical repair work does not impact response time provided the parts used for repair are of the same type and value. One example where response time could be affected is replacing the sensing assembly of a transmitter. INSERT Channel testing in a bypassed condition shall be performed without lifting leads or jumpering bistables.
The CHANNEL CALIBRATION surveillance for the Power Range Neutron Flux Function instrumentation is modified by Note 17. Note 17 states that in MODES 1 and 2 the SSPS input relays are excluded from this surveillance when the installed bypass test capability is used to perform this surveillance. When the installed bypass test capability is used, the channel is tested in bypass versus tripped condition. To preclude placing the channel in a tripped condition, the SSPS input relays are excluded from this surveillance. The exclusion of the SSPS input relays from this test is intended to reduce the potential for an inadvertent reactor trip during surveillance testing. Therefore, the exclusion of the SSPS input relays from the surveillance is only applicable in MODES 1 and 2. The SSPS input relays must be included in the CHANNEL CALIBRATION surveillance at least once every 18 months.
The CHANNEL FUNCTIONAL TEST surveillances for the Power Range Neutron Flux and Power Range Neutron Flux High Positive Rate Function Instrumentation are modified by Note
- 18. Note 18 states that the SSPS input relays are excluded from this surveillance when the installed bypass test capability is used to perform this surveillance. When the installed bypass test capability is used, the channel is tested in a bypassed versus tripped condition. To preclude placing the channel in a tripped condition, the SSPS input relays are excluded from this surveillance. The exclusion of the SSPS input relays from this test is intended to reduce the potential for an inadvertent reactor trip during surveillance testing. The SSPS input relays must be included in the CHANNEL CALIBRATION surveillance at least once every 18 months.
The Intermediate Range (IR) Neutron Flux trip Function ensures that protection is provided against an uncontrolled RCCA bank rod withdrawal accident from a subcritical condition during startup. This trip Function provides redundant protection to the Power Range (PR) Neutron Flux
- Low Setting trip Function. In MODE 1 below the P-10 setpoint, and in MODE 2 above the P-6 setpoint, when there is a potential for an uncontrolled RCCA bank rod withdrawal accident during reactor startup, the IR Neutron Flux trip must be OPERABLE. Above the P-10 setpoint, the PR Neutron Flux - High Setpoint trip function provides core protection for a rod withdrawal accident. In MODE 2 below the P-6 setpoint, the Source Range (SR) Neutron Flux Trip provides core protection for reactivity accidents. In MODE 3, 4, or 5, the IR Neutron Flux trip does not have to be OPERABLE because the control rods must be fully inserted and only the shutdown rods may be withdrawn. The reactor cannot be started up in this condition.
SALEM - UNIT 2 B 3/4 3-1b Amendment No. 316 (PSEG Issued)
LR-N21-0006 LAR S19-06 Bases Insert:
INSERT The response time may be verified for components that replace the components that were previously evaluated in Rev. 2 of WCAP-13632-P-A provided that the components have been evaluated in accordance with the NRC approved methodology as discussed in Attachment 1 to TSTF-569, Methodology to Eliminate Pressure Sensor and Protection Channel (for Westinghouse Plants Only) Response Time Testing.