LR-N16-0057, Supplement for License Amendment Request Regarding Replacement of Source Range and Intermediate Range Neutron Monitoring Systems
Letter Sequence Supplement | |
---|---|
TAC:MF6065, Clarify Application of Setpoint Methodology for LSSS Functions, TSTF-4 (Open) TAC:MF6066, Clarify Application of Setpoint Methodology for LSSS Functions, TSTF-4 (Open) | |
Initiation Administration Questions
Results
Other: | |
MONTHYEARML15127A2872015-05-14014 May 2015
[Table View]Supplemental Information Needed for Acceptance of Requested Licensing Action Amendment Request Regarding Replacement of Source Range and Intermediate Range Neutron Monitoring Systems Project stage: Acceptance Review LR-N15-0124, Supplemental Information Needed for Acceptance of Requested Licensing Action Amendment Request Regarding Replacement of Source Range and Intermediate Range Neutron Monitoring Systmens2015-06-0202 June 2015 Supplemental Information Needed for Acceptance of Requested Licensing Action Amendment Request Regarding Replacement of Source Range and Intermediate Range Neutron Monitoring Systmens Project stage: Supplement ML15169A9612015-06-24024 June 2015 Acceptance of Requested Licensing Action Amendment Request Regarding Replacement of Source Range and Intermediate Range Neutron Monitoring Systems Project stage: Acceptance Review LR-N16-0057, Supplement for License Amendment Request Regarding Replacement of Source Range and Intermediate Range Neutron Monitoring Systems2016-03-0404 March 2016 Supplement for License Amendment Request Regarding Replacement of Source Range and Intermediate Range Neutron Monitoring Systems Project stage: Supplement 2015-06-02 |
ML16064A350 | |
Person / Time | |
---|---|
Site: | Salem |
Issue date: | 03/04/2016 |
From: | Jamila Perry Public Service Enterprise Group |
To: | Document Control Desk, Office of Nuclear Reactor Regulation |
References | |
LAR S15-02, LR-N16-0057, TAC MF6065, TAC MF6066 | |
Download: ML16064A350 (2) | |
Similar Documents at Salem | |
---|---|
Category:Letter type:LR
MONTHYEARLR-N23-0079, Special Report 23-02-00 Pursuant to the Requirements of Salem Unit 1 Technical Specification 3.3.3.7, Action 10, for the Unit 1 Main Steam Line Rad Monitor Inoperable for Greater than Seven Days2023-12-0707 December 2023
[Table view]Special Report 23-02-00 Pursuant to the Requirements of Salem Unit 1 Technical Specification 3.3.3.7, Action 10, for the Unit 1 Main Steam Line Rad Monitor Inoperable for Greater than Seven Days LR-N23-0077, Loss of Coolant Accident Peak Cladding Temperature Margin Tracking - Annual Report 2023 & 30 Day Report for Salem Unit 1 Upflow Conversion2023-11-29029 November 2023 Loss of Coolant Accident Peak Cladding Temperature Margin Tracking - Annual Report 2023 & 30 Day Report for Salem Unit 1 Upflow Conversion LR-N23-0072, Core Operating Limits Report Cycle 302023-11-0101 November 2023 Core Operating Limits Report Cycle 30 LR-N23-0045, and Peach Bottom Atomic Power Station, Units 2 and 3 - Notice of Proposed Amendment to Decommissioning Trust Agreement2023-09-0808 September 2023 and Peach Bottom Atomic Power Station, Units 2 and 3 - Notice of Proposed Amendment to Decommissioning Trust Agreement LR-N23-0055, Special Report 272/23-01-00, Pursuant to the Requirements of Technical Specification 3.3.3.1, Action 23, for the Vent Noble Gas Rad Monitor Inoperable for Greater than Seven Days2023-08-0303 August 2023 Special Report 272/23-01-00, Pursuant to the Requirements of Technical Specification 3.3.3.1, Action 23, for the Vent Noble Gas Rad Monitor Inoperable for Greater than Seven Days LR-N23-0054, In-Service Inspection Activities2023-07-26026 July 2023 In-Service Inspection Activities LR-N23-0046, Emergency Plan Document Revisions Implemented June 28, 20232023-07-10010 July 2023 Emergency Plan Document Revisions Implemented June 28, 2023 LR-N23-0005, License Amendment Request to Amend Technical Specifications (TS) 6.8.4.f for Permanent Extension of Type a and Type C Leak Rate Test Frequencies2023-06-23023 June 2023 License Amendment Request to Amend Technical Specifications (TS) 6.8.4.f for Permanent Extension of Type a and Type C Leak Rate Test Frequencies LR-N23-0035, 2022 Annual Radioactive Effluent Release Report (ARERR)2023-04-27027 April 2023 2022 Annual Radioactive Effluent Release Report (ARERR) LR-N23-0034, 2022 Annual Radiological Environmental Operating Report (AREOR) - Salem Nuclear Generating Station, Unit Nos. 1 and 2 and Hope Creek Generating Station2023-04-27027 April 2023 2022 Annual Radiological Environmental Operating Report (AREOR) - Salem Nuclear Generating Station, Unit Nos. 1 and 2 and Hope Creek Generating Station LR-N23-0033, Core Operating Limits Report Cycle 272023-04-26026 April 2023 Core Operating Limits Report Cycle 27 LR-N23-0010, License Amendment Request Revision of Technical Specification (TS) to Delete TS Section 5.5 - Meteorological Tower Location2023-04-21021 April 2023 License Amendment Request Revision of Technical Specification (TS) to Delete TS Section 5.5 - Meteorological Tower Location LR-N23-0006, Report on Status of Decommissioning Funding for Reactors and Independent Spent Fuel Storage Installations2023-03-24024 March 2023 Report on Status of Decommissioning Funding for Reactors and Independent Spent Fuel Storage Installations LR-N23-0019, and Salem Generating Station, Units 1 and 2 - Guarantees of Payment of Deferred Premiums2023-03-21021 March 2023 and Salem Generating Station, Units 1 and 2 - Guarantees of Payment of Deferred Premiums LR-N23-0016, and Salem Generating Station, Units 1 and 2 - Report of Changes, Tests, and Experiments2023-02-28028 February 2023 and Salem Generating Station, Units 1 and 2 - Report of Changes, Tests, and Experiments LR-N23-0012, Annual Property Insurance Status Report2023-02-24024 February 2023 Annual Property Insurance Status Report LR-N23-0014, Stations Submittal of 2022 Annual Report of Fitness for Duty Performance Data Per 10 CFR 26.203(e) and 10 CFR 26.7172023-02-23023 February 2023 Stations Submittal of 2022 Annual Report of Fitness for Duty Performance Data Per 10 CFR 26.203(e) and 10 CFR 26.717 LR-N23-0003, Response to Requests for Additional Information Salem Unit 2 Relief Request S2-I4R-2112023-02-0101 February 2023 Response to Requests for Additional Information Salem Unit 2 Relief Request S2-I4R-211 LR-N22-0096, and Salem Generating Station, Units 1 and 2 - Request for Threshold Determination2023-01-0505 January 2023 and Salem Generating Station, Units 1 and 2 - Request for Threshold Determination LR-N22-0095, Loss of Coolant Accident Peak Cladding Temperature Margin Tracking - Annual Report 20222022-12-20020 December 2022 Loss of Coolant Accident Peak Cladding Temperature Margin Tracking - Annual Report 2022 LR-N22-0094, Emergency Plan Document Revisions Implemented November 21, 20222022-12-14014 December 2022 Emergency Plan Document Revisions Implemented November 21, 2022 LR-N22-0092, Response to Final Iolb Request for Additional Information for Salem LAR to Revise TS to Extend Allowed Outage Time for Inoperable EDG2022-12-0909 December 2022 Response to Final Iolb Request for Additional Information for Salem LAR to Revise TS to Extend Allowed Outage Time for Inoperable EDG LR-N22-0091, Independent Spent Fuel Storage Installation, Report of 10 CFR 72.48 Changes, Tests, and Experiments2022-12-0202 December 2022 Independent Spent Fuel Storage Installation, Report of 10 CFR 72.48 Changes, Tests, and Experiments LR-N22-0084, Response to Final Request for Additional Information for Salem LAR to Revise TS to Extend Allowed Outage Time for Inoperable EDG (EPID L- 2022-LLA-0095)2022-11-17017 November 2022 Response to Final Request for Additional Information for Salem LAR to Revise TS to Extend Allowed Outage Time for Inoperable EDG (EPID L- 2022-LLA-0095) LR-N22-0090, Supplement to Submittal of Salem Generating Station Updated FSAR, Revision 33, 10 CFR 71.106 Review Results and 10 CFR 54.37(b) Review Results for Salem2022-11-10010 November 2022 Supplement to Submittal of Salem Generating Station Updated FSAR, Revision 33, 10 CFR 71.106 Review Results and 10 CFR 54.37(b) Review Results for Salem LR-N22-0065, Submittal of Relief Request Associated with the Fourth Inservice Inspection (ISI) Interval Limited Examinations2022-09-27027 September 2022 Submittal of Relief Request Associated with the Fourth Inservice Inspection (ISI) Interval Limited Examinations LR-N22-0074, Emergency Plan Evacuation Time Estimate2022-09-15015 September 2022 Emergency Plan Evacuation Time Estimate LR-N22-0066, License Amendment Request (LAR) to Relocate Technical Specifications (TS) Requirements for Reactor Head Vents to the Technical Requirements Manual (TRM)2022-08-31031 August 2022 License Amendment Request (LAR) to Relocate Technical Specifications (TS) Requirements for Reactor Head Vents to the Technical Requirements Manual (TRM) LR-N22-0063, Spent Fuel Cask Registration2022-08-10010 August 2022 Spent Fuel Cask Registration LR-N22-0068, In-Service Inspection Activities - 90-Day Report2022-08-10010 August 2022 In-Service Inspection Activities - 90-Day Report LR-N22-0012, License Amendment Request to Amend the Technical Specifications to Revise and Relocate the Reactor Coolant System Pressure and Temperature Limits and Pressurizer Overpressure Protection System Limits to a Pressure and Temperature2022-08-0707 August 2022 License Amendment Request to Amend the Technical Specifications to Revise and Relocate the Reactor Coolant System Pressure and Temperature Limits and Pressurizer Overpressure Protection System Limits to a Pressure and Temperature LR-N22-0062, Spent Fuel Cask Registration2022-07-21021 July 2022 Spent Fuel Cask Registration LR-N22-0006, License Amendment Request (LAR) to Amend Salem Unit 1 and Unit 2 Technical Specifications (TS) to Extend the Allowed Outage Time for an Inoperable Emergency Diesel Generator from 72 Hours to 14 Days2022-06-29029 June 2022 License Amendment Request (LAR) to Amend Salem Unit 1 and Unit 2 Technical Specifications (TS) to Extend the Allowed Outage Time for an Inoperable Emergency Diesel Generator from 72 Hours to 14 Days LR-N22-0051, License Amendment Request to Relocate Technical Specification Facility/Unit Staff Qualification Requirements to Quality Assurance Topical Report2022-06-22022 June 2022 License Amendment Request to Relocate Technical Specification Facility/Unit Staff Qualification Requirements to Quality Assurance Topical Report LR-N22-0044, Emergency Plan Document Revisions Implemented November, 20212022-05-19019 May 2022 Emergency Plan Document Revisions Implemented November, 2021 LR-N22-0043, Core Operating Limits Report - Cycle 292022-05-0909 May 2022 Core Operating Limits Report - Cycle 29 LR-N22-0041, 2021 Annual Radioactive Effluent Release Report (Rerr)2022-04-28028 April 2022 2021 Annual Radioactive Effluent Release Report (Rerr) LR-N22-0040, 2021 Annual Radiological Environmental Operating Report2022-04-28028 April 2022 2021 Annual Radiological Environmental Operating Report LR-N22-0039, Emergency Plan Document Revisions Implemented March 24, 20222022-04-21021 April 2022 Emergency Plan Document Revisions Implemented March 24, 2022 LR-N21-0052, Request for Relief from ASME Code Defect Removal for Service Water Buried Piping2022-04-0707 April 2022 Request for Relief from ASME Code Defect Removal for Service Water Buried Piping LR-N22-0023, Guarantees of Payment of Deferred Premiums2022-03-21021 March 2022 Guarantees of Payment of Deferred Premiums LR-N22-0022, Response to Request for Additional Information Relief Request S1-14R-210, Alternative Examination of Welds2022-03-21021 March 2022 Response to Request for Additional Information Relief Request S1-14R-210, Alternative Examination of Welds LR-N22-0017, Submittal of 2021 Annual Report of Fitness for Duty (FFD) Performance Data2022-02-25025 February 2022 Submittal of 2021 Annual Report of Fitness for Duty (FFD) Performance Data LR-N22-0016, Radiological Survey of Site Property to Be Used for Offshore Wind Port Facility2022-02-24024 February 2022 Radiological Survey of Site Property to Be Used for Offshore Wind Port Facility LR-N22-0013, In-Service Inspection Activities - 90-Day Report2022-02-10010 February 2022 In-Service Inspection Activities - 90-Day Report LR-N22-0007, Request for Exemption from Specific Requirements of 10 CFR Part 26, Fitness for Duty Programs2022-01-0505 January 2022 Request for Exemption from Specific Requirements of 10 CFR Part 26, Fitness for Duty Programs LR-N21-0061, Annual Report of Specific Activity Analysis - TS 6.9.1.5c2021-12-0909 December 2021 Annual Report of Specific Activity Analysis - TS 6.9.1.5c LR-N21-0083, Loss of Coolant Accident Peak Cladding Temperature Margin Tracking - Annual Report 2021 & 30 Day Report for Salem Unit 2 Upflow Conversion2021-11-24024 November 2021 Loss of Coolant Accident Peak Cladding Temperature Margin Tracking - Annual Report 2021 & 30 Day Report for Salem Unit 2 Upflow Conversion LR-N21-0078, Hope and Creek Generating Station, Supplement to License Amendment Request to Revise Technical Specifications (TS) to Delete Definitions Found in 10 CFR Part 20 and Delete Figures of the Site and Surrounding Areas from TS2021-11-18018 November 2021 Hope and Creek Generating Station, Supplement to License Amendment Request to Revise Technical Specifications (TS) to Delete Definitions Found in 10 CFR Part 20 and Delete Figures of the Site and Surrounding Areas from TS LR-N21-0066, Submittal of Relief Request Associated with the Fourth Inservice Inspection (ISI) Interval Limited Examinations2021-11-10010 November 2021 Submittal of Relief Request Associated with the Fourth Inservice Inspection (ISI) Interval Limited Examinations 2023-09-08 Category:License-Application for Facility Operating License (Amend/Renewal) DKT 50 MONTHYEARLR-N23-0045, and Peach Bottom Atomic Power Station, Units 2 and 3 - Notice of Proposed Amendment to Decommissioning Trust Agreement2023-09-0808 September 2023
[Table view]and Peach Bottom Atomic Power Station, Units 2 and 3 - Notice of Proposed Amendment to Decommissioning Trust Agreement ML23249A2612023-09-0606 September 2023 License Amendment Request to Modify the Salem and Hope Creek Exclusion Area Boundary LR-N23-0005, License Amendment Request to Amend Technical Specifications (TS) 6.8.4.f for Permanent Extension of Type a and Type C Leak Rate Test Frequencies2023-06-23023 June 2023 License Amendment Request to Amend Technical Specifications (TS) 6.8.4.f for Permanent Extension of Type a and Type C Leak Rate Test Frequencies ML23096A1842023-05-0909 May 2023 Issuance of Amendment No. 328 Revise and Relocate Reactor Coolant System Pressure and Temperature Limits and Pressurizer Overpressure Protection System Limits to Pressure and Temperature Limits Report LR-N23-0010, License Amendment Request Revision of Technical Specification (TS) to Delete TS Section 5.5 - Meteorological Tower Location2023-04-21021 April 2023 License Amendment Request Revision of Technical Specification (TS) to Delete TS Section 5.5 - Meteorological Tower Location LR-N22-0066, License Amendment Request (LAR) to Relocate Technical Specifications (TS) Requirements for Reactor Head Vents to the Technical Requirements Manual (TRM)2022-08-31031 August 2022 License Amendment Request (LAR) to Relocate Technical Specifications (TS) Requirements for Reactor Head Vents to the Technical Requirements Manual (TRM) LR-N22-0012, License Amendment Request to Amend the Technical Specifications to Revise and Relocate the Reactor Coolant System Pressure and Temperature Limits and Pressurizer Overpressure Protection System Limits to a Pressure and Temperature2022-08-0707 August 2022 License Amendment Request to Amend the Technical Specifications to Revise and Relocate the Reactor Coolant System Pressure and Temperature Limits and Pressurizer Overpressure Protection System Limits to a Pressure and Temperature LR-N22-0006, License Amendment Request (LAR) to Amend Salem Unit 1 and Unit 2 Technical Specifications (TS) to Extend the Allowed Outage Time for an Inoperable Emergency Diesel Generator from 72 Hours to 14 Days2022-06-29029 June 2022 License Amendment Request (LAR) to Amend Salem Unit 1 and Unit 2 Technical Specifications (TS) to Extend the Allowed Outage Time for an Inoperable Emergency Diesel Generator from 72 Hours to 14 Days LR-N22-0051, License Amendment Request to Relocate Technical Specification Facility/Unit Staff Qualification Requirements to Quality Assurance Topical Report2022-06-22022 June 2022 License Amendment Request to Relocate Technical Specification Facility/Unit Staff Qualification Requirements to Quality Assurance Topical Report ML22061A0302022-04-0404 April 2022 Issuance of Amendment Nos. 343 and 324 Revise Technical Specifications Surveillance Requirements for Auxiliary Feedwater ML21277A1932021-11-16016 November 2021 Enclosure 2, Draft Conforming License Amendments ML21230A0182021-10-0808 October 2021 Issuance of Amendment No. 339 Revise and Relocate Reactor Coolant System Pressure and Temperature Limits and Pressurizer Overpressure Protection System Limits to Pressure and Temperature Limits Report LR-N21-0065, License Amendment Request - Revision of Salem and Hope Creek Generating Station Technical Specification (TS) to Delete Definitions Found in 10 CFR Part 20 and Delete Figures of the Site and Surrounding Areas from TS2021-09-29029 September 2021 License Amendment Request - Revision of Salem and Hope Creek Generating Station Technical Specification (TS) to Delete Definitions Found in 10 CFR Part 20 and Delete Figures of the Site and Surrounding Areas from TS LR-N21-0048, One-Time License Amendment Request to Revise Unit 2 Technical Specification Action for Rod Position Indicators2021-06-18018 June 2021 One-Time License Amendment Request to Revise Unit 2 Technical Specification Action for Rod Position Indicators LR-N21-0043, Supplement to License Amendment Request to Adopt TSTF-490, Delete Ebar Definition and Revision to RCS Specific Activity Tech Spec2021-06-0909 June 2021 Supplement to License Amendment Request to Adopt TSTF-490, Delete Ebar Definition and Revision to RCS Specific Activity Tech Spec RS-21-039, Supplemental Information Regarding Application for Order Approving Transfers and Proposed Conforming License Amendments2021-03-25025 March 2021 Supplemental Information Regarding Application for Order Approving Transfers and Proposed Conforming License Amendments LR-N21-0026, Supplement to License Amendment Request to Amend the Technical Specifications to Revise and Relocate the Reactor Coolant System Pressure and Temperature Limits and Pressurizer Overpressure Protection System2021-03-17017 March 2021 Supplement to License Amendment Request to Amend the Technical Specifications to Revise and Relocate the Reactor Coolant System Pressure and Temperature Limits and Pressurizer Overpressure Protection System ML21057A2732021-02-25025 February 2021 Application for Order Approving License Transfers and Proposed Conforming License Amendments LR-N21-0006, Application to Revise Technical Specifications to Adopt TSTF-569 Revision of Response Time Testing Definitions2021-02-16016 February 2021 Application to Revise Technical Specifications to Adopt TSTF-569 Revision of Response Time Testing Definitions LR-N20-0003, License Amendment Request to Adopt TSTF-490, Deletion of E-Bar Definition and Revision to RCS Specific Activity Tech Spec2020-09-17017 September 2020 License Amendment Request to Adopt TSTF-490, Deletion of E-Bar Definition and Revision to RCS Specific Activity Tech Spec LR-N20-0027, Supplement to License Amendment Request: Revise Minimum Required Channels, Mode Applicability and Actions for the Source Range and Intermediate Range Neutron Flux Reactor Trip System Instrumentation Technical Specifications2020-05-11011 May 2020 Supplement to License Amendment Request: Revise Minimum Required Channels, Mode Applicability and Actions for the Source Range and Intermediate Range Neutron Flux Reactor Trip System Instrumentation Technical Specifications LR-N20-0010, License Amendment Request to Exclude the Dynamic Effects of Specific Postulated Pipe Ruptures from the Design and Licensing Basis Based on Leak-Before-Break Methodology2020-04-24024 April 2020 License Amendment Request to Exclude the Dynamic Effects of Specific Postulated Pipe Ruptures from the Design and Licensing Basis Based on Leak-Before-Break Methodology LR-N19-0055, License Amendment Request: Revise Minimum Required Channels, Mode Applicability and Actions for the Source Range and Intermediate Range Neutron Flux Reactor Trip System Instrumentation Technical Specifications2019-10-23023 October 2019 License Amendment Request: Revise Minimum Required Channels, Mode Applicability and Actions for the Source Range and Intermediate Range Neutron Flux Reactor Trip System Instrumentation Technical Specifications LR-N19-0064, License Amendment Request - Deletion of Facility Operating License Conditions Related to Decommissioning Trust Provisions and License Transfer2019-07-29029 July 2019 License Amendment Request - Deletion of Facility Operating License Conditions Related to Decommissioning Trust Provisions and License Transfer LR-N19-0065, License Amendment Request for Approval of Changes to Emergency Plan Staffing Requirements2019-07-0808 July 2019 License Amendment Request for Approval of Changes to Emergency Plan Staffing Requirements LR-N19-0006, Application to Revise Technical Specifications to Adopt TSTF-563, Revise Instrument Testing Definitions to Incorporate the Surveillance Frequency Control Program2019-04-0808 April 2019 Application to Revise Technical Specifications to Adopt TSTF-563, Revise Instrument Testing Definitions to Incorporate the Surveillance Frequency Control Program LR-N18-0129, License Amendment Request to Revise Technical Specifications to Adopt TSTF-547, Clarification of Rod Position Requirements.2019-02-0404 February 2019 License Amendment Request to Revise Technical Specifications to Adopt TSTF-547, Clarification of Rod Position Requirements. LR-N18-0116, Response to Request for Additional Information, License Amendment Request: Inverter Allowed Outage Time (AOT) Extension2018-10-30030 October 2018 Response to Request for Additional Information, License Amendment Request: Inverter Allowed Outage Time (AOT) Extension LR-N18-0113, Supplement to License Amendment Request: Revise Reactor Trip System Instrumentation, Engineered Safety Feature Actuation System Instrumentation, Main Steam Isolation Valves and Add Main Feedwater Isolation Technical Specification2018-10-27027 October 2018 Supplement to License Amendment Request: Revise Reactor Trip System Instrumentation, Engineered Safety Feature Actuation System Instrumentation, Main Steam Isolation Valves and Add Main Feedwater Isolation Technical Specification LR-N18-0059, Application to Revise Technical Specifications to Adopt TSTF-529, Clarify Use and Application Rules2018-06-29029 June 2018 Application to Revise Technical Specifications to Adopt TSTF-529, Clarify Use and Application Rules LR-N18-0038, License Amendment Request (LAR) to Amend the Salem Technical Specifications (TS) to Extend the Refueling Water Storage Tank (RWST) Allowed Outage Time2018-06-29029 June 2018 License Amendment Request (LAR) to Amend the Salem Technical Specifications (TS) to Extend the Refueling Water Storage Tank (RWST) Allowed Outage Time LR-N17-0144, License Amendment Request: Revise Reactor Trip System Instrumentation, Engineered Safety Feature Actuation System Instrumentation, Main Steam Isolation Valves and Add Main Feedwater Isolation Technical Specification2018-06-29029 June 2018 License Amendment Request: Revise Reactor Trip System Instrumentation, Engineered Safety Feature Actuation System Instrumentation, Main Steam Isolation Valves and Add Main Feedwater Isolation Technical Specification LR-N18-0067, Supplement to License Amendment Request for Vital Instrument Bus Inverter Allowed Outage Time (AOT) Extension2018-06-14014 June 2018 Supplement to License Amendment Request for Vital Instrument Bus Inverter Allowed Outage Time (AOT) Extension ML18136A8662018-05-16016 May 2018 License Amendment Request: Vital Instrument Bus Inverter Allowed Outage Time (AOT) Extension LR-N18-0022, License Amendment Request to Revise Technical Specification Actions for Rod Position Indicators2018-02-0808 February 2018 License Amendment Request to Revise Technical Specification Actions for Rod Position Indicators LR-N17-0135, License Amendment Request for Implementation of WCAP-14333 and WCAP-15376, Reactor Trip System Instrumentation and Engineered Safety Feature Actuation System Instrumentation Test Times and Completion Times2017-12-18018 December 2017 License Amendment Request for Implementation of WCAP-14333 and WCAP-15376, Reactor Trip System Instrumentation and Engineered Safety Feature Actuation System Instrumentation Test Times and Completion Times LR-N17-0121, License Amendment Request to Relocate the Reactor Coolant System Pressure Isolation Valve Table from the Technical Specifications to the Technical Requirements Manual2017-09-27027 September 2017 License Amendment Request to Relocate the Reactor Coolant System Pressure Isolation Valve Table from the Technical Specifications to the Technical Requirements Manual LR-N17-0058, License Amendment Request to Revise the Implementation Period for License Amendment No. 2942017-03-13013 March 2017 License Amendment Request to Revise the Implementation Period for License Amendment No. 294 LR-N16-0173, License Amendment Request: Containment Fan Cooler Unit (Cfcu) Allowed Outage Time (AOT) Extension2017-03-0606 March 2017 License Amendment Request: Containment Fan Cooler Unit (Cfcu) Allowed Outage Time (AOT) Extension LR-N16-0003, License Amendment Request to Amend the Accident Monitoring Instrumentation Technical Specifications2016-11-17017 November 2016 License Amendment Request to Amend the Accident Monitoring Instrumentation Technical Specifications LR-N16-0175, License Amendment Request - Administrative Controls2016-10-17017 October 2016 License Amendment Request - Administrative Controls LR-N16-0114, License Amendment Request to Revise Technical Specifications to Adopt TSTF-545, Revision 3, TS Lnservice Testing Program Removal & Clarify SR Usage Rule Application to Section 5.5 Testing Using the Consolidated Line .2016-08-30030 August 2016 License Amendment Request to Revise Technical Specifications to Adopt TSTF-545, Revision 3, TS Lnservice Testing Program Removal & Clarify SR Usage Rule Application to Section 5.5 Testing Using the Consolidated Line . LR-N16-0093, License Amendment Request to Extend the Implementation Period for Salem, Unit 1 License Amendment No. 311 and Salem, Unit 2 License Amendment No. 2922016-05-10010 May 2016 License Amendment Request to Extend the Implementation Period for Salem, Unit 1 License Amendment No. 311 and Salem, Unit 2 License Amendment No. 292 LR-N16-0057, Supplement for License Amendment Request Regarding Replacement of Source Range and Intermediate Range Neutron Monitoring Systems2016-03-0404 March 2016 Supplement for License Amendment Request Regarding Replacement of Source Range and Intermediate Range Neutron Monitoring Systems LR-N16-0044, Emergency License Amendment Request to Modify Technical Specification Requirements for One Inoperable Subcooling Margin Monitor Channel2016-02-11011 February 2016 Emergency License Amendment Request to Modify Technical Specification Requirements for One Inoperable Subcooling Margin Monitor Channel LR-N16-0015, Supplemental Information for License Amendment to Revise Technical Specification 3/4.3.1, Reactor Trip System Instrumentation2016-02-0303 February 2016 Supplemental Information for License Amendment to Revise Technical Specification 3/4.3.1, Reactor Trip System Instrumentation LR-N15-0084, License Amendment Request Modifying Chilled Water System Requirements2015-09-11011 September 2015 License Amendment Request Modifying Chilled Water System Requirements LR-N15-0189, Supplemental Information Needed for Review of Emergency License Amendment Request to Remove Pressurizer Power Operated Relief Valve Position Indication Instrumentation from Accident Monitoring Instrumentation Technical Specifications2015-09-0202 September 2015 Supplemental Information Needed for Review of Emergency License Amendment Request to Remove Pressurizer Power Operated Relief Valve Position Indication Instrumentation from Accident Monitoring Instrumentation Technical Specifications LR-N15-0187, Emergency License Amendment Request to Remove Pressurizer Power Operated Relief Valve (PORV) Position Indication Instrumentation from the Accident Monitoring Instrumentation Technical Specifications2015-08-31031 August 2015 Emergency License Amendment Request to Remove Pressurizer Power Operated Relief Valve (PORV) Position Indication Instrumentation from the Accident Monitoring Instrumentation Technical Specifications LR-N15-0021, License Amendment Request Regarding Replacement of Source Range and Intermediate Range Neutron Monitoring Systems2015-04-0303 April 2015 License Amendment Request Regarding Replacement of Source Range and Intermediate Range Neutron Monitoring Systems 2023-09-08 |
Text
PSEG Nuclear LLC P.O. Box 236, Hancocks Bridge, NJ 08038-0236 MAR 0 4 2016 10 CFR 50.90 LR-N 16-0057 LAR S15-02 U.S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, DC 20555-0001 Salem Nuclear Generating Station Units 1 and 2 Renewed Facility Operating License Nos. DPR-70 and 75 NRC Docket Nos. 50-272 and 50-311
Subject:
Supplement for License Amendment Request Regarding Replacement Of Source Range And Intermediate Range Neutron Monitoring Systems References 1. PSEG letter to NRC, "License Amendment Request Regarding Replacement of Source Range and Intermediate Range Neutron Monitoring Systems,"
dated April 3, 2015 (ADAMS Accession No. ML15093A291)
- 2. PSEG letter to NRC, "Supplemental Information Needed for Acceptance of Requested Licensing Action Re: Amendment Request Regarding Replacement of Source Range and Intermediate Range Neutron Monitoring Systems (TAG Nos. MF6065 and MF6066)," dated June 2, 2015 (ADAMS Accession No. ML15153A193)
- 3. PSEG Letter to NRC, "Response to Request For Additional Information Re:
License Amendment Request Regarding Replacement Of Source Range And Intermediate Range Neutron Monitoring Systems (CAC NOS. MF6065 AND MF6066)," dated November 27,2015 (ADAMS Accession No. ML15334A107)
- 4. PSEG Letter to NRC, "Supplemental Response to Request For Additional Information Re: License Amendment Request Regarding Replacement Of Source Range And Intermediate Range Neutron Monitoring Systems (CAC NOS. MF6065 AND MF6066)," dated February 10, 2016 (ADAMS Accession No. ML16042A600)
In the Reference 1 letter,PSEG Nuclear LLC (PSEG) submitted a license amendment request for Salem Nuclear Generating Station (Salem), Units 1 and 2. PSEG provided additional information to support the NRC's review in References 2 through 4. The proposed amendment would revise Technical Specifications {TS) 3/4.3.1, Reactor Trip System, to support the replacement of the existing source range (SR) and intermediate range (IR) nuclear instrumentation.
10 CFR 50.90 Page 2 LR-N16-0057 The replacement of the SR and IR nuclear instrumentation is being performed in accordance with PSEG's design change process under 10 CFR 50.59. As described in Section 2.0 of of Reference 1, PSEG is only requesting NRC review and approval of the TS changes associated with the change to the SR and IR instrumentation channels. The TS changes consist of a revison to the allowable values for both the SR and IR channels, removal of the footnote associated with de-energizing the SR channel high voltage power supply above P-6, change to the P-6 setpoint description and the addition of TSTF-493 notes for the SR and IR channels.
PSEG has determined that the information provided in this submittal does not alter the conclusions reached in the 10 CFR 50.92 no significant hazards determination previously submitted. In addition, the information provided in this submittal does not affect the bases for concluding that neither an environmental impact statement nor an environmental assessment needs to be prepared in connection with the proposed amendment.
There are no regulatory commitments contained in this letter.
If you have any questions or require additional information, please contact Mr. Brian Thomas at 856-339-2022.
I declare under penalty of perjury that the foregoing is true and correct.
Executed on 5h//6' (date)
Respectfully, 8-:.:: . . c,*---*-----z:;- c..,., ....
John F. Perry Site Vice President Salem Nuclear Generating Station cc: Mr. D. Dorman, Administrator, Region I, NRC Ms. C. Parker, NRC Project Manager, Salem NRC Senior Resident Inspector, Salem Mr. P. Mulligan, Chief, NJBNE Mr. L. Marabella, Corporate Commitment Tracking Coordinator Mr. T. Cachaza, Salem Commitment Tracking Coordinator