Letter Sequence Approval |
---|
EPID:L-2021-LLA-0117, License Amendment Request (LAR) to Amend Salem Unit 1 and Unit 2 Technical Specifications (TS) Surveillance Requirements (SR) for Auxiliary Feedwater (Approved, Closed) |
|
|
Similar Documents at Salem |
---|
Category:Letter
MONTHYEARIR 05000272/20230042024-02-0505 February 2024 Integrated Inspection Report 05000272/2023004 and 05000311/2023004 ML24009A1022024-01-26026 January 2024 Exemption from Select Requirements of 10 CF Part 73 (EPID L-2023-LLE-0045 (Security Notifications, Reports, and Recordkeeping and Suspicious Activity Reporting)) IR 05000272/20234012024-01-22022 January 2024 Material Control and Accounting Program Inspection Report 05000272/2023401 and 05000311/2023401 ML24004A1542024-01-0808 January 2024 Notification of Conduct of a Fire Protection Team Inspection LR-N23-0079, Special Report 23-02-00 Pursuant to the Requirements of Salem Unit 1 Technical Specification 3.3.3.7, Action 10, for the Unit 1 Main Steam Line Rad Monitor Inoperable for Greater than Seven Days2023-12-0707 December 2023 Special Report 23-02-00 Pursuant to the Requirements of Salem Unit 1 Technical Specification 3.3.3.7, Action 10, for the Unit 1 Main Steam Line Rad Monitor Inoperable for Greater than Seven Days ML23270C0072023-11-29029 November 2023 Notice of Proposed Amendment to Decommissioning Trust Agreement LR-N23-0077, Loss of Coolant Accident Peak Cladding Temperature Margin Tracking - Annual Report 2023 & 30 Day Report for Salem Unit 1 Upflow Conversion2023-11-29029 November 2023 Loss of Coolant Accident Peak Cladding Temperature Margin Tracking - Annual Report 2023 & 30 Day Report for Salem Unit 1 Upflow Conversion ML23324A3072023-11-17017 November 2023 Request for Exemption from Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Implementation IR 05000272/20230032023-11-13013 November 2023 Integrated Inspection Report 05000272/2023003 and 05000311/2023003 LR-N23-0072, Core Operating Limits Report Cycle 302023-11-0101 November 2023 Core Operating Limits Report Cycle 30 IR 05000272/20230102023-10-12012 October 2023 Biennial Problem Identification and Resolution Inspection Report O5000272/2023010 and 05000311/2023010 IR 05000272/20234022023-10-12012 October 2023 and Salem Nuclear Generating Station, Units 1 and 2 - Security Baseline Inspection Report 05000354/2023402, 05000272/2023402 and 05000311/2023402 (Cover Letter Only) LR-N23-0045, and Peach Bottom Atomic Power Station, Units 2 and 3 - Notice of Proposed Amendment to Decommissioning Trust Agreement2023-09-0808 September 2023 and Peach Bottom Atomic Power Station, Units 2 and 3 - Notice of Proposed Amendment to Decommissioning Trust Agreement ML23249A2612023-09-0606 September 2023 License Amendment Request to Modify the Salem and Hope Creek Exclusion Area Boundary IR 05000272/20230052023-08-31031 August 2023 Updated Inspection Plan for Salem Nuclear Generating Station, Units 1 and 2 (Reports 05000272/2023005 and 05000311/2023005) ML23233A0762023-08-21021 August 2023 Requalification Program Inspection ML23192A8212023-08-14014 August 2023 and Salem Nuclear Generating Station, Unit Nos. 1 and 2 - Issuance of Amendment Nos. 234, 347, and 329 Revise Technical Specifications to Delete Meteorological Tower Location IR 05000272/20230022023-08-0909 August 2023 Integrated Inspection Report 05000272/2023002 and 05000311/2023002 LR-N23-0055, Special Report 272/23-01-00, Pursuant to the Requirements of Technical Specification 3.3.3.1, Action 23, for the Vent Noble Gas Rad Monitor Inoperable for Greater than Seven Days2023-08-0303 August 2023 Special Report 272/23-01-00, Pursuant to the Requirements of Technical Specification 3.3.3.1, Action 23, for the Vent Noble Gas Rad Monitor Inoperable for Greater than Seven Days IR 05000354/20230022023-08-0303 August 2023 Integrated Inspection Report 05000354/2023002 and Independent Spent Fuel Storage Installation Inspection Report 07200048/2023001 LR-N23-0054, In-Service Inspection Activities2023-07-26026 July 2023 In-Service Inspection Activities LR-N23-0046, Emergency Plan Document Revisions Implemented June 28, 20232023-07-10010 July 2023 Emergency Plan Document Revisions Implemented June 28, 2023 LR-N23-0005, License Amendment Request to Amend Technical Specifications (TS) 6.8.4.f for Permanent Extension of Type a and Type C Leak Rate Test Frequencies2023-06-23023 June 2023 License Amendment Request to Amend Technical Specifications (TS) 6.8.4.f for Permanent Extension of Type a and Type C Leak Rate Test Frequencies ML23139A1472023-06-0505 June 2023 Relief Request Associated with Fourth Interval In-service Inspection Limited Examinations of Weld Coverage ML23096A1842023-05-0909 May 2023 Issuance of Amendment No. 328 Revise and Relocate Reactor Coolant System Pressure and Temperature Limits and Pressurizer Overpressure Protection System Limits to Pressure and Temperature Limits Report IR 05000272/20230012023-05-0303 May 2023 Integrated Inspection Report 05000272/2023001 and 05000311/2023001 ML23081A4662023-05-0202 May 2023 Issuance of Amendment Nos. 346 and 327 Revise Technical Specifications to Extend Allowable Outage Time for Inoperable Emergency Diesel Generator IR 05000272/20233012023-05-0101 May 2023 Initial Operator Licensing Examination Report 05000272/2023301 and 05000311/2023301 LR-N23-0034, 2022 Annual Radiological Environmental Operating Report (AREOR) - Salem Nuclear Generating Station, Unit Nos. 1 and 2 and Hope Creek Generating Station2023-04-27027 April 2023 2022 Annual Radiological Environmental Operating Report (AREOR) - Salem Nuclear Generating Station, Unit Nos. 1 and 2 and Hope Creek Generating Station LR-N23-0035, 2022 Annual Radioactive Effluent Release Report (ARERR)2023-04-27027 April 2023 2022 Annual Radioactive Effluent Release Report (ARERR) LR-N23-0033, Core Operating Limits Report Cycle 272023-04-26026 April 2023 Core Operating Limits Report Cycle 27 LR-N23-0010, License Amendment Request Revision of Technical Specification (TS) to Delete TS Section 5.5 - Meteorological Tower Location2023-04-21021 April 2023 License Amendment Request Revision of Technical Specification (TS) to Delete TS Section 5.5 - Meteorological Tower Location ML23089A0942023-04-17017 April 2023 NRC to PSEG Hope Creek, Transmittal of the National Marine Fisheries Service'S March 24, 2023, Biological Opinion GAR-2020-02842 Concerning Salem and Hope Creek ML23087A1492023-04-17017 April 2023 NRC to PSEG Salem, Transmittal of the National Marine Fisheries Service'S March 24, 2023, Biological Opinion GAR-2020-02842 Concerning Salem and Hope Creek ML23103A3232023-04-13013 April 2023 Submittal of Updated Final Safety Analysis Report, Rev. 26, Summary of Revised Regulatory Commitments for Hope Creek, Summary of Changes to PSEG Nuclear LLC, Quality Assurance Topical Report, NO-AA-10, Rev. 89 ML23095A3682023-04-12012 April 2023 and Salem Nuclear Generating Station, Unit Nos. 1 and 2 - Threshold Determination for Proposed Transfer of Land Ownership LR-N23-0006, Report on Status of Decommissioning Funding for Reactors and Independent Spent Fuel Storage Installations2023-03-24024 March 2023 Report on Status of Decommissioning Funding for Reactors and Independent Spent Fuel Storage Installations ML23086A0912023-03-24024 March 2023 NMFS to NRC, Transmittal of Biological Opinion for Continued Operations of Salem and Hope Creek Nuclear Generating Stations RS-23-049, Constellation Energy Generation, LLC, Report on Status of Decommissioning Funding for Reactors and Independent Spent Fuel Storage Installations2023-03-23023 March 2023 Constellation Energy Generation, LLC, Report on Status of Decommissioning Funding for Reactors and Independent Spent Fuel Storage Installations LR-N23-0019, and Salem Generating Station, Units 1 and 2 - Guarantees of Payment of Deferred Premiums2023-03-21021 March 2023 and Salem Generating Station, Units 1 and 2 - Guarantees of Payment of Deferred Premiums ML23044A1052023-03-13013 March 2023 Issuance of Amendment Nos. 345 and 326 Relocate Technical Specifications Requirements for Reactor Head Vents to Technical Requirements Manual ML23037A9712023-03-0909 March 2023 and Salem Nuclear, Unit Nos. 1 and 2 Issuance of Amendment Nos. 233, 344, and 325 Relocate Technical Specification Staff Qualification Requirements to the PSEG Quality Assurance Topical Report IR 05000272/20230112023-03-0707 March 2023 Comprehensive Engineering Team Inspection Report 05000272/2023011 and 05000311/2023011 IR 05000272/20220062023-03-0101 March 2023 Annual Assessment Letter for Salem Nuclear Generating Station, Units 1 and 2 (Reports 05000272/2022006 and 05000311/2022006) LR-N23-0016, and Salem Generating Station, Units 1 and 2 - Report of Changes, Tests, and Experiments2023-02-28028 February 2023 and Salem Generating Station, Units 1 and 2 - Report of Changes, Tests, and Experiments LR-N23-0012, Annual Property Insurance Status Report2023-02-24024 February 2023 Annual Property Insurance Status Report LR-N23-0014, Stations Submittal of 2022 Annual Report of Fitness for Duty Performance Data Per 10 CFR 26.203(e) and 10 CFR 26.7172023-02-23023 February 2023 Stations Submittal of 2022 Annual Report of Fitness for Duty Performance Data Per 10 CFR 26.203(e) and 10 CFR 26.717 ML23034A1532023-02-0909 February 2023 Operator Licensing Examination Approval ML23019A3482023-02-0202 February 2023 Issuance of Relief Request No. SC-I5R-221 for the Alternative Repair for Service Water System Piping LR-N23-0003, Response to Requests for Additional Information Salem Unit 2 Relief Request S2-I4R-2112023-02-0101 February 2023 Response to Requests for Additional Information Salem Unit 2 Relief Request S2-I4R-211 2024-02-05
[Table view] Category:License-Application for Facility Operating License (Amend/Renewal) DKT 50
MONTHYEARLR-N23-0045, and Peach Bottom Atomic Power Station, Units 2 and 3 - Notice of Proposed Amendment to Decommissioning Trust Agreement2023-09-0808 September 2023 and Peach Bottom Atomic Power Station, Units 2 and 3 - Notice of Proposed Amendment to Decommissioning Trust Agreement ML23249A2612023-09-0606 September 2023 License Amendment Request to Modify the Salem and Hope Creek Exclusion Area Boundary LR-N23-0005, License Amendment Request to Amend Technical Specifications (TS) 6.8.4.f for Permanent Extension of Type a and Type C Leak Rate Test Frequencies2023-06-23023 June 2023 License Amendment Request to Amend Technical Specifications (TS) 6.8.4.f for Permanent Extension of Type a and Type C Leak Rate Test Frequencies ML23096A1842023-05-0909 May 2023 Issuance of Amendment No. 328 Revise and Relocate Reactor Coolant System Pressure and Temperature Limits and Pressurizer Overpressure Protection System Limits to Pressure and Temperature Limits Report LR-N23-0010, License Amendment Request Revision of Technical Specification (TS) to Delete TS Section 5.5 - Meteorological Tower Location2023-04-21021 April 2023 License Amendment Request Revision of Technical Specification (TS) to Delete TS Section 5.5 - Meteorological Tower Location LR-N22-0066, License Amendment Request (LAR) to Relocate Technical Specifications (TS) Requirements for Reactor Head Vents to the Technical Requirements Manual (TRM)2022-08-31031 August 2022 License Amendment Request (LAR) to Relocate Technical Specifications (TS) Requirements for Reactor Head Vents to the Technical Requirements Manual (TRM) LR-N22-0012, License Amendment Request to Amend the Technical Specifications to Revise and Relocate the Reactor Coolant System Pressure and Temperature Limits and Pressurizer Overpressure Protection System Limits to a Pressure and Temperature2022-08-0707 August 2022 License Amendment Request to Amend the Technical Specifications to Revise and Relocate the Reactor Coolant System Pressure and Temperature Limits and Pressurizer Overpressure Protection System Limits to a Pressure and Temperature LR-N22-0006, License Amendment Request (LAR) to Amend Salem Unit 1 and Unit 2 Technical Specifications (TS) to Extend the Allowed Outage Time for an Inoperable Emergency Diesel Generator from 72 Hours to 14 Days2022-06-29029 June 2022 License Amendment Request (LAR) to Amend Salem Unit 1 and Unit 2 Technical Specifications (TS) to Extend the Allowed Outage Time for an Inoperable Emergency Diesel Generator from 72 Hours to 14 Days LR-N22-0051, License Amendment Request to Relocate Technical Specification Facility/Unit Staff Qualification Requirements to Quality Assurance Topical Report2022-06-22022 June 2022 License Amendment Request to Relocate Technical Specification Facility/Unit Staff Qualification Requirements to Quality Assurance Topical Report ML22061A0302022-04-0404 April 2022 Issuance of Amendment Nos. 343 and 324 Revise Technical Specifications Surveillance Requirements for Auxiliary Feedwater ML21277A1932021-11-16016 November 2021 Enclosure 2, Draft Conforming License Amendments ML21230A0182021-10-0808 October 2021 Issuance of Amendment No. 339 Revise and Relocate Reactor Coolant System Pressure and Temperature Limits and Pressurizer Overpressure Protection System Limits to Pressure and Temperature Limits Report LR-N21-0065, License Amendment Request - Revision of Salem and Hope Creek Generating Station Technical Specification (TS) to Delete Definitions Found in 10 CFR Part 20 and Delete Figures of the Site and Surrounding Areas from TS2021-09-29029 September 2021 License Amendment Request - Revision of Salem and Hope Creek Generating Station Technical Specification (TS) to Delete Definitions Found in 10 CFR Part 20 and Delete Figures of the Site and Surrounding Areas from TS LR-N21-0048, One-Time License Amendment Request to Revise Unit 2 Technical Specification Action for Rod Position Indicators2021-06-18018 June 2021 One-Time License Amendment Request to Revise Unit 2 Technical Specification Action for Rod Position Indicators LR-N21-0043, Supplement to License Amendment Request to Adopt TSTF-490, Delete Ebar Definition and Revision to RCS Specific Activity Tech Spec2021-06-0909 June 2021 Supplement to License Amendment Request to Adopt TSTF-490, Delete Ebar Definition and Revision to RCS Specific Activity Tech Spec RS-21-039, Supplemental Information Regarding Application for Order Approving Transfers and Proposed Conforming License Amendments2021-03-25025 March 2021 Supplemental Information Regarding Application for Order Approving Transfers and Proposed Conforming License Amendments LR-N21-0026, Supplement to License Amendment Request to Amend the Technical Specifications to Revise and Relocate the Reactor Coolant System Pressure and Temperature Limits and Pressurizer Overpressure Protection System2021-03-17017 March 2021 Supplement to License Amendment Request to Amend the Technical Specifications to Revise and Relocate the Reactor Coolant System Pressure and Temperature Limits and Pressurizer Overpressure Protection System ML21057A2732021-02-25025 February 2021 Application for Order Approving License Transfers and Proposed Conforming License Amendments LR-N21-0006, Application to Revise Technical Specifications to Adopt TSTF-569 Revision of Response Time Testing Definitions2021-02-16016 February 2021 Application to Revise Technical Specifications to Adopt TSTF-569 Revision of Response Time Testing Definitions LR-N20-0003, License Amendment Request to Adopt TSTF-490, Deletion of E-Bar Definition and Revision to RCS Specific Activity Tech Spec2020-09-17017 September 2020 License Amendment Request to Adopt TSTF-490, Deletion of E-Bar Definition and Revision to RCS Specific Activity Tech Spec LR-N20-0027, Supplement to License Amendment Request: Revise Minimum Required Channels, Mode Applicability and Actions for the Source Range and Intermediate Range Neutron Flux Reactor Trip System Instrumentation Technical Specifications2020-05-11011 May 2020 Supplement to License Amendment Request: Revise Minimum Required Channels, Mode Applicability and Actions for the Source Range and Intermediate Range Neutron Flux Reactor Trip System Instrumentation Technical Specifications LR-N20-0010, License Amendment Request to Exclude the Dynamic Effects of Specific Postulated Pipe Ruptures from the Design and Licensing Basis Based on Leak-Before-Break Methodology2020-04-24024 April 2020 License Amendment Request to Exclude the Dynamic Effects of Specific Postulated Pipe Ruptures from the Design and Licensing Basis Based on Leak-Before-Break Methodology LR-N19-0055, License Amendment Request: Revise Minimum Required Channels, Mode Applicability and Actions for the Source Range and Intermediate Range Neutron Flux Reactor Trip System Instrumentation Technical Specifications2019-10-23023 October 2019 License Amendment Request: Revise Minimum Required Channels, Mode Applicability and Actions for the Source Range and Intermediate Range Neutron Flux Reactor Trip System Instrumentation Technical Specifications LR-N19-0064, License Amendment Request - Deletion of Facility Operating License Conditions Related to Decommissioning Trust Provisions and License Transfer2019-07-29029 July 2019 License Amendment Request - Deletion of Facility Operating License Conditions Related to Decommissioning Trust Provisions and License Transfer LR-N19-0065, License Amendment Request for Approval of Changes to Emergency Plan Staffing Requirements2019-07-0808 July 2019 License Amendment Request for Approval of Changes to Emergency Plan Staffing Requirements LR-N19-0006, Application to Revise Technical Specifications to Adopt TSTF-563, Revise Instrument Testing Definitions to Incorporate the Surveillance Frequency Control Program2019-04-0808 April 2019 Application to Revise Technical Specifications to Adopt TSTF-563, Revise Instrument Testing Definitions to Incorporate the Surveillance Frequency Control Program LR-N18-0129, License Amendment Request to Revise Technical Specifications to Adopt TSTF-547, Clarification of Rod Position Requirements.2019-02-0404 February 2019 License Amendment Request to Revise Technical Specifications to Adopt TSTF-547, Clarification of Rod Position Requirements. LR-N18-0116, Response to Request for Additional Information, License Amendment Request: Inverter Allowed Outage Time (AOT) Extension2018-10-30030 October 2018 Response to Request for Additional Information, License Amendment Request: Inverter Allowed Outage Time (AOT) Extension LR-N18-0113, Supplement to License Amendment Request: Revise Reactor Trip System Instrumentation, Engineered Safety Feature Actuation System Instrumentation, Main Steam Isolation Valves and Add Main Feedwater Isolation Technical Specification2018-10-27027 October 2018 Supplement to License Amendment Request: Revise Reactor Trip System Instrumentation, Engineered Safety Feature Actuation System Instrumentation, Main Steam Isolation Valves and Add Main Feedwater Isolation Technical Specification LR-N18-0059, Application to Revise Technical Specifications to Adopt TSTF-529, Clarify Use and Application Rules2018-06-29029 June 2018 Application to Revise Technical Specifications to Adopt TSTF-529, Clarify Use and Application Rules LR-N18-0038, License Amendment Request (LAR) to Amend the Salem Technical Specifications (TS) to Extend the Refueling Water Storage Tank (RWST) Allowed Outage Time2018-06-29029 June 2018 License Amendment Request (LAR) to Amend the Salem Technical Specifications (TS) to Extend the Refueling Water Storage Tank (RWST) Allowed Outage Time LR-N17-0144, License Amendment Request: Revise Reactor Trip System Instrumentation, Engineered Safety Feature Actuation System Instrumentation, Main Steam Isolation Valves and Add Main Feedwater Isolation Technical Specification2018-06-29029 June 2018 License Amendment Request: Revise Reactor Trip System Instrumentation, Engineered Safety Feature Actuation System Instrumentation, Main Steam Isolation Valves and Add Main Feedwater Isolation Technical Specification LR-N18-0067, Supplement to License Amendment Request for Vital Instrument Bus Inverter Allowed Outage Time (AOT) Extension2018-06-14014 June 2018 Supplement to License Amendment Request for Vital Instrument Bus Inverter Allowed Outage Time (AOT) Extension ML18136A8662018-05-16016 May 2018 License Amendment Request: Vital Instrument Bus Inverter Allowed Outage Time (AOT) Extension LR-N18-0022, License Amendment Request to Revise Technical Specification Actions for Rod Position Indicators2018-02-0808 February 2018 License Amendment Request to Revise Technical Specification Actions for Rod Position Indicators LR-N17-0135, License Amendment Request for Implementation of WCAP-14333 and WCAP-15376, Reactor Trip System Instrumentation and Engineered Safety Feature Actuation System Instrumentation Test Times and Completion Times2017-12-18018 December 2017 License Amendment Request for Implementation of WCAP-14333 and WCAP-15376, Reactor Trip System Instrumentation and Engineered Safety Feature Actuation System Instrumentation Test Times and Completion Times LR-N17-0121, License Amendment Request to Relocate the Reactor Coolant System Pressure Isolation Valve Table from the Technical Specifications to the Technical Requirements Manual2017-09-27027 September 2017 License Amendment Request to Relocate the Reactor Coolant System Pressure Isolation Valve Table from the Technical Specifications to the Technical Requirements Manual LR-N17-0058, License Amendment Request to Revise the Implementation Period for License Amendment No. 2942017-03-13013 March 2017 License Amendment Request to Revise the Implementation Period for License Amendment No. 294 LR-N16-0173, License Amendment Request: Containment Fan Cooler Unit (Cfcu) Allowed Outage Time (AOT) Extension2017-03-0606 March 2017 License Amendment Request: Containment Fan Cooler Unit (Cfcu) Allowed Outage Time (AOT) Extension LR-N16-0003, License Amendment Request to Amend the Accident Monitoring Instrumentation Technical Specifications2016-11-17017 November 2016 License Amendment Request to Amend the Accident Monitoring Instrumentation Technical Specifications LR-N16-0175, License Amendment Request - Administrative Controls2016-10-17017 October 2016 License Amendment Request - Administrative Controls LR-N16-0114, License Amendment Request to Revise Technical Specifications to Adopt TSTF-545, Revision 3, TS Lnservice Testing Program Removal & Clarify SR Usage Rule Application to Section 5.5 Testing Using the Consolidated Line .2016-08-30030 August 2016 License Amendment Request to Revise Technical Specifications to Adopt TSTF-545, Revision 3, TS Lnservice Testing Program Removal & Clarify SR Usage Rule Application to Section 5.5 Testing Using the Consolidated Line . LR-N16-0093, License Amendment Request to Extend the Implementation Period for Salem, Unit 1 License Amendment No. 311 and Salem, Unit 2 License Amendment No. 2922016-05-10010 May 2016 License Amendment Request to Extend the Implementation Period for Salem, Unit 1 License Amendment No. 311 and Salem, Unit 2 License Amendment No. 292 LR-N16-0057, Supplement for License Amendment Request Regarding Replacement of Source Range and Intermediate Range Neutron Monitoring Systems2016-03-0404 March 2016 Supplement for License Amendment Request Regarding Replacement of Source Range and Intermediate Range Neutron Monitoring Systems LR-N16-0044, Emergency License Amendment Request to Modify Technical Specification Requirements for One Inoperable Subcooling Margin Monitor Channel2016-02-11011 February 2016 Emergency License Amendment Request to Modify Technical Specification Requirements for One Inoperable Subcooling Margin Monitor Channel LR-N16-0015, Supplemental Information for License Amendment to Revise Technical Specification 3/4.3.1, Reactor Trip System Instrumentation2016-02-0303 February 2016 Supplemental Information for License Amendment to Revise Technical Specification 3/4.3.1, Reactor Trip System Instrumentation LR-N15-0084, License Amendment Request Modifying Chilled Water System Requirements2015-09-11011 September 2015 License Amendment Request Modifying Chilled Water System Requirements LR-N15-0189, Supplemental Information Needed for Review of Emergency License Amendment Request to Remove Pressurizer Power Operated Relief Valve Position Indication Instrumentation from Accident Monitoring Instrumentation Technical Specifications2015-09-0202 September 2015 Supplemental Information Needed for Review of Emergency License Amendment Request to Remove Pressurizer Power Operated Relief Valve Position Indication Instrumentation from Accident Monitoring Instrumentation Technical Specifications LR-N15-0187, Emergency License Amendment Request to Remove Pressurizer Power Operated Relief Valve (PORV) Position Indication Instrumentation from the Accident Monitoring Instrumentation Technical Specifications2015-08-31031 August 2015 Emergency License Amendment Request to Remove Pressurizer Power Operated Relief Valve (PORV) Position Indication Instrumentation from the Accident Monitoring Instrumentation Technical Specifications LR-N15-0021, License Amendment Request Regarding Replacement of Source Range and Intermediate Range Neutron Monitoring Systems2015-04-0303 April 2015 License Amendment Request Regarding Replacement of Source Range and Intermediate Range Neutron Monitoring Systems 2023-09-08
[Table view] Category:Safety Evaluation
MONTHYEARML23192A8212023-08-14014 August 2023 and Salem Nuclear Generating Station, Unit Nos. 1 and 2 - Issuance of Amendment Nos. 234, 347, and 329 Revise Technical Specifications to Delete Meteorological Tower Location ML23139A1472023-06-0505 June 2023 Relief Request Associated with Fourth Interval In-service Inspection Limited Examinations of Weld Coverage ML23096A1842023-05-0909 May 2023 Issuance of Amendment No. 328 Revise and Relocate Reactor Coolant System Pressure and Temperature Limits and Pressurizer Overpressure Protection System Limits to Pressure and Temperature Limits Report ML23081A4662023-05-0202 May 2023 Issuance of Amendment Nos. 346 and 327 Revise Technical Specifications to Extend Allowable Outage Time for Inoperable Emergency Diesel Generator ML23095A3682023-04-12012 April 2023 and Salem Nuclear Generating Station, Unit Nos. 1 and 2 - Threshold Determination for Proposed Transfer of Land Ownership ML23044A1052023-03-13013 March 2023 Issuance of Amendment Nos. 345 and 326 Relocate Technical Specifications Requirements for Reactor Head Vents to Technical Requirements Manual ML23037A9712023-03-0909 March 2023 and Salem Nuclear, Unit Nos. 1 and 2 Issuance of Amendment Nos. 233, 344, and 325 Relocate Technical Specification Staff Qualification Requirements to the PSEG Quality Assurance Topical Report ML23019A3482023-02-0202 February 2023 Issuance of Relief Request No. SC-I5R-221 for the Alternative Repair for Service Water System Piping ML22130A7912022-05-24024 May 2022 Issuance of Relief Request No. S1-I4R-210 Fourth Inservice Inspection Interval Limited Examinations ML22061A0302022-04-0404 April 2022 Issuance of Amendment Nos. 343 and 324 Revise Technical Specifications Surveillance Requirements for Auxiliary Feedwater ML22012A4352022-02-14014 February 2022 and Salem Nuclear Generating Station, Unit Nos. 1 and 2 - Issuance of Amendments Nos. 230, 342, and 323 Delete Definition in 10 CFR 20 and Figures of Site and Surrounding Areas ML21277A2482021-11-16016 November 2021 Letter with Enclosure 4, Safety Evaluation for Transfer of Licenses and Draft Conforming License Amendments (Public Version) ML21295A2292021-11-15015 November 2021 Issuance of Amendment Nos. 340 and 321 Revise Technical Specifications to Adopt TSTF 569, Revision of Response Time Testing Definitions ML21230A0182021-10-0808 October 2021 Issuance of Amendment No. 339 Revise and Relocate Reactor Coolant System Pressure and Temperature Limits and Pressurizer Overpressure Protection System Limits to Pressure and Temperature Limits Report ML21202A0782021-09-0303 September 2021 Issuance of Amendment Nos. 338 and 320 Revise Technical Specifications to Adopt TSTF-577, Revised Frequencies for Steam Generator Tube Inspections ML21195A0622021-08-0303 August 2021 Issuance of Amendment No. 319 One-Time Request to Revise Technical Specification Action for Rod Position Indicators ML21110A0522021-07-19019 July 2021 Issuance of Amendment Nos. 337 and 318, Revise Technical Specifications to Adopt TSTF-490, Deletion of E Bar Definition and Revision to RCS Specific Activity Tech Spec ML21145A1892021-06-10010 June 2021 Authorization and Safety Evaluation for Alternative Request No. SC-I4R-200 ML20338A0382021-02-23023 February 2021 Issuance of Amendment Nos. 336 and 317 Leak-Before-Break for Accumulator, Residual Heat Removal, Safety Injection, and Pressurizer Surge Lines ML20224A2982020-08-20020 August 2020 and Salem Nuclear Generating Station, Unit Nos. 1 and 2 - Request to Use a Provision of a Later Edition of the American Society of Mechanical Engineers Boiler and Pressure Vessel Code, Section XI ML20191A2032020-08-0606 August 2020 Issuance of Amendment Nos. 335 & 316-Revise Minimum Required Channels, Mode Applicability, & Actions for Source Range/Intermediate Range Neutron Flux Reactor Trip System Instrumentation ML20104A1862020-04-20020 April 2020 Issuance of Alternative Request SC-I4R-192 for Examination of ASME Code, Section XI, Steam Generator and Pressurizer Nozzle Inside Radius Sections ML20099E2332020-04-20020 April 2020 Issuance of Alternative Request S1-I4R-191 for the Fourth 10-Year Inservice Inspection Interval ML20091K7302020-04-13013 April 2020 Issuance of Relief Request SC-I4R-190 for the Fourth 10-Year Inservice Inspection Interval ML20034E6172020-02-27027 February 2020 and Salem Nuclear Generating Station, Unit Nos. 1 and 2 - Issuance of Amendment Nos. 222, 333, and 314 Deletion of Facility Operating License Conditions Related to Decommissioning Trust Provisions and License Transfer ML19352F2312020-02-18018 February 2020 and Salem Nuclear Generating Station, Unit Nos. 1 and 2; Issuance of Amendment Nos. 221, 332, and 313 Revise Emergency Plan Staffing Requirements ML19330F1562020-01-14014 January 2020 Issuance of Amendment Nos. 331 and 312 Revise Technical Specifications to Adopt TSTF-563, Revision 0, Revise Instrument Testing Definitions to Incorporate the Surveillance Frequency Control Program ML19275D6942019-11-18018 November 2019 Issuance of Amendment Nos. 330 and 311 Revise Technical Specifications to Adopt TSFT-547, Clarification of Rod Position Requirements ML19105B1712019-05-31031 May 2019 Issuance of Amendment Nos. 329 and 310 Revise Reactor Trip System and Engineered Safety Feature Actuation System Instrumentation, Main Steam Isolation Valves, and Add New TS ML19077A3362019-04-11011 April 2019 Issuance of Amendment Nos. 328 and 309 Revise Technical Specifications to Extend Refueling Water Storage Tank Allowed Outage Time ML19044A6272019-03-0606 March 2019 and Salem Nuclear Generating Station, Unit Nos. 1 and 2 - Issuance of Amendment Nos. 214, 327, and 308 Revise Technical Specifications to Adopt TSTF-529 ML19050A3702019-03-0606 March 2019 Alternative to Reactor Vessel Nozzle Welds Examinations Inspection Interval (EPID-L-2018-LLR-0110) ML19009A4772019-01-25025 January 2019 Issuance of Amendment Nos. 326 and 307 Revise Technical Specifications to Increase Vital Instrument Bus Inverter Allowed Outage Time ML18318A2662018-12-19019 December 2018 Issuance of Amendment Nos. 325 and 306 Revise TS Reactor Trip System Instrumentation and Engineered Safety Features Actuation System Instrumentation Test Times and Completion Times ML18142B1262018-05-29029 May 2018 Use of a Later Edition of the ASME Boiler and Pressure Vessel Code, Section XI, for Inservice Inspection Activities ML18040A7782018-04-18018 April 2018 Issuance of Amendment Nos. 323 and 304 Relocation of Reactor Coolant System Pressure Isolation Valve Tables ML18085B1982018-04-18018 April 2018 Issuance of Amendment Nos. 324 and 305 Revise Technical Specification Actions for Rod Position Indicators ML17355A5702018-02-16016 February 2018 Issuance of Amendment Nos. 322, 303, & 210, to Adopt Emergency Action Level Scheme Pursuant to NEI 99-01, Revision 6 (CAC Nos. MF9268/MF9269/MF9270; EPID L-2017-LLA-0173) ML17349A1082018-01-18018 January 2018 Issuance of Amendments Containment Fan Coil Unit Allowed Outage Time Extension (CAC Nos. MF9364 and MF9365; EPID L-2017-LLA-0212) ML17227A0162017-11-14014 November 2017 Issuance of Amendments Accident Monitoring Instrumentation ML17304A9432017-11-0101 November 2017 Use of a Later Edition of the ASME Boiler and Pressure Vessel Code, Section XI, for Inservice Inspection Activities ML17219A1862017-08-17017 August 2017 Safety Evaluation of Relief Request SC-I4R-171 Regarding the Fourth 10-Year Interval of the Inservice Inspection Program ML17172A5872017-07-17017 July 2017 Safety Evaluation of Relief Request S1-I4R-160 Regarding the Fourth 10-Year Interval of the Inservice Inspection Program ML17165A2142017-06-28028 June 2017 Issuance of Amendment to Revise Technical Specifications to Adopt TSTF-545, Revision 3, TS Inservice Testing Program Removal & Clarify SR Usage Rule App. to Section 5.5 Testing ML17132A0052017-05-19019 May 2017 Alternative Request to Adopt American Society of Mechanical Engineers Code Case OMN-20 (CAC Nos. MF8313 and MF8314) ML17093A8702017-05-16016 May 2017 and Salem Nuclear Generating Station, Unit Nos. 1 and 2 - Issuance of Amendments Revised PSEG Nulcear LLC Cyber Security Plan Milestone 8 Implementation Schedule ML17012A2922017-02-0606 February 2017 and Salem Nuclear Generating Station, Unit Nos. 1 and 2, Issuance of Amendments ML16351A1822017-01-19019 January 2017 Safety Evaluation Regarding Implementation of Mitigating Strategies and Reliable Spent Fuel Pool Instrumentation Related to Orders EA-12-049 and EA-12-051 ML16229A5192016-09-29029 September 2016 Issuance of Amendments Correct Non-Conservative Technical Specifications and Other Discrepancies ML16137A5792016-06-29029 June 2016 Issuance of Amendments Extension of Implementation Period for Salem, Unit No. 1, License Amendment No. 311, and Salem, Unit No. 2 License Amendment No. 292 2023-08-14
[Table view] |
Text
UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555-0001 April 4, 2022 Mr. Eric Carr President and Chief Nuclear Officer PSEG Nuclear LLC - N09 P.O. Box 236 Hancocks Bridge, NJ 08038
SUBJECT:
SALEM NUCLEAR GENERATING STATION, UNIT NOS. 1 AND 2 ISSUANCE OF AMENDMENT NOS. 343 AND 324 RE: REVISE TECHNICAL SPECIFICATIONS SURVEILLANCE REQUIREMENTS FOR AUXILIARY FEEDWATER (EPID L-2021-LLA-0117)
Dear Mr. Carr:
The U.S. Nuclear Regulatory Commission (the Commission) has issued the enclosed Amendment Nos. 343 and 324 to Renewed Facility Operating License Nos. DPR-70 and DPR-75 for the Salem Nuclear Generating Station, Unit Nos. 1 and 2, respectively. These amendments consist of changes to the technical specifications (TSs) in response to your application dated June 17, 2021.
The changes revised the Salem Nuclear Generating Station (Salem), Unit 2, Technical Specification (TS) Table 4.3-2 Functional Unit 8.f, Auxiliary Feedwater-Trip of Main Feedwater Pumps, Channel Functional Test surveillance frequency and the Mode in which Salem, Unit 1, TS Table 4.3-2 Functional Unit 8.f, Auxiliary Feedwater-Trip of Main Feedwater Pumps is required. The changes also removed Salem, Unit 2, Surveillance Requirement 4.7.1.3.4 to verify the service water spool piece is onsite.
E. Carr A copy of the related safety evaluation is also enclosed. A Notice of Issuance will be included in the Commissions monthly Federal Register notice.
Sincerely,
/RA/
James S. Kim, Project Manager Plant Licensing Branch I Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket Nos. 50-272 and 50-311
Enclosures:
- 1. Amendment No. 343 to DPR-70
- 2. Amendment No. 324 to DPR-75
- 3. Safety Evaluation cc: Listserv
PSEG NUCLEAR LLC CONSTELLATION ENERGY GENERATION, LLC DOCKET NO. 50-272 SALEM NUCLEAR GENERATING STATION, UNIT NO. 1 AMENDMENT TO RENEWED FACILITY OPERATING LICENSE Amendment No. 343 Renewed License No. DPR-70
- 1. The U.S. Nuclear Regulatory Commission (the Commission) has found that:
A. The application for amendment filed by PSEG Nuclear LLC, acting on behalf of itself and Exelon Generation Company, LLC (the licensees), dated June 17, 2021, complies with the standards and requirements of the Atomic Energy Act of 1954, as amended (the Act), and the Commissions rules and regulations set forth in 10 CFR Chapter I; B. The facility will operate in conformity with the application, the provisions of the Act, and the rules and regulations of the Commission; C. There is reasonable assurance: (i) that the activities authorized by this amendment can be conducted without endangering the health and safety of the public, and (ii) that such activities will be conducted in compliance with the Commissions regulations; D. The issuance of this amendment will not be inimical to the common defense and security or to the health and safety of the public; and E. The issuance of this amendment is in accordance with 10 CFR Part 51 of the Commissions regulations and all applicable requirements have been satisfied.
Enclosure 1
- 2. Accordingly, the license is amended by changes to the Technical Specifications as indicated in the attachment to this license amendment, and paragraph 2.C.(2) of Renewed Facility Operating License No. DPR-70 is hereby amended to read as follows:
(2) Technical Specifications and Environmental Protection Plan The Technical Specifications contained in Appendix A, as revised through Amendment No. 343, and the Environmental Protection Plan contained in Appendix B, are hereby incorporated in the renewed license. PSEG Nuclear LLC shall operate the facility in accordance with the Technical Specifications, and the Environmental Protection Plan.
- 3. This license amendment is effective as of its date of issuance and shall be implemented within 60 days of the date of issuance.
FOR THE NUCLEAR REGULATORY COMMISSION Digitally signed by James G. James G. Danna Date: 2022.04.04 Danna 12:06:46 -04'00' James G. Danna, Chief Plant Licensing Branch I Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation
Attachment:
Changes to Renewed Facility Operating License and Technical Specifications Date of Issuance: April 4, 2022
ATTACHMENT TO LICENSE AMENDMENT NO. 343 SALEM NUCLEAR GENERATING STATION, UNIT NO. 1 RENEWED FACILITY OPERATING LICENSE NO. DPR-70 DOCKET NO. 50-272 Replace the following page of Renewed Facility Operating License No. DPR-70 with the attached revised page as indicated. The revised page is identified by amendment number and contains a marginal line indicating the area of change.
Remove Insert 3 3 Replace the following page of the Appendix A, Technical Specifications, with the attached revised page as indicated. The revised page is identified by amendment number and contain marginal lines indicating the areas of change.
Remove Insert 3/4 3-33 3/4 3-33
(4) PSEG Nuclear LLC, pursuant to the Act and 10 CFR Parts 30, 40 and 70 to receive, possess and use at any time any byproduct, source and special nuclear material as sealed neutron sources for reactor startup, sealed sources for reactor instrumentation and radiation monitoring equipment calibration, and as fission detectors in amounts as required; (5) PSEG Nuclear LLC, pursuant to the Act and 10 CFR Parts 30, 40 and 70, to receive, possess and use in amounts as required any byproduct, source or special nuclear material without restriction to chemical or physical form, for sample analysis or instrument calibration or associated with radioactive apparatus or components; and (6) PSEG Nuclear LLC, pursuant to the Act and 10 CFR Parts 30 and 70, to possess but not separate, such byproduct and special nuclear materials as may be produced by the operation of the facility.
C. This renewed license shall be deemed to contain and is subject to the conditions specified in the following Commission regulations in 10 CFR Chapter I: Part 20, Section 30.34 of Part 30, Section 40.41 of Part 40, Sections 50.54 and 50.59 of Part 50, and Section 70.32 of Part 70; and is subject to all applicable provisions of the Act and to the rules, regulations, and orders of the Commission now or hereafter in effect; and is subject to the additional conditions specified or incorporated below:
(1) Maximum Power Level PSEG Nuclear LLC is authorized to operate the facility at a steady state reactor core power level not in excess of 3459 megawatts (one hundred percent of rated core power).
(2) Technical Specifications and Environmental Protection Plan The Technical Specifications contained in Appendix A, as revised through Amendment No. 343, and the Environmental Protection Plan contained in Appendix B, are hereby incorporated in the renewed license. PSEG Nuclear LLC shall operate the facility in accordance with the Technical Specifications, and the Environmental Protection Plan.
(3) Deleted Per Amendment 22, 11-20-79 (4) Less than Four Loop Operation PSEG Nuclear LLC shall not operate the reactor at power levels above P-7 (as defined in Table 3.3-1 of Specification 3.3.1.1 of Appendix A to this renewed license) with less than four (4) reactor coolant loops in operation until safety analyses for less than four loop operation have been submitted by the licensees and approval for less than four loop operation at power levels above P-7 has been granted by the Commission by Amendment of this renewed license.
(5) PSEG Nuclear LLC shall implement and maintain in effect all provisions of the approved fire protection program as described in the Updated Final Safety Renewed License No. DPR-70 Amendment No. 343
TABLE 4.3-2 (Continued)
ENGINEERED SAFETY FEATURE ACTUATION SYSTEM INSTRUMENTATION SURVEILLANCE REQUIREMENTS MODES IN CHANNEL WHICH CHANNEL CHANNEL FUNCTIONAL SURVEILLANCE FUNCTIONAL UNIT CHECK(7) CALIBRATION(7) TEST(7) REQUIRED
- 8. AUXILIARY FEEDWATER
- a. Automatic Actuation Logic N.A. N.A. (2) 1,2,3
- b. NOT USED
- c. Steam Generator Water 1,2,3 Level--Low-Low
- d. Undervoltage - RCP 1,2
- e. S.I. See 1 above (All S.I. surveillance requirements)
- f. Trip of Main Feedwater N.A. N.A. 1,2 Pumps
- g. Station Blackout See 6b and 7 above (SEC and U/V Vital Bus)
SALEM - UNIT 1 3/4 3-33 Amendment No. 343
PSEG NUCLEAR LLC CONSTELLATION ENERGY GENERATION, LLC DOCKET NO. 50-311 SALEM NUCLEAR GENERATING STATION, UNIT NO. 2 AMENDMENT TO RENEWED FACILITY OPERATING LICENSE Amendment No. 324 Renewed License No. DPR-75
- 1. The U.S. Nuclear Regulatory Commission (the Commission) has found that:
A. The application for amendment filed by PSEG Nuclear LLC, acting on behalf of itself and Exelon Generation Company, LLC (the licensees), dated June 17, 2021, complies with the standards and requirements of the Atomic Energy Act of 1954, as amended (the Act), and the Commissions rules and regulations set forth in 10 CFR Chapter I; B. The facility will operate in conformity with the application, the provisions of the Act, and the rules and regulations of the Commission; C. There is reasonable assurance: (i) that the activities authorized by this amendment can be conducted without endangering the health and safety of the public, and (ii) that such activities will be conducted in compliance with the Commissions regulations; D. The issuance of this amendment will not be inimical to the common defense and security or to the health and safety of the public; and E. The issuance of this amendment is in accordance with 10 CFR Part 51 of the Commissions regulations and all applicable requirements have been satisfied.
Enclosure 2
- 2. Accordingly, the license is amended by changes to the Technical Specifications as indicated in the attachment to this license amendment, and paragraph 2.C.(2) of Renewed Facility Operating License No. DPR-75 is hereby amended to read as follows:
(2) Technical Specifications and Environmental Protection Plan The Technical Specifications contained in Appendix A, as revised through Amendment No. 324, and the Environmental Protection Plan contained in Appendix B, are hereby incorporated in the renewed license. PSEG Nuclear LLC shall operate the facility in accordance with the Technical Specifications and the Environmental Protection Plan.
- 3. This license amendment is effective as of its date of issuance and shall be implemented within 60 days of the date of issuance.
FOR THE NUCLEAR REGULATORY COMMISSION Digitally signed by James G. James G. Danna Date: 2022.04.04 Danna 12:08:09 -04'00' James G. Danna, Chief Plant Licensing Branch I Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation
Attachment:
Changes to Renewed Facility Operating License and Technical Specifications Date of Issuance: April 4, 2022
ATTACHMENT TO LICENSE AMENDMENT NO. 324 SALEM NUCLEAR GENERATING STATION, UNIT NO. 2 RENEWED FACILITY OPERATING LICENSE NO. DPR-75 DOCKET NO. 50-311 Replace the following page of Renewed Facility Operating License No. DPR-75 with the attached revised page as indicated. The revised page is identified by amendment number and contains a marginal line indicating the area of change.
Remove Insert 3 3 Replace the following pages of the Appendix A, Technical Specifications, with the attached revised pages as indicated. The revised pages are identified by amendment number and contains marginal lines indicating the areas of change.
Remove Insert 3/4 3-36 3/4 3-36 3/4 3-37 3/4 3-37 3/4 7-7 3/4 7-7
(3) PSEG Nuclear LLC, pursuant to the Act and 10 CFR Part 70, to receive, possess and use at any time special nuclear material as reactor fuel, in accordance with the limitations for storage and amounts required for reactor operation, as described in the Final Safety Analysis Report, as supplemented and amended; (4) PSEG Nuclear LLC, pursuant to the Act and 10 CFR Parts 30, 40 and 70, to receive, possess and use at any time any byproduct, source or special nuclear material as sealed neutron sources for reactor startup, sealed sources for reactor instrumentation and radiation monitoring equipment calibration and as fission detectors in amounts as required; (5) PSEG Nuclear LLC, pursuant to the Act and 10 CFR Parts 30, 40 and 70, to receive, possess and use in amounts as required any byproduct, source or special nuclear material without restriction to chemical or physical form, for sample analysis or instrument calibration or associated with radioactive apparatus or components; and (6) PSEG Nuclear LLC, pursuant to the Act and 10 CFR Parts 30, 40 and 70, to possess but not separate, such byproduct and special nuclear materials as may be produced by the operation of the facility.
C. This renewed license shall be deemed to contain and is subject to the conditions specified in the Commissions regulations set forth in 10 CFR Chapter I and is subject to all applicable provisions of the Act and to the rules, regulations and orders of the Commission now or hereafter in effect; and is subject to the additional conditions specified or incorporated below:
(1) Maximum Power Level PSEG Nuclear LLC is authorized to operate the facility at steady state reactor core power levels not in excess of 3459 megawatts (thermal).
(2) Technical Specifications and Environmental Protection Plan The Technical Specifications contained in Appendix A, as revised through Amendment No. 324, and the Environmental Protection Plan contained in Appendix B, are hereby incorporated in the renewed license. PSEG Nuclear LLC shall operate the facility in accordance with the Technical Specifications and the Environmental Protection Plan.
Renewed License No. DPR-75 Amendment No. 324
TABLE 4.3-2 (Continued)
ENGINEERED SAFETY FEATURE ACTUATION SYSTEM INSTRUMENTATION SURVEILLANCE REQUIREMENTS MODES IN CHANNEL WHICH CHANNEL CHANNEL FUNCTIONAL SURVEILLANCE FUNCTIONAL UNIT CHECK(7) CALIBRATION(7) TEST(7) REQUIRED
- 8. AUXILIARY FEEDWATER
- a. Automatic Actuation Logic N.A. N.A. (2) 1,2,3
- b. NOT USED
- c. Steam Generator Water 1,2,3 Level--Low-Low
- d. Undervoltage - RCP 1,2
- e. S.I. See 1 above (All S.I. surveillance requirements)
- f. Trip of Main Feedwater N.A. N.A. 1,2 Pumps
- g. Station Blackout See 6 and 7 above (SEC and U/V Vital Bus)
- 9. SEMIAUTOMATIC TRANSFER TO RECIRCULATION
- a. RWST Low Level 1,2,3
- b. Automatic Initiation Logic N.A. N.A. (2) 1,2,3,4 SALEM - UNIT 2 3/4 3-36 Amendment No. 324
TABLE 4.3-2 (Continued)
TABLE NOTATION
- Outputs are up to, but not including, the Output Relays.
- The provisions of Specification of 4.0.4 are not applicable.
(1) Each logic channel shall be tested in accordance with the Surveillance Frequency Control Program. The CHANNEL FUNCTIONAL TEST of each logic channel shall verify that its associated diesel generator automatic load sequence timer is OPERABLE with the interval between each load block within 1 second of its design interval.
(2) Each train or logic channel shall be tested in accordance with the Surveillance Frequency Control Program.
(3) The CHANNEL FUNCTIONAL TEST shall include exercising the transmitter by applying either a vacuum or pressure to the appropriate side of the transmitter.
(4) NOT USED (5) NOT USED (6) Inputs from undervoltage, Vital Bus, shall be tested in accordance with the Surveillance Frequency Control Program. Inputs from Solid State Protection System, shall be tested in accordance with the Surveillance Frequency Control Program.
(7) Frequencies are specified in the Surveillance Frequency Control Program unless otherwise noted in the table.
(a) Except when all MSIVs are closed.
(b) Except when all main feedwater lines are isolated by (1) a closed and de-activated feedwater isolation valve, or (2) closed and de-activated feedwater regulating valve (FRV) and FRV bypass valves, or (3) a closed manual valve.
SALEM - UNIT 2 3/4 3-37 Amendment No. 324
PLANT SYSTEMS AUXILIARY FEED STORAGE TANK LIMITING CONDITION FOR OPERATION 3.7.1.3 The auxiliary feed storage tank (AFST) shall be OPERABLE with a contained volume of at least 200,000 gallons of water.
APPLICABILITY: MODES 1, 2 and 3.
ACTION:
With the auxiliary feed storage tank inoperable, within 4 hours4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br /> either:
- a. Restore the AFST to OPERABLE status or be in HOT SHUTDOWN within the next 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br />, or
- b. Demonstrate the OPERABILITY of a demineralized water or a fire protection/domestic water storage tank as a backup supply to the auxiliary feedwater pumps and restore the auxiliary feed storage tank to OPERABLE status within 7 days or be in HOT SHUTDOWN within the next 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br />.
SURVEILLANCE REQUIREMENTS 4.7.1.3.1 The auxiliary feed storage tank shall be demonstrated OPERABLE in accordance with the Surveillance Frequency Control Program by verifying the water level is within its limits when the tank is the supply source for the auxiliary feedwater pumps.
4.7.1.3.2 A demineralized water storage tank shall be demonstrated OPERABLE in accordance with the Surveillance Frequency Control Program by verifying the tank contains greater than or equal to 200,000 gallons of water and by verifying proper alignment of valves for taking suction from this tank when it is the supply source for the auxiliary feedwater pumps.
4.7.1.3.3 A fire protection/domestic water storage tank shall be demonstrated OPERABLE in accordance with the Surveillance Frequency Control Program by verifying the tank contains greater than or equal to 200,000 gallons of water and by verifying proper alignment of valves for taking suction from this tank when it is the supply source for the auxiliary feedwater pumps.
SALEM - UNIT 2 3/4 7-7 Amendment No. 324
SAFETY EVALUATION BY THE OFFICE OF NUCLEAR REACTOR REGULATION RELATED TO AMENDMENT NOS. 343 AND 324 TO RENEWED FACILITY OPERATING LICENSE NOS. DPR-70 AND DPR-75 PSEG NUCLEAR LLC CONSTELLATION ENERGY GENERATION, LLC SALEM NUCLEAR GENERATING STATION, UNIT NOS. 1 AND 2 DOCKET NOS. 50-272 AND 50-311
1.0 INTRODUCTION
By application dated June 17, 2021 (Agencywide Documents Access and Management System (ADAMS) Accession No. ML21173A090), PSEG Nuclear LLC (PSEG) (the licensee) submitted a license amendment request (LAR) for the Salem Generating Station (Salem), Units 1 and 2.
The amendment includes three proposed changes to Salem, Units 1 and 2, technical specifications (TSs). The first proposed change modifies Salem, Unit 2, TS Table 4.3-2 Functional Unit 8.f "Auxiliary Feedwater - Trip of Main Feedwater Pumps," Channel Functional Test surveillance frequency from an event driven frequency to a periodic frequency controlled in accordance with the Surveillance Frequency Control Program (SFCP). The second proposed change modifies Salem, Unit 1, TS Table 4.3-2 Functional Unit 8.f "Modes in Which Surveillance Required" of the TS table to include Mode 2. The third proposed change deletes Salem, Unit 2, Surveillance Requirements (SR) 4.7.1.3.4, which verifies the onsite presence of a spool piece to demonstrate the capability of the Service Water (SW) system to provide a backup water supply to the Auxiliary Feedwater (AFW) system.
2.0 REGULATORY EVALUATION
In Title 10 of the Code of Federal Regulations (10 CFR) 50.36, "Technical specification," the Commission established its regulatory requirements related to the content of the TSs. Pursuant to 10 CFR 50.36(c)(3), SR are requirements relating to test, calibration, or inspection to assure that the necessary quality of systems and components is maintained, that facility operation will be within safety limits, and that the limiting conditions for operation will be met.
Enclosure 3
3.0 TECHNICAL EVALUATION
3.1 Licensees Proposed Changes - Channel Functional Test Surveillance for Unit 2 TS Table 4.3-2 Functional Unit 8.f Salem Unit 2 TS Table 4.3-2 Functional Unit 8 currently reads:
FUNCTIONAL CHANNEL CHANNEL CHANNEL MODES IN UNIT CHECK(7) CALIBRATION(7) FUNCTIONAL WHICH TEST(7) SURVEILLANCE REQUIRED
- f. Trip of Main N/A N/A S/U(4) 1,2 Feedwater Pumps Table 4.3-2, Table Notations:
(4) If not performed in the previous 92 days.
The licensee proposed to modify the Channel Functional Test frequency of S/U(4), which currently requires the Channel Functional Test to be performed prior to each Unit startup if not performed within the prior 92 days, to frequency R, which requires the functional test to be performed at least once every 18 months. The licensee also proposed to delete the Note (4) and relocate the new frequency, "R", to the Salem, Unit 2, SFCP.
U.S. Nuclear Regulatory Commission (NRC) Staffs Evaluation The AFW system serves as a backup system for supplying feedwater to the secondary side of the steam generators at times when the Main Feedwater (MFW) system is not available. The AFW system is designed to automatically initiate in response to a trip of the MFW system in order to maintain inventory in the steam generators to maintain secondary cooling to the core.
In order to assure the proper operation of these systems, the instrumentation and logic associated with this automatic initiation must undergo a routine Channel Functional Test.
The LAR indicates that the current frequency of the Channel Functional Test is a burden to operations and maintenance personnel during startup and results in distractions from more critical actions required during the startup evolution. The licensee identified that the instrumentation and logic configuration between Salem, Unit 1 and Unit 2, are identical, but the surveillance frequency of the Channel Functional Test are different. The frequency for the corresponding Channel Functional Test for Salem, Unit 1, TS Table 4.3-2, Functional Unit 8.f is contained in the Salem SFCP which identifies the frequency as "R", at least once every 18 months. This frequency is also consistent with the frequency identified in NUREG-1431, Standard Technical Specifications for Westinghouse plants Revision 5.
The NRC staff reviewed the licensees proposed change, the systems description provided in the LAR, and the Salem, Unit 2, final safety analysis report and confirmed that a Channel Functional Test surveillance frequency of every 18 months, would be consistent with the testing frequency described in NUREG-1431, and with the testing frequency used in Salem, Unit 1.
Based on its review, the staff finds that changing the Channel Functional Test surveillance frequency to every 18 months does not reduce the margin of safety nor does it create or
increase the probability of an accident. Therefore, the staff finds the proposed change to modify Salem, Unit 2, TS Table 4.3-2 Functional Unit 8.f "Auxiliary Feedwater - Trip of Main Feedwater Pumps," Channel Functional Test surveillance frequency from every startup if not performed within the past 92 days to once per 18 months is acceptable because the new SR remains consistent with the requirement specified in 10 CFR 50.36(c)(3).
The licensee also proposed to relocate the surveillance frequency from Salem, Unit 2, TS Table 4.3-2 to the licensee-controlled surveillance frequency control program. The LAR indicates that Salem, Units 1 and 2 have implemented (with NRC approval of Amendment Nos. 299 and 282 (ADAMS Accession No. ML110410691)) TSTF Change Traveler TSTF-425, Revision 3 (ADAMS Accession No. ML090850642) Relocate Surveillance Frequencies to Licensee Control - RITSTF [Risk-Informed Technical Specifications Task Force] Initiative 5b.
As part of the implementation of this TSTF, the Salem, Unit 1, "Auxiliary Feedwater - Trip of Main Feedwater Pumps," Channel Functional Test surveillance frequency was relocated to the Salem, Unit 1, SFCP.
TSTF-425 indicates that:
All Surveillance Frequencies are relocated except:
Frequencies that reference other approved programs for the specific interval (such as the Inservice Testing Program or the Primary Containment Leakage Rate Testing Program);
Frequencies that are purely event driven (e.g., Each time the control rod is withdrawn to the full out position);
Frequencies that are event-driven but have a time component for performing the surveillance on a one-time basis once the event occurs (e.g., within 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> after thermal power reaching 95% RTP); and Frequencies that are related to specific conditions (e.g., battery degradation, age, and capacity) or conditions for the performance of a surveillance requirement (e.g., drywell to suppression chamber differential pressure decrease).
Since the Salem, Unit 2, Auxiliary Feedwater - Trip of Main Feedwater Pumps, Channel Functional Test surveillance frequency is an event-driven frequency, it could not be relocated to the SFCP as part of Amendment 282. The LAR indicates that once the Channel Functional Test surveillance frequency is changed to a periodic surveillance (once per 18 months), it will fall within the scope of TSTF-425 for relocation to the licensee-controlled SFCP.
The NRC staff evaluated the proposed change discussed in the LAR and the staffs issuance of the Amendment Nos. 299 and 282 (ADAMS Accession No. ML110410691) which approved the modifications to the TSs that relocated specific surveillance frequencies to a licensee-controlled program, based on TSTF-425, Revision 3. The staff observed that once Salem, Unit 2, Auxiliary Feedwater - Trip of Main Feedwater Pumps, Channel Functional Test surveillance frequency has been changed to once per 18 months, it will fall within the applicability criteria of TSTF-425 for relocation to a licensee-controlled SFCP. The staff also noted that the revised frequency would be consistent with the frequency of Salem, Unit 1, Auxiliary Feedwater - Trip of Main Feedwater Pumps, Channel Functional Test surveillance, which was relocated to the
SFCP when the licensee implemented TSTF-425. Therefore, the staff finds the licensees request to relocate the surveillance frequency to the SFCP acceptable, because the SR remains consistent with the requirement specified in 10 CFR 50.36(c)(3).
3.2 Licensees Proposed Changes - Mode of Applicability for Performance of Channel Surveillance Tests for Salem, Unit 1, TS Table 4.3-2 Functional Unit 8.f Salem, Unit 1, TS Table 4.3-2 Function Unit 8.f currently identifies the required modes as Mode 1 while Unit 2 identifies both Mode 1 and 2. The LAR indicates that the lack of a Mode 2 applicability in Salem, Unit 1, TS Table 4.3-2, Functional Unit 8.f stems from an oversight in a 1992 LAR. The 1992 LAR added Mode 2 in Unit 1 TS Table 4.3-2 Functional Unit 8.f; however, the mode applicability in Table 4.3-2 Functional Unit 8.f was not revised.
NRC Staffs Evaluation The NRC staff reviewed the information provided in the LAR and noted that there is an inconsistency in the modes of applicability between Salem, Unit 1, TS Table 4.3-2 and Salem, Unit 2, TS Table 4.3-2. The licensees proposed change would correct this inconsistency in the Unit 1 TS and add consistency between both units. The staff finds that the proposed change to add Mode2 to Salem, Unit 1, TS Table 4.3-2 Function Unit 8.f modes of operability corrects an oversight and increases consistency in the TS; therefore, the staff finds the proposed change acceptable is acceptable because the SR remains consistent with the requirement specified in 10 CFR 50.36(c)(3).
3.3 Licensees Proposed Changes - Deletion of Unit 2 SR 4.7.1.3.4 The LAR proposes to delete Salem, Unit 2, SR 4.7.1.3.4, which states:
The Service Water System shall be demonstrated capable of providing a water supply to the Auxiliary Feedwater System in accordance with the Surveillance Frequency Control Program by verifying that the required spool-piece is on site.
The LAR indicates that the systems have been modified. The spool piece is no longer necessary to achieve alignment of the SW system to the AFW system; the system alignment is now performed via a permanently installed spectacle flange.
NRC Staffs Evaluation The NRC staff evaluated the LAR and noted that the LAR indicates that Salem, Unit 1, utilizes the same spectacle flange arrangement in order to align the SW system as a backup water supply for the AFW system, and Unit 1 TS does not include a similar SR. The staff noted that the licensee has completed plant modifications that allow the alignment of the SW system to the AFW system without relying on the spool piece. Therefore, the staff finds that Salem, Unit 2, SR 4.7.1.3.4 is no longer required to meet the requirement specified in 10 CFR 50.36(c)(3), and that the licensees proposed deletion of SR 4.7.1.3.4 is acceptable.
4.0 STATE CONSULTATION
In accordance with the Commissions regulations, the New Jersey State official was notified of the proposed issuance of the amendments on March 11, 2022. The State official had no comments.
5.0 ENVIRONMENTAL CONSIDERATION
The amendments change requirements with respect to the installation or use of facility components located within the restricted area as defined in 10 CFR Part 20 and change SRs.
The NRC staff has determined that the amendments involve no significant increase in the amounts, and no significant change in the types, of any effluents that may be released offsite, and that there is no significant increase in individual or cumulative occupational radiation exposure. The Commission has previously issued a proposed finding that the amendments involve NSHC, published in the Federal Register on August 10, 2021 (86 FR 43691), and there were no public comments on such finding. Accordingly, the amendments meet the eligibility criteria for categorical exclusion set forth in 10 CFR 51.22(c)(9). Pursuant to 10 CFR 51.22(b),
no environmental impact statement or environmental assessment need be prepared in connection with the issuance of the amendments.
6.0 CONCLUSION
The Commission has concluded, based on the considerations discussed above, that: (1) there is reasonable assurance that the health and safety of the public will not be endangered by operation in the proposed manner, (2) there is reasonable assurance that such activities will be conducted in compliance with the Commissions regulations, and (3) the issuance of the amendments will not be inimical to the common defense and security or to the health and safety of the public.
Principal Contributor: R. Hernandez Date: April 4, 2022
ML22061A030 OFFICE NRR/DORL/LPL1/PM NRR/DORL/LPL1/LA NRR/DSS/SCPB/BC (A)
NAME JKim KEntz SJones DATE 3/3/2022 3/3/2022 2/23/2022 OFFICE NRR/DSS/STSB/BC OGC - NLO NRR/DORL/LPL1/BC NAME VCusumano AGhosh-Naber JDanna DATE 3/9/2022 3/23/2022 4/4/2022 OFFICE NRR/DORL/LPL1/PM NAME JKim DATE 4/4/2022