Category:Emergency Preparedness-Emergency Plan
MONTHYEARLR-N23-0046, Emergency Plan Document Revisions Implemented June 28, 20232023-07-10010 July 2023 Emergency Plan Document Revisions Implemented June 28, 2023 LR-N22-0094, Emergency Plan Document Revisions Implemented November 21, 20222022-12-14014 December 2022 Emergency Plan Document Revisions Implemented November 21, 2022 LR-N22-0044, Emergency Plan Document Revisions Implemented November, 20212022-05-19019 May 2022 Emergency Plan Document Revisions Implemented November, 2021 LR-N22-0039, Emergency Plan Document Revisions Implemented March 24, 20222022-04-21021 April 2022 Emergency Plan Document Revisions Implemented March 24, 2022 LR-N20-0065, Emergency Plan Document Revisions Implemented September 9, 20202020-10-0505 October 2020 Emergency Plan Document Revisions Implemented September 9, 2020 LR-N19-0104, Emergency Plan Document Revision Implemented October 30, 20192019-11-15015 November 2019 Emergency Plan Document Revision Implemented October 30, 2019 LR-N19-0073, Emergency Plan Document Revision Implemented June 26, 20192019-07-23023 July 2019 Emergency Plan Document Revision Implemented June 26, 2019 LR-N19-0065, License Amendment Request for Approval of Changes to Emergency Plan Staffing Requirements2019-07-0808 July 2019 License Amendment Request for Approval of Changes to Emergency Plan Staffing Requirements LR-N18-0074, Enclosure 2 to LR-N18-0074, Emergency Plan Document Revisions Implemented June 25, 20182018-07-18018 July 2018 Enclosure 2 to LR-N18-0074, Emergency Plan Document Revisions Implemented June 25, 2018 LR-N18-0064, Emergency Plan Document Revision Implemented May 14, 20182018-06-12012 June 2018 Emergency Plan Document Revision Implemented May 14, 2018 LR-N14-0141, Response to March 12, 2012, Request for Information Pursuant to Title 10 of the Code of Federal Regulations 50.54(f) Regarding Recommendations of the Near-Term Task Force Review of Insights from the Fukushima Dai-ichi Accid.2014-06-16016 June 2014 Response to March 12, 2012, Request for Information Pursuant to Title 10 of the Code of Federal Regulations 50.54(f) Regarding Recommendations of the Near-Term Task Force Review of Insights from the Fukushima Dai-ichi Accid. LR-N11-0061, Emergency Plan, Rev. 20, Section 17, Emergency Plan Administration2011-01-26026 January 2011 Emergency Plan, Rev. 20, Section 17, Emergency Plan Administration ML1105907832011-01-26026 January 2011 and Hope Creek, Emergency Plan, Rev. 16, Section 10, Accident Assessment ML1105907772011-01-26026 January 2011 and Hope Creek, Emergency Plan, Rev. 21, Section 9, Emergency Facilities and Equipment ML1105907712011-01-26026 January 2011 and Hope Creek, Emergency Plan, Rev. 15, Section 6, Notification Methods - Response Organizations ML1105907692011-01-26026 January 2011 and Hope Creek, Emergency Plan, Rev. 19, Section 2, Assignment of Responsibility ML1105907612011-01-26026 January 2011 and Hope Creek, Emergency Plan, Rev. 14, Section 1 LR-N11-0061, Salem, Units 1 and 2, and Hope Creek, Emergency Plan, Rev. 16, Section 10, Accident Assessment2011-01-26026 January 2011 Salem, Units 1 and 2, and Hope Creek, Emergency Plan, Rev. 16, Section 10, Accident Assessment LR-N11-0061, Salem, Units 1 and 2, and Hope Creek, Emergency Plan, Rev. 21, Section 9, Emergency Facilities and Equipment2011-01-26026 January 2011 Salem, Units 1 and 2, and Hope Creek, Emergency Plan, Rev. 21, Section 9, Emergency Facilities and Equipment LR-N11-0061, Salem, Units 1 and 2, and Hope Creek, Emergency Plan, Rev. 15, Section 6, Notification Methods - Response Organizations2011-01-26026 January 2011 Salem, Units 1 and 2, and Hope Creek, Emergency Plan, Rev. 15, Section 6, Notification Methods - Response Organizations LR-N11-0061, Salem, Units 1 and 2, and Hope Creek, Emergency Plan, Rev. 19, Section 2, Assignment of Responsibility2011-01-26026 January 2011 Salem, Units 1 and 2, and Hope Creek, Emergency Plan, Rev. 19, Section 2, Assignment of Responsibility LR-N11-0061, Salem, Units 1 and 2, and Hope Creek, Emergency Plan, Rev. 14, Section 12011-01-26026 January 2011 Salem, Units 1 and 2, and Hope Creek, Emergency Plan, Rev. 14, Section 1 ML1100503752010-10-14014 October 2010 Attachment 1 to LR-N10-0355, Hope Creek Generating Station, Emergency Action Level Technical Bases Document (Strike-out Version) ML1100504022010-10-14014 October 2010 Attachment 2 to LR-N10-0355, Hope Creek Generating Station, Emergency Action Level Technical Bases Document (Clean Version) LR-N10-0355, EP Section 7, Communications.2010-10-14014 October 2010 EP Section 7, Communications. ML1100603722010-10-14014 October 2010 EP Section 7, Communications. LR-N10-0355, Hope Creek and Salem, Section 7 Emergency Communications2010-10-14014 October 2010 Hope Creek and Salem, Section 7 Emergency Communications ML1100504162010-10-14014 October 2010 Hope Creek and Salem, Section 7 Emergency Communications LR-N10-0355, Hope Creek, CY-AA-170-500, Revision 0, Meteorological Monitoring System Calibration and Maintenance2010-10-14014 October 2010 Hope Creek, CY-AA-170-500, Revision 0, Meteorological Monitoring System Calibration and Maintenance ML1100504152010-10-14014 October 2010 Hope Creek, CY-AA-170-500, Revision 0, Meteorological Monitoring System Calibration and Maintenance LR-N10-0355, Attachment 2 to LR-N10-0355, Hope Creek Generating Station, Emergency Action Level Technical Bases Document (Clean Version)2010-10-14014 October 2010 Attachment 2 to LR-N10-0355, Hope Creek Generating Station, Emergency Action Level Technical Bases Document (Clean Version) LR-N10-0355, Attachment 4 to LR-N10-0355, Hope Creek Generating Station, Emergency Action Level Technical Bases Supporting Documents (Cd with Paper Index)2010-10-14014 October 2010 Attachment 4 to LR-N10-0355, Hope Creek Generating Station, Emergency Action Level Technical Bases Supporting Documents (Cd with Paper Index) ML1100503992010-10-14014 October 2010 Attachment 4 to LR-N10-0355, Hope Creek Generating Station, Emergency Action Level Technical Bases Supporting Documents (Cd with Paper Index) LR-N10-0355, Attachment 3 to LR-N10-0355, Hope Creek Generating Station, Emergency Action Level Comparison Matrix2010-10-14014 October 2010 Attachment 3 to LR-N10-0355, Hope Creek Generating Station, Emergency Action Level Comparison Matrix ML1100503982010-10-14014 October 2010 Attachment 3 to LR-N10-0355, Hope Creek Generating Station, Emergency Action Level Comparison Matrix LR-N10-0355, Salem and Hope Creek - Submittal of Emergency Action Level Changes2010-10-14014 October 2010 Salem and Hope Creek - Submittal of Emergency Action Level Changes ML1100503762010-10-14014 October 2010 Salem and Hope Creek - Submittal of Emergency Action Level Changes LR-N10-0355, Attachment 1 to LR-N10-0355, Hope Creek Generating Station, Emergency Action Level Technical Bases Document (Strike-out Version)2010-10-14014 October 2010 Attachment 1 to LR-N10-0355, Hope Creek Generating Station, Emergency Action Level Technical Bases Document (Strike-out Version) LR-N10-0355, Hope Creek, HC.OP-AR.ZZ-0016(Q), Rev. 14, Overhead Annunciator Window Box E32010-09-17017 September 2010 Hope Creek, HC.OP-AR.ZZ-0016(Q), Rev. 14, Overhead Annunciator Window Box E3 ML1100601012010-09-17017 September 2010 Hope Creek, HC.OP-AR.ZZ-0016(Q), Rev. 14, Overhead Annunciator Window Box E3 LR-N10-0355, Hope Creek, HC.OP-AR.ZZ-0010(Q), Rev. 14, Overhead Annunciator Window Box C52010-09-12012 September 2010 Hope Creek, HC.OP-AR.ZZ-0010(Q), Rev. 14, Overhead Annunciator Window Box C5 ML1100505932010-09-12012 September 2010 Hope Creek, HC.OP-AR.ZZ-0010(Q), Rev. 14, Overhead Annunciator Window Box C5 LR-N10-0355, Hope Creek, HC.OP-AR.ZZ-0024(Q), Rev. 7, Crids Computer Points Book 5 D3624 Thru D42882010-08-24024 August 2010 Hope Creek, HC.OP-AR.ZZ-0024(Q), Rev. 7, Crids Computer Points Book 5 D3624 Thru D4288 ML1100601032010-08-24024 August 2010 Hope Creek, HC.OP-AR.ZZ-0024(Q), Rev. 7, Crids Computer Points Book 5 D3624 Thru D4288 LR-N10-0355, Hope Creek, HC.OP-AR.ZZ-0014(Q), Rev. 29, Overhead Annunciator Window Box D32010-08-24024 August 2010 Hope Creek, HC.OP-AR.ZZ-0014(Q), Rev. 29, Overhead Annunciator Window Box D3 ML1100505972010-08-24024 August 2010 Hope Creek, HC.OP-AR.ZZ-0014(Q), Rev. 29, Overhead Annunciator Window Box D3 LR-N10-0355, Hope Creek, HC.OP-AB.ZZ-0150(Q), Rev. 6, 125VDC System Malfunction2010-08-24024 August 2010 Hope Creek, HC.OP-AB.ZZ-0150(Q), Rev. 6, 125VDC System Malfunction ML1100505182010-08-24024 August 2010 Hope Creek, HC.OP-AB.ZZ-0150(Q), Rev. 6, 125VDC System Malfunction ML11215A1812010-07-30030 July 2010 Attachment 5, Salem Generating Stations, EAL Technical Bases Document, EP-SC-111-201 LR-N10-0355, Hope Creek, HC.OP-AB.HVAC-0002(Q), Rev. 7, Control Room Environment2010-07-13013 July 2010 Hope Creek, HC.OP-AB.HVAC-0002(Q), Rev. 7, Control Room Environment 2023-07-10
[Table view] Category:Technical Specification
MONTHYEARLR-N23-0005, License Amendment Request to Amend Technical Specifications (TS) 6.8.4.f for Permanent Extension of Type a and Type C Leak Rate Test Frequencies2023-06-23023 June 2023 License Amendment Request to Amend Technical Specifications (TS) 6.8.4.f for Permanent Extension of Type a and Type C Leak Rate Test Frequencies LR-N23-0024, Submittal of Hope Creek Generating Station Technical Specification Bases Changes2023-03-29029 March 2023 Submittal of Hope Creek Generating Station Technical Specification Bases Changes ML22270A3172022-09-27027 September 2022 Submittal of Technical Specification Bases Changes, Amendment No. 201 LR-N22-0078, Submittal of Technical Specification Bases Changes, Amendment No. 2152022-09-27027 September 2022 Submittal of Technical Specification Bases Changes, Amendment No. 215 LR-N21-0078, Hope and Creek Generating Station, Supplement to License Amendment Request to Revise Technical Specifications (TS) to Delete Definitions Found in 10 CFR Part 20 and Delete Figures of the Site and Surrounding Areas from TS2021-11-18018 November 2021 Hope and Creek Generating Station, Supplement to License Amendment Request to Revise Technical Specifications (TS) to Delete Definitions Found in 10 CFR Part 20 and Delete Figures of the Site and Surrounding Areas from TS LR-N21-0079, Submittal of Hope Creek Generating Station Technical Specification Bases Changes2021-11-0303 November 2021 Submittal of Hope Creek Generating Station Technical Specification Bases Changes LR-N21-0048, One-Time License Amendment Request to Revise Unit 2 Technical Specification Action for Rod Position Indicators2021-06-18018 June 2021 One-Time License Amendment Request to Revise Unit 2 Technical Specification Action for Rod Position Indicators LR-N21-0045, Submittal of Changes to Technical Specifications Bases2021-06-16016 June 2021 Submittal of Changes to Technical Specifications Bases LR-N21-0025, License Amendment Request to Revise Technical Specification Limits for Ultimate Heat Sink2021-05-0707 May 2021 License Amendment Request to Revise Technical Specification Limits for Ultimate Heat Sink LR-N21-0006, Application to Revise Technical Specifications to Adopt TSTF-569 Revision of Response Time Testing Definitions2021-02-16016 February 2021 Application to Revise Technical Specifications to Adopt TSTF-569 Revision of Response Time Testing Definitions LR-N20-0072, License Amendment Request to Amend Tech Specs to Revise and Relocate the Reactor Coolant System Pressure & Temperature Limits & Pressurizer Overpressure Protection System Limits to a Pressure & Temperature Limits Report2020-12-0606 December 2020 License Amendment Request to Amend Tech Specs to Revise and Relocate the Reactor Coolant System Pressure & Temperature Limits & Pressurizer Overpressure Protection System Limits to a Pressure & Temperature Limits Report LR-N20-0060, Application to Revise Technical Specifications to Adopt TSTF-582, Reactor Pressure Vessel Water Inventory Control (RPV WIC) Enhancements2020-09-29029 September 2020 Application to Revise Technical Specifications to Adopt TSTF-582, Reactor Pressure Vessel Water Inventory Control (RPV WIC) Enhancements LR-N20-0003, License Amendment Request to Adopt TSTF-490, Deletion of E-Bar Definition and Revision to RCS Specific Activity Tech Spec2020-09-17017 September 2020 License Amendment Request to Adopt TSTF-490, Deletion of E-Bar Definition and Revision to RCS Specific Activity Tech Spec ML20142A5412020-05-21021 May 2020 4 to Updated Final Safety Analysis Report, Section 16, Technical Specifications LR-N20-0033, Submittal of Hope Creek Generating Station Technical Specification Bases Changes2020-05-15015 May 2020 Submittal of Hope Creek Generating Station Technical Specification Bases Changes LR-N20-0015, License Amendment Request to Revise Technical Specification Actions for Suppression Pool Cooling2020-05-0707 May 2020 License Amendment Request to Revise Technical Specification Actions for Suppression Pool Cooling ML19058A2212019-02-27027 February 2019 Application to Revise Technical Specifications to Adopt TSTF-546, Revise APRM Channel Adjustment Surveillance Requirement. LR-N18-0127, Application to Revise Technical Specifications to Adopt TSTF-546, Revise APRM Channel Adjustment Surveillance Requirement.2019-02-27027 February 2019 Application to Revise Technical Specifications to Adopt TSTF-546, Revise APRM Channel Adjustment Surveillance Requirement. LR-N18-0013, License Amendment Request (LAR) to Amend the Hope Creek Technical Specifications (TS) to Revise Action for Inoperable Emergency Diesel Generator (EDG) a or B2018-03-28028 March 2018 License Amendment Request (LAR) to Amend the Hope Creek Technical Specifications (TS) to Revise Action for Inoperable Emergency Diesel Generator (EDG) a or B LR-N18-0011, Supplement to License Amendment Request- Safety Limit Minimum Critical Power Ratio Change. Includes GNF-004N5379-R1-NP, Gnf Additional Information Regarding the Requested Changes to the Technical Specification SLMCPR2018-01-22022 January 2018 Supplement to License Amendment Request- Safety Limit Minimum Critical Power Ratio Change. Includes GNF-004N5379-R1-NP, Gnf Additional Information Regarding the Requested Changes to the Technical Specification SLMCPR LR-N17-0163, License Amendment Request - Safety Limit Minimum Critical Power Ratio Change, Non-Proprietary2017-11-0909 November 2017 License Amendment Request - Safety Limit Minimum Critical Power Ratio Change, Non-Proprietary LR-N17-0124, Application to Revise Technical Specifications to Adopt TSTF-542, Reactor Pressure Vessel Water Inventory Control2017-09-21021 September 2017 Application to Revise Technical Specifications to Adopt TSTF-542, Reactor Pressure Vessel Water Inventory Control ML17157B2652017-05-0909 May 2017 Submittal of Hope Creek Generating Station Updated Final Safety Analysis Report, Revision 22, Hope Creek Technical Specification Bases Changes, 10CFR54.37(b) Review Results for Hope Creek and PSEG Nuclear LLC Quality Assurance Topical Repor LR-N17-0088, Submittal of Hope Creek Generating Station Updated Final Safety Analysis Report, Revision 22, Hope Creek Technical Specification Bases Changes, 10CFR54.37(b) Review Results for Hope Creek and Pseg Nuclear LLC Quality Assurance Topical Re2017-05-0909 May 2017 Submittal of Hope Creek Generating Station Updated Final Safety Analysis Report, Revision 22, Hope Creek Technical Specification Bases Changes, 10CFR54.37(b) Review Results for Hope Creek and Pseg Nuclear LLC Quality Assurance Topical Repor ML17046A2292017-01-30030 January 2017 Submittal of Revision 29 to Updated Final Safety Analysis Report, and Technical Specification Bases Changes and Quality Assurance Topical Report, NO-AA-10, Rev. 85 LR-N17-0034, Salem Generating Station, Units 1 & 2, Submittal of Revision 29 to Updated Final Safety Analysis Report, and Technical Specification Bases Changes and Quality Assurance Topical Report, NO-AA-10, Rev. 852017-01-30030 January 2017 Salem Generating Station, Units 1 & 2, Submittal of Revision 29 to Updated Final Safety Analysis Report, and Technical Specification Bases Changes and Quality Assurance Topical Report, NO-AA-10, Rev. 85 LR-N16-0003, License Amendment Request to Amend the Accident Monitoring Instrumentation Technical Specifications2016-11-17017 November 2016 License Amendment Request to Amend the Accident Monitoring Instrumentation Technical Specifications LR-N16-0114, License Amendment Request to Revise Technical Specifications to Adopt TSTF-545, Revision 3, TS Lnservice Testing Program Removal & Clarify SR Usage Rule Application to Section 5.5 Testing Using the Consolidated Line .2016-08-30030 August 2016 License Amendment Request to Revise Technical Specifications to Adopt TSTF-545, Revision 3, TS Lnservice Testing Program Removal & Clarify SR Usage Rule Application to Section 5.5 Testing Using the Consolidated Line . LR-N16-0066, License Amendment Request to Permit Operability of Low Pressure Coolant Injection While Aligned to Shutdown Cooling2016-06-17017 June 2016 License Amendment Request to Permit Operability of Low Pressure Coolant Injection While Aligned to Shutdown Cooling LR-N15-0178, Hope Creek - License Amendment Request, Digital Power Range Neutron Monitoring (Prnm) System Upgrade2015-09-21021 September 2015 Hope Creek - License Amendment Request, Digital Power Range Neutron Monitoring (Prnm) System Upgrade ML15265A2242015-09-21021 September 2015 License Amendment Request, Digital Power Range Neutron Monitoring (Prnm) System Upgrade LR-N15-0187, Emergency License Amendment Request to Remove Pressurizer Power Operated Relief Valve (PORV) Position Indication Instrumentation from the Accident Monitoring Instrumentation Technical Specifications2015-08-31031 August 2015 Emergency License Amendment Request to Remove Pressurizer Power Operated Relief Valve (PORV) Position Indication Instrumentation from the Accident Monitoring Instrumentation Technical Specifications LR-N15-0021, License Amendment Request Regarding Replacement of Source Range and Intermediate Range Neutron Monitoring Systems2015-04-0303 April 2015 License Amendment Request Regarding Replacement of Source Range and Intermediate Range Neutron Monitoring Systems LR-N15-0020, License Amendment Request to Revise Technical Specification 3/4.3.1, Reactor Trip System Instrumentation2015-03-27027 March 2015 License Amendment Request to Revise Technical Specification 3/4.3.1, Reactor Trip System Instrumentation ML14210A4842014-07-28028 July 2014 License Amendment Request to Revise Technical Specifications to Adopt TSTF-510, Revision 2, Revision to Steam Generator Program Inspection Frequencies and Tube Sample Selection Using the Consolidated Line Item Improvement Process LR-N13-0155, License Amendment Request to Relocate the Flood Protection Technical Specification to the Technical Requirements Manual2013-09-0505 September 2013 License Amendment Request to Relocate the Flood Protection Technical Specification to the Technical Requirements Manual ML1118615602011-07-28028 July 2011 and Salem Nuclear Generating Station, Unit Nos. 1 and 2, License Amendment, Issuance of Amendments Approval of Cyber Security Plan LR-N11-0068, Application for Technical Specification Change TSTF-477, Revision 3, Add Action for Two Inoperable Control Room AC Subsystems to the Technical Specifications Using Consolidated Line Item Improvement Process2011-02-28028 February 2011 Application for Technical Specification Change TSTF-477, Revision 3, Add Action for Two Inoperable Control Room AC Subsystems to the Technical Specifications Using Consolidated Line Item Improvement Process LR-N11-0056, Supplement to Application for Technical Specification Change Regarding Risk-Informed Justification for the Relocation of Specific Surveillance Frequency Requirements to a Licensee Controlled Program2011-02-23023 February 2011 Supplement to Application for Technical Specification Change Regarding Risk-Informed Justification for the Relocation of Specific Surveillance Frequency Requirements to a Licensee Controlled Program ML1100503752010-10-14014 October 2010 Attachment 1 to LR-N10-0355, Hope Creek Generating Station, Emergency Action Level Technical Bases Document (Strike-out Version) LR-N10-0355, Attachment 1 to LR-N10-0355, Hope Creek Generating Station, Emergency Action Level Technical Bases Document (Strike-out Version)2010-10-14014 October 2010 Attachment 1 to LR-N10-0355, Hope Creek Generating Station, Emergency Action Level Technical Bases Document (Strike-out Version) ML1100503982010-10-14014 October 2010 Attachment 3 to LR-N10-0355, Hope Creek Generating Station, Emergency Action Level Comparison Matrix LR-N10-0355, Attachment 3 to LR-N10-0355, Hope Creek Generating Station, Emergency Action Level Comparison Matrix2010-10-14014 October 2010 Attachment 3 to LR-N10-0355, Hope Creek Generating Station, Emergency Action Level Comparison Matrix ML1100503992010-10-14014 October 2010 Attachment 4 to LR-N10-0355, Hope Creek Generating Station, Emergency Action Level Technical Bases Supporting Documents (Cd with Paper Index) LR-N10-0355, Attachment 4 to LR-N10-0355, Hope Creek Generating Station, Emergency Action Level Technical Bases Supporting Documents (Cd with Paper Index)2010-10-14014 October 2010 Attachment 4 to LR-N10-0355, Hope Creek Generating Station, Emergency Action Level Technical Bases Supporting Documents (Cd with Paper Index) LR-N10-0355, Attachment 2 to LR-N10-0355, Hope Creek Generating Station, Emergency Action Level Technical Bases Document (Clean Version)2010-10-14014 October 2010 Attachment 2 to LR-N10-0355, Hope Creek Generating Station, Emergency Action Level Technical Bases Document (Clean Version) ML1100504152010-10-14014 October 2010 Hope Creek, CY-AA-170-500, Revision 0, Meteorological Monitoring System Calibration and Maintenance LR-N10-0355, Hope Creek, CY-AA-170-500, Revision 0, Meteorological Monitoring System Calibration and Maintenance2010-10-14014 October 2010 Hope Creek, CY-AA-170-500, Revision 0, Meteorological Monitoring System Calibration and Maintenance ML1100504022010-10-14014 October 2010 Attachment 2 to LR-N10-0355, Hope Creek Generating Station, Emergency Action Level Technical Bases Document (Clean Version) ML1025802412010-09-0808 September 2010 License Amendment Request S10-01 Application for Technical Specification Change Regarding Risk-Informed Justification for the Relocation of Specific Surveillance Frequency Requirements to a Licensee Controlled Program 2023-06-23
[Table view] Category:Bases Change
MONTHYEARLR-N23-0024, Submittal of Hope Creek Generating Station Technical Specification Bases Changes2023-03-29029 March 2023 Submittal of Hope Creek Generating Station Technical Specification Bases Changes ML22270A3172022-09-27027 September 2022 Submittal of Technical Specification Bases Changes, Amendment No. 201 LR-N22-0078, Submittal of Technical Specification Bases Changes, Amendment No. 2152022-09-27027 September 2022 Submittal of Technical Specification Bases Changes, Amendment No. 215 LR-N21-0078, Hope and Creek Generating Station, Supplement to License Amendment Request to Revise Technical Specifications (TS) to Delete Definitions Found in 10 CFR Part 20 and Delete Figures of the Site and Surrounding Areas from TS2021-11-18018 November 2021 Hope and Creek Generating Station, Supplement to License Amendment Request to Revise Technical Specifications (TS) to Delete Definitions Found in 10 CFR Part 20 and Delete Figures of the Site and Surrounding Areas from TS LR-N21-0079, Submittal of Hope Creek Generating Station Technical Specification Bases Changes2021-11-0303 November 2021 Submittal of Hope Creek Generating Station Technical Specification Bases Changes LR-N21-0045, Submittal of Changes to Technical Specifications Bases2021-06-16016 June 2021 Submittal of Changes to Technical Specifications Bases LR-N20-0060, Application to Revise Technical Specifications to Adopt TSTF-582, Reactor Pressure Vessel Water Inventory Control (RPV WIC) Enhancements2020-09-29029 September 2020 Application to Revise Technical Specifications to Adopt TSTF-582, Reactor Pressure Vessel Water Inventory Control (RPV WIC) Enhancements LR-N20-0003, License Amendment Request to Adopt TSTF-490, Deletion of E-Bar Definition and Revision to RCS Specific Activity Tech Spec2020-09-17017 September 2020 License Amendment Request to Adopt TSTF-490, Deletion of E-Bar Definition and Revision to RCS Specific Activity Tech Spec ML20142A5412020-05-21021 May 2020 4 to Updated Final Safety Analysis Report, Section 16, Technical Specifications LR-N20-0033, Submittal of Hope Creek Generating Station Technical Specification Bases Changes2020-05-15015 May 2020 Submittal of Hope Creek Generating Station Technical Specification Bases Changes ML19058A2212019-02-27027 February 2019 Application to Revise Technical Specifications to Adopt TSTF-546, Revise APRM Channel Adjustment Surveillance Requirement. LR-N18-0127, Application to Revise Technical Specifications to Adopt TSTF-546, Revise APRM Channel Adjustment Surveillance Requirement.2019-02-27027 February 2019 Application to Revise Technical Specifications to Adopt TSTF-546, Revise APRM Channel Adjustment Surveillance Requirement. LR-N18-0013, License Amendment Request (LAR) to Amend the Hope Creek Technical Specifications (TS) to Revise Action for Inoperable Emergency Diesel Generator (EDG) a or B2018-03-28028 March 2018 License Amendment Request (LAR) to Amend the Hope Creek Technical Specifications (TS) to Revise Action for Inoperable Emergency Diesel Generator (EDG) a or B LR-N18-0011, Supplement to License Amendment Request- Safety Limit Minimum Critical Power Ratio Change. Includes GNF-004N5379-R1-NP, Gnf Additional Information Regarding the Requested Changes to the Technical Specification SLMCPR2018-01-22022 January 2018 Supplement to License Amendment Request- Safety Limit Minimum Critical Power Ratio Change. Includes GNF-004N5379-R1-NP, Gnf Additional Information Regarding the Requested Changes to the Technical Specification SLMCPR LR-N17-0163, License Amendment Request - Safety Limit Minimum Critical Power Ratio Change, Non-Proprietary2017-11-0909 November 2017 License Amendment Request - Safety Limit Minimum Critical Power Ratio Change, Non-Proprietary ML17157B2652017-05-0909 May 2017 Submittal of Hope Creek Generating Station Updated Final Safety Analysis Report, Revision 22, Hope Creek Technical Specification Bases Changes, 10CFR54.37(b) Review Results for Hope Creek and PSEG Nuclear LLC Quality Assurance Topical Repor LR-N17-0088, Submittal of Hope Creek Generating Station Updated Final Safety Analysis Report, Revision 22, Hope Creek Technical Specification Bases Changes, 10CFR54.37(b) Review Results for Hope Creek and Pseg Nuclear LLC Quality Assurance Topical Re2017-05-0909 May 2017 Submittal of Hope Creek Generating Station Updated Final Safety Analysis Report, Revision 22, Hope Creek Technical Specification Bases Changes, 10CFR54.37(b) Review Results for Hope Creek and Pseg Nuclear LLC Quality Assurance Topical Repor ML17046A2292017-01-30030 January 2017 Submittal of Revision 29 to Updated Final Safety Analysis Report, and Technical Specification Bases Changes and Quality Assurance Topical Report, NO-AA-10, Rev. 85 LR-N17-0034, Salem Generating Station, Units 1 & 2, Submittal of Revision 29 to Updated Final Safety Analysis Report, and Technical Specification Bases Changes and Quality Assurance Topical Report, NO-AA-10, Rev. 852017-01-30030 January 2017 Salem Generating Station, Units 1 & 2, Submittal of Revision 29 to Updated Final Safety Analysis Report, and Technical Specification Bases Changes and Quality Assurance Topical Report, NO-AA-10, Rev. 85 LR-N16-0003, License Amendment Request to Amend the Accident Monitoring Instrumentation Technical Specifications2016-11-17017 November 2016 License Amendment Request to Amend the Accident Monitoring Instrumentation Technical Specifications LR-N16-0114, License Amendment Request to Revise Technical Specifications to Adopt TSTF-545, Revision 3, TS Lnservice Testing Program Removal & Clarify SR Usage Rule Application to Section 5.5 Testing Using the Consolidated Line .2016-08-30030 August 2016 License Amendment Request to Revise Technical Specifications to Adopt TSTF-545, Revision 3, TS Lnservice Testing Program Removal & Clarify SR Usage Rule Application to Section 5.5 Testing Using the Consolidated Line . LR-N16-0066, License Amendment Request to Permit Operability of Low Pressure Coolant Injection While Aligned to Shutdown Cooling2016-06-17017 June 2016 License Amendment Request to Permit Operability of Low Pressure Coolant Injection While Aligned to Shutdown Cooling ML15265A2242015-09-21021 September 2015 License Amendment Request, Digital Power Range Neutron Monitoring (Prnm) System Upgrade LR-N15-0178, Hope Creek - License Amendment Request, Digital Power Range Neutron Monitoring (Prnm) System Upgrade2015-09-21021 September 2015 Hope Creek - License Amendment Request, Digital Power Range Neutron Monitoring (Prnm) System Upgrade LR-N15-0187, Emergency License Amendment Request to Remove Pressurizer Power Operated Relief Valve (PORV) Position Indication Instrumentation from the Accident Monitoring Instrumentation Technical Specifications2015-08-31031 August 2015 Emergency License Amendment Request to Remove Pressurizer Power Operated Relief Valve (PORV) Position Indication Instrumentation from the Accident Monitoring Instrumentation Technical Specifications LR-N15-0021, License Amendment Request Regarding Replacement of Source Range and Intermediate Range Neutron Monitoring Systems2015-04-0303 April 2015 License Amendment Request Regarding Replacement of Source Range and Intermediate Range Neutron Monitoring Systems ML14210A4842014-07-28028 July 2014 License Amendment Request to Revise Technical Specifications to Adopt TSTF-510, Revision 2, Revision to Steam Generator Program Inspection Frequencies and Tube Sample Selection Using the Consolidated Line Item Improvement Process LR-N13-0155, License Amendment Request to Relocate the Flood Protection Technical Specification to the Technical Requirements Manual2013-09-0505 September 2013 License Amendment Request to Relocate the Flood Protection Technical Specification to the Technical Requirements Manual LR-N11-0068, Application for Technical Specification Change TSTF-477, Revision 3, Add Action for Two Inoperable Control Room AC Subsystems to the Technical Specifications Using Consolidated Line Item Improvement Process2011-02-28028 February 2011 Application for Technical Specification Change TSTF-477, Revision 3, Add Action for Two Inoperable Control Room AC Subsystems to the Technical Specifications Using Consolidated Line Item Improvement Process LR-N11-0056, Supplement to Application for Technical Specification Change Regarding Risk-Informed Justification for the Relocation of Specific Surveillance Frequency Requirements to a Licensee Controlled Program2011-02-23023 February 2011 Supplement to Application for Technical Specification Change Regarding Risk-Informed Justification for the Relocation of Specific Surveillance Frequency Requirements to a Licensee Controlled Program ML1100503992010-10-14014 October 2010 Attachment 4 to LR-N10-0355, Hope Creek Generating Station, Emergency Action Level Technical Bases Supporting Documents (Cd with Paper Index) LR-N10-0355, Attachment 3 to LR-N10-0355, Hope Creek Generating Station, Emergency Action Level Comparison Matrix2010-10-14014 October 2010 Attachment 3 to LR-N10-0355, Hope Creek Generating Station, Emergency Action Level Comparison Matrix ML1100503982010-10-14014 October 2010 Attachment 3 to LR-N10-0355, Hope Creek Generating Station, Emergency Action Level Comparison Matrix LR-N10-0355, Attachment 1 to LR-N10-0355, Hope Creek Generating Station, Emergency Action Level Technical Bases Document (Strike-out Version)2010-10-14014 October 2010 Attachment 1 to LR-N10-0355, Hope Creek Generating Station, Emergency Action Level Technical Bases Document (Strike-out Version) LR-N10-0355, Attachment 4 to LR-N10-0355, Hope Creek Generating Station, Emergency Action Level Technical Bases Supporting Documents (Cd with Paper Index)2010-10-14014 October 2010 Attachment 4 to LR-N10-0355, Hope Creek Generating Station, Emergency Action Level Technical Bases Supporting Documents (Cd with Paper Index) ML1100504022010-10-14014 October 2010 Attachment 2 to LR-N10-0355, Hope Creek Generating Station, Emergency Action Level Technical Bases Document (Clean Version) ML1100503752010-10-14014 October 2010 Attachment 1 to LR-N10-0355, Hope Creek Generating Station, Emergency Action Level Technical Bases Document (Strike-out Version) LR-N10-0355, Attachment 2 to LR-N10-0355, Hope Creek Generating Station, Emergency Action Level Technical Bases Document (Clean Version)2010-10-14014 October 2010 Attachment 2 to LR-N10-0355, Hope Creek Generating Station, Emergency Action Level Technical Bases Document (Clean Version) ML1100504152010-10-14014 October 2010 Hope Creek, CY-AA-170-500, Revision 0, Meteorological Monitoring System Calibration and Maintenance LR-N10-0355, Hope Creek, CY-AA-170-500, Revision 0, Meteorological Monitoring System Calibration and Maintenance2010-10-14014 October 2010 Hope Creek, CY-AA-170-500, Revision 0, Meteorological Monitoring System Calibration and Maintenance ML1025802422010-09-0808 September 2010 License Amendment Request H10-01:, Application for Technical Specification Change Regarding Risk-Informed Justification for the Relocation of Specific Surveillance Frequency Requirements to a Licensee Controlled Program ML1025802412010-09-0808 September 2010 License Amendment Request S10-01 Application for Technical Specification Change Regarding Risk-Informed Justification for the Relocation of Specific Surveillance Frequency Requirements to a Licensee Controlled Program LR-N10-0355, Hope Creek, HC.OP-AB.ZZ-0150(Q), Rev. 6, 125VDC System Malfunction2010-08-24024 August 2010 Hope Creek, HC.OP-AB.ZZ-0150(Q), Rev. 6, 125VDC System Malfunction ML1100505182010-08-24024 August 2010 Hope Creek, HC.OP-AB.ZZ-0150(Q), Rev. 6, 125VDC System Malfunction ML1100505002010-07-13013 July 2010 Hope Creek, HC.OP-AB.HVAC-0002(Q), Rev. 7, Control Room Environment LR-N10-0355, Hope Creek, HC.OP-AB.HVAC-0002(Q), Rev. 7, Control Room Environment2010-07-13013 July 2010 Hope Creek, HC.OP-AB.HVAC-0002(Q), Rev. 7, Control Room Environment ML1100505162010-06-24024 June 2010 Hope Creek, HC.OP-AB.RPV-0009(Q), Rev. 7, Shutdown Cooling LR-N10-0355, Hope Creek, HC.OP-AB.RPV-0009(Q), Rev. 7, Shutdown Cooling2010-06-24024 June 2010 Hope Creek, HC.OP-AB.RPV-0009(Q), Rev. 7, Shutdown Cooling ML1100504772010-05-0303 May 2010 Hope Creek, HC.OP-AB.CONT-0002(Q), Rev. 9, Containment LR-N10-0355, Hope Creek, HC.OP-AB.CONT-0002(Q), Rev. 9, Containment2010-05-0303 May 2010 Hope Creek, HC.OP-AB.CONT-0002(Q), Rev. 9, Containment 2023-03-29
[Table view] |
Text
PSEG Internal Use Only HC.OP-AB.HVAC-0002(Q) CONTROL ROOM ENVIRONMENT Hope Creek Page 1 of 20 Rev. 7 Effective Date 7/13/10 CATEGORY II CONTROL ROOM ENVIRONMENT
ALARMS CONTROL RM VENT RAD ALARM/TRBL E6 - A1 CONTROL AREA HVAC FAN MALF E6 - B1 RADIATION MONITORING ALARM/TRBL C6 - C1 FIRE PROT PANEL 10C671 A2 - A5 INDICATIONS Pungent odor in the Control Room air supply. Control Room Fire/Dense Smoke. Smoke in the Control Room air supply. Elevated activity reading for the Contro l Room air supply Radiation Monitors. Control Room High Airborne Activity. Control Room High Temperature. Control Room Instrumentation Failures.
Terminated Date/Time:
PSEG Internal Use Only HC.OP-AB.HVAC-0002(Q) CONTROL ROOM ENVIRONMENT Hope Creek Page 2 of 20 Rev. 7 RETAINMENT OVERRIDE CONDITION ACTION
___ I.a PRESS the ISOLATE PB for the I/S Control Room Ventilation Train.
I. Smoke OR Toxic Gases are ENTERING the Control Room from an
Outside source.
Date/Time:
___ I.b PRESS the RECIRC PB for the I/S
CREF Unit.
PSEG Internal Use Only HC.OP-AB.HVAC-0002(Q) CONTROL ROOM ENVIRONMENT Hope Creek Page 3 of 20 Rev. 7 IMMEDIATE OPERATOR ACTIONS NONE AUTOMATIC ACTIONS IF THEN 2 x 10-5 Ci/cc (outside air supply) Control Room Ventilation Outside Air Dampers isolate. Control Room Emergency Filter Unit starts in Outside Air mode. Control Area Exhaust Fans trip.
Loss of Air Flow in the CREF SYS. Operating unit TRIPS and ISOLATES.
Loss of Air Flow in the Operating Control Room Supply Unit Operating Control Room Supply train trips Standby Control Room Supply train starts Control Room Emergency Filter Unit start (IF 2 x 10-5 Ci/cc outside air supply)
PSEG Internal Use Only HC.OP-AB.HVAC-0002(Q) CONTROL ROOM ENVIRONMENT Hope Creek Page 4 of 20 Rev. 7 RETAINMENT OVERRIDE CONDITION ACTION
___ I.a PRESS the ISOLATE PB for the I/S Control Room Ventilation Train.
I. Smoke OR Toxic Gases are ENTERING the Control Room from an Outside
source.
Date/Time:
___ I.b PRESS the RECIRC PB for the I/S
CREF Unit.
PSEG Internal Use Only HC.OP-AB.HVAC-0002(Q) CONTROL ROOM ENVIRONMENT Hope Creek Page 5 of 20 Rev. 7 LIST OF CONDITIONS A. Smoke OR Toxic Gases are detected in the Control Room air supply..................................7 B. CREF has started due to High Radiat ion in the Outside Air s upply.......................................7 C. Evacuation of the Cont rol Room is required..........................................................................
9
PSEG Internal Use Only HC.OP-AB.HVAC-0002(Q) CONTROL ROOM ENVIRONMENT Hope Creek Page 6 of 20 Rev. 7 RETAINMENT OVERRIDE CONDITION ACTION
___ I.a PRESS the ISOLATE PB for the I/S Control Room Ventilation Train.
I. Smoke OR Toxic Gases are ENTERING the Control Room from an Outside
source.
Date/Time:
___ I.b PRESS the RECIRC PB for the I/S
CREF Unit.
NOTES 1. Portable ELUs (Emergency Lighting Units) are located on elevation 54' of the Diesel Building for use during fire as necessary.
CAUTIONS: 1. Control Room personnel should not remove protective clothing OR respiratory equipment until Radiation Protection Department OR Site Protection has lifted the requirements.
ADDITIONAL INFORMATION
- Procedures: HC.OP-SO.GK-0001(Q), Control Area Ventilation System Operation.
PSEG Internal Use Only HC.OP-AB.HVAC-0002(Q) CONTROL ROOM ENVIRONMENT Hope Creek Page 7 of 20 Rev. 7 SUBSEQUENT OPERATOR ACTIONS CONDITION ACTION ___ A.1 NOTIFY Site Protection.
___ A.2 NOTIFY Salem Control Room
___ **NOTE 1** ___ A.3 DETERMINE source of Smoke or Toxic Gas. ___ CAUTION 1
___ A.4 DON Respiratory Equipment as necessary. A. Smoke OR Toxic Gases are detected in the Control Room air supply.
Date/Time:
___ A.5 WHEN the source of Smoke/Toxic Gas has been determined AND isolated, THEN VENTILATE the Control Room (GK). ___ B.1 REQUEST Radiation Protection to SURVEY the Control Room
AND Limit access as necessary.
___ CAUTION 1
___ B.2 DON Respiratory Equipment AND Protective Clothing as necessary. B. CREF has started due to High Radiation in the Outside Air supply.
Date/Time:
___ B.3 WHEN the source of High Radiation has been determined AND isolated THEN VENTILATE the Control Room (GK).
PSEG Internal Use Only HC.OP-AB.HVAC-0002(Q) CONTROL ROOM ENVIRONMENT Hope Creek Page 8 of 20 Rev. 7 RETAINMENT OVERRIDE CONDITION ACTION
___ I.a PRESS the ISOLATE PB for the I/S Control Room Ventilation Train.
I. Smoke OR Toxic Gases are ENTERING the Control Room from an Outside
source.
Date/Time:
___ I.b PRESS the RECIRC PB for the I/S
CREF Unit.
CAUTIONS: 2. Personnel safety should not be compromised to perform the following steps prior to evacuating the Control Room. Steps C.2, C.3 and C.4 are not mandatory prior to Control Room Evacuation. 3. Main Condenser vacuum should not be broken before Turbine speed lowers to less than 1200 RPM, except in Emergency Conditions.
ADDITIONAL INFORMATION
- Valves: AB-HV-F022A(B,C,D), INBD MSIV AB-HV-F028A(B,C,D) OUTBD MSIV AB-HV-F016, CTMT INBD STM LINE DRAIN HDR ISLN INBOARD VALVE AB-HV-F019, CTMT INBD STM LINE DRAIN HDR ISLN OUTBOARD VALVE BB-HV-F031A, RECIRC PUMP A DISCH VALVE BB-HV-F031B, RECIRC PUMP B DISCH VALVE 1-CG-HV-1972A/B/C, MAIN CONDENSER VACUUM BREAKERS
PSEG Internal Use Only HC.OP-AB.HVAC-0002(Q) CONTROL ROOM ENVIRONMENT Hope Creek Page 9 of 20 Rev. 7 SUBSEQUENT OPERATOR ACTIONS (continued)
CONDITION ACTION C.1 ___
___
___ PERFORM the following:
- a. REDUCE Recirc. Pump Speed to MINIMUM. b. LOCK the Mode Switch in SHUTDOWN.
- c. VERIFY Reactor Shutdown Status.
___ CAUTION 2
___ C.2 TRIP the Main Turbine AND LOCK OUT the Main Generator
. ___ C.3 CLOSE the MSIV's.
AND Steam Line Drains.
___ C.4 PERFORM the following:
___ TRIP the Reactor Recirculation Pumps, AND CLOSE BB-HV-F031A & B.
___ TRIP ALL Primary AND Secondary Condensate Pumps.
___ CAUTION 3
___ WHEN the Turbine is <1200 RPM OR PRIOR to Exiting the Control Room, OPEN HV-1972A/B/C to BREAK CONDENSER VACUUM: C. Evacuation of the Control Room is required.
Date/Time: ____________
(Continued on Page 11)
___ STOP Control Room HVAC fans A (B) VH-403 Control Room Supply Fans AND A (B) V-415 Control Room Return Air Fan. Continued on Page 11
PSEG Internal Use Only HC.OP-AB.HVAC-0002(Q) CONTROL ROOM ENVIRONMENT Hope Creek Page 10 of 20 Rev. 7 RETAINMENT OVERRIDE CONDITION ACTION
___ I.a PRESS the ISOLATE PB for the I/S Control Room Ventilation Train.
I. Smoke OR Toxic Gases are ENTERING the Control Room from an Outside
source.
Date/Time:
___ I.b PRESS the RECIRC PB for the I/S
CREF Unit.
CAUTIONS: 4. Conditions must be evaluated quickly and at the earliest opportunity.
The order to evacuate the Control Room must be made prior to a significant
deterioration in conditions.
NOTES: 2. The following actions are performed when init ially establishing control at the Remote Shutdown Panel prior to executing HC.OP-IO.ZZ-0008(Q).
- 3. IF the Reactor was NOT scrammed AND the MSIVs are still open, then the Feedwater System AND the Main Turbine Bypass Valves may be regulating Rx level AND Rx pressure at this time.
ADDITIONAL INFORMATION
- Procedures: HC.OP-IO.ZZ-0008(Q), Shutdown From Outside The Control Room.
Indications:
PR-7853D Reactor Vessel Pressure LR-7854 Reactor Vessel Level PSEG Internal Use Only HC.OP-AB.HVAC-0002(Q) CONTROL ROOM ENVIRONMENT Hope Creek Page 11 of 20 Rev. 7 SUBSEQUENT OPERATOR ACTIONS (continued)
CONDITION ACTION Continued from Page 9
___ CAUTION 4 ___ C.5 EVACUATE Main Control Room personnel AND TAKE the following:
___ SM key ring
___ EOP locker key (# 9)
___ C.6 ANNOUNCE on the Public Address System:
The Main Control Room has been EVACUATED.
___ C.7 PROCEED to the Remote Shutdown Panel.
___ C.8 REQUEST Communicators to report to the TSC to perform Notification calls.
___ **NOTE 2** ___ **NOTE 3** C.9 MONITOR the following Plant Parameters:
___ Reactor Pressure
___ Reactor Level C.10 PLACE the following RSP Panel Transfer
Switches to EMER:
___ Channel 'A' TRANSFER
___ Channel 'C' TRANSFER
___ Channel 'B' TRANSFER
___ Channel 'D' TRANSFER
___ Channel 'NON-1E' TRANSFER C. Evacuation of the Control Room is required.
(Continued from Page 9)
Continued on Page 13 PSEG Internal Use Only HC.OP-AB.HVAC-0002(Q) CONTROL ROOM ENVIRONMENT Hope Creek Page 12 of 20 Rev. 7 RETAINMENT OVERRIDE CONDITION ACTION
___ I.a PRESS the ISOLATE PB for the I/S Control Room Ventilation Train.
I. Smoke OR Toxic Gases are ENTERING the Control Room from an Outside
source.
Date/Time:
___ I.b PRESS the RECIRC PB for the I/S
CREF Unit.
CAUTIONS: 5. The high level trip may NOT function in the event a fire occurs in the relay room.
[CD-012Z] 6. To prevent RCIC Turbine exhaust piping and check valve vibrat ion problems, RCIC Turbine speed should be rapidly increased to 2150 rpm and maintained above 2150 rpm to prevent possible bearing damage. 7. The OPEN push button for the HV-F045 TURB STM SUP VLV must be held pressed until the valve is fully open.
NOTES: 4. Opening the 1AD417-10 breaker will shut down HPCI by closing the Turbine Stop Valve, Governor Valve, AND HPCI Pump Discharge Valve.
ADDITIONAL INFORMATION
- Procedures: HC.OP-IO.ZZ-0008(Q), Shutdown From Outside The Control Room.
Pumps/Valves:
0P219 VACUUM PUMP RCIC GLAND SEAL CONDENSER VAC PUMP HV-F046 LUBE OIL COOLER WTR ISLN VLV. FC-HV-4282 TURB TRIP THROT VLV Limitorque Operator. HV-F045 TURB STM SUP VLV HV-F013 RCIC FW ISLN MOV HV-F025 RCIC STM LINE DRN AOV HV-F004 RCIC VAC TANK LVL AOV HV-F022 RCIC TEST BYP TO CST MOV SI-4280-2 RCIC Turbine Speed FIC-4158 RCIC Pump Flow Controller PSEG Internal Use Only HC.OP-AB.HVAC-0002(Q) CONTROL ROOM ENVIRONMENT Hope Creek Page 13 of 20 Rev. 7 SUBSEQUENT OPERATOR ACTIONS (continued)
CONDITION ACTION Continued from Page 11
___ C.11
___ ___
___ C.12 ___ C.13 IF emergency takeover is successful, NOTIFY the Shift Manager that control has been established from the Remote Shutdown Panel.
- NOTE 4** CAUTION 5 WHEN HPCI is no longer required, OPEN 1AD417-10, HPCI RELAY VERT BD 10C620. IF RCIC operation is required, THEN VERIFY RCIC System auto initiation OR PLACE RCIC in service as follows:
___ a. ENSURE RCIC Flow Controller is set to 600 gpm AND AUTO is ON.
___ b. START 0P219. ___ c. OPEN HV-F046.
___ d. ENSURE FC-HV-4282 is OPEN.
___ CAUTION 6
___ CAUTION 7
- e. SIMULTANEOUSLY PERFORM the following:
___ PRESS AND HOLD HV-F045 OPEN PB UNTIL OPEN. ___ OPEN HV-F013.
- f. ENSURE the following:
___ HV-F025 is CLOSED
___ HV-F004 is CLOSED
___ HV-F022 is CLOSED
___ RCIC Turbine Speed of 2150 - 4500 rpm C. Evacuation of the Control Room is required.
(Continued from Page 11)
(Continued on Page 15)
Continued on Page 15
PSEG Internal Use Only HC.OP-AB.HVAC-0002(Q) CONTROL ROOM ENVIRONMENT Hope Creek Page 14 of 20 Rev. 7 RETAINMENT OVERRIDE CONDITION ACTION
___ I.a PRESS the ISOLATE PB for the I/S Control Room Ventilation Train.
I. Smoke OR Toxic Gases are ENTERING the Control Room from an Outside
source.
Date/Time:
___ I.b PRESS the RECIRC PB for the I/S
CREF Unit.
CAUTIONS: 8. Opening SRVs at low Reactor pressures (< 700 psig) may result in failure of SRVs to reclose when required.
NOTES: 5. During normal observed operation of the RCI C Turbine, Gland Seal Condenser Condensate Pump 0P220 cycles ON for 1.5 minutes of every 2.5 minutes. This run frequency maintains the collection tank within the 6.75 - 13.25 level band. 6. Different SRVs should be opened each time to evenly distribute the heat being added to the Suppression Chamber.
Procedures: HC.OP-IO.ZZ-0008(Q), Shutdown From Outside The Control Room.
Pumps/Valves: PSV-F013F(H, M) Safety/Relief Valve F(H,M)
PSEG Internal Use Only HC.OP-AB.HVAC-0002(Q) CONTROL ROOM ENVIRONMENT Hope Creek Page 15 of 20 Rev. 7 SUBSEQUENT OPERATOR ACTIONS (continued)
CONDITION ACTION ___ C.14 ___ ___ C.15 ___ C.16 ADJUST RCIC Flow Controller RAISE/LOWER SETPOINT as required to maintain Reactor
Level. **NOTE 5** WITH the RCIC Turbine in service, Approximately every 2.5 minutes PRESS AND HOLD 0P220 START PB for 1.5 min, THEN RELEASE the START push button.
MAKE a plant announcement stating the RCIC system is in service and for all personnel to stay
clear of the Torus Chamber area.
___ **NOTE 6** ___ CAUTION 8
___ C.17 ___ C.18 ENSURE Reactor Pressure 905-1045 psig utilizing PSV-F013F (H, M) OPEN and/or CLOSE
Pushbuttons.
ENTER IO.ZZ-0008(Q).
C. Evacuation of the Control Room is required.
(Continued from Page 13)
PSEG Internal Use Only HC.OP-AB.HVAC-0002(Q) CONTROL ROOM ENVIRONMENT Hope Creek Page 16 of 20 Rev. 7
This Page Intentionally Blank PSEG Internal Use Only HC.OP-AB.HVAC-0002(Q) CONTROL ROOM ENVIRONMENT Hope Creek Page 17 of 20 Rev. 7 COMPLETION AND REVIEW
1.0 COMPLETION AND REVIEW 1.1 EXPLAIN the entry Condition into the abnormal in the Comments Section. ___
1.2 ANNOTATE in the comments section all systems affected by the implementation of this procedure AND restoration actions (i.e. restoration line ups) completed/required. ___
1.3 ATTACH photocopies of any Hard Cards utilized as part of this procedure implementation to Attachment 1. ___
1.4 ENSURE the Exit time for any applicable conditions and this abnormal are annotated in the comment section
AND the Control Room Logs. ___ 1.5 FORWARD completed Portions of this procedure AND Sections 1 and 2 of Attachment 1 to SM/CRS for approval and Record Retention. ___
PSEG Internal Use Only HC.OP-AB.HVAC-0002(Q) CONTROL ROOM ENVIRONMENT Hope Creek Page 18 of 20 Rev. 7
This Page Intentionally Blank PSEG Internal Use Only HC.OP-AB.HVAC-0002(Q) CONTROL ROOM ENVIRONMENT Hope Creek Page 19 of 20 Rev. 7 ATTACHMENT 1 COMPLETION AND REVIEW Page 1 of 2
_______________________________________________________________________ _______________________________________________________________________
_______________________________________________________________________
_______________________________________________________________________
_______________________________________________________________________
_______________________________________________________________________
_______________________________________________________________________
_______________________________________________________________________
_______________________________________________________________________
_______________________________________________________________________
_______________________________________________________________________
_______________________________________________________________________
_______________________________________________________________________
_______________________________________________________________________
_______________________________________________________________________
_______________________________________________________________________
_______________________________________________________________________
_______________________________________________________________________
_______________________________________________________________________
_______________________________________________________________________
_______________________________________________________________________
PSEG Internal Use Only HC.OP-AB.HVAC-0002(Q) CONTROL ROOM ENVIRONMENT Hope Creek Page 20 of 20 Rev. 7 ATTACHMENT 1 COMPLETION AND REVIEW Page 2 of 2
2.0 SIGNATURES
Print Name Initials Signature Date __________________ ______ ________________________ _________ __________________ ______ ________________________ _________
__________________ ______ ________________________ _________
__________________ ______ ________________________ _________
__________________ ______ ________________________ _________
__________________ ______ ________________________ _________
Completion of this attachment is annotated in the Control Room Logs:
Printed Name Signature Date/Time 3.0 SM/CRS FINAL REVIEW AND APPROVAL:
This procedure and Attachment 1 have been reviewed for completeness and accuracy.
Entry/Exit conditions and all deficiencies, incl uding corrective actions, are clearly recorded in the COMMENTS Section above.
Printed Name Signature Date/Time
4.0 RECORDS
4.1 RETAIN the following in accordance with RM-AA-101 Records Management Program: Procedure cover page Affected Conditions and Hard Cards performed Completion and Review section Attachment 1
PSEG Internal Use Only HC.OP-AB.HVAC-0002(Q) CONTROL ROOM ENVIRONMENT Hope Creek Page 1 of 1 Rev. 7 Packages and Affected Document Numbers incorporated into this revision: CP No. CP Rev. AD No. Rev No. None The following OPEX were incorporated into this revision: None The following OTSCs were incorporated into this revision: None REVISION
SUMMARY
70108592-0020 Added new Subsequent Action C.12 to OPEN the HPCI RELAY VERT BD Breaker when HPCI is no longer required.
Added Subsequent Action C - CAUTION #5 to Aler t that the high level may NOT function in the event a fire occurs in the Relay Room.
Added Subsequent Action C - NOTE #4 to inform that the HPCI RELAY VERT BD Breaker will shut down HPCI by closing the Turbine Stop Valve, Governor Valve, and HPCI Pump Discharge Valve.
70107332-0020 Added Subsequent Action C.11 to inform the Shift Manager that control has been established at the RSP.
IMPLEMENTATION REQUIREMENTS: