ML040080443
Letter Sequence Other | |
---|---|
TAC:MB9896, (Approved, Closed) | |
Initiation
Administration | |
MONTHYEARML0319005882003-07-0909 July 2003
[Table View]FRN: General Notice: Salem Nuclear Generating Station, Unit No. 2, Application for Amendment to Facility Operating License Request for Change to License Condition 2.C.10, Fire Protection Project stage: Other ML0330802832003-11-0404 November 2003 Request for Additional Information Request for Changes to License Condition 2.C.10 Project stage: RAI ML0400804432004-01-0707 January 2004 Tech Spec Pages for License Amendment, Request for Changes to License Condition 2.C.(10) Project stage: Other ML0400702912004-01-0707 January 2004 License Amendment, Issuance of Amendment, Request for Changes to License Condition 2.C.(10) Project stage: Approval 2003-07-09 |
ML040080443 | |
Person / Time | |
---|---|
Site: | Salem ![]() |
Issue date: | 01/07/2004 |
From: | Robert Fretz NRC/NRR/DLPM/LPD1 |
To: | Richard Anderson Public Service Enterprise Group |
Shared Package | |
ML040070361 | List: |
References | |
TAC MB9896 | |
Download: ML040080443 (1) | |
Similar Documents at Salem | |
---|---|
Category:Technical Specification
MONTHYEARLR-N23-0005, License Amendment Request to Amend Technical Specifications (TS) 6.8.4.f for Permanent Extension of Type a and Type C Leak Rate Test Frequencies2023-06-23023 June 2023
[Table view]License Amendment Request to Amend Technical Specifications (TS) 6.8.4.f for Permanent Extension of Type a and Type C Leak Rate Test Frequencies ML22270A3172022-09-27027 September 2022 Submittal of Technical Specification Bases Changes, Amendment No. 201 LR-N22-0078, Submittal of Technical Specification Bases Changes, Amendment No. 2152022-09-27027 September 2022 Submittal of Technical Specification Bases Changes, Amendment No. 215 LR-N21-0078, Hope and Creek Generating Station, Supplement to License Amendment Request to Revise Technical Specifications (TS) to Delete Definitions Found in 10 CFR Part 20 and Delete Figures of the Site and Surrounding Areas from TS2021-11-18018 November 2021 Hope and Creek Generating Station, Supplement to License Amendment Request to Revise Technical Specifications (TS) to Delete Definitions Found in 10 CFR Part 20 and Delete Figures of the Site and Surrounding Areas from TS LR-N21-0048, One-Time License Amendment Request to Revise Unit 2 Technical Specification Action for Rod Position Indicators2021-06-18018 June 2021 One-Time License Amendment Request to Revise Unit 2 Technical Specification Action for Rod Position Indicators LR-N21-0045, Submittal of Changes to Technical Specifications Bases2021-06-16016 June 2021 Submittal of Changes to Technical Specifications Bases LR-N21-0006, Application to Revise Technical Specifications to Adopt TSTF-569 Revision of Response Time Testing Definitions2021-02-16016 February 2021 Application to Revise Technical Specifications to Adopt TSTF-569 Revision of Response Time Testing Definitions LR-N20-0072, License Amendment Request to Amend Tech Specs to Revise and Relocate the Reactor Coolant System Pressure & Temperature Limits & Pressurizer Overpressure Protection System Limits to a Pressure & Temperature Limits Report2020-12-0606 December 2020 License Amendment Request to Amend Tech Specs to Revise and Relocate the Reactor Coolant System Pressure & Temperature Limits & Pressurizer Overpressure Protection System Limits to a Pressure & Temperature Limits Report LR-N20-0003, License Amendment Request to Adopt TSTF-490, Deletion of E-Bar Definition and Revision to RCS Specific Activity Tech Spec2020-09-17017 September 2020 License Amendment Request to Adopt TSTF-490, Deletion of E-Bar Definition and Revision to RCS Specific Activity Tech Spec ML17157B2652017-05-0909 May 2017 Submittal of Hope Creek Generating Station Updated Final Safety Analysis Report, Revision 22, Hope Creek Technical Specification Bases Changes, 10CFR54.37(b) Review Results for Hope Creek and PSEG Nuclear LLC Quality Assurance Topical Repor LR-N17-0088, Submittal of Hope Creek Generating Station Updated Final Safety Analysis Report, Revision 22, Hope Creek Technical Specification Bases Changes, 10CFR54.37(b) Review Results for Hope Creek and Pseg Nuclear LLC Quality Assurance Topical Re2017-05-0909 May 2017 Submittal of Hope Creek Generating Station Updated Final Safety Analysis Report, Revision 22, Hope Creek Technical Specification Bases Changes, 10CFR54.37(b) Review Results for Hope Creek and Pseg Nuclear LLC Quality Assurance Topical Repor LR-N17-0034, Salem Generating Station, Units 1 & 2, Submittal of Revision 29 to Updated Final Safety Analysis Report, and Technical Specification Bases Changes and Quality Assurance Topical Report, NO-AA-10, Rev. 852017-01-30030 January 2017 Salem Generating Station, Units 1 & 2, Submittal of Revision 29 to Updated Final Safety Analysis Report, and Technical Specification Bases Changes and Quality Assurance Topical Report, NO-AA-10, Rev. 85 ML17046A2292017-01-30030 January 2017 Submittal of Revision 29 to Updated Final Safety Analysis Report, and Technical Specification Bases Changes and Quality Assurance Topical Report, NO-AA-10, Rev. 85 LR-N16-0003, License Amendment Request to Amend the Accident Monitoring Instrumentation Technical Specifications2016-11-17017 November 2016 License Amendment Request to Amend the Accident Monitoring Instrumentation Technical Specifications LR-N16-0114, License Amendment Request to Revise Technical Specifications to Adopt TSTF-545, Revision 3, TS Lnservice Testing Program Removal & Clarify SR Usage Rule Application to Section 5.5 Testing Using the Consolidated Line .2016-08-30030 August 2016 License Amendment Request to Revise Technical Specifications to Adopt TSTF-545, Revision 3, TS Lnservice Testing Program Removal & Clarify SR Usage Rule Application to Section 5.5 Testing Using the Consolidated Line . LR-N15-0187, Emergency License Amendment Request to Remove Pressurizer Power Operated Relief Valve (PORV) Position Indication Instrumentation from the Accident Monitoring Instrumentation Technical Specifications2015-08-31031 August 2015 Emergency License Amendment Request to Remove Pressurizer Power Operated Relief Valve (PORV) Position Indication Instrumentation from the Accident Monitoring Instrumentation Technical Specifications LR-N15-0021, License Amendment Request Regarding Replacement of Source Range and Intermediate Range Neutron Monitoring Systems2015-04-0303 April 2015 License Amendment Request Regarding Replacement of Source Range and Intermediate Range Neutron Monitoring Systems LR-N15-0020, License Amendment Request to Revise Technical Specification 3/4.3.1, Reactor Trip System Instrumentation2015-03-27027 March 2015 License Amendment Request to Revise Technical Specification 3/4.3.1, Reactor Trip System Instrumentation ML14210A4842014-07-28028 July 2014 License Amendment Request to Revise Technical Specifications to Adopt TSTF-510, Revision 2, Revision to Steam Generator Program Inspection Frequencies and Tube Sample Selection Using the Consolidated Line Item Improvement Process ML1118615602011-07-28028 July 2011 and Salem Nuclear Generating Station, Unit Nos. 1 and 2, License Amendment, Issuance of Amendments Approval of Cyber Security Plan LR-N11-0056, Supplement to Application for Technical Specification Change Regarding Risk-Informed Justification for the Relocation of Specific Surveillance Frequency Requirements to a Licensee Controlled Program2011-02-23023 February 2011 Supplement to Application for Technical Specification Change Regarding Risk-Informed Justification for the Relocation of Specific Surveillance Frequency Requirements to a Licensee Controlled Program LR-N10-0355, Attachment 3 to LR-N10-0355, Hope Creek Generating Station, Emergency Action Level Comparison Matrix2010-10-14014 October 2010 Attachment 3 to LR-N10-0355, Hope Creek Generating Station, Emergency Action Level Comparison Matrix LR-N10-0355, Attachment 1 to LR-N10-0355, Hope Creek Generating Station, Emergency Action Level Technical Bases Document (Strike-out Version)2010-10-14014 October 2010 Attachment 1 to LR-N10-0355, Hope Creek Generating Station, Emergency Action Level Technical Bases Document (Strike-out Version) ML1100503982010-10-14014 October 2010 Attachment 3 to LR-N10-0355, Hope Creek Generating Station, Emergency Action Level Comparison Matrix LR-N10-0355, Hope Creek, CY-AA-170-500, Revision 0, Meteorological Monitoring System Calibration and Maintenance2010-10-14014 October 2010 Hope Creek, CY-AA-170-500, Revision 0, Meteorological Monitoring System Calibration and Maintenance ML1100504152010-10-14014 October 2010 Hope Creek, CY-AA-170-500, Revision 0, Meteorological Monitoring System Calibration and Maintenance LR-N10-0355, Attachment 2 to LR-N10-0355, Hope Creek Generating Station, Emergency Action Level Technical Bases Document (Clean Version)2010-10-14014 October 2010 Attachment 2 to LR-N10-0355, Hope Creek Generating Station, Emergency Action Level Technical Bases Document (Clean Version) LR-N10-0355, Attachment 4 to LR-N10-0355, Hope Creek Generating Station, Emergency Action Level Technical Bases Supporting Documents (Cd with Paper Index)2010-10-14014 October 2010 Attachment 4 to LR-N10-0355, Hope Creek Generating Station, Emergency Action Level Technical Bases Supporting Documents (Cd with Paper Index) ML1100503992010-10-14014 October 2010 Attachment 4 to LR-N10-0355, Hope Creek Generating Station, Emergency Action Level Technical Bases Supporting Documents (Cd with Paper Index) ML1100503752010-10-14014 October 2010 Attachment 1 to LR-N10-0355, Hope Creek Generating Station, Emergency Action Level Technical Bases Document (Strike-out Version) ML1100504022010-10-14014 October 2010 Attachment 2 to LR-N10-0355, Hope Creek Generating Station, Emergency Action Level Technical Bases Document (Clean Version) ML1025802412010-09-0808 September 2010 License Amendment Request S10-01 Application for Technical Specification Change Regarding Risk-Informed Justification for the Relocation of Specific Surveillance Frequency Requirements to a Licensee Controlled Program ML1100505182010-08-24024 August 2010 Hope Creek, HC.OP-AB.ZZ-0150(Q), Rev. 6, 125VDC System Malfunction LR-N10-0355, Hope Creek, HC.OP-AB.ZZ-0150(Q), Rev. 6, 125VDC System Malfunction2010-08-24024 August 2010 Hope Creek, HC.OP-AB.ZZ-0150(Q), Rev. 6, 125VDC System Malfunction LR-N10-0355, Hope Creek, HC.OP-AB.HVAC-0002(Q), Rev. 7, Control Room Environment2010-07-13013 July 2010 Hope Creek, HC.OP-AB.HVAC-0002(Q), Rev. 7, Control Room Environment ML1100505002010-07-13013 July 2010 Hope Creek, HC.OP-AB.HVAC-0002(Q), Rev. 7, Control Room Environment LR-N10-0355, Hope Creek, HC.OP-AB.RPV-0009(Q), Rev. 7, Shutdown Cooling2010-06-24024 June 2010 Hope Creek, HC.OP-AB.RPV-0009(Q), Rev. 7, Shutdown Cooling ML1100505162010-06-24024 June 2010 Hope Creek, HC.OP-AB.RPV-0009(Q), Rev. 7, Shutdown Cooling LR-N10-0355, Hope Creek, HC.OP-AB.CONT-0002(Q), Rev. 9, Containment2010-05-0303 May 2010 Hope Creek, HC.OP-AB.CONT-0002(Q), Rev. 9, Containment ML1100504772010-05-0303 May 2010 Hope Creek, HC.OP-AB.CONT-0002(Q), Rev. 9, Containment LR-N10-0355, Hope Creek, HC.OP-AB.RPV-0003(Q), Rev. 21, Recirculation System/Power Oscillations2010-04-21021 April 2010 Hope Creek, HC.OP-AB.RPV-0003(Q), Rev. 21, Recirculation System/Power Oscillations ML1100505052010-04-21021 April 2010 Hope Creek, HC.OP-AB.MISC-0002(Q), Rev. 10, Crids/Overhead Annunciators/Ppc Computer LR-N10-0355, Hope Creek, HC.OP-AB.MISC-0002(Q), Rev. 10, Crids/Overhead Annunciators/Ppc Computer2010-04-21021 April 2010 Hope Creek, HC.OP-AB.MISC-0002(Q), Rev. 10, Crids/Overhead Annunciators/Ppc Computer ML1100505062010-04-21021 April 2010 Hope Creek, HC.OP-AB.RPV-0003(Q), Rev. 21, Recirculation System/Power Oscillations LR-N10-0355, Hope Creek, Offsite Dose Calculation Manual, Revision 252010-04-16016 April 2010 Hope Creek, Offsite Dose Calculation Manual, Revision 25 ML1100504172010-04-16016 April 2010 Hope Creek, Offsite Dose Calculation Manual, Revision 25 ML1100504742010-03-17017 March 2010 Hope Creek, HC.IC-GP.BB-0003(Q) - Rev. 17, Nuclear Boiler - Nondivisional Channel L-11683/B21-N027 Rx Cavity Flood Up Level/Rx Shutdown Range Level Setup LR-N10-0355, Hope Creek, HC.IC-GP.BB-0003(Q) - Rev. 17, Nuclear Boiler - Nondivisional Channel L-11683/B21-N027 Rx Cavity Flood Up Level/Rx Shutdown Range Level Setup2010-03-17017 March 2010 Hope Creek, HC.IC-GP.BB-0003(Q) - Rev. 17, Nuclear Boiler - Nondivisional Channel L-11683/B21-N027 Rx Cavity Flood Up Level/Rx Shutdown Range Level Setup LR-N10-0355, Hope Creek, HC.OP-AB.MISC-0001(Q), Rev. 15, Acts of Nature2010-03-0505 March 2010 Hope Creek, HC.OP-AB.MISC-0001(Q), Rev. 15, Acts of Nature ML1100505022010-03-0505 March 2010 Hope Creek, HC.OP-AB.MISC-0001(Q), Rev. 15, Acts of Nature 2023-06-23 Category:Amendment MONTHYEARLR-N23-0005, License Amendment Request to Amend Technical Specifications (TS) 6.8.4.f for Permanent Extension of Type a and Type C Leak Rate Test Frequencies2023-06-23023 June 2023
[Table view]License Amendment Request to Amend Technical Specifications (TS) 6.8.4.f for Permanent Extension of Type a and Type C Leak Rate Test Frequencies LR-N21-0048, One-Time License Amendment Request to Revise Unit 2 Technical Specification Action for Rod Position Indicators2021-06-18018 June 2021 One-Time License Amendment Request to Revise Unit 2 Technical Specification Action for Rod Position Indicators LR-N21-0006, Application to Revise Technical Specifications to Adopt TSTF-569 Revision of Response Time Testing Definitions2021-02-16016 February 2021 Application to Revise Technical Specifications to Adopt TSTF-569 Revision of Response Time Testing Definitions LR-N20-0072, License Amendment Request to Amend Tech Specs to Revise and Relocate the Reactor Coolant System Pressure & Temperature Limits & Pressurizer Overpressure Protection System Limits to a Pressure & Temperature Limits Report2020-12-0606 December 2020 License Amendment Request to Amend Tech Specs to Revise and Relocate the Reactor Coolant System Pressure & Temperature Limits & Pressurizer Overpressure Protection System Limits to a Pressure & Temperature Limits Report LR-N15-0020, License Amendment Request to Revise Technical Specification 3/4.3.1, Reactor Trip System Instrumentation2015-03-27027 March 2015 License Amendment Request to Revise Technical Specification 3/4.3.1, Reactor Trip System Instrumentation ML1118615602011-07-28028 July 2011 and Salem Nuclear Generating Station, Unit Nos. 1 and 2, License Amendment, Issuance of Amendments Approval of Cyber Security Plan LR-N09-0034, License Amendment Request to Relocate Communications, Manipulator Crane, and Crane Travel Requirements from Technical Specifications2009-04-0909 April 2009 License Amendment Request to Relocate Communications, Manipulator Crane, and Crane Travel Requirements from Technical Specifications LR-N08-0046, Request for Changes to Technical Specifications Refueling Operations - Decay Time, License Amendment Request (LAR) S08-012008-03-11011 March 2008 Request for Changes to Technical Specifications Refueling Operations - Decay Time, License Amendment Request (LAR) S08-01 ML0715901852007-06-0606 June 2007 Units, 1 and 2, Tech Spec Pages for Amendment 265 Relocation of Technical Specification Requirements for the Movable Incore Detectors and Radioactive Gaseous Effluent Oxygen Monitoring Instrumentation LR-N07-0030, License Change Request S06-010, Steam Generator Feedwater Pump Trip, Feedwater Isolation Valve Response Time Testing and Containment Cooling System2007-03-16016 March 2007 License Change Request S06-010, Steam Generator Feedwater Pump Trip, Feedwater Isolation Valve Response Time Testing and Containment Cooling System ML0701900942007-01-11011 January 2007 License Amendment Request 07-01, Revision to Technical Specifications to Support Steam Generator Replacement LR-N06-0201, Request for Change to Technical Specifications to Eliminate Requirements for Hydrogen Recombiners and Hydrogen Analyzers Using the Consolidated Line Item Improvement Process2006-06-0707 June 2006 Request for Change to Technical Specifications to Eliminate Requirements for Hydrogen Recombiners and Hydrogen Analyzers Using the Consolidated Line Item Improvement Process LR-N06-0055, Request for Change to Technical Specifications to Add Requirements for Steam Generator Tube Integrity, Steam Generator Program and Steam Generator Tube Inspection Report and to Revise Reactor Coolant System Operational Leakage Requiremen2006-04-0606 April 2006 Request for Change to Technical Specifications to Add Requirements for Steam Generator Tube Integrity, Steam Generator Program and Steam Generator Tube Inspection Report and to Revise Reactor Coolant System Operational Leakage Requirements ML0601300252006-01-11011 January 2006 Technical Specifications Deletion of Reactor Coolant System Volume ML0525600402005-09-0909 September 2005 Units, 1 and 2 - Tech Spec Pages for Amendments 265 and 247 to Extend the Inspection Interval for Reactor Coolant Pump Flywheels LR-N05-0377, Revision to Request for Changes to Technical Specifications Containment Systems - Containment Cooling System2005-08-11011 August 2005 Revision to Request for Changes to Technical Specifications Containment Systems - Containment Cooling System LR-N05-0018, Request for Change to Technical Specifications to Add Requirements for Steam Generator Tube Integrity, Steam Generator Program, & Steam Generator Tube Inspection Report & to Revise Reactor Coolant System Operational.2005-02-23023 February 2005 Request for Change to Technical Specifications to Add Requirements for Steam Generator Tube Integrity, Steam Generator Program, & Steam Generator Tube Inspection Report & to Revise Reactor Coolant System Operational. LR-N04-0021, Units I and 2 - Implementation of Alternative Source Term (AST) Request for Changes to Technical Specifications and Updated Final Safety Analysis Report2004-04-26026 April 2004 Units I and 2 - Implementation of Alternative Source Term (AST) Request for Changes to Technical Specifications and Updated Final Safety Analysis Report ML0400804432004-01-0707 January 2004 Tech Spec Pages for License Amendment, Request for Changes to License Condition 2.C.(10) LR-N03-0092, Request for Change to TSs Explosive Gas Mixture2003-06-0606 June 2003 Request for Change to TSs Explosive Gas Mixture LR-N03-0022, Revision to Request for Change to Technical Specifications2003-02-14014 February 2003 Revision to Request for Change to Technical Specifications LR-N03-0014, Request for Change to Technical Specifications Administrative and Editorial Changes2003-01-29029 January 2003 Request for Change to Technical Specifications Administrative and Editorial Changes LR-N02-0344, Request for Change to Technical Specifications Revise Section 6.12, High Radiation Area.2002-10-23023 October 2002 Request for Change to Technical Specifications Revise Section 6.12, High Radiation Area. ML0200702422002-01-0404 January 2002 TS Pages to Amendment 249 & 229 Change to Technical Specifications 28 Volt D.C. Distribution 2023-06-23 |
Text
(d) Complete and auditable records must be available and maintained at a central location which describe the environmental qualification method used for all safety-related electrical equipment in sufficient detail to document the degree of compliance with the DOR Guidelines or NUREG-0588. Such records should be updated and maintained current as equipment is replaced, further tested, or otherwise further qualified to document complete compliance by June 30, 1982.
(e) Within 90 days of receipt of the equipment qualification safety evaluation, the licensee shall either (i) provide missing documentation identified in Sections 3 and 4 of the equipment qualification safety evaluation which will demonstrate compliance of the applicable equipment with NUREG-0588, or (ii) commit to corrective actions which will result in documentation of compliance of applicable equipment with NUREG-0588 not later than June 30, 1982.
(10) Fire Protection PSEG Nuclear LLC shall implement and maintain in effect all provisions of the approved fire protection program as described in the Updated Final Safety Analysis Report, as approved in the NRC Safety Evaluation Report, dated November 20, 1979, and in its supplements, and in the NRC Safety Evaluation dated January 7, 2004, subject to the following provision:
PSEG Nuclear LLC may make changes to the approved fire protection program without prior approval of the Commission only if those changes would not adversely affect the ability to achieve and maintain safe shutdown in the event of a fire.
Amendment No. 242