Category:Letter type:LR
MONTHYEARLR-N23-0079, Special Report 23-02-00 Pursuant to the Requirements of Salem Unit 1 Technical Specification 3.3.3.7, Action 10, for the Unit 1 Main Steam Line Rad Monitor Inoperable for Greater than Seven Days2023-12-0707 December 2023 Special Report 23-02-00 Pursuant to the Requirements of Salem Unit 1 Technical Specification 3.3.3.7, Action 10, for the Unit 1 Main Steam Line Rad Monitor Inoperable for Greater than Seven Days LR-N23-0077, Loss of Coolant Accident Peak Cladding Temperature Margin Tracking - Annual Report 2023 & 30 Day Report for Salem Unit 1 Upflow Conversion2023-11-29029 November 2023 Loss of Coolant Accident Peak Cladding Temperature Margin Tracking - Annual Report 2023 & 30 Day Report for Salem Unit 1 Upflow Conversion LR-N23-0072, Core Operating Limits Report Cycle 302023-11-0101 November 2023 Core Operating Limits Report Cycle 30 LR-N23-0045, and Peach Bottom Atomic Power Station, Units 2 and 3 - Notice of Proposed Amendment to Decommissioning Trust Agreement2023-09-0808 September 2023 and Peach Bottom Atomic Power Station, Units 2 and 3 - Notice of Proposed Amendment to Decommissioning Trust Agreement LR-N23-0055, Special Report 272/23-01-00, Pursuant to the Requirements of Technical Specification 3.3.3.1, Action 23, for the Vent Noble Gas Rad Monitor Inoperable for Greater than Seven Days2023-08-0303 August 2023 Special Report 272/23-01-00, Pursuant to the Requirements of Technical Specification 3.3.3.1, Action 23, for the Vent Noble Gas Rad Monitor Inoperable for Greater than Seven Days LR-N23-0054, In-Service Inspection Activities2023-07-26026 July 2023 In-Service Inspection Activities LR-N23-0046, Emergency Plan Document Revisions Implemented June 28, 20232023-07-10010 July 2023 Emergency Plan Document Revisions Implemented June 28, 2023 LR-N23-0005, License Amendment Request to Amend Technical Specifications (TS) 6.8.4.f for Permanent Extension of Type a and Type C Leak Rate Test Frequencies2023-06-23023 June 2023 License Amendment Request to Amend Technical Specifications (TS) 6.8.4.f for Permanent Extension of Type a and Type C Leak Rate Test Frequencies LR-N23-0035, 2022 Annual Radioactive Effluent Release Report (ARERR)2023-04-27027 April 2023 2022 Annual Radioactive Effluent Release Report (ARERR) LR-N23-0034, 2022 Annual Radiological Environmental Operating Report (AREOR) - Salem Nuclear Generating Station, Unit Nos. 1 and 2 and Hope Creek Generating Station2023-04-27027 April 2023 2022 Annual Radiological Environmental Operating Report (AREOR) - Salem Nuclear Generating Station, Unit Nos. 1 and 2 and Hope Creek Generating Station LR-N23-0033, Core Operating Limits Report Cycle 272023-04-26026 April 2023 Core Operating Limits Report Cycle 27 LR-N23-0010, License Amendment Request Revision of Technical Specification (TS) to Delete TS Section 5.5 - Meteorological Tower Location2023-04-21021 April 2023 License Amendment Request Revision of Technical Specification (TS) to Delete TS Section 5.5 - Meteorological Tower Location LR-N23-0006, Report on Status of Decommissioning Funding for Reactors and Independent Spent Fuel Storage Installations2023-03-24024 March 2023 Report on Status of Decommissioning Funding for Reactors and Independent Spent Fuel Storage Installations LR-N23-0019, and Salem Generating Station, Units 1 and 2 - Guarantees of Payment of Deferred Premiums2023-03-21021 March 2023 and Salem Generating Station, Units 1 and 2 - Guarantees of Payment of Deferred Premiums LR-N23-0016, and Salem Generating Station, Units 1 and 2 - Report of Changes, Tests, and Experiments2023-02-28028 February 2023 and Salem Generating Station, Units 1 and 2 - Report of Changes, Tests, and Experiments LR-N23-0012, Annual Property Insurance Status Report2023-02-24024 February 2023 Annual Property Insurance Status Report LR-N23-0014, Stations Submittal of 2022 Annual Report of Fitness for Duty Performance Data Per 10 CFR 26.203(e) and 10 CFR 26.7172023-02-23023 February 2023 Stations Submittal of 2022 Annual Report of Fitness for Duty Performance Data Per 10 CFR 26.203(e) and 10 CFR 26.717 LR-N23-0003, Response to Requests for Additional Information Salem Unit 2 Relief Request S2-I4R-2112023-02-0101 February 2023 Response to Requests for Additional Information Salem Unit 2 Relief Request S2-I4R-211 LR-N22-0096, and Salem Generating Station, Units 1 and 2 - Request for Threshold Determination2023-01-0505 January 2023 and Salem Generating Station, Units 1 and 2 - Request for Threshold Determination LR-N22-0095, Loss of Coolant Accident Peak Cladding Temperature Margin Tracking - Annual Report 20222022-12-20020 December 2022 Loss of Coolant Accident Peak Cladding Temperature Margin Tracking - Annual Report 2022 LR-N22-0094, Emergency Plan Document Revisions Implemented November 21, 20222022-12-14014 December 2022 Emergency Plan Document Revisions Implemented November 21, 2022 LR-N22-0092, Response to Final Iolb Request for Additional Information for Salem LAR to Revise TS to Extend Allowed Outage Time for Inoperable EDG2022-12-0909 December 2022 Response to Final Iolb Request for Additional Information for Salem LAR to Revise TS to Extend Allowed Outage Time for Inoperable EDG LR-N22-0091, Independent Spent Fuel Storage Installation, Report of 10 CFR 72.48 Changes, Tests, and Experiments2022-12-0202 December 2022 Independent Spent Fuel Storage Installation, Report of 10 CFR 72.48 Changes, Tests, and Experiments LR-N22-0084, Response to Final Request for Additional Information for Salem LAR to Revise TS to Extend Allowed Outage Time for Inoperable EDG (EPID L- 2022-LLA-0095)2022-11-17017 November 2022 Response to Final Request for Additional Information for Salem LAR to Revise TS to Extend Allowed Outage Time for Inoperable EDG (EPID L- 2022-LLA-0095) LR-N22-0090, Supplement to Submittal of Salem Generating Station Updated FSAR, Revision 33, 10 CFR 71.106 Review Results and 10 CFR 54.37(b) Review Results for Salem2022-11-10010 November 2022 Supplement to Submittal of Salem Generating Station Updated FSAR, Revision 33, 10 CFR 71.106 Review Results and 10 CFR 54.37(b) Review Results for Salem LR-N22-0065, Submittal of Relief Request Associated with the Fourth Inservice Inspection (ISI) Interval Limited Examinations2022-09-27027 September 2022 Submittal of Relief Request Associated with the Fourth Inservice Inspection (ISI) Interval Limited Examinations LR-N22-0074, Emergency Plan Evacuation Time Estimate2022-09-15015 September 2022 Emergency Plan Evacuation Time Estimate LR-N22-0066, License Amendment Request (LAR) to Relocate Technical Specifications (TS) Requirements for Reactor Head Vents to the Technical Requirements Manual (TRM)2022-08-31031 August 2022 License Amendment Request (LAR) to Relocate Technical Specifications (TS) Requirements for Reactor Head Vents to the Technical Requirements Manual (TRM) LR-N22-0063, Spent Fuel Cask Registration2022-08-10010 August 2022 Spent Fuel Cask Registration LR-N22-0068, In-Service Inspection Activities - 90-Day Report2022-08-10010 August 2022 In-Service Inspection Activities - 90-Day Report LR-N22-0012, License Amendment Request to Amend the Technical Specifications to Revise and Relocate the Reactor Coolant System Pressure and Temperature Limits and Pressurizer Overpressure Protection System Limits to a Pressure and Temperature2022-08-0707 August 2022 License Amendment Request to Amend the Technical Specifications to Revise and Relocate the Reactor Coolant System Pressure and Temperature Limits and Pressurizer Overpressure Protection System Limits to a Pressure and Temperature LR-N22-0062, Spent Fuel Cask Registration2022-07-21021 July 2022 Spent Fuel Cask Registration LR-N22-0006, License Amendment Request (LAR) to Amend Salem Unit 1 and Unit 2 Technical Specifications (TS) to Extend the Allowed Outage Time for an Inoperable Emergency Diesel Generator from 72 Hours to 14 Days2022-06-29029 June 2022 License Amendment Request (LAR) to Amend Salem Unit 1 and Unit 2 Technical Specifications (TS) to Extend the Allowed Outage Time for an Inoperable Emergency Diesel Generator from 72 Hours to 14 Days LR-N22-0051, License Amendment Request to Relocate Technical Specification Facility/Unit Staff Qualification Requirements to Quality Assurance Topical Report2022-06-22022 June 2022 License Amendment Request to Relocate Technical Specification Facility/Unit Staff Qualification Requirements to Quality Assurance Topical Report LR-N22-0044, Emergency Plan Document Revisions Implemented November, 20212022-05-19019 May 2022 Emergency Plan Document Revisions Implemented November, 2021 LR-N22-0043, Core Operating Limits Report - Cycle 292022-05-0909 May 2022 Core Operating Limits Report - Cycle 29 LR-N22-0041, 2021 Annual Radioactive Effluent Release Report (Rerr)2022-04-28028 April 2022 2021 Annual Radioactive Effluent Release Report (Rerr) LR-N22-0040, 2021 Annual Radiological Environmental Operating Report2022-04-28028 April 2022 2021 Annual Radiological Environmental Operating Report LR-N22-0039, Emergency Plan Document Revisions Implemented March 24, 20222022-04-21021 April 2022 Emergency Plan Document Revisions Implemented March 24, 2022 LR-N21-0052, Request for Relief from ASME Code Defect Removal for Service Water Buried Piping2022-04-0707 April 2022 Request for Relief from ASME Code Defect Removal for Service Water Buried Piping LR-N22-0023, Guarantees of Payment of Deferred Premiums2022-03-21021 March 2022 Guarantees of Payment of Deferred Premiums LR-N22-0022, Response to Request for Additional Information Relief Request S1-14R-210, Alternative Examination of Welds2022-03-21021 March 2022 Response to Request for Additional Information Relief Request S1-14R-210, Alternative Examination of Welds LR-N22-0017, Submittal of 2021 Annual Report of Fitness for Duty (FFD) Performance Data2022-02-25025 February 2022 Submittal of 2021 Annual Report of Fitness for Duty (FFD) Performance Data LR-N22-0016, Radiological Survey of Site Property to Be Used for Offshore Wind Port Facility2022-02-24024 February 2022 Radiological Survey of Site Property to Be Used for Offshore Wind Port Facility LR-N22-0013, In-Service Inspection Activities - 90-Day Report2022-02-10010 February 2022 In-Service Inspection Activities - 90-Day Report LR-N22-0007, Request for Exemption from Specific Requirements of 10 CFR Part 26, Fitness for Duty Programs2022-01-0505 January 2022 Request for Exemption from Specific Requirements of 10 CFR Part 26, Fitness for Duty Programs LR-N21-0061, Annual Report of Specific Activity Analysis - TS 6.9.1.5c2021-12-0909 December 2021 Annual Report of Specific Activity Analysis - TS 6.9.1.5c LR-N21-0083, Loss of Coolant Accident Peak Cladding Temperature Margin Tracking - Annual Report 2021 & 30 Day Report for Salem Unit 2 Upflow Conversion2021-11-24024 November 2021 Loss of Coolant Accident Peak Cladding Temperature Margin Tracking - Annual Report 2021 & 30 Day Report for Salem Unit 2 Upflow Conversion LR-N21-0078, Hope and Creek Generating Station, Supplement to License Amendment Request to Revise Technical Specifications (TS) to Delete Definitions Found in 10 CFR Part 20 and Delete Figures of the Site and Surrounding Areas from TS2021-11-18018 November 2021 Hope and Creek Generating Station, Supplement to License Amendment Request to Revise Technical Specifications (TS) to Delete Definitions Found in 10 CFR Part 20 and Delete Figures of the Site and Surrounding Areas from TS LR-N21-0066, Submittal of Relief Request Associated with the Fourth Inservice Inspection (ISI) Interval Limited Examinations2021-11-10010 November 2021 Submittal of Relief Request Associated with the Fourth Inservice Inspection (ISI) Interval Limited Examinations 2023-09-08
[Table view] Category:License-Application for Facility Operating License (Amend/Renewal) DKT 50
MONTHYEARLR-N23-0045, and Peach Bottom Atomic Power Station, Units 2 and 3 - Notice of Proposed Amendment to Decommissioning Trust Agreement2023-09-0808 September 2023 and Peach Bottom Atomic Power Station, Units 2 and 3 - Notice of Proposed Amendment to Decommissioning Trust Agreement ML23249A2612023-09-0606 September 2023 License Amendment Request to Modify the Salem and Hope Creek Exclusion Area Boundary LR-N23-0005, License Amendment Request to Amend Technical Specifications (TS) 6.8.4.f for Permanent Extension of Type a and Type C Leak Rate Test Frequencies2023-06-23023 June 2023 License Amendment Request to Amend Technical Specifications (TS) 6.8.4.f for Permanent Extension of Type a and Type C Leak Rate Test Frequencies ML23096A1842023-05-0909 May 2023 Issuance of Amendment No. 328 Revise and Relocate Reactor Coolant System Pressure and Temperature Limits and Pressurizer Overpressure Protection System Limits to Pressure and Temperature Limits Report LR-N23-0010, License Amendment Request Revision of Technical Specification (TS) to Delete TS Section 5.5 - Meteorological Tower Location2023-04-21021 April 2023 License Amendment Request Revision of Technical Specification (TS) to Delete TS Section 5.5 - Meteorological Tower Location LR-N22-0066, License Amendment Request (LAR) to Relocate Technical Specifications (TS) Requirements for Reactor Head Vents to the Technical Requirements Manual (TRM)2022-08-31031 August 2022 License Amendment Request (LAR) to Relocate Technical Specifications (TS) Requirements for Reactor Head Vents to the Technical Requirements Manual (TRM) LR-N22-0012, License Amendment Request to Amend the Technical Specifications to Revise and Relocate the Reactor Coolant System Pressure and Temperature Limits and Pressurizer Overpressure Protection System Limits to a Pressure and Temperature2022-08-0707 August 2022 License Amendment Request to Amend the Technical Specifications to Revise and Relocate the Reactor Coolant System Pressure and Temperature Limits and Pressurizer Overpressure Protection System Limits to a Pressure and Temperature LR-N22-0006, License Amendment Request (LAR) to Amend Salem Unit 1 and Unit 2 Technical Specifications (TS) to Extend the Allowed Outage Time for an Inoperable Emergency Diesel Generator from 72 Hours to 14 Days2022-06-29029 June 2022 License Amendment Request (LAR) to Amend Salem Unit 1 and Unit 2 Technical Specifications (TS) to Extend the Allowed Outage Time for an Inoperable Emergency Diesel Generator from 72 Hours to 14 Days LR-N22-0051, License Amendment Request to Relocate Technical Specification Facility/Unit Staff Qualification Requirements to Quality Assurance Topical Report2022-06-22022 June 2022 License Amendment Request to Relocate Technical Specification Facility/Unit Staff Qualification Requirements to Quality Assurance Topical Report ML22061A0302022-04-0404 April 2022 Issuance of Amendment Nos. 343 and 324 Revise Technical Specifications Surveillance Requirements for Auxiliary Feedwater ML21277A1932021-11-16016 November 2021 Enclosure 2, Draft Conforming License Amendments ML21230A0182021-10-0808 October 2021 Issuance of Amendment No. 339 Revise and Relocate Reactor Coolant System Pressure and Temperature Limits and Pressurizer Overpressure Protection System Limits to Pressure and Temperature Limits Report LR-N21-0065, License Amendment Request - Revision of Salem and Hope Creek Generating Station Technical Specification (TS) to Delete Definitions Found in 10 CFR Part 20 and Delete Figures of the Site and Surrounding Areas from TS2021-09-29029 September 2021 License Amendment Request - Revision of Salem and Hope Creek Generating Station Technical Specification (TS) to Delete Definitions Found in 10 CFR Part 20 and Delete Figures of the Site and Surrounding Areas from TS LR-N21-0048, One-Time License Amendment Request to Revise Unit 2 Technical Specification Action for Rod Position Indicators2021-06-18018 June 2021 One-Time License Amendment Request to Revise Unit 2 Technical Specification Action for Rod Position Indicators LR-N21-0043, Supplement to License Amendment Request to Adopt TSTF-490, Delete Ebar Definition and Revision to RCS Specific Activity Tech Spec2021-06-0909 June 2021 Supplement to License Amendment Request to Adopt TSTF-490, Delete Ebar Definition and Revision to RCS Specific Activity Tech Spec RS-21-039, Supplemental Information Regarding Application for Order Approving Transfers and Proposed Conforming License Amendments2021-03-25025 March 2021 Supplemental Information Regarding Application for Order Approving Transfers and Proposed Conforming License Amendments LR-N21-0026, Supplement to License Amendment Request to Amend the Technical Specifications to Revise and Relocate the Reactor Coolant System Pressure and Temperature Limits and Pressurizer Overpressure Protection System2021-03-17017 March 2021 Supplement to License Amendment Request to Amend the Technical Specifications to Revise and Relocate the Reactor Coolant System Pressure and Temperature Limits and Pressurizer Overpressure Protection System ML21057A2732021-02-25025 February 2021 Application for Order Approving License Transfers and Proposed Conforming License Amendments LR-N21-0006, Application to Revise Technical Specifications to Adopt TSTF-569 Revision of Response Time Testing Definitions2021-02-16016 February 2021 Application to Revise Technical Specifications to Adopt TSTF-569 Revision of Response Time Testing Definitions LR-N20-0003, License Amendment Request to Adopt TSTF-490, Deletion of E-Bar Definition and Revision to RCS Specific Activity Tech Spec2020-09-17017 September 2020 License Amendment Request to Adopt TSTF-490, Deletion of E-Bar Definition and Revision to RCS Specific Activity Tech Spec LR-N20-0027, Supplement to License Amendment Request: Revise Minimum Required Channels, Mode Applicability and Actions for the Source Range and Intermediate Range Neutron Flux Reactor Trip System Instrumentation Technical Specifications2020-05-11011 May 2020 Supplement to License Amendment Request: Revise Minimum Required Channels, Mode Applicability and Actions for the Source Range and Intermediate Range Neutron Flux Reactor Trip System Instrumentation Technical Specifications LR-N20-0010, License Amendment Request to Exclude the Dynamic Effects of Specific Postulated Pipe Ruptures from the Design and Licensing Basis Based on Leak-Before-Break Methodology2020-04-24024 April 2020 License Amendment Request to Exclude the Dynamic Effects of Specific Postulated Pipe Ruptures from the Design and Licensing Basis Based on Leak-Before-Break Methodology LR-N19-0055, License Amendment Request: Revise Minimum Required Channels, Mode Applicability and Actions for the Source Range and Intermediate Range Neutron Flux Reactor Trip System Instrumentation Technical Specifications2019-10-23023 October 2019 License Amendment Request: Revise Minimum Required Channels, Mode Applicability and Actions for the Source Range and Intermediate Range Neutron Flux Reactor Trip System Instrumentation Technical Specifications LR-N19-0064, License Amendment Request - Deletion of Facility Operating License Conditions Related to Decommissioning Trust Provisions and License Transfer2019-07-29029 July 2019 License Amendment Request - Deletion of Facility Operating License Conditions Related to Decommissioning Trust Provisions and License Transfer LR-N19-0065, License Amendment Request for Approval of Changes to Emergency Plan Staffing Requirements2019-07-0808 July 2019 License Amendment Request for Approval of Changes to Emergency Plan Staffing Requirements LR-N19-0006, Application to Revise Technical Specifications to Adopt TSTF-563, Revise Instrument Testing Definitions to Incorporate the Surveillance Frequency Control Program2019-04-0808 April 2019 Application to Revise Technical Specifications to Adopt TSTF-563, Revise Instrument Testing Definitions to Incorporate the Surveillance Frequency Control Program LR-N18-0129, License Amendment Request to Revise Technical Specifications to Adopt TSTF-547, Clarification of Rod Position Requirements.2019-02-0404 February 2019 License Amendment Request to Revise Technical Specifications to Adopt TSTF-547, Clarification of Rod Position Requirements. LR-N18-0116, Response to Request for Additional Information, License Amendment Request: Inverter Allowed Outage Time (AOT) Extension2018-10-30030 October 2018 Response to Request for Additional Information, License Amendment Request: Inverter Allowed Outage Time (AOT) Extension LR-N18-0113, Supplement to License Amendment Request: Revise Reactor Trip System Instrumentation, Engineered Safety Feature Actuation System Instrumentation, Main Steam Isolation Valves and Add Main Feedwater Isolation Technical Specification2018-10-27027 October 2018 Supplement to License Amendment Request: Revise Reactor Trip System Instrumentation, Engineered Safety Feature Actuation System Instrumentation, Main Steam Isolation Valves and Add Main Feedwater Isolation Technical Specification LR-N18-0059, Application to Revise Technical Specifications to Adopt TSTF-529, Clarify Use and Application Rules2018-06-29029 June 2018 Application to Revise Technical Specifications to Adopt TSTF-529, Clarify Use and Application Rules LR-N18-0038, License Amendment Request (LAR) to Amend the Salem Technical Specifications (TS) to Extend the Refueling Water Storage Tank (RWST) Allowed Outage Time2018-06-29029 June 2018 License Amendment Request (LAR) to Amend the Salem Technical Specifications (TS) to Extend the Refueling Water Storage Tank (RWST) Allowed Outage Time LR-N17-0144, License Amendment Request: Revise Reactor Trip System Instrumentation, Engineered Safety Feature Actuation System Instrumentation, Main Steam Isolation Valves and Add Main Feedwater Isolation Technical Specification2018-06-29029 June 2018 License Amendment Request: Revise Reactor Trip System Instrumentation, Engineered Safety Feature Actuation System Instrumentation, Main Steam Isolation Valves and Add Main Feedwater Isolation Technical Specification LR-N18-0067, Supplement to License Amendment Request for Vital Instrument Bus Inverter Allowed Outage Time (AOT) Extension2018-06-14014 June 2018 Supplement to License Amendment Request for Vital Instrument Bus Inverter Allowed Outage Time (AOT) Extension ML18136A8662018-05-16016 May 2018 License Amendment Request: Vital Instrument Bus Inverter Allowed Outage Time (AOT) Extension LR-N18-0022, License Amendment Request to Revise Technical Specification Actions for Rod Position Indicators2018-02-0808 February 2018 License Amendment Request to Revise Technical Specification Actions for Rod Position Indicators LR-N17-0135, License Amendment Request for Implementation of WCAP-14333 and WCAP-15376, Reactor Trip System Instrumentation and Engineered Safety Feature Actuation System Instrumentation Test Times and Completion Times2017-12-18018 December 2017 License Amendment Request for Implementation of WCAP-14333 and WCAP-15376, Reactor Trip System Instrumentation and Engineered Safety Feature Actuation System Instrumentation Test Times and Completion Times LR-N17-0121, License Amendment Request to Relocate the Reactor Coolant System Pressure Isolation Valve Table from the Technical Specifications to the Technical Requirements Manual2017-09-27027 September 2017 License Amendment Request to Relocate the Reactor Coolant System Pressure Isolation Valve Table from the Technical Specifications to the Technical Requirements Manual LR-N17-0058, License Amendment Request to Revise the Implementation Period for License Amendment No. 2942017-03-13013 March 2017 License Amendment Request to Revise the Implementation Period for License Amendment No. 294 LR-N16-0173, License Amendment Request: Containment Fan Cooler Unit (Cfcu) Allowed Outage Time (AOT) Extension2017-03-0606 March 2017 License Amendment Request: Containment Fan Cooler Unit (Cfcu) Allowed Outage Time (AOT) Extension LR-N16-0003, License Amendment Request to Amend the Accident Monitoring Instrumentation Technical Specifications2016-11-17017 November 2016 License Amendment Request to Amend the Accident Monitoring Instrumentation Technical Specifications LR-N16-0175, License Amendment Request - Administrative Controls2016-10-17017 October 2016 License Amendment Request - Administrative Controls LR-N16-0114, License Amendment Request to Revise Technical Specifications to Adopt TSTF-545, Revision 3, TS Lnservice Testing Program Removal & Clarify SR Usage Rule Application to Section 5.5 Testing Using the Consolidated Line .2016-08-30030 August 2016 License Amendment Request to Revise Technical Specifications to Adopt TSTF-545, Revision 3, TS Lnservice Testing Program Removal & Clarify SR Usage Rule Application to Section 5.5 Testing Using the Consolidated Line . LR-N16-0093, License Amendment Request to Extend the Implementation Period for Salem, Unit 1 License Amendment No. 311 and Salem, Unit 2 License Amendment No. 2922016-05-10010 May 2016 License Amendment Request to Extend the Implementation Period for Salem, Unit 1 License Amendment No. 311 and Salem, Unit 2 License Amendment No. 292 LR-N16-0057, Supplement for License Amendment Request Regarding Replacement of Source Range and Intermediate Range Neutron Monitoring Systems2016-03-0404 March 2016 Supplement for License Amendment Request Regarding Replacement of Source Range and Intermediate Range Neutron Monitoring Systems LR-N16-0044, Emergency License Amendment Request to Modify Technical Specification Requirements for One Inoperable Subcooling Margin Monitor Channel2016-02-11011 February 2016 Emergency License Amendment Request to Modify Technical Specification Requirements for One Inoperable Subcooling Margin Monitor Channel LR-N16-0015, Supplemental Information for License Amendment to Revise Technical Specification 3/4.3.1, Reactor Trip System Instrumentation2016-02-0303 February 2016 Supplemental Information for License Amendment to Revise Technical Specification 3/4.3.1, Reactor Trip System Instrumentation LR-N15-0084, License Amendment Request Modifying Chilled Water System Requirements2015-09-11011 September 2015 License Amendment Request Modifying Chilled Water System Requirements LR-N15-0189, Supplemental Information Needed for Review of Emergency License Amendment Request to Remove Pressurizer Power Operated Relief Valve Position Indication Instrumentation from Accident Monitoring Instrumentation Technical Specifications2015-09-0202 September 2015 Supplemental Information Needed for Review of Emergency License Amendment Request to Remove Pressurizer Power Operated Relief Valve Position Indication Instrumentation from Accident Monitoring Instrumentation Technical Specifications LR-N15-0187, Emergency License Amendment Request to Remove Pressurizer Power Operated Relief Valve (PORV) Position Indication Instrumentation from the Accident Monitoring Instrumentation Technical Specifications2015-08-31031 August 2015 Emergency License Amendment Request to Remove Pressurizer Power Operated Relief Valve (PORV) Position Indication Instrumentation from the Accident Monitoring Instrumentation Technical Specifications LR-N15-0021, License Amendment Request Regarding Replacement of Source Range and Intermediate Range Neutron Monitoring Systems2015-04-0303 April 2015 License Amendment Request Regarding Replacement of Source Range and Intermediate Range Neutron Monitoring Systems 2023-09-08
[Table view] Category:Technical Specification
MONTHYEARLR-N23-0005, License Amendment Request to Amend Technical Specifications (TS) 6.8.4.f for Permanent Extension of Type a and Type C Leak Rate Test Frequencies2023-06-23023 June 2023 License Amendment Request to Amend Technical Specifications (TS) 6.8.4.f for Permanent Extension of Type a and Type C Leak Rate Test Frequencies ML22270A3172022-09-27027 September 2022 Submittal of Technical Specification Bases Changes, Amendment No. 201 LR-N22-0078, Submittal of Technical Specification Bases Changes, Amendment No. 2152022-09-27027 September 2022 Submittal of Technical Specification Bases Changes, Amendment No. 215 LR-N21-0078, Hope and Creek Generating Station, Supplement to License Amendment Request to Revise Technical Specifications (TS) to Delete Definitions Found in 10 CFR Part 20 and Delete Figures of the Site and Surrounding Areas from TS2021-11-18018 November 2021 Hope and Creek Generating Station, Supplement to License Amendment Request to Revise Technical Specifications (TS) to Delete Definitions Found in 10 CFR Part 20 and Delete Figures of the Site and Surrounding Areas from TS LR-N21-0048, One-Time License Amendment Request to Revise Unit 2 Technical Specification Action for Rod Position Indicators2021-06-18018 June 2021 One-Time License Amendment Request to Revise Unit 2 Technical Specification Action for Rod Position Indicators LR-N21-0045, Submittal of Changes to Technical Specifications Bases2021-06-16016 June 2021 Submittal of Changes to Technical Specifications Bases LR-N21-0006, Application to Revise Technical Specifications to Adopt TSTF-569 Revision of Response Time Testing Definitions2021-02-16016 February 2021 Application to Revise Technical Specifications to Adopt TSTF-569 Revision of Response Time Testing Definitions LR-N20-0072, License Amendment Request to Amend Tech Specs to Revise and Relocate the Reactor Coolant System Pressure & Temperature Limits & Pressurizer Overpressure Protection System Limits to a Pressure & Temperature Limits Report2020-12-0606 December 2020 License Amendment Request to Amend Tech Specs to Revise and Relocate the Reactor Coolant System Pressure & Temperature Limits & Pressurizer Overpressure Protection System Limits to a Pressure & Temperature Limits Report LR-N20-0003, License Amendment Request to Adopt TSTF-490, Deletion of E-Bar Definition and Revision to RCS Specific Activity Tech Spec2020-09-17017 September 2020 License Amendment Request to Adopt TSTF-490, Deletion of E-Bar Definition and Revision to RCS Specific Activity Tech Spec ML17157B2652017-05-0909 May 2017 Submittal of Hope Creek Generating Station Updated Final Safety Analysis Report, Revision 22, Hope Creek Technical Specification Bases Changes, 10CFR54.37(b) Review Results for Hope Creek and PSEG Nuclear LLC Quality Assurance Topical Repor LR-N17-0088, Submittal of Hope Creek Generating Station Updated Final Safety Analysis Report, Revision 22, Hope Creek Technical Specification Bases Changes, 10CFR54.37(b) Review Results for Hope Creek and Pseg Nuclear LLC Quality Assurance Topical Re2017-05-0909 May 2017 Submittal of Hope Creek Generating Station Updated Final Safety Analysis Report, Revision 22, Hope Creek Technical Specification Bases Changes, 10CFR54.37(b) Review Results for Hope Creek and Pseg Nuclear LLC Quality Assurance Topical Repor LR-N17-0034, Salem Generating Station, Units 1 & 2, Submittal of Revision 29 to Updated Final Safety Analysis Report, and Technical Specification Bases Changes and Quality Assurance Topical Report, NO-AA-10, Rev. 852017-01-30030 January 2017 Salem Generating Station, Units 1 & 2, Submittal of Revision 29 to Updated Final Safety Analysis Report, and Technical Specification Bases Changes and Quality Assurance Topical Report, NO-AA-10, Rev. 85 ML17046A2292017-01-30030 January 2017 Submittal of Revision 29 to Updated Final Safety Analysis Report, and Technical Specification Bases Changes and Quality Assurance Topical Report, NO-AA-10, Rev. 85 LR-N16-0003, License Amendment Request to Amend the Accident Monitoring Instrumentation Technical Specifications2016-11-17017 November 2016 License Amendment Request to Amend the Accident Monitoring Instrumentation Technical Specifications LR-N16-0114, License Amendment Request to Revise Technical Specifications to Adopt TSTF-545, Revision 3, TS Lnservice Testing Program Removal & Clarify SR Usage Rule Application to Section 5.5 Testing Using the Consolidated Line .2016-08-30030 August 2016 License Amendment Request to Revise Technical Specifications to Adopt TSTF-545, Revision 3, TS Lnservice Testing Program Removal & Clarify SR Usage Rule Application to Section 5.5 Testing Using the Consolidated Line . LR-N15-0187, Emergency License Amendment Request to Remove Pressurizer Power Operated Relief Valve (PORV) Position Indication Instrumentation from the Accident Monitoring Instrumentation Technical Specifications2015-08-31031 August 2015 Emergency License Amendment Request to Remove Pressurizer Power Operated Relief Valve (PORV) Position Indication Instrumentation from the Accident Monitoring Instrumentation Technical Specifications LR-N15-0021, License Amendment Request Regarding Replacement of Source Range and Intermediate Range Neutron Monitoring Systems2015-04-0303 April 2015 License Amendment Request Regarding Replacement of Source Range and Intermediate Range Neutron Monitoring Systems LR-N15-0020, License Amendment Request to Revise Technical Specification 3/4.3.1, Reactor Trip System Instrumentation2015-03-27027 March 2015 License Amendment Request to Revise Technical Specification 3/4.3.1, Reactor Trip System Instrumentation ML14210A4842014-07-28028 July 2014 License Amendment Request to Revise Technical Specifications to Adopt TSTF-510, Revision 2, Revision to Steam Generator Program Inspection Frequencies and Tube Sample Selection Using the Consolidated Line Item Improvement Process ML1118615602011-07-28028 July 2011 and Salem Nuclear Generating Station, Unit Nos. 1 and 2, License Amendment, Issuance of Amendments Approval of Cyber Security Plan LR-N11-0056, Supplement to Application for Technical Specification Change Regarding Risk-Informed Justification for the Relocation of Specific Surveillance Frequency Requirements to a Licensee Controlled Program2011-02-23023 February 2011 Supplement to Application for Technical Specification Change Regarding Risk-Informed Justification for the Relocation of Specific Surveillance Frequency Requirements to a Licensee Controlled Program LR-N10-0355, Attachment 3 to LR-N10-0355, Hope Creek Generating Station, Emergency Action Level Comparison Matrix2010-10-14014 October 2010 Attachment 3 to LR-N10-0355, Hope Creek Generating Station, Emergency Action Level Comparison Matrix LR-N10-0355, Attachment 1 to LR-N10-0355, Hope Creek Generating Station, Emergency Action Level Technical Bases Document (Strike-out Version)2010-10-14014 October 2010 Attachment 1 to LR-N10-0355, Hope Creek Generating Station, Emergency Action Level Technical Bases Document (Strike-out Version) ML1100503982010-10-14014 October 2010 Attachment 3 to LR-N10-0355, Hope Creek Generating Station, Emergency Action Level Comparison Matrix LR-N10-0355, Hope Creek, CY-AA-170-500, Revision 0, Meteorological Monitoring System Calibration and Maintenance2010-10-14014 October 2010 Hope Creek, CY-AA-170-500, Revision 0, Meteorological Monitoring System Calibration and Maintenance ML1100504152010-10-14014 October 2010 Hope Creek, CY-AA-170-500, Revision 0, Meteorological Monitoring System Calibration and Maintenance LR-N10-0355, Attachment 2 to LR-N10-0355, Hope Creek Generating Station, Emergency Action Level Technical Bases Document (Clean Version)2010-10-14014 October 2010 Attachment 2 to LR-N10-0355, Hope Creek Generating Station, Emergency Action Level Technical Bases Document (Clean Version) LR-N10-0355, Attachment 4 to LR-N10-0355, Hope Creek Generating Station, Emergency Action Level Technical Bases Supporting Documents (Cd with Paper Index)2010-10-14014 October 2010 Attachment 4 to LR-N10-0355, Hope Creek Generating Station, Emergency Action Level Technical Bases Supporting Documents (Cd with Paper Index) ML1100503992010-10-14014 October 2010 Attachment 4 to LR-N10-0355, Hope Creek Generating Station, Emergency Action Level Technical Bases Supporting Documents (Cd with Paper Index) ML1100503752010-10-14014 October 2010 Attachment 1 to LR-N10-0355, Hope Creek Generating Station, Emergency Action Level Technical Bases Document (Strike-out Version) ML1100504022010-10-14014 October 2010 Attachment 2 to LR-N10-0355, Hope Creek Generating Station, Emergency Action Level Technical Bases Document (Clean Version) ML1025802412010-09-0808 September 2010 License Amendment Request S10-01 Application for Technical Specification Change Regarding Risk-Informed Justification for the Relocation of Specific Surveillance Frequency Requirements to a Licensee Controlled Program ML1100505182010-08-24024 August 2010 Hope Creek, HC.OP-AB.ZZ-0150(Q), Rev. 6, 125VDC System Malfunction LR-N10-0355, Hope Creek, HC.OP-AB.ZZ-0150(Q), Rev. 6, 125VDC System Malfunction2010-08-24024 August 2010 Hope Creek, HC.OP-AB.ZZ-0150(Q), Rev. 6, 125VDC System Malfunction LR-N10-0355, Hope Creek, HC.OP-AB.HVAC-0002(Q), Rev. 7, Control Room Environment2010-07-13013 July 2010 Hope Creek, HC.OP-AB.HVAC-0002(Q), Rev. 7, Control Room Environment ML1100505002010-07-13013 July 2010 Hope Creek, HC.OP-AB.HVAC-0002(Q), Rev. 7, Control Room Environment LR-N10-0355, Hope Creek, HC.OP-AB.RPV-0009(Q), Rev. 7, Shutdown Cooling2010-06-24024 June 2010 Hope Creek, HC.OP-AB.RPV-0009(Q), Rev. 7, Shutdown Cooling ML1100505162010-06-24024 June 2010 Hope Creek, HC.OP-AB.RPV-0009(Q), Rev. 7, Shutdown Cooling LR-N10-0355, Hope Creek, HC.OP-AB.CONT-0002(Q), Rev. 9, Containment2010-05-0303 May 2010 Hope Creek, HC.OP-AB.CONT-0002(Q), Rev. 9, Containment ML1100504772010-05-0303 May 2010 Hope Creek, HC.OP-AB.CONT-0002(Q), Rev. 9, Containment LR-N10-0355, Hope Creek, HC.OP-AB.RPV-0003(Q), Rev. 21, Recirculation System/Power Oscillations2010-04-21021 April 2010 Hope Creek, HC.OP-AB.RPV-0003(Q), Rev. 21, Recirculation System/Power Oscillations ML1100505052010-04-21021 April 2010 Hope Creek, HC.OP-AB.MISC-0002(Q), Rev. 10, Crids/Overhead Annunciators/Ppc Computer LR-N10-0355, Hope Creek, HC.OP-AB.MISC-0002(Q), Rev. 10, Crids/Overhead Annunciators/Ppc Computer2010-04-21021 April 2010 Hope Creek, HC.OP-AB.MISC-0002(Q), Rev. 10, Crids/Overhead Annunciators/Ppc Computer ML1100505062010-04-21021 April 2010 Hope Creek, HC.OP-AB.RPV-0003(Q), Rev. 21, Recirculation System/Power Oscillations LR-N10-0355, Hope Creek, Offsite Dose Calculation Manual, Revision 252010-04-16016 April 2010 Hope Creek, Offsite Dose Calculation Manual, Revision 25 ML1100504172010-04-16016 April 2010 Hope Creek, Offsite Dose Calculation Manual, Revision 25 ML1100504742010-03-17017 March 2010 Hope Creek, HC.IC-GP.BB-0003(Q) - Rev. 17, Nuclear Boiler - Nondivisional Channel L-11683/B21-N027 Rx Cavity Flood Up Level/Rx Shutdown Range Level Setup LR-N10-0355, Hope Creek, HC.IC-GP.BB-0003(Q) - Rev. 17, Nuclear Boiler - Nondivisional Channel L-11683/B21-N027 Rx Cavity Flood Up Level/Rx Shutdown Range Level Setup2010-03-17017 March 2010 Hope Creek, HC.IC-GP.BB-0003(Q) - Rev. 17, Nuclear Boiler - Nondivisional Channel L-11683/B21-N027 Rx Cavity Flood Up Level/Rx Shutdown Range Level Setup LR-N10-0355, Hope Creek, HC.OP-AB.MISC-0001(Q), Rev. 15, Acts of Nature2010-03-0505 March 2010 Hope Creek, HC.OP-AB.MISC-0001(Q), Rev. 15, Acts of Nature ML1100505022010-03-0505 March 2010 Hope Creek, HC.OP-AB.MISC-0001(Q), Rev. 15, Acts of Nature 2023-06-23
[Table view] Category:Bases Change
MONTHYEARML22270A3172022-09-27027 September 2022 Submittal of Technical Specification Bases Changes, Amendment No. 201 LR-N22-0078, Submittal of Technical Specification Bases Changes, Amendment No. 2152022-09-27027 September 2022 Submittal of Technical Specification Bases Changes, Amendment No. 215 LR-N21-0078, Hope and Creek Generating Station, Supplement to License Amendment Request to Revise Technical Specifications (TS) to Delete Definitions Found in 10 CFR Part 20 and Delete Figures of the Site and Surrounding Areas from TS2021-11-18018 November 2021 Hope and Creek Generating Station, Supplement to License Amendment Request to Revise Technical Specifications (TS) to Delete Definitions Found in 10 CFR Part 20 and Delete Figures of the Site and Surrounding Areas from TS LR-N21-0045, Submittal of Changes to Technical Specifications Bases2021-06-16016 June 2021 Submittal of Changes to Technical Specifications Bases LR-N20-0003, License Amendment Request to Adopt TSTF-490, Deletion of E-Bar Definition and Revision to RCS Specific Activity Tech Spec2020-09-17017 September 2020 License Amendment Request to Adopt TSTF-490, Deletion of E-Bar Definition and Revision to RCS Specific Activity Tech Spec ML17157B2652017-05-0909 May 2017 Submittal of Hope Creek Generating Station Updated Final Safety Analysis Report, Revision 22, Hope Creek Technical Specification Bases Changes, 10CFR54.37(b) Review Results for Hope Creek and PSEG Nuclear LLC Quality Assurance Topical Repor LR-N17-0088, Submittal of Hope Creek Generating Station Updated Final Safety Analysis Report, Revision 22, Hope Creek Technical Specification Bases Changes, 10CFR54.37(b) Review Results for Hope Creek and Pseg Nuclear LLC Quality Assurance Topical Re2017-05-0909 May 2017 Submittal of Hope Creek Generating Station Updated Final Safety Analysis Report, Revision 22, Hope Creek Technical Specification Bases Changes, 10CFR54.37(b) Review Results for Hope Creek and Pseg Nuclear LLC Quality Assurance Topical Repor LR-N17-0034, Salem Generating Station, Units 1 & 2, Submittal of Revision 29 to Updated Final Safety Analysis Report, and Technical Specification Bases Changes and Quality Assurance Topical Report, NO-AA-10, Rev. 852017-01-30030 January 2017 Salem Generating Station, Units 1 & 2, Submittal of Revision 29 to Updated Final Safety Analysis Report, and Technical Specification Bases Changes and Quality Assurance Topical Report, NO-AA-10, Rev. 85 ML17046A2292017-01-30030 January 2017 Submittal of Revision 29 to Updated Final Safety Analysis Report, and Technical Specification Bases Changes and Quality Assurance Topical Report, NO-AA-10, Rev. 85 LR-N16-0003, License Amendment Request to Amend the Accident Monitoring Instrumentation Technical Specifications2016-11-17017 November 2016 License Amendment Request to Amend the Accident Monitoring Instrumentation Technical Specifications LR-N16-0114, License Amendment Request to Revise Technical Specifications to Adopt TSTF-545, Revision 3, TS Lnservice Testing Program Removal & Clarify SR Usage Rule Application to Section 5.5 Testing Using the Consolidated Line .2016-08-30030 August 2016 License Amendment Request to Revise Technical Specifications to Adopt TSTF-545, Revision 3, TS Lnservice Testing Program Removal & Clarify SR Usage Rule Application to Section 5.5 Testing Using the Consolidated Line . LR-N15-0187, Emergency License Amendment Request to Remove Pressurizer Power Operated Relief Valve (PORV) Position Indication Instrumentation from the Accident Monitoring Instrumentation Technical Specifications2015-08-31031 August 2015 Emergency License Amendment Request to Remove Pressurizer Power Operated Relief Valve (PORV) Position Indication Instrumentation from the Accident Monitoring Instrumentation Technical Specifications LR-N15-0021, License Amendment Request Regarding Replacement of Source Range and Intermediate Range Neutron Monitoring Systems2015-04-0303 April 2015 License Amendment Request Regarding Replacement of Source Range and Intermediate Range Neutron Monitoring Systems ML14210A4842014-07-28028 July 2014 License Amendment Request to Revise Technical Specifications to Adopt TSTF-510, Revision 2, Revision to Steam Generator Program Inspection Frequencies and Tube Sample Selection Using the Consolidated Line Item Improvement Process LR-N11-0056, Supplement to Application for Technical Specification Change Regarding Risk-Informed Justification for the Relocation of Specific Surveillance Frequency Requirements to a Licensee Controlled Program2011-02-23023 February 2011 Supplement to Application for Technical Specification Change Regarding Risk-Informed Justification for the Relocation of Specific Surveillance Frequency Requirements to a Licensee Controlled Program ML1100503982010-10-14014 October 2010 Attachment 3 to LR-N10-0355, Hope Creek Generating Station, Emergency Action Level Comparison Matrix LR-N10-0355, Attachment 3 to LR-N10-0355, Hope Creek Generating Station, Emergency Action Level Comparison Matrix2010-10-14014 October 2010 Attachment 3 to LR-N10-0355, Hope Creek Generating Station, Emergency Action Level Comparison Matrix ML1100503992010-10-14014 October 2010 Attachment 4 to LR-N10-0355, Hope Creek Generating Station, Emergency Action Level Technical Bases Supporting Documents (Cd with Paper Index) LR-N10-0355, Attachment 4 to LR-N10-0355, Hope Creek Generating Station, Emergency Action Level Technical Bases Supporting Documents (Cd with Paper Index)2010-10-14014 October 2010 Attachment 4 to LR-N10-0355, Hope Creek Generating Station, Emergency Action Level Technical Bases Supporting Documents (Cd with Paper Index) LR-N10-0355, Attachment 2 to LR-N10-0355, Hope Creek Generating Station, Emergency Action Level Technical Bases Document (Clean Version)2010-10-14014 October 2010 Attachment 2 to LR-N10-0355, Hope Creek Generating Station, Emergency Action Level Technical Bases Document (Clean Version) ML1100504152010-10-14014 October 2010 Hope Creek, CY-AA-170-500, Revision 0, Meteorological Monitoring System Calibration and Maintenance LR-N10-0355, Hope Creek, CY-AA-170-500, Revision 0, Meteorological Monitoring System Calibration and Maintenance2010-10-14014 October 2010 Hope Creek, CY-AA-170-500, Revision 0, Meteorological Monitoring System Calibration and Maintenance LR-N10-0355, Attachment 1 to LR-N10-0355, Hope Creek Generating Station, Emergency Action Level Technical Bases Document (Strike-out Version)2010-10-14014 October 2010 Attachment 1 to LR-N10-0355, Hope Creek Generating Station, Emergency Action Level Technical Bases Document (Strike-out Version) ML1100503752010-10-14014 October 2010 Attachment 1 to LR-N10-0355, Hope Creek Generating Station, Emergency Action Level Technical Bases Document (Strike-out Version) ML1100504022010-10-14014 October 2010 Attachment 2 to LR-N10-0355, Hope Creek Generating Station, Emergency Action Level Technical Bases Document (Clean Version) ML1025802412010-09-0808 September 2010 License Amendment Request S10-01 Application for Technical Specification Change Regarding Risk-Informed Justification for the Relocation of Specific Surveillance Frequency Requirements to a Licensee Controlled Program ML1100505182010-08-24024 August 2010 Hope Creek, HC.OP-AB.ZZ-0150(Q), Rev. 6, 125VDC System Malfunction LR-N10-0355, Hope Creek, HC.OP-AB.ZZ-0150(Q), Rev. 6, 125VDC System Malfunction2010-08-24024 August 2010 Hope Creek, HC.OP-AB.ZZ-0150(Q), Rev. 6, 125VDC System Malfunction LR-N10-0355, Hope Creek, HC.OP-AB.HVAC-0002(Q), Rev. 7, Control Room Environment2010-07-13013 July 2010 Hope Creek, HC.OP-AB.HVAC-0002(Q), Rev. 7, Control Room Environment ML1100505002010-07-13013 July 2010 Hope Creek, HC.OP-AB.HVAC-0002(Q), Rev. 7, Control Room Environment LR-N10-0355, Hope Creek, HC.OP-AB.RPV-0009(Q), Rev. 7, Shutdown Cooling2010-06-24024 June 2010 Hope Creek, HC.OP-AB.RPV-0009(Q), Rev. 7, Shutdown Cooling ML1100505162010-06-24024 June 2010 Hope Creek, HC.OP-AB.RPV-0009(Q), Rev. 7, Shutdown Cooling LR-N10-0355, Hope Creek, HC.OP-AB.CONT-0002(Q), Rev. 9, Containment2010-05-0303 May 2010 Hope Creek, HC.OP-AB.CONT-0002(Q), Rev. 9, Containment ML1100504772010-05-0303 May 2010 Hope Creek, HC.OP-AB.CONT-0002(Q), Rev. 9, Containment ML1100505052010-04-21021 April 2010 Hope Creek, HC.OP-AB.MISC-0002(Q), Rev. 10, Crids/Overhead Annunciators/Ppc Computer LR-N10-0355, Hope Creek, HC.OP-AB.RPV-0003(Q), Rev. 21, Recirculation System/Power Oscillations2010-04-21021 April 2010 Hope Creek, HC.OP-AB.RPV-0003(Q), Rev. 21, Recirculation System/Power Oscillations LR-N10-0355, Hope Creek, HC.OP-AB.MISC-0002(Q), Rev. 10, Crids/Overhead Annunciators/Ppc Computer2010-04-21021 April 2010 Hope Creek, HC.OP-AB.MISC-0002(Q), Rev. 10, Crids/Overhead Annunciators/Ppc Computer ML1100505062010-04-21021 April 2010 Hope Creek, HC.OP-AB.RPV-0003(Q), Rev. 21, Recirculation System/Power Oscillations LR-N10-0355, Hope Creek, Offsite Dose Calculation Manual, Revision 252010-04-16016 April 2010 Hope Creek, Offsite Dose Calculation Manual, Revision 25 ML1100504172010-04-16016 April 2010 Hope Creek, Offsite Dose Calculation Manual, Revision 25 ML1100504742010-03-17017 March 2010 Hope Creek, HC.IC-GP.BB-0003(Q) - Rev. 17, Nuclear Boiler - Nondivisional Channel L-11683/B21-N027 Rx Cavity Flood Up Level/Rx Shutdown Range Level Setup LR-N10-0355, Hope Creek, HC.IC-GP.BB-0003(Q) - Rev. 17, Nuclear Boiler - Nondivisional Channel L-11683/B21-N027 Rx Cavity Flood Up Level/Rx Shutdown Range Level Setup2010-03-17017 March 2010 Hope Creek, HC.IC-GP.BB-0003(Q) - Rev. 17, Nuclear Boiler - Nondivisional Channel L-11683/B21-N027 Rx Cavity Flood Up Level/Rx Shutdown Range Level Setup LR-N10-0355, Hope Creek, HC.OP-AB.MISC-0001(Q), Rev. 15, Acts of Nature2010-03-0505 March 2010 Hope Creek, HC.OP-AB.MISC-0001(Q), Rev. 15, Acts of Nature ML1100505022010-03-0505 March 2010 Hope Creek, HC.OP-AB.MISC-0001(Q), Rev. 15, Acts of Nature ML1100504992009-09-0909 September 2009 Hope Creek, HC.OP-AB.COOL-0004(Q), Rev. 4, Fuel Pool Cooling LR-N10-0355, Hope Creek, HC.OP-AB.COOL-0004(Q), Rev. 4, Fuel Pool Cooling2009-09-0909 September 2009 Hope Creek, HC.OP-AB.COOL-0004(Q), Rev. 4, Fuel Pool Cooling LR-N10-0355, Hope Creek, HC.OP-AB.IC-0003(Q), Rev. 3, Reactor Protection System2009-04-25025 April 2009 Hope Creek, HC.OP-AB.IC-0003(Q), Rev. 3, Reactor Protection System ML1100505012009-04-25025 April 2009 Hope Creek, HC.OP-AB.IC-0003(Q), Rev. 3, Reactor Protection System ML1100504312009-03-0909 March 2009 Hope Creek, HC.lC-CC.SE-0001(Q), Rev. 28, Nuclear Instrumentation System - Channel a Source Range Monitor C51-K6OOA LR-N10-0355, Hope Creek, HC.lC-CC.SE-0001(Q), Rev. 28, Nuclear Instrumentation System - Channel a Source Range Monitor C51-K6OOA2009-03-0909 March 2009 Hope Creek, HC.lC-CC.SE-0001(Q), Rev. 28, Nuclear Instrumentation System - Channel a Source Range Monitor C51-K6OOA 2022-09-27
[Table view] |