Discusses Const Appraisal Team Insp 50-530/86-03 on 860113-24 & 0203-14 & Forwards Notice of Violation
ML20199D740
Person / Time
Site: Palo Verde Arizona Public Service icon.png
Issue date: 06/16/1986
From: Kirsch D
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION V)
To: Van Brunt E
ARIZONA PUBLIC SERVICE CO. (FORMERLY ARIZONA NUCLEAR
Shared Package
ML20199D743 List:
References
NUDOCS 8606230004
Download: ML20199D740 (2)


Text

,

.

..

=

.:

- -

.

_

-

.

-

~

'

s

~ ;

+

.

.

b

,

'*

'g

+

C g'

.

-

.

s

.

.

,

.

,

,

,

g

P-

.

.

.

Y

.

~

,,

.

L

-.

-

.

.

_

-

JUN.161986: c

-

,

.

,

IDocket. Number. 50-530

' '

'

+

,

,

~

-

,

_

t

.

s

.

IArizona Nuclear Power Project

.

' -

<

Attention:

- Mr.: E. E. Van Brunt, Jr.

Executive Vice President P.-O. Box 52034-

-

Phoenix, Arizona 85072-2034

~ Gentlemen:

j.

i; Subject: NRC Construction Appraisal Team Inspection of Palo Verde ~ Unit 3

'

-

A special' Construction; Appraisal Team'(CAT)-inspection-was conducted by the

. Office of Inspection.and Enforcement (IE) on January 13-24, and-February 3-14,

'

~

.

1986, of activities at the Palo Verde Nuclear Generating Station authorized by NRC Construction Permit No.-CPPR-143.

-A~ report of the results:of the-

'

inspection,"No. 50-530/86-03, was forwarded to you on April 4, 1986. The

.. inspection concentrated.on~ an. examination of hardware and was intended to

_

assess whether the construction of Unit'3 had been performed in accordans.e with quality. requirements by comparing the as-built condition to the' design

'

requirements.

'

~, Based on the results of this inspection, it appears that certain of-your

,

activities.were not conducted _in-full compliance with NRC requirements, as set

>

.. -

s forth.in-the-Notice of Violation, enclosed herewith as Appendix A.

.The areas of concern included'a failure to properly translate design requirements into construction specifications, a. failure to assure the quality.

of vendor supplied components, and a failure to assure adequate inspection of

,

. field' installations.

'

.:

Your. response to'this Notice is to be submitted in accordance with the-s

. provisions of'10 CFR 2.201 as stated in Appendix A, Notice of. Violation.

In

+

g

,

addition; we request that your response to eack violation particularly address-

~

- '

your actions to ensure that future construction ' sad modification activities at-

-=your facilities do not have siniilar problems during the preoperational testing

,.j and plant' operation phases.

In accordance with 10 CFR 2.790(A), a copy of this letter and the enclosure

~

will be placed in the NRC Public Document Room.

The response directed by this letter and the accompanying Notice are not

'

subject :to the clearance procedure of the Office of Management and Budget as t

-

required by the Paperwork Reduction Act of 1980, PL 96-511.

r-

,

s 8606230004 860616

-- _.

PDR ADOCK 05000530 G

PDR

_

.

'

g;

.[

, I

_._,__[._,.._,

,~. _.. _

'

.

,.

_

,_...

- ~,

-,, -,., _ _,. _ _... _.. _.

_. _

,

.

.

-

..

.

-

.

-2-JUN L161986

_

. Should y'ou have any question concerning this inspection, we will.be pleased to discuss them with you.

.

x

Sincerely, Originol signed tiy

..

D. F. Kirsch.

D. F.: Kirsch, Director

'

<

Division of Reactor Safety and Projects

. Enclosure:

77 ~

Appendix A:--Notice of Violation

,

'

. cc'w/ enclosure:

'

J. Bynum, ANPP

,W. F. Quinn, ANPP:

- T. D. Shriver, ANPP..

'

W. E. Ide, ANPP

-

'

<

C. N. Russo,-ANPP

.

.

Ms'. Jill Morrison, PVIF~

,

, Lynne Bernabei,. GAP

.

-

Duke Railsback, ACC

,

- '

Arthur C. Gehr, Esq., Snell & Wilmer bec w/ enclosure:

..

RSB/ Document' Control' Desk (RIDS)

Project Inspector '

.

-

Resident: Inspector:

-.G. Cook,'RV B. Faulkenberry, RV

'

J.1 Martin, RV LFMB

.

'

.--

,

S..

,

~

ion V~

_

iller / dot DKirsch 6/f[g/86.

6//p/86.

-

.

_f -

%

m b

_,....

,

'

_

y k

g

4 4.-

_j'_

_