U.S. NUCLEAR REGULATORY COMMISSION
REGION I
Report Nos.
70-3027/86-02 50-443/86-26 Docket Nos.
70-3027 50-443 License Nos.
SNM-1963 CPPR-135 Licensee:
Public Service of New Hampshire P.O. Box 330 Manchester, New Hampshire Facility Name:
New Hampshire-Yankee-Seabrook Nuclear Statior Unit 1 Inspection At:
Seabrook, New Hampshire Inspection Conducted:
May 6-8, 1986 Type of Inspection:
Initial Material Control and Accounting Inspector:
p r[
4 F#4
~
AAellaRpta,S eprdsAuditor date Approved by:
[=$
6 0N f
pfR.Keimis,ChieJ/SafeguardsSection, date Nuclear MaterialVSafety and Safeguards Branch Inspection Summary:
Inspection on May 6-8, 1986 (Combined Report Nos. 70-3027/86-02 and 50-443/86-26).
Areas Inspected:
Initial, routine, unannounced inspection of nuclear material control and accounting, including: organi;:ation and operation; shipping and receiving; storage and internal control; inventory; records and reports; and, management of the material control system.
Results: The licensee's procedure were adequate for the control of special nuclear material (SNM) and were being followed.
Records and reports were complete, well maintained and readily available.
k[
O G
a
A.L-.
m aa me.
,
M.,44C J
A.4---.iA
-
-1-
.
e.
.AJ--
=.m
-
Aa-.&
>+a-
4
.
.
'
DETAILS I
j
- 1.
Key Persons Contacted I
W. Middleton, Quality Assurance Engineer
y R. Guillette, Assistant Project Construction QA Manager
0. Lambert, Project Field Quality Control Manager
J. Tefft, Startup Test Department Project Engineer
J. Dold, YAEC Licensing
,
'
P. Gurney, Reactor Engineer Department Supervisor V. Sanchez, Engineer, Licensing
'
G. Kline, Technical Service Manager
!
A. Chesno, Reactor Engineer i
H. Crain, Fuel Representative (Westinghouse Electric Corp.)
i A. Merril, Reactor Engineer j
W. Cash, HP Supervisor i
A. Cerne, NRC Senior Resident Inspector
D. Ruscitto, NRC Resident Inspector
present at exit interview 2.
30703-Exit Interview The inspector met with the licensee representatives denoted in paragraph 1 on May 8, 1986, and stated that this was the initial inspection of the
,
nuclear material control and accounting program for the facility. The inspector then summarized the scope and findings of the inspection.
'
At no time during this inspection was written material provided to the licensee by the inspector.
,
3.
85102-Nuclear Material Control and Accounting a.
Organization and Operation i
j The inspector verified through review that the licensee had established and was maintaining written procedures for nuclear material control and accounting and that written statements of i
responsibility and authority had been established for those positions with responsibility for special nuclear material (SNM). These procedures were included in the licensee's SNM Accountability Manual, l
FMD-004, for Seabrook, dated January 1986, and SNM Inventory and Control Procedure, RS 0720, Revision 01, dated February 6,1986.
Both documents appeared adequate for the control of SNM.
!
,
!
i I
i
!
t
.
,, -,.,
.-,y
.,-.c_w,_
m.
- -.
..-
w..-.
,~~-s,
,,,%,.c, -,,
..r-e-,-
---nn,-
-.
--m.
--,.--. - -,
e-..--
-- - --
-
.
.
b.
Shipping and Receiving The inspector determined through review that the licensee had established, maintained and followed procedures to assure that all SNM received was accurately accounted for.
There were no shipments of SNM made during tne period under review (February 1,1985 through March 31, 1986).
In addition, the inspector determined that the preparation and transmittal of Nuclear Material Transaction Reports (DOE /NRC Form-741) were the responsibility of the Reactor Engineering Accountant.
The inspector performed a review of all DOE /NRC Form-741's generated during the period February 1, 1985-May 6, 1986 to determine authorized signature, timely dispatch, and accuracy of data. With the exception of an incorrect reporting identification symbol (RIS)
shown on three documents, which the licensee was in the process of correcting, no discrepancies were noted.
The inspection and storage of new fuel assemblies received from an off-site vendor was observed on May 8,1986, to determine if the licensee was following Procedure No. RS 0720, SNM Inventory Control, and Procedure No. RS 0722, New Fuel Receipt and Inspection. Health physics and reactor engineering department personnel strictly followed the procedures in accomplishing their responsibilities from receipt to storage of the fuel assemblies in the new fuel storage vault.
c.
Storage and Internal Control The inspector determined through review that the licensee had established and was maintaining and following a system of written material control and accounting procedures which provided for knowledge of the quantity, identity, and current location of all SNM l
bearing materials within the facility.
The inspector also determined that the licensee had established and was maintaining Item Control Areas (ICA's) that included the reactor, new fuel storage vault, spent fuel storage pool and other areas that were appropriate for SNM contained in other than fuel.
d.
Inventory The inspector performed an inventory verification on May 7 and 8,1986, which consisted of a piece count of the fuel assemblies shown on the new fuel storage map. The inspector also compared the new fuel storage map to the fuel location history card file. There were a total of 182 fuel assemblies located in the new fuel storage area.
A
,
.
e.
Records and Reports The inspector reviewed the licensee's records, reports and source data used for the preoaration of the Material Status Reports (DOE /NRC Form-742) submitted for the period October 1, 1985-March 31, 1986 as required by 10 CFR 70.53. With the exception of an incorrect RIS shown on a material status report, which the licensee was in the process of correcting, no discrepancies were identified.
Attached to this report as Exhibit I is a summary of the licensee's material activity for the period February 1,1985-May 8,1986.
f.
Management of Material Control Systems The inspector determined through review that the licensee had established a management system which provided for the development, revision, implementation and enforcement of nuclear material control and accounting procedures.
There was an organizational structure responsive to the nuclear material control and accounting requirements, pursuant to the license and applicable NRC regulations.
.
.
.
EXHIBIT I New Hampshire Yankee-Seabrook Nuclear Station Unit 1 Docket No. 50-443 License No. CPPR-135 Docket No. 70-3027 License No. SNM-1963 Material Balance for Period:
February 1, 1985-May 8, 1986 Reporting Identification Symbol:
XTB Reporting Unit:
grams Enriched Uranium Element Isotope Beginning Inventory:
(February 1,1985)
--
o---
--- ---
Additions:
Receipts:
84.345,169 2,006,414 84,345,169 2,006,414 Material to Account For:
========--
m--
xx Removals:
Shipments:
--
o---
--- ---
Ending Inventory:
(May 8, 1966)
1l 84,345,169 2,006,414 84,345,169 2,006,414 Material Accounted For:
=-----
182 Fuel Assemblies 84,345,145 2,006,393
=
3 Excore Detectors
21 (Serial Nos. 001, 002, 003) _
84,345,169 2,006,414
-====---------
L