IR 05000413/1986020
| ML20215K851 | |
| Person / Time | |
|---|---|
| Site: | Catawba |
| Issue date: | 10/07/1986 |
| From: | Grace J NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II) |
| To: | Tucker H DUKE POWER CO. |
| References | |
| NUDOCS 8610280325 | |
| Download: ML20215K851 (1) | |
Text
-
.
or'9m OCT 0 71986 Duke Power Company
/TTN: Mr. H. B. Tucker, Vice President Nuclear Production Department 422 South Church Street Charlotte, NC 28242 Gentlemen:
SUBJECT:
REPORT N0. 50-413/86-20 Thank you for your response of August 14, 1986, to our Notice of Violation issued on July 15, 1986, concerning activities conducted at your Catawba facility.
After careful review of the bases for your denial of the violation, we have concluded, for the reasons presented in the Enclosure to this letter, that the violation occurred as stated in the Notice of Violation.
Therefore, in accor-dance with 10 CFR 2.201(a), please submit to this office within 30 days of the date of this letter, a written statement describing steps which have been taken to correct the violation and the results achieved, corrective actions which will be taken to avoid further violations, and the date when full compliance will be achieved.
We appreciate your cooperation in this matter.
Sincerely,
.
- Dj7:
-;
1 U. u., u,4::
J. Nelson Grace Regional Administrator Enclosure:
Staff Assessment of Licensee Response to Notice of Violation fcw/ encl:
v'J. W. Hampton, Station Manager b
w/ encl:
. N. Jabbour, NRR NRC Resident Inspector g o28ggg gg0gg4ig Document Control Desk o
PDR State of South Carolina
_
RII V'
N RII RIl RI RII(I RI RII RII
'
li
. gj i
G
'
f (z,}4
'
/k2 n Bkyf ()l W
evsin CHo DCollins JStohr ger TPeetiles V.
wnlee G s
9/p/86 9g/86 9/2/86 9/pt/86 9/g/86 9/d/86
/8
6 g/gp RI RII.
s Ms'
Rha1keh nh's,
65S 9/d886 9/yrf86 c5[/J'
_n-4 gy