IR 05000412/1986017

From kanterella
Jump to navigation Jump to search
Advises That Since Issuance of Insp Rept 50-412/86-17,two Open Items Identified in Insp Rept 50-412/86-09 Adequately Addressed by S&W.Confirmatory Ltr Requested Prior to Fuel Loading Re Completion of Listed S&W Confirmation Programs
ML20206C047
Person / Time
Site: Beaver Valley
Issue date: 04/08/1987
From: Rubenstein L
Office of Nuclear Reactor Regulation
To: Carey J
DUQUESNE LIGHT CO.
References
TAC-62939, NUDOCS 8704100143
Preceding documents:
Download: ML20206C047 (6)


Text

..

--

-

-

-

-

.

.

_. _ _

..

b.,

s

'o UNITED STATES

.

~,,

NUCLEAR REGULATORY COMMISSION o

.

,

t WASHINGTON, D. C. 20555 -

'

\\*****/

'

.

April 8, 1987

+

.

Docket No. :

50-412

,

Mr. J. J. Carey, Vice President

!

Duquesne Light Company i

Nuclear Group

-

'

P. O. Box 4

.Shippingport PA 15077

,

,

,

I

Dear Mr. Carey:

.

SUBJECT: BEAVER VALLEY POWER STATION - UNIT NO. 2 (BV-?.) ENGINEERING ASSURANCE PROGRAM (EAP) (TAC 62939)

At the time our Inspection Report 50-412/86-17 dated August 13, 1986 was prepared, two items from our previous inspection as documented in Inspection

,

Report 50-412/86-09 dated June 17, 1986 remained open. Since the issuance

'

,

of report 50-412/86-17, Stone and Webster Engineering Corporation (SWEC)

has adequately addressed these items as described below.

1.

Item 4.3 of Inspection Report 50-412/86-09 concerned the interface between the Stress Design Group and the Power Division pf SWEC. This item has been

incorporated in EA action item (AI) P-12.

This AI has been resolved to our satisfaction and is considered closed as will be iridicated in Section 17.5.4

of Supplement 5 of the safety evaluation report (SSER 5).

2.

Item 4.8 of Inspection Report 50-412/86-09 indicated that the recircul.ating spray system (RSS) cooler support design should be analyzed. This item was addressed by EA in Al M-26. AI M-26 has been satisfactorily resolved by SWEC

'

and is considered closed by NRC. This item will be dicussed in Section 17.5.4 of the SSER 5.

!

Inspection Report 50-412/86-17, in a number of areas, indicated that NRC would J

monitor or follow-up on certain items that were under active review by SWEC.

This has been accomplished and these items will be addressed in the staff's

'

SSER 5.

.

We consider that all of these NRC follow-up items have been satisfactorily

resolved. However, we request a confirmatory letter, prior to fuel loading, i

regarding the completion of the following SWEC confirmation programs, l

1) 2BVM-117, "Confimation Program of Key Documents", and 2) 2BVM-122,

" Engineering Confirmation Update Program." Confirmation is also requested to

indicate that the Internally Generated Missile and Seismically Induced Safe.ty/

Non-Safety Interaction assessments of the " Hazards Analysis Program Audit" (SWEC EA Audit No. 50) have been fully implemented, e704100143 870408 f

PDR ADOCK 05000412

i G

PDR i

...

.

.

.-

.

_ _,, _ _ _. _

_ _ _. _. _ _ _. _ _ _ _ _ _ _. _ _.. _ _ _. -.. _ _ _ _. _.. _ _, _

., _ _ _ _ _ _

- _. _

_

_ _

__ ___ _ _ _ _ _ - _ _ _ _ _ _ _ _ _

..

.

Mr. J..

In addition, we also request confirmation that the corrective actions in response to Action Items P-13 and P-15 of SWEC Engineering Assurance Audit No. 52 have been completed. The Action Item P-13 corrective action concerned the SWEC

!

review of the stress data packages for the six Westinghouse designed systems I

to assure the validity of the input data, e.g., temperatures, pressures, etc.

i The corrective action for Action Item P-15 involved the SWEC verification of i

design inputs to instrument tubing design calculations.

  • The following Engineering Assurance Action Items (Als) were resolved based on

<

a commitment to submit proposed FSAR changes to the NRC. The Als in this category are: C01, C03, C06, C07 C22, C45. E03, E04, E05, E08 E09, M01, M02, M03, P07, P10, S01, 503, 507, 512 of EA Audit No. 52 and Item 1.3 of Audit

No. 44. With the exception of FSAR changes resulting from finding C01, all of the proposed FSAR changes have been submitted in FSAR amendments 13, and 15.

Proposed FSAR changes constitute open licensing issues to be resolved between the Duquesne Light Company and the NRC as part of the norwal licensing process.

Sincerely,

.

h.

-i c

_o_

-

Lester S.

ubinstein, Director Project Dtrectorate # 2 Division of PWR Licensing - A Office of Nuclear Reactor Regulation

cc: See next page

-

.

o

e e

.

.

.., -

-. - -

-

,-

, - -

,,,, _ - - - -

. - - - -. -,, -

-. - - - -

,,,-,,-a,

,,,

w

+, - -, - - - - - - - - - - - - -

-

,,.

..

i Mr. J.,

Duquesne Light Company B2 aver Valley 2 Power Station

'

l

.

cc:

Gerald Charnoff, Esq.

Mr. R. E. Martin, Manager Jay E. Silberg, Esq.

Regulatory Affairs Shaw, Pittman, Potts & Trowbridge Duquesne Light Company 2300 N Street, N.W.

Beaver Valley Two Proiect Washington, DC 20037 P. O. Box 328-Shippingport, Pennsylvania 15077 Mr. C. W. Ewing, Quality Assurance Pennsylvania Office of Consumer Manager

. Advocate Ouality Assurance Department ATTN: Michael Bardee Duquesne Light Company 1425 Strawberry Square P. O. Box 186 Harrisburg, Pennsylvania 17120

-

Shippingport, Pennsylvania 15077 John D. Burrows, P.E.

.

Director, Pennsylvania Emergency Director of Utilities Management Agency State of Ohio Room B-151 Public Utilities Commission Transportation & Safety Building 180 East Broad Street Harrisburg, Pennsylvania 17120-Columbus, Ohio 43266-0573 Mr. T. J. Lex Bureau of Radiation Protection Westinghouse Electric Corporation PA Department of Environmental Power Systems Resources i

P. O. Box 355 ATTN:

R. Janati Pittsburgh, Pennsylvania 15230 P.O. Box 2063 Harrisburg, Pennsylvania 17120 Mr. P. RaySircar

'

.

Stone & Webster Engineering Corporation BVPS-2' Records Management Supervisor P. O. Box 2325 Duquesne Light Company Boston, Massachusetts 0?107 Post Office Box 4 Shippingport, Pennsylvania 15077 Mr. J. Beall

'

U. S. NRC John A. Lee, Esq.

'

P. O. 181 Duquesne Light Company Shippingport, Pennsylvania 15077 1 0xford Centre 301 Grant Street Mr. Thomas E. Murley, Regional Admin.

Pittsburgh, Pennsylvania 15279 U. S. NRC, Region I 631 Park Avenue King of Prussia, Pennsylvania 15229

,

I e

..,.

_ _ _ _. _..

, _. _..

.,,,..,

._

- _ -.. _, -.. -

_ - -,,

y

-,

.

-

-

r_

'

.:

s

,

Mr. J..

Distribution

<

Ty.-

Local PDR OAB Reading DQAYT Reading JMTaylor, IE BKGrimes. IE HJMiller, IE EVImbro IE HBWang, IE-LSRubenstein, NRR PSTam, NRR PKEapen, RI LETripp, RI

  • See previous concurrences
  • 0AB:DQAVT:IE *0AB:DQAVT:IE *DD:00AVT:IE tD:DOAVT:IE PADZ:N HBWang:Je EVImbro HJMiller BKGrimes PSTam

/

3/ /87 3/ /87 3/ /87 4/ /87 4Q/8 c.

R

,LSRubenstein 4/ P/87

. -

-

-

- -

- - -

-

- -

-

-

.

.

-

-

I

. - -.

.

,

_Mr. J. Distribution DCS 016 PDR Local PDR QAB Reading DQAVT~ Reading

'

JMTaylor,IE IE BKGrimes, HJMiller,IE EVImbro, IE HBWang, IE LSRubenstein,NRR-PSTam NRR

,

PKEape,n, RI LETripp, RI

.

  • See previous concurrences
  • QAB:DQAVT:IE *QAB:DQAVT:IE *DD:DQAVT:IE

)

.E PADZ:NRR HBWang:je EVImbro HJMiller K rimes PSTam 3/ /87 3/ /87 3/ /87 4/td87-4/ /87 D:PADZ:NRR LSRubenstein 4/ /87

,

..

..

' Distribution DCS 016 PDR Local PDR QAB Reading

~DQAVT Reading JMTaylor, IE-Mter6HTcROB=:r-

~BKGrimes, IE HJMiller, IE

'

EVImbro, IE HBWang, IE4 PSTam, NRR PKEapen, RI LETripp, RI LSRubenstein, NRR~

,

!

!

i

!

/T l

VT:IE QAB:DQAVT:IE (Miller (DQAVT:IE D:DQAVT:IE PADZ:NRR H8 ang EVImbro BKGrimes PSTam s

3/5/87 3/4 /87 3/)]/87 3/ /87 3/ /87 l

D:PADZ:NRR LSRubenstein 3/ /87

,

.

....

..