IR 05000395/1982035
| ML20053D169 | |
| Person / Time | |
|---|---|
| Site: | Summer |
| Issue date: | 05/24/1982 |
| From: | Mcguire D, Moore D, Stansberry W NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II) |
| To: | |
| Shared Package | |
| ML20053D162 | List: |
| References | |
| 50-395-82-35, NUDOCS 8206040147 | |
| Download: ML20053D169 (1) | |
Text
je"'%
SAFEGUARE,lMFATION
NUCLEAR REGULATORY COMMISSION
<,
REGION 11
- g[
101 MARIETTA ST., N.W., SulTE 3100 o,
ATLANTA, GEORGIA 30303 MAY 261982 Report No. 50-395/82-35 Docket No. 50-395 License No. CPPR-94 Licensee:
~ /th Carolina Electric and Gas Company ambia, SC 29218 Facility Name:
V. C. Summer Nuclear Station Inspection at: Jenkinsville, SC Inspection conducted: May 10-14, 1982 Date of Last Physical Security Inspection Visit: March 30 - April 2, 1982 Type of Inspection:
Announced Physical Security
<
Inspector h
(?M 6[Q / fh D ETM'oord ~,JPhysi 1 Security Inspector Date Si ned Sh1.)]
%
S SI $V
-
W.' W. Stans err'9, Physi 1 Security Inspector Dat!e Slaned
-
2-Approved by:
D. R. McGuire, Chief, Physical Protection Section (Tate'# Signed
'
Technical Inspection Branch, Division of Engineering and Technical Programs Inspection Summary
,
.
Areas Inspected:
Included review of Security Plan; T&Q and Contingency Plans; I
Physical Barriers-PA; Physical Barriers-VA; Detection Aids-PA; Detection Aids-VA; Assessment Aids; Access Control-Personnel; Access Control-Packages;
,
l Access Control-Vehicles and Security Program Audit.
l The inspection involved 63 inspector hours on site by two NRC inspectors.
Eleven inspection hours were accomplished during offshift periods.
'
!
l Results: The licensee was found to be in compliance with NRC requirements within the areas examined.
Four inspector follow-up items were identified during this inspection.
S-F2 M - 96 Copy
- f
'7 Copies E:TCT.0SURE CONTAINS f
pg,3 SAFEGUARDS Itry0RMATION.
This Document ic not to be UPON SEPARATION THIS reproduced without specifio
- "I " IE*II
'
8206040147 020526 PDR ADOCK 05000395
G PDR _ _._