IR 05000395/1982030
| ML20055A769 | |
| Person / Time | |
|---|---|
| Site: | Summer |
| Issue date: | 07/12/1982 |
| From: | Goode R, Mcguire D NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II) |
| To: | |
| Shared Package | |
| ML20055A759 | List: |
| References | |
| 50-395-82-30, NUDOCS 8207190421 | |
| Download: ML20055A769 (1) | |
Text
-.n, UNITED STATES
g
NUCLEAR REGULATORY. COMMISSION g
REGION 11 s
101 MARIETTA ST., N.W., SulTE 3100 ATLANTA, GEORGIA 30303
JUL 121982 Report No. 50-395/82-30 Docket No. 50-395 License No. CPPR-94 Licensee:
South Carolina Electric and Gas Company ATTN:
Mr. O. W. Dixon Jr., Vice President Nuclear Operations P. O.
Box 764 (Mail Code F-04)
Columbia, SC 29218 Facility Name:
V. C. Summer Nuclear Station Inspection at: Jenkinsville, SC Inspection conducted: June 28-30, 1982 Date of Last Physical Security Inspection Visit: May 10-14, 1982 Type of In,specti Announced Physical Security Inspector:
AbAv t,
(
u.R 1982 R. W.[joode, Physical Security Inspector Dat( Slgned Approved by:
C
-
7!/E/72__
[i. R. McGuire, Chief, Physical Protection Section D/te 5'igned Technical Inspection Branch Division of Engineering and Technical Programs Inspection Summary Areas Inspected:
Included review of Security Plan, T&Q and Contingency Plans; Security Organization; Records and Reports; Testing and Maintenance; Physical Barriers; Lighting; Assessment Aids; Access Control; Detection Aids and Alarm Stations.
The inspection involved 21 inspector hours by one NRC inspector.
Two inspection hours were accomplished during offshift periods.
Results:
The licensee was found to be in compliance with NRC requirements within the areas examined during the inspection.
h-Er
//>
. ;;;AIN3 Cr -
EI@
-
cf g 13;yoKT.ATIO**
C Ar * '.
Pages Copies
-
pylo,; THIS
'
L; This Docurent is not to be go;;IROLLED.
reproduced without specifio approval of IE:II
.__
?" ^ [oh h
820719