IE Insp Rept 50-395/82-19 on 820301-04.No Noncompliance Noted.Major Areas Inspected:Preoperational Tests,Ie Bulletin 81-01 & Licensee Identified Items Per 10CFR50.55(e)
ML20050N534
Person / Time
Site: Summer South Carolina Electric & Gas Company icon.png
Issue date: 03/16/1982
From: Hunt M, Jape F
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To:
Shared Package
ML20050N533 List:
References
50-395-82-19, IEB-81-01, IEB-81-1, NUDOCS 8204140389
Download: ML20050N534 (3)


Text

.

.

,

'o,,

UNITED STATES

NUCLEAR REGULATORY COMMISSION o

$

REGION 11

&[

101 MARIETTA ST., N.W., SUITE 3100 Q

%

ATLANTA, GEORGIA 30303

Report No. 50-395/82-19 Licensee:

South Carolina Electric and Gas Company Columbia, South Carolina Facility Name:

V. C. Summer Docket No. 50-395 License No. CPPR-94 Inspection at V. C. Summer site near Parr, South Carolina Inspector:

,W/M C/22 M. D. Hunt '

f [/

Date Signed Approved by:

,/ M hR O[N F. Jape, Section Chief [/ /

Date Signed Engineering Inspection Branch Division of Engineering and Technical Programs SUMMARY Inspection on March 1-4, 1982 Areas Inspected This routine, unannounced inspection involved 27 inspector-hours on site in the areas of preoperation test results, IE Bulletins and licensee identified item (10 CFR 50.55(e)).

Results Of the areas inspected, no violations or deviations were identified.

<

l 8204140309 820318 PDR ADOCK 05000395

PDR

,

=

]

(.

...

r

.

i o

I a

i REPORT DETAILS l

.

1.

Persons Contacted

Licensee Employees

  • W. A. Williams, Jr., General Manager, Nuclear Operations
  • A. R. Koon, Technical Services Coordinator a
  • H. I. Donnelly, I.S.E.G. Engineer

)

  • H. C. Fields, Tech. Services Engineer
  • S. J. Smith, Assistant Manager, Maintenance Section
  • S. S. Howze, Nuclear Licensing Engineer
  • P. V. Fant, Director, Station QC l

J. Turkett, Nuclear Operation Maintenance Engineer i

R. Craven, Operations QC J. G. Connelly, Deputy Site Manager Other Organizations H. A. Bamberger, Gilbert Associates, Inc., (GAI) Resident Engineer D. Cunningham, GAI Field Engineer J. Wilcox, Electrical Engineer, Daniel Construction

-

NRC Resident Inspector

  • J. L. Skolds
  • Attended exit interview 2.

Exit Interview The inspection scope and findings were summarized on March 4, 1982, with

'

those persons indicated in paragraph 1 above.

3.

Licensee Action on Previous Inspection Findings Not inspected.

4.

Unresolved Items Unresolved items were not identified during this inspection.

5.

Preoperational Test Results Evaluation The inspector examined 33 preoperational test results for tests which tested all or parts of 13 different systems required for operation and safe shut-down of the reactor. All had been reviewed by the appropriate personnel in accordance with procedure SUM-B-2, Preparation of Phase II Start-up Proce-dures. This procedure requires the test results to be approved by the NSSS

.

.

_ _ _ _ _ _ - - - -

-

.

! ~

vendor and the A-E when applicable in addition to the startup supervisor and

.

plant manager.

The test results examined covered portions of the following systems:

AC Power Distribution System Instrument Air System Reactor Building Instrument Air System Component Cooling Flow Test Control Rod Drive System Reactor Trip Breaker Tests DC Electrical System DC Electrical Distribution System Atmospheric Steam Dump System RHR Pump Flow Tests Boric Acid Transfer Flow Test Charging Seal and Letdown Flow Test Diesel Generator Fuel Oil Transfer Test Within the area examined, no violations were identified.

6.

IE Bulletins (IEB)

(Closed) IEB 81-01, Surveillance of Mechanical Snubbers. The licensee has developed and instituted two procedures in complying with their commitment made in their August 31, 1981 letter to RII.

These procedures are STP 403.002 Mechanical Snubber Visual Inspection and STP 403.003 Mechanical Snubber Operational Test.

i 7.

Licensee Identified Items (LII) 10 CFR 50.55(e)

'

(Closed) LII 50-395/79-30-04, ASCO Solenoid Values. The licensee submitted a final report dated October 24, 1979.

All solenoid values have been identified and all but 23 out of 111 have been modified.

-(Closed) LII 50-395/81-05-10, Corroded Hermatic Connectors. The corrective

.

actions described in the final report dated January 27, 1982 have-been completed to correct the Valcor solenoid valve coil gassing contamination of connectors.

8.

Inspector Followup Items (IFI)

(Closed) IFI 50-395/80-22-01. Areas shimmed after HFT will be reinspected on next heatup.

The inspector reviewed the NSSS supplier's memo that

. verified that the shimming of reactor coolant components had been completed and was acceptable.

.

-;

-

,.. _ -

.

__

_