Insp Rept 50-327/87-22 & 50-328/87-22 on 870406-10.No Deficiencies Noted.Major Areas Inspected:Implementation of Program Per Requirements of 10CFR50.49 for Establishing & Maintaining Qualification of Electric EquipmentML20215H491 |
Person / Time |
---|
Site: |
Sequoyah |
---|
Issue date: |
05/19/1987 |
---|
From: |
Hubbard G, Pierson R NRC OFFICE OF SPECIAL PROJECTS |
---|
To: |
|
---|
Shared Package |
---|
ML20215H476 |
List: |
---|
References |
---|
50-327-87-22, 50-328-87-22, NUDOCS 8706240125 |
Download: ML20215H491 (16) |
|
|
---|
Category:INSPECTION REPORT
MONTHYEARIR 05000327/19990051999-09-27027 September 1999 Insp Repts 50-327/99-05 & 50-328/99-05 on 990718-0828. Violations Noted.Major Areas Inspected:Mitigating Sys ML20210V1621999-08-13013 August 1999 Insp Repts 50-327/99-04 & 50-328/99-04 on 990601-0717.One Potentially Safety Significant Issue Noted.Major Areas Inspected:Licensee Emergency Preparedness IR 05000327/19990031999-06-30030 June 1999 Insp Repts 50-327/99-03 & 50-328/99-03 on 990328-0531.Non- Cited Violations Noted.Major Areas Inspected:Aspects of Licensee Operations,Maint & Engineering IR 05000327/19990021999-04-23023 April 1999 Insp Repts 50-327/99-02 & 50-328/99-02 on 990214-0327.No Violations Noted.Major Areas Inspected:Licensee Operations, Maint & Engineering IR 05000327/19990011999-03-15015 March 1999 Insp Repts 50-327/99-01 & 50-328/99-01 on 990103-0213. Violations Noted & Being Treated as non-cited Violations. Major Areas Inspected:Aspects of Licensee Operations,Maint & Engineering IR 05000327/19980111999-02-0101 February 1999 Insp Repts 50-327/98-11 & 50-328/98-11 on 981122-990102. Violations Noted.Major Areas Inspected:Licensee Operations, Maint & Engineering IR 05000327/19980101998-12-0707 December 1998 Insp Repts 50-327/98-10 & 50-328/98-10 on 981011-1121.No Violations Noted.Major Areas Inspected:Operations,Maint & Engineering IR 05000327/19980141998-12-0404 December 1998 Insp Repts 50-327/98-14 & 50-328/98-14 on 981102-06.No Violations Noted.Major Areas Inspected:Observation & Evaluation of Biennial Emergency Preparedness Exercise for Sequoyah Nuclear Plan IR 05000327/19980131998-11-24024 November 1998 Insp Repts 50-327/98-13 & 50-328/98-13 on 980914-1016. Violations Noted.Major Areas Inspected:Aspects of Licensee maint,testing,engineering,self-assessment & Problem Evaluations of Licensee Ice Condenser Sys IR 05000327/19980091998-11-0909 November 1998 Insp Repts 50-327/98-09 & 50-328/98-09 on 980830-1010. Violations Noted.Major Areas Inspected:Licensee Operations, Maint,Engineering Plant Support & Effectiveness of Licensee Controls in Identifying,Resolving & Preventing Problems IR 05000327/19980081998-09-18018 September 1998 Insp Repts 50-327/98-08 & 50-328/98-08 on 980719-0829.No Violations Noted.Major Areas Inspected:Operations,Maint, Engineering & Plant Support,Licensee Conducted Radiological Emergency Plan Drill IR 05000327/19980071998-08-0404 August 1998 Insp Repts 50-327/98-07 & 50-328/98-07 on 980607-0718. Violations Noted.Major Areas Inspected:Aspects of Licensee Operation,Maint,Engineering,Plant Support & Effectiveness of Licensee Controls in Identifying & Preventing Problems ML20236J6631998-06-26026 June 1998 Insp Repts 50-327/98-06 & 50-328/98-06 on 980426-0606. Violations Noted.Major Areas Inspected:Operations, Maintenance,Engineering & Plant Support IR 05000327/19980051998-06-12012 June 1998 Insp Repts 50-327/98-05 & 50-328/98-05 on 980504-08.No Violations Noted.Major Areas Inspected:Maint Procedure.Insp Team Comprised Region II & Headquarters Personnel.Switchgear & Surrounding Areas Found in Good Matl Condition IR 05000327/19980041998-05-15015 May 1998 Insp Repts 50-327/98-04 & 50-328/98-04 on 980315-0425. Violations Noted.Major Areas Inspected:Operations,Maint, Engineering & Plant Support ML20216H7841998-04-10010 April 1998 Insp Repts 50-327/98-03 & 50-328/98-03 on 980201-0314. Violations Noted.Major Areas Inspected:Operations,Maint, Engineering & Plant Support ML20217K3801998-03-30030 March 1998 Insp Repts 50-327/98-01 & 50-328/98-01 on 980126-0213.No Violations Noted.Major Areas Inspected:Operations,Maint & Engineering IR 05000327/19980021998-03-0505 March 1998 Insp Repts 50-327/98-02 & 50-328/98-02 on 980202-06.No Violations Noted.Major Areas Inspected:Aspects of Licensee Operations & Maint.Review of Initial & Requalification Training Programs Were Also Conducted ML20203J5541998-02-19019 February 1998 Insp Repts 50-327/97-18 & 50-328/97-18 on 971221-980131. Violations Noted.Major Areas Inspected:Licensee Operations, Maint,Engineering,Plant Support & Effectiveness of Licensee Controls in Identifying & Resolving Problems IR 05000327/19970171998-01-16016 January 1998 Insp Repts 50-327/97-17 & 50-328/97-17 on 971109-1220.No Violations Noted.Major Areas Inspected:Operations,Maint, Engineering,Plant Support & Effectiveness of Licensee Controls in Identifying,Resolving & Preventing Problems IR 05000327/19970141997-12-0808 December 1997 Insp Repts 50-327/97-14 & 50-328/97-14 on 970928-1108.No Violations Noted.Major Areas Inspected:Operations,Maint, Engineering,Plant Support,Effectiveness of License Controls in Identifying,Resolving & Preventing Problems IR 05000327/19970161997-12-0505 December 1997 Insp Repts 50-327/97-16 & 50-328/97-16 on 971103-06.No Violations Noted.Major Areas Inspected:Evaluation of 971017 Wire Damage Event at Electrical Penetration 22 IR 05000327/19970121997-10-24024 October 1997 Insp Repts 50-327/97-12 & 50-328/97-12 on 970824-0927.No Violations Noted.Major Areas Inspected:Operations,Maint, Engineering & Plant Support & Operator Requalification Program IR 05000327/19970151997-10-23023 October 1997 Insp Repts 50-327/97-15 & 50-328/97-15 on 970922-29.No Violations Noted.Major Areas Inspected:Emergency Preparedness IR 05000327/19970081997-09-22022 September 1997 Insp Repts 50-327/97-08 & 50-328/97-08 on 970706-0823. Violations Noted.Major Areas Inspected:Licensee Operations, Maint,Engineering,Plant Support & Effectiveness of Licensee Controls in Identifying,Resolving & Preventing Problems IR 05000327/19970091997-09-15015 September 1997 Insp Repts 50-327/97-09 & 50-328/97-09 on 970804-08.No Violations Noted.Major Areas Inspected:Operations,Maint & Engineering Re Effectiveness of Licensee Controls in Identifying,Resolving & Preventing Problems ML20198H7911997-09-11011 September 1997 Insp Repts 50-327/97-13 & 50-328/97-13 on 970725-0904. Violations Noted.Major Areas Inspected:Insp Scope,Event Synopsis & Observations & Findings ML20141H9581997-07-28028 July 1997 Insp Repts 50-327/97-06 & 50-328/97-06 on 970525-0705. Violations Noted.Major Areas Inspected:Operations,Maint, Engineering & Plant Support IR 05000327/19970071997-07-24024 July 1997 Insp Repts 50-327/97-07 & 50-328/97-07 on 970623-27. Violations Noted.Major Areas Inspected:Aspects of Licensee Plant Support ML20141G0441997-06-20020 June 1997 Insp Repts 50-327/97-04 & 50-328/97-04 on 970413-0524. Violations Noted.Major Areas Inspected:Operations Re Physics Testing,Maint,Engineering & Plant Support ML20148F9631997-05-27027 May 1997 Special Insp Repts 50-327/97-05 & 50-328/97-05 on 970324-0522.Violations Noted.Major Areas Inspected:Events Associated W/Unit 1 Inadvertent RCS Drain Down on 970324 ML20141C9881997-05-12012 May 1997 Insp Repts 50-327/97-03 & 50-328/97-03 on 970302-0412. Violations Noted.Major Areas Inspected:Operations, Maintenance,Engineering & Plant Support IR 05000327/19970021997-03-24024 March 1997 Insp Repts 50-327/97-02 & 50-328/97-02 on 970203-14.No Violations Noted.Major Areas Inspected:Detailed Reviews of Corrective Actions 14-1,14-2,14-3,15 & 16 ML20137F7081997-03-18018 March 1997 Insp Repts 50-327/97-01 & 50-328/97-01 on 970119-0301. Violations Noted.Major Areas Inspected:Operations, Maintenance,Engineering,Plant Support & Effectiveness of Licensee Controls in Identifying & Preventing Problems IR 05000327/19960171997-02-14014 February 1997 Insp Repts 50-327/96-17 & 50-328/96-17 on 961208-970118.No Violations Noted.Major Areas Inspected:Operations, Maintenance,Engineering,Plant Support & Plant Status ML20134G1851997-01-13013 January 1997 Insp Repts 50-327/96-16 & 50-328/96-16 on 960923-1219. Violations Noted.Major Areas Inspected:Review of Corrective Actions Implemented for Problem Evaluation Repts IR 05000327/19960141996-12-31031 December 1996 Insp Repts 50-327/96-14 & 50-328/96-14 on 961027-1207.No Violations Noted.Major Areas Inspected:Operations,Maint, Engineering & Plant Support IR 05000327/19960151996-12-23023 December 1996 Insp Repts 50-327/96-15 & 50-328/96-15 on 961104-08.No Violations Noted.Major Areas Inspected:Control Room Simulator,Tsc,Osc,Cecc & Joint Info Ctr of Biennial Emergency Preparedness Exercise ML20134Q1721996-11-25025 November 1996 Insp Repts 50-327/96-13 & 50-328/96-13 on 960919-1102. Violations Noted.Major Areas Inspected:Events Associated W/Reactor Shutdown & Subsequent Manual Tripping of Unit 2 on 961011 IR 05000327/19960111996-11-19019 November 1996 Insp Repts 50-327/96-11 & 50-328/96-11 on 960915-1026. Violations Noted.Major Areas Inspected:Licensee Operations, Maint,Engineering,Plant Support, & Effectiveness of Licensee Controls in Identifying,Resolving & Preventing Problems ML20134Q3301996-11-19019 November 1996 Insp Repts 50-327/96-11 & 50-328/96-11 on 960915-1026. Violations Noted.Major Areas Inspected:Licensee Operations, Maint,Engineering,Plant Support, & Effectiveness of Licensee Controls in Identifying,Resolving & Preventing Problems ML20129A2141996-10-10010 October 1996 Insp Repts 50-327/96-09 & 50-328/96-09 on 960728-0914. Violations Noted.Major Areas Inspected:Operations,Maint, Engineering & Plant Support ML20128H8021996-09-27027 September 1996 Insp Repts 50-327/96-10 & 50-328/96-10 on 960708,10-12 & 0819-22.Non Cited Violations Noted.Major Areas Inspected: Plant FP Program & Action Taken of Insp Findings Previously Identified IR 05000327/19930521993-12-23023 December 1993 Insp Repts 50-327/93-52 & 50-328/93-52 on 931107-1204. Violations Noted.Major Areas Inspected:Plant Operations, Maint,Plant Surveillance,Evaluation of Licensee self-assessment Capability & LER Closeout IR 05000327/19930371993-12-17017 December 1993 Insp Repts 50-327/93-37 & 50-328/93-37 on 931115-19. Violations Noted.Major Areas Inspected:Operator Requalification Program,Exam Development & Administration & Training Staff Qualifications & Training IR 05000327/19930531993-12-17017 December 1993 Insp Repts 50-327/93-53 & 50-328/93-53 on 931115-19.No Violations Noted.Major Areas Inspected:Meteorological Monitoring,Control Room Emergency Ventilation,Audits & Secondary Water Chemistry IR 05000327/19930511993-12-13013 December 1993 Partially Withheld Insp Repts 50-327/93-51 & 50-328/93-51 on 931115-19 (Ref 10CFR73.21).No Violations Noted.Major Areas Inspected:Mgt Support,Security Program Plans & Implementing Procedures & Security Program Audit IR 05000327/19930501993-11-24024 November 1993 Insp Repts 50-327/93-50 & 50-328/93-50 on 931011-1106. Violations Noted.Major Areas Inspected:Plant Operations, Plant Maintenance,Plant Surveillance,Evaluation of Licensee self-assessment Capability & LER Closeout IR 05000327/19930421993-11-0909 November 1993 Insp Repts 50-327/93-42 & 50-328/93-42 on 930904-1010. Violations Noted.Major Areas Inspected:Plant Operations, Maint & Surveillance,Evaluation of Licensee self-assessment Capability & Licensee Event Rept Closeout IR 05000327/19930481993-11-0909 November 1993 Insp Repts 50-327/93-48 & 50-328/93-48 on 931006-08. Violation Noted.Major Areas Inspected:Qualifications of Acting Lab Supervisor,Use of Expired Stds in Alcohol breath-analysis Equipment & Testing Lab Procedures 1999-09-27
[Table view] Category:NRC-GENERATED
MONTHYEARIR 05000327/19990051999-09-27027 September 1999 Insp Repts 50-327/99-05 & 50-328/99-05 on 990718-0828. Violations Noted.Major Areas Inspected:Mitigating Sys ML20210V1621999-08-13013 August 1999 Insp Repts 50-327/99-04 & 50-328/99-04 on 990601-0717.One Potentially Safety Significant Issue Noted.Major Areas Inspected:Licensee Emergency Preparedness IR 05000327/19990031999-06-30030 June 1999 Insp Repts 50-327/99-03 & 50-328/99-03 on 990328-0531.Non- Cited Violations Noted.Major Areas Inspected:Aspects of Licensee Operations,Maint & Engineering IR 05000327/19990021999-04-23023 April 1999 Insp Repts 50-327/99-02 & 50-328/99-02 on 990214-0327.No Violations Noted.Major Areas Inspected:Licensee Operations, Maint & Engineering IR 05000327/19990011999-03-15015 March 1999 Insp Repts 50-327/99-01 & 50-328/99-01 on 990103-0213. Violations Noted & Being Treated as non-cited Violations. Major Areas Inspected:Aspects of Licensee Operations,Maint & Engineering IR 05000327/19980111999-02-0101 February 1999 Insp Repts 50-327/98-11 & 50-328/98-11 on 981122-990102. Violations Noted.Major Areas Inspected:Licensee Operations, Maint & Engineering IR 05000327/19980101998-12-0707 December 1998 Insp Repts 50-327/98-10 & 50-328/98-10 on 981011-1121.No Violations Noted.Major Areas Inspected:Operations,Maint & Engineering IR 05000327/19980141998-12-0404 December 1998 Insp Repts 50-327/98-14 & 50-328/98-14 on 981102-06.No Violations Noted.Major Areas Inspected:Observation & Evaluation of Biennial Emergency Preparedness Exercise for Sequoyah Nuclear Plan IR 05000327/19980131998-11-24024 November 1998 Insp Repts 50-327/98-13 & 50-328/98-13 on 980914-1016. Violations Noted.Major Areas Inspected:Aspects of Licensee maint,testing,engineering,self-assessment & Problem Evaluations of Licensee Ice Condenser Sys IR 05000327/19980091998-11-0909 November 1998 Insp Repts 50-327/98-09 & 50-328/98-09 on 980830-1010. Violations Noted.Major Areas Inspected:Licensee Operations, Maint,Engineering Plant Support & Effectiveness of Licensee Controls in Identifying,Resolving & Preventing Problems IR 05000327/19980081998-09-18018 September 1998 Insp Repts 50-327/98-08 & 50-328/98-08 on 980719-0829.No Violations Noted.Major Areas Inspected:Operations,Maint, Engineering & Plant Support,Licensee Conducted Radiological Emergency Plan Drill IR 05000327/19980071998-08-0404 August 1998 Insp Repts 50-327/98-07 & 50-328/98-07 on 980607-0718. Violations Noted.Major Areas Inspected:Aspects of Licensee Operation,Maint,Engineering,Plant Support & Effectiveness of Licensee Controls in Identifying & Preventing Problems ML20236J6631998-06-26026 June 1998 Insp Repts 50-327/98-06 & 50-328/98-06 on 980426-0606. Violations Noted.Major Areas Inspected:Operations, Maintenance,Engineering & Plant Support IR 05000327/19980051998-06-12012 June 1998 Insp Repts 50-327/98-05 & 50-328/98-05 on 980504-08.No Violations Noted.Major Areas Inspected:Maint Procedure.Insp Team Comprised Region II & Headquarters Personnel.Switchgear & Surrounding Areas Found in Good Matl Condition IR 05000327/19980041998-05-15015 May 1998 Insp Repts 50-327/98-04 & 50-328/98-04 on 980315-0425. Violations Noted.Major Areas Inspected:Operations,Maint, Engineering & Plant Support ML20216H7841998-04-10010 April 1998 Insp Repts 50-327/98-03 & 50-328/98-03 on 980201-0314. Violations Noted.Major Areas Inspected:Operations,Maint, Engineering & Plant Support ML20217K3801998-03-30030 March 1998 Insp Repts 50-327/98-01 & 50-328/98-01 on 980126-0213.No Violations Noted.Major Areas Inspected:Operations,Maint & Engineering IR 05000327/19980021998-03-0505 March 1998 Insp Repts 50-327/98-02 & 50-328/98-02 on 980202-06.No Violations Noted.Major Areas Inspected:Aspects of Licensee Operations & Maint.Review of Initial & Requalification Training Programs Were Also Conducted ML20203J5541998-02-19019 February 1998 Insp Repts 50-327/97-18 & 50-328/97-18 on 971221-980131. Violations Noted.Major Areas Inspected:Licensee Operations, Maint,Engineering,Plant Support & Effectiveness of Licensee Controls in Identifying & Resolving Problems IR 05000327/19970171998-01-16016 January 1998 Insp Repts 50-327/97-17 & 50-328/97-17 on 971109-1220.No Violations Noted.Major Areas Inspected:Operations,Maint, Engineering,Plant Support & Effectiveness of Licensee Controls in Identifying,Resolving & Preventing Problems IR 05000327/19970141997-12-0808 December 1997 Insp Repts 50-327/97-14 & 50-328/97-14 on 970928-1108.No Violations Noted.Major Areas Inspected:Operations,Maint, Engineering,Plant Support,Effectiveness of License Controls in Identifying,Resolving & Preventing Problems IR 05000327/19970161997-12-0505 December 1997 Insp Repts 50-327/97-16 & 50-328/97-16 on 971103-06.No Violations Noted.Major Areas Inspected:Evaluation of 971017 Wire Damage Event at Electrical Penetration 22 IR 05000327/19970121997-10-24024 October 1997 Insp Repts 50-327/97-12 & 50-328/97-12 on 970824-0927.No Violations Noted.Major Areas Inspected:Operations,Maint, Engineering & Plant Support & Operator Requalification Program IR 05000327/19970151997-10-23023 October 1997 Insp Repts 50-327/97-15 & 50-328/97-15 on 970922-29.No Violations Noted.Major Areas Inspected:Emergency Preparedness IR 05000327/19970081997-09-22022 September 1997 Insp Repts 50-327/97-08 & 50-328/97-08 on 970706-0823. Violations Noted.Major Areas Inspected:Licensee Operations, Maint,Engineering,Plant Support & Effectiveness of Licensee Controls in Identifying,Resolving & Preventing Problems IR 05000327/19970091997-09-15015 September 1997 Insp Repts 50-327/97-09 & 50-328/97-09 on 970804-08.No Violations Noted.Major Areas Inspected:Operations,Maint & Engineering Re Effectiveness of Licensee Controls in Identifying,Resolving & Preventing Problems ML20198H7911997-09-11011 September 1997 Insp Repts 50-327/97-13 & 50-328/97-13 on 970725-0904. Violations Noted.Major Areas Inspected:Insp Scope,Event Synopsis & Observations & Findings ML20141H9581997-07-28028 July 1997 Insp Repts 50-327/97-06 & 50-328/97-06 on 970525-0705. Violations Noted.Major Areas Inspected:Operations,Maint, Engineering & Plant Support IR 05000327/19970071997-07-24024 July 1997 Insp Repts 50-327/97-07 & 50-328/97-07 on 970623-27. Violations Noted.Major Areas Inspected:Aspects of Licensee Plant Support ML20141G0441997-06-20020 June 1997 Insp Repts 50-327/97-04 & 50-328/97-04 on 970413-0524. Violations Noted.Major Areas Inspected:Operations Re Physics Testing,Maint,Engineering & Plant Support ML20148F9631997-05-27027 May 1997 Special Insp Repts 50-327/97-05 & 50-328/97-05 on 970324-0522.Violations Noted.Major Areas Inspected:Events Associated W/Unit 1 Inadvertent RCS Drain Down on 970324 ML20141C9881997-05-12012 May 1997 Insp Repts 50-327/97-03 & 50-328/97-03 on 970302-0412. Violations Noted.Major Areas Inspected:Operations, Maintenance,Engineering & Plant Support IR 05000327/19970021997-03-24024 March 1997 Insp Repts 50-327/97-02 & 50-328/97-02 on 970203-14.No Violations Noted.Major Areas Inspected:Detailed Reviews of Corrective Actions 14-1,14-2,14-3,15 & 16 ML20137F7081997-03-18018 March 1997 Insp Repts 50-327/97-01 & 50-328/97-01 on 970119-0301. Violations Noted.Major Areas Inspected:Operations, Maintenance,Engineering,Plant Support & Effectiveness of Licensee Controls in Identifying & Preventing Problems IR 05000327/19960171997-02-14014 February 1997 Insp Repts 50-327/96-17 & 50-328/96-17 on 961208-970118.No Violations Noted.Major Areas Inspected:Operations, Maintenance,Engineering,Plant Support & Plant Status ML20134G1851997-01-13013 January 1997 Insp Repts 50-327/96-16 & 50-328/96-16 on 960923-1219. Violations Noted.Major Areas Inspected:Review of Corrective Actions Implemented for Problem Evaluation Repts IR 05000327/19960141996-12-31031 December 1996 Insp Repts 50-327/96-14 & 50-328/96-14 on 961027-1207.No Violations Noted.Major Areas Inspected:Operations,Maint, Engineering & Plant Support IR 05000327/19960151996-12-23023 December 1996 Insp Repts 50-327/96-15 & 50-328/96-15 on 961104-08.No Violations Noted.Major Areas Inspected:Control Room Simulator,Tsc,Osc,Cecc & Joint Info Ctr of Biennial Emergency Preparedness Exercise ML20134Q1721996-11-25025 November 1996 Insp Repts 50-327/96-13 & 50-328/96-13 on 960919-1102. Violations Noted.Major Areas Inspected:Events Associated W/Reactor Shutdown & Subsequent Manual Tripping of Unit 2 on 961011 IR 05000327/19960111996-11-19019 November 1996 Insp Repts 50-327/96-11 & 50-328/96-11 on 960915-1026. Violations Noted.Major Areas Inspected:Licensee Operations, Maint,Engineering,Plant Support, & Effectiveness of Licensee Controls in Identifying,Resolving & Preventing Problems ML20134Q3301996-11-19019 November 1996 Insp Repts 50-327/96-11 & 50-328/96-11 on 960915-1026. Violations Noted.Major Areas Inspected:Licensee Operations, Maint,Engineering,Plant Support, & Effectiveness of Licensee Controls in Identifying,Resolving & Preventing Problems ML20129A2141996-10-10010 October 1996 Insp Repts 50-327/96-09 & 50-328/96-09 on 960728-0914. Violations Noted.Major Areas Inspected:Operations,Maint, Engineering & Plant Support ML20128H8021996-09-27027 September 1996 Insp Repts 50-327/96-10 & 50-328/96-10 on 960708,10-12 & 0819-22.Non Cited Violations Noted.Major Areas Inspected: Plant FP Program & Action Taken of Insp Findings Previously Identified IR 05000327/19930521993-12-23023 December 1993 Insp Repts 50-327/93-52 & 50-328/93-52 on 931107-1204. Violations Noted.Major Areas Inspected:Plant Operations, Maint,Plant Surveillance,Evaluation of Licensee self-assessment Capability & LER Closeout IR 05000327/19930371993-12-17017 December 1993 Insp Repts 50-327/93-37 & 50-328/93-37 on 931115-19. Violations Noted.Major Areas Inspected:Operator Requalification Program,Exam Development & Administration & Training Staff Qualifications & Training IR 05000327/19930531993-12-17017 December 1993 Insp Repts 50-327/93-53 & 50-328/93-53 on 931115-19.No Violations Noted.Major Areas Inspected:Meteorological Monitoring,Control Room Emergency Ventilation,Audits & Secondary Water Chemistry IR 05000327/19930511993-12-13013 December 1993 Partially Withheld Insp Repts 50-327/93-51 & 50-328/93-51 on 931115-19 (Ref 10CFR73.21).No Violations Noted.Major Areas Inspected:Mgt Support,Security Program Plans & Implementing Procedures & Security Program Audit IR 05000327/19930501993-11-24024 November 1993 Insp Repts 50-327/93-50 & 50-328/93-50 on 931011-1106. Violations Noted.Major Areas Inspected:Plant Operations, Plant Maintenance,Plant Surveillance,Evaluation of Licensee self-assessment Capability & LER Closeout IR 05000327/19930421993-11-0909 November 1993 Insp Repts 50-327/93-42 & 50-328/93-42 on 930904-1010. Violations Noted.Major Areas Inspected:Plant Operations, Maint & Surveillance,Evaluation of Licensee self-assessment Capability & Licensee Event Rept Closeout IR 05000327/19930481993-11-0909 November 1993 Insp Repts 50-327/93-48 & 50-328/93-48 on 931006-08. Violation Noted.Major Areas Inspected:Qualifications of Acting Lab Supervisor,Use of Expired Stds in Alcohol breath-analysis Equipment & Testing Lab Procedures 1999-09-27
[Table view] Category:INSPECTION REPORT
MONTHYEARIR 05000327/19990051999-09-27027 September 1999 Insp Repts 50-327/99-05 & 50-328/99-05 on 990718-0828. Violations Noted.Major Areas Inspected:Mitigating Sys ML20210V1621999-08-13013 August 1999 Insp Repts 50-327/99-04 & 50-328/99-04 on 990601-0717.One Potentially Safety Significant Issue Noted.Major Areas Inspected:Licensee Emergency Preparedness IR 05000327/19990031999-06-30030 June 1999 Insp Repts 50-327/99-03 & 50-328/99-03 on 990328-0531.Non- Cited Violations Noted.Major Areas Inspected:Aspects of Licensee Operations,Maint & Engineering IR 05000327/19990021999-04-23023 April 1999 Insp Repts 50-327/99-02 & 50-328/99-02 on 990214-0327.No Violations Noted.Major Areas Inspected:Licensee Operations, Maint & Engineering IR 05000327/19990011999-03-15015 March 1999 Insp Repts 50-327/99-01 & 50-328/99-01 on 990103-0213. Violations Noted & Being Treated as non-cited Violations. Major Areas Inspected:Aspects of Licensee Operations,Maint & Engineering IR 05000327/19980111999-02-0101 February 1999 Insp Repts 50-327/98-11 & 50-328/98-11 on 981122-990102. Violations Noted.Major Areas Inspected:Licensee Operations, Maint & Engineering IR 05000327/19980101998-12-0707 December 1998 Insp Repts 50-327/98-10 & 50-328/98-10 on 981011-1121.No Violations Noted.Major Areas Inspected:Operations,Maint & Engineering IR 05000327/19980141998-12-0404 December 1998 Insp Repts 50-327/98-14 & 50-328/98-14 on 981102-06.No Violations Noted.Major Areas Inspected:Observation & Evaluation of Biennial Emergency Preparedness Exercise for Sequoyah Nuclear Plan IR 05000327/19980131998-11-24024 November 1998 Insp Repts 50-327/98-13 & 50-328/98-13 on 980914-1016. Violations Noted.Major Areas Inspected:Aspects of Licensee maint,testing,engineering,self-assessment & Problem Evaluations of Licensee Ice Condenser Sys IR 05000327/19980091998-11-0909 November 1998 Insp Repts 50-327/98-09 & 50-328/98-09 on 980830-1010. Violations Noted.Major Areas Inspected:Licensee Operations, Maint,Engineering Plant Support & Effectiveness of Licensee Controls in Identifying,Resolving & Preventing Problems IR 05000327/19980081998-09-18018 September 1998 Insp Repts 50-327/98-08 & 50-328/98-08 on 980719-0829.No Violations Noted.Major Areas Inspected:Operations,Maint, Engineering & Plant Support,Licensee Conducted Radiological Emergency Plan Drill IR 05000327/19980071998-08-0404 August 1998 Insp Repts 50-327/98-07 & 50-328/98-07 on 980607-0718. Violations Noted.Major Areas Inspected:Aspects of Licensee Operation,Maint,Engineering,Plant Support & Effectiveness of Licensee Controls in Identifying & Preventing Problems ML20236J6631998-06-26026 June 1998 Insp Repts 50-327/98-06 & 50-328/98-06 on 980426-0606. Violations Noted.Major Areas Inspected:Operations, Maintenance,Engineering & Plant Support IR 05000327/19980051998-06-12012 June 1998 Insp Repts 50-327/98-05 & 50-328/98-05 on 980504-08.No Violations Noted.Major Areas Inspected:Maint Procedure.Insp Team Comprised Region II & Headquarters Personnel.Switchgear & Surrounding Areas Found in Good Matl Condition IR 05000327/19980041998-05-15015 May 1998 Insp Repts 50-327/98-04 & 50-328/98-04 on 980315-0425. Violations Noted.Major Areas Inspected:Operations,Maint, Engineering & Plant Support ML20216H7841998-04-10010 April 1998 Insp Repts 50-327/98-03 & 50-328/98-03 on 980201-0314. Violations Noted.Major Areas Inspected:Operations,Maint, Engineering & Plant Support ML20217K3801998-03-30030 March 1998 Insp Repts 50-327/98-01 & 50-328/98-01 on 980126-0213.No Violations Noted.Major Areas Inspected:Operations,Maint & Engineering IR 05000327/19980021998-03-0505 March 1998 Insp Repts 50-327/98-02 & 50-328/98-02 on 980202-06.No Violations Noted.Major Areas Inspected:Aspects of Licensee Operations & Maint.Review of Initial & Requalification Training Programs Were Also Conducted ML20203J5541998-02-19019 February 1998 Insp Repts 50-327/97-18 & 50-328/97-18 on 971221-980131. Violations Noted.Major Areas Inspected:Licensee Operations, Maint,Engineering,Plant Support & Effectiveness of Licensee Controls in Identifying & Resolving Problems IR 05000327/19970171998-01-16016 January 1998 Insp Repts 50-327/97-17 & 50-328/97-17 on 971109-1220.No Violations Noted.Major Areas Inspected:Operations,Maint, Engineering,Plant Support & Effectiveness of Licensee Controls in Identifying,Resolving & Preventing Problems IR 05000327/19970141997-12-0808 December 1997 Insp Repts 50-327/97-14 & 50-328/97-14 on 970928-1108.No Violations Noted.Major Areas Inspected:Operations,Maint, Engineering,Plant Support,Effectiveness of License Controls in Identifying,Resolving & Preventing Problems IR 05000327/19970161997-12-0505 December 1997 Insp Repts 50-327/97-16 & 50-328/97-16 on 971103-06.No Violations Noted.Major Areas Inspected:Evaluation of 971017 Wire Damage Event at Electrical Penetration 22 IR 05000327/19970121997-10-24024 October 1997 Insp Repts 50-327/97-12 & 50-328/97-12 on 970824-0927.No Violations Noted.Major Areas Inspected:Operations,Maint, Engineering & Plant Support & Operator Requalification Program IR 05000327/19970151997-10-23023 October 1997 Insp Repts 50-327/97-15 & 50-328/97-15 on 970922-29.No Violations Noted.Major Areas Inspected:Emergency Preparedness IR 05000327/19970081997-09-22022 September 1997 Insp Repts 50-327/97-08 & 50-328/97-08 on 970706-0823. Violations Noted.Major Areas Inspected:Licensee Operations, Maint,Engineering,Plant Support & Effectiveness of Licensee Controls in Identifying,Resolving & Preventing Problems IR 05000327/19970091997-09-15015 September 1997 Insp Repts 50-327/97-09 & 50-328/97-09 on 970804-08.No Violations Noted.Major Areas Inspected:Operations,Maint & Engineering Re Effectiveness of Licensee Controls in Identifying,Resolving & Preventing Problems ML20198H7911997-09-11011 September 1997 Insp Repts 50-327/97-13 & 50-328/97-13 on 970725-0904. Violations Noted.Major Areas Inspected:Insp Scope,Event Synopsis & Observations & Findings ML20141H9581997-07-28028 July 1997 Insp Repts 50-327/97-06 & 50-328/97-06 on 970525-0705. Violations Noted.Major Areas Inspected:Operations,Maint, Engineering & Plant Support IR 05000327/19970071997-07-24024 July 1997 Insp Repts 50-327/97-07 & 50-328/97-07 on 970623-27. Violations Noted.Major Areas Inspected:Aspects of Licensee Plant Support ML20141G0441997-06-20020 June 1997 Insp Repts 50-327/97-04 & 50-328/97-04 on 970413-0524. Violations Noted.Major Areas Inspected:Operations Re Physics Testing,Maint,Engineering & Plant Support ML20148F9631997-05-27027 May 1997 Special Insp Repts 50-327/97-05 & 50-328/97-05 on 970324-0522.Violations Noted.Major Areas Inspected:Events Associated W/Unit 1 Inadvertent RCS Drain Down on 970324 ML20141C9881997-05-12012 May 1997 Insp Repts 50-327/97-03 & 50-328/97-03 on 970302-0412. Violations Noted.Major Areas Inspected:Operations, Maintenance,Engineering & Plant Support IR 05000327/19970021997-03-24024 March 1997 Insp Repts 50-327/97-02 & 50-328/97-02 on 970203-14.No Violations Noted.Major Areas Inspected:Detailed Reviews of Corrective Actions 14-1,14-2,14-3,15 & 16 ML20137F7081997-03-18018 March 1997 Insp Repts 50-327/97-01 & 50-328/97-01 on 970119-0301. Violations Noted.Major Areas Inspected:Operations, Maintenance,Engineering,Plant Support & Effectiveness of Licensee Controls in Identifying & Preventing Problems IR 05000327/19960171997-02-14014 February 1997 Insp Repts 50-327/96-17 & 50-328/96-17 on 961208-970118.No Violations Noted.Major Areas Inspected:Operations, Maintenance,Engineering,Plant Support & Plant Status ML20134G1851997-01-13013 January 1997 Insp Repts 50-327/96-16 & 50-328/96-16 on 960923-1219. Violations Noted.Major Areas Inspected:Review of Corrective Actions Implemented for Problem Evaluation Repts IR 05000327/19960141996-12-31031 December 1996 Insp Repts 50-327/96-14 & 50-328/96-14 on 961027-1207.No Violations Noted.Major Areas Inspected:Operations,Maint, Engineering & Plant Support IR 05000327/19960151996-12-23023 December 1996 Insp Repts 50-327/96-15 & 50-328/96-15 on 961104-08.No Violations Noted.Major Areas Inspected:Control Room Simulator,Tsc,Osc,Cecc & Joint Info Ctr of Biennial Emergency Preparedness Exercise ML20134Q1721996-11-25025 November 1996 Insp Repts 50-327/96-13 & 50-328/96-13 on 960919-1102. Violations Noted.Major Areas Inspected:Events Associated W/Reactor Shutdown & Subsequent Manual Tripping of Unit 2 on 961011 IR 05000327/19960111996-11-19019 November 1996 Insp Repts 50-327/96-11 & 50-328/96-11 on 960915-1026. Violations Noted.Major Areas Inspected:Licensee Operations, Maint,Engineering,Plant Support, & Effectiveness of Licensee Controls in Identifying,Resolving & Preventing Problems ML20134Q3301996-11-19019 November 1996 Insp Repts 50-327/96-11 & 50-328/96-11 on 960915-1026. Violations Noted.Major Areas Inspected:Licensee Operations, Maint,Engineering,Plant Support, & Effectiveness of Licensee Controls in Identifying,Resolving & Preventing Problems ML20129A2141996-10-10010 October 1996 Insp Repts 50-327/96-09 & 50-328/96-09 on 960728-0914. Violations Noted.Major Areas Inspected:Operations,Maint, Engineering & Plant Support ML20128H8021996-09-27027 September 1996 Insp Repts 50-327/96-10 & 50-328/96-10 on 960708,10-12 & 0819-22.Non Cited Violations Noted.Major Areas Inspected: Plant FP Program & Action Taken of Insp Findings Previously Identified IR 05000327/19930521993-12-23023 December 1993 Insp Repts 50-327/93-52 & 50-328/93-52 on 931107-1204. Violations Noted.Major Areas Inspected:Plant Operations, Maint,Plant Surveillance,Evaluation of Licensee self-assessment Capability & LER Closeout IR 05000327/19930371993-12-17017 December 1993 Insp Repts 50-327/93-37 & 50-328/93-37 on 931115-19. Violations Noted.Major Areas Inspected:Operator Requalification Program,Exam Development & Administration & Training Staff Qualifications & Training IR 05000327/19930531993-12-17017 December 1993 Insp Repts 50-327/93-53 & 50-328/93-53 on 931115-19.No Violations Noted.Major Areas Inspected:Meteorological Monitoring,Control Room Emergency Ventilation,Audits & Secondary Water Chemistry IR 05000327/19930511993-12-13013 December 1993 Partially Withheld Insp Repts 50-327/93-51 & 50-328/93-51 on 931115-19 (Ref 10CFR73.21).No Violations Noted.Major Areas Inspected:Mgt Support,Security Program Plans & Implementing Procedures & Security Program Audit IR 05000327/19930501993-11-24024 November 1993 Insp Repts 50-327/93-50 & 50-328/93-50 on 931011-1106. Violations Noted.Major Areas Inspected:Plant Operations, Plant Maintenance,Plant Surveillance,Evaluation of Licensee self-assessment Capability & LER Closeout IR 05000327/19930421993-11-0909 November 1993 Insp Repts 50-327/93-42 & 50-328/93-42 on 930904-1010. Violations Noted.Major Areas Inspected:Plant Operations, Maint & Surveillance,Evaluation of Licensee self-assessment Capability & Licensee Event Rept Closeout IR 05000327/19930481993-11-0909 November 1993 Insp Repts 50-327/93-48 & 50-328/93-48 on 931006-08. Violation Noted.Major Areas Inspected:Qualifications of Acting Lab Supervisor,Use of Expired Stds in Alcohol breath-analysis Equipment & Testing Lab Procedures 1999-09-27
[Table view] Category:UTILITY
MONTHYEARIR 05000327/19900341990-11-16016 November 1990 Insp Repts 50-327/90-34 & 50-328/90-34 on 901006-1105.One Violation & One Apparent Violation Noted.Major Areas Inspected:Operational Safety Verification Including Control Room Observations & Sys Lineups IR 05000327/19900361990-11-0909 November 1990 Augmented Insp Team Repts 50-327/90-36 & 50-328/90-36 on 901011-19.Insp Included Review of Events That Led to Discovery of Multiple Failures of Main Steam Check Valves on 901008 IR 05000327/19900321990-11-0101 November 1990 Insp Repts 50-327/90-32 & 50-328/90-32 on 900906-1005. Violations Noted.Major Areas Inspected:Operational Safety Verification,Including Control Room Observations,Operations Performance,Sys Lineups & Radiation Protection IR 05000327/19900291990-10-0505 October 1990 Insp Repts 50-327/90-29 & 50-328/90-29 on 900827-31. Violation Noted.Major Areas Inspected:Measurement of Incore Power Distributions,Calibr of Nuclear Instruments, Measurement of Thermal Power & Followup of LERs IR 05000327/19900311990-09-26026 September 1990 Insp Repts 50-327/90-31 & 50-328/90-31 on 900910-14.No Violations or Deviations Noted.Major Areas Inspected: Occupational Exposure During Extended Outages & Licensee Actions to Correct Previously Identified Weaknesses IR 05000327/19900261990-08-30030 August 1990 Insp Repts 50-327/90-26 & 50-328/90-26 on 900706-0805. Violations Noted But Not Cited.Major Areas Inspected:Control Room Observations,Operations Performance,Sys Lineups, Radiation Protection & Safeguards ML20059H0431990-08-21021 August 1990 Insp Repts 50-327/90-23 & 50-328/90-23 on 900625-29.No Violations or Deviations Noted.Weaknesses in Program Implementation Noted.Major Areas Inspected:Plant Program to Maintain Occupational Dose to Workers ALARA IR 05000327/19900211990-07-31031 July 1990 Insp Repts 50-327/90-21 & 50-328/90-21 on 900709-13.No Violations or Deviations Noted.Major Areas Inspected: Observation & Evaluation of Annual Emergency Response Exercise IR 05000327/19900201990-06-29029 June 1990 Insp Repts 50-327/90-20 & 50-328/90-20 on 900506-0605.No Violations or Deviations Noted.Major Areas Inspected: Operational Safety Verification,Including Control Room Observations,Operations Performance & Sys Lineups IR 05000327/19890201989-08-29029 August 1989 Insp Repts 50-327/89-20 & 50-328/89-20 on 890717-20.No Violations or Deviations Noted.Major Areas Inspected:Annual Emergency Exercise,Including Staffing & Response of Emergency Organizations in Control Room & Support Ctrs IR 05000327/19890141989-08-28028 August 1989 Insp Repts 50-327/89-14 & 50-328/89-14 on 890424-28. Violations Noted.Major Areas Inspected:Surveillance & Operational Records & Procedures.Discussions Held W/ Operations,Engineering & Transmissions Personnel IR 05000327/19890191989-08-25025 August 1989 Insp Repts 50-327/89-19 & 50-328/89-19 on 890706-0805. Violations Noted.Major Areas Inspected:Operational Safety Verification,Including Control Room Observations,Operations Performance,Sys Lineups & Radiation Protection IR 05000327/19890181989-08-10010 August 1989 Insp Repts 50-327/89-18 & 50-328/89-18 on 890606-0705. Violations Noted.Major Areas Inspected:Operational Safety Verification,Control Room Observations,Sys Lineups,Radiation Protection,Safeguards,Operations Performance & Housekeeping ML20245L3191989-08-0101 August 1989 Insp Repts 50-327/89-11 & 50-328/89-11 on 890626-30. Violations Noted.Major Areas Inspected:Radiation Protection Program,Follow Up on Previous Inspector Identified Items & IE Info Notices IR 05000327/19890171989-07-28028 July 1989 Partially Withheld Safeguards Insp Repts 50-327/89-17 & 50-328/89-17 on 890522-26 (Ref 10CFR2.790(d) & 73.21)). Violations Noted.Major Areas Inspected:Physical Security Program for Power Reactors & Protected Area Alarms ML20246B6511989-06-26026 June 1989 Insp Repts 50-327/89-15 & 50-328/89-15 on 890506-0605. Violations Noted.Major Areas Inspected:Operational Safety Verification,Operations Performance,Sys Lineups,Radiation Protection,Safeguards & Housekeeping Insps ML20245D4191989-06-14014 June 1989 Insp Repts 50-327/89-16 & 50-328/89-16 on 890508-12. Violation Noted.Major Areas Inspected:Review of Completed Unit 2,Cycle 4 Initial Criticality & Post Refueling Start Up Tests & Evaluation of Thermal Power Measurements for Unit 1 IR 05000327/19890121989-05-24024 May 1989 Insp Repts 50-327/89-12 & 50-328/89-12 on 890406-0505. Violation Noted.Major Areas Inspected:Radiation Protection, Safeguards & Operational Safety Verification,Including Control Room Observations & Operational Performance IR 05000327/19890131989-05-16016 May 1989 Insp Repts 50-327/89-13 & 50-328/89-13 on 890417-21.No Violations or Deviations Noted.Major Areas Inspected: Emergency Preparedness,Including Review of Programmatic Elements & Radiological Emergency Plan & Training IR 05000327/19890101989-05-0404 May 1989 Insp Repts 50-327/89-10 & 50-328/89-10 on 890316-20.No Violations or Deviations Noted.Major Areas Inspected: Containment Integrated Leak Rate Testing,Review of Test Procedures & Evaluation of Test Results ML20246K0751989-05-0303 May 1989 Insp Repts 50-327/89-09 & 50-328/89-09 on 890305-0405. Violations Noted.Major Areas Inspected:Operational Safety Verification,Including Operations Performance,Sys Lineups, Radiation Protection,Safeguards & Housekeeping Insps IR 05000327/19890071989-04-13013 April 1989 Insp Repts 50-327/89-07 & 50-328/89-07 on 890205-0304. Violations Noted.Major Areas Inspected:Operational Safety Verification,Including Operations Performance,Sys Lineups, Radiation Protection,Safeguards & Housekeeping ML20244C3911989-04-0404 April 1989 Insp Repts 50-327/88-50 & 50-328/88-50 on 881212-890126. Violations Noted.Major Areas Inspected:Plant Operations, Surveillance & Sys Outage Control,Corrective Action Program, Maint Activities & Qualified Reviewer Process IR 05000327/19890051989-03-13013 March 1989 Special Team Insp Repts 50-327/89-05 & 50-328/89-05 on 890131-0209.Violations Noted.Major Areas Inspected:Radwaste, Radiological Controls,Corporate QA Audits & Site Chemistry ML20247F3461989-03-13013 March 1989 Special Team Insp Repts 50-327/89-05 & 50-328/89-05 on 890131-0209.Violations Noted.Major Areas Inspected:Radwaste, Radiological Controls,Corporate QA Audits & Site Chemistry IR 05000327/19890061989-03-10010 March 1989 Partially Withheld Insp Repts 50-327/89-06 & 50-328/89-06 on 890123-27 (Ref 10CFR2.790(d) & 73.21).Violation Noted.Major Areas Inspected:Physical Security Program for Reactors, Including Security Mgt,Audit,Barriers,Alarms & Maint IR 05000327/19890021989-03-0909 March 1989 Insp Repts 50-327/89-02 & 50-328/89-02 on 890105-0204.No Violations or Deviations Noted.Major Areas Inspected: Operational Safety Verification Including,Operations Performance,Sys Lineups & Radiation Protection IR 05000327/19890081989-03-0303 March 1989 Insp Repts 50-327/89-08 & 50-328/89-08 on 890213-17. Violations Noted.Major Areas Inspected:Inservice Insp, Including Eddy Current Exam of Unit 2 Steam Generator Tubing,Reviews of NDE Exams Procedures & Exam Verifications IR 05000327/19880601989-03-0101 March 1989 Insp Repts 50-327/88-60 & 50-328/88-60 on 881222-23 & 890222.Major Areas Inspected:Review Licensee Resolution of Differences Between Measured & Predicted Critical Boron Concentrations Observed During Restart Testing IR 05000327/19890041989-02-15015 February 1989 Insp Repts 50-327/89-04 & 50-328/89-04 on 890117-20.No Violations or Deviations Noted.Major Areas Inspected: Licensee Action on Previous Insp Findings,Ie Bulletin 80-11 & Snubber Surveillance Programs IR 05000327/19890031989-02-10010 February 1989 Insp Repts 50-327/89-03 & 50-328/89-03 on 890109-13.No Violations or Deviations Noted.One Unresolved Item Identified.Major Areas Inspected:Inservice Insp & Inservice Testing of Pumps & Valves IR 05000327/19880471988-11-28028 November 1988 Insp Repts 50-327/88-47 & 50-328/88-47 on 881012-19.No Violations Noted.Major Areas Inspected:Operations Performance,Sys Lineups,Radiation Protection & Safeguards & Housekeeping Insps IR 05000327/19880451988-11-22022 November 1988 Insp Repts 50-327/88-45 & 50-328/88-45 on 880920-28 & 27-28. No Violations or Deviations Noted.Major Areas Inspected: Snubber Surveillance Program & Licensee Action on Previous Insp Findings ML20205Q6801988-10-28028 October 1988 Insp Repts 50-327/88-43 & 50-328/88-43 on 880906-09. Violations Noted.Major Areas Inspected:Followup on Previous Insp Finding & 10CFR50.59 Safety Evaluation Program & Implementation Re Plant Site IR 05000327/19880461988-10-27027 October 1988 Insp Repts 50-327/88-46 & 50-328/88-46 on 881005-11. Violations Noted.Major Areas Inspected:Operational Safety Verification,Including Operations Performance,Sys Lineups, Radiation Protection,Safeguards & Housekeeping IR 05000327/19880421988-10-25025 October 1988 Insp Repts 50-327/88-42 & 50-328/88-42 on 880829-0902.No Violations or Deviations Noted.Major Areas Inspected: Operational Staffing,Review Committee Activities,Maint Status & Status of Testing IR 05000327/19880441988-10-24024 October 1988 Insp Repts 50-327/88-44 & 50-328/88-44 on 880913-1005. Violations Noted.Major Areas Inspected:Operational Safety Verification Including Operations Performance,Sys Lineups, Radiation Protection,Safeguards & Housekeeping Insps IR 05000327/19880401988-10-21021 October 1988 Insp Repts 50-327/88-40 & 50-328/88-40 on 880925-1004. Violation Noted.Major Areas Inspected:Extended Control Room Operation & Operational Safety Verification,Including Radiation Protection & Safeguards IR 05000327/19880391988-10-18018 October 1988 Insp Repts 50-327/88-39 & 50-328/88-39 on 880806-0912.No Violations Noted.Major Areas Inspected:Operational Safety Verification,Including Operations Performance,Sys Lineups, Radiation Protection & Safeguards & Housekeeping Insps ML20195C7751988-10-12012 October 1988 Insp Repts 50-327/88-29 & 50-328/88-29 on 880620-0708. Violations Noted.Major Areas inspected:in-plant Review in Mechanical,Electrical,Civil,Structural & Instrumentation Control Disciplines in Order to Verify CS Sys Design Basis IR 05000327/19880411988-09-22022 September 1988 Partially Withheld Insp Repts 50-327/88-41 & 50-328/88-41 on 880822-26 (Ref 10CFR2.790 & 73.21).No Violations or Deviations Noted.Major Areas Inspected:Security Records, Maint,Locks,Power Supply,Lighting & Compensatory Measures IR 05000327/19880381988-09-15015 September 1988 Insp Repts 50-327/88-38 & 50-328/88-38 on 880725-29.No Violations or Deviations Noted.Major Areas Inspected:Plant Chemistry,Corrosion Control & Pipe Wall Thinning ML20154N5121988-09-15015 September 1988 Insp Repts 50-327/88-36 & 50-328/88-36 on 880712-0805. Violation Noted.Major Areas Inspected:Operational Safety Verification,Including Operations Performance,Sys Lineups, Radiation Protection & Safeguards & Housekeeping Insps ML20154L6431988-09-12012 September 1988 Insp Repts 50-327/88-35 & 50-328/88-35 on 880711-15 & 0822- 23.Violations Noted.Major Areas Inspected:Excessive post-trip Cooldown Condition & Effect on end-of-life Margin ML20153C4721988-08-22022 August 1988 Insp Repts 50-327/88-33 & 50-328/88-33 on 880711-15. Violation Noted.Major Areas Inspected:Emergency Preparedness,Including Review of Listed Progammatic Elements ML20207D7061988-07-27027 July 1988 Insp Repts 50-327/88-27 & 50-328/88-27 on 880501-0530. Violation Noted.Major Areas Inspected:Operational Safety Verification,Review of Previous Insp Findings,Followup of Events & Review of Licensee Identified Items IR 05000327/19880281988-07-25025 July 1988 Insp Repts 50-327/88-28 & 50-328/88-38 on 880505-0602. Violations Noted.Major Areas Inspected:Extended Control Room Observation & Operational Safety Verification,Maint,Review of Previous Insp Findings & Follow Up of Events ML20153C1251988-07-19019 July 1988 Insp Repts 50-327/88-31 & 50-328/88-31 on 880606-10. Violations Noted:Failure to Perform Air Sampling Per Written Procedures.Major Areas Inspected:Training & Qualifications, External & Internal Exposure Controls & Solid Wastes IR 05000327/19880311988-07-19019 July 1988 Revised Insp Repts 50-327/88-31 & 50-328/88-31 on 880606-10. Violation Noted.Major Areas Inspected:Areas of Training & Qualifications,External & Internal Exposures Control,Control of Radioactive Matl & Surveys,Solid Waste & Transportation ML20196L3571988-06-24024 June 1988 Insp Repts 50-327/88-12 & 50-328/88-12 on 880215-19.No Violations or Deviations Noted.Major Areas Inspected:Review of Util Corrective Actions Re Civil Engineering Portion of Calculation Review Program & Review of Piping Analyses 1990-09-26
[Table view] Category:TEXT-INSPECTION & AUDIT & I&E CIRCULARS
MONTHYEARIR 05000327/19990051999-09-27027 September 1999 Insp Repts 50-327/99-05 & 50-328/99-05 on 990718-0828. Violations Noted.Major Areas Inspected:Mitigating Sys ML20210V1621999-08-13013 August 1999 Insp Repts 50-327/99-04 & 50-328/99-04 on 990601-0717.One Potentially Safety Significant Issue Noted.Major Areas Inspected:Licensee Emergency Preparedness IR 05000327/19990031999-06-30030 June 1999 Insp Repts 50-327/99-03 & 50-328/99-03 on 990328-0531.Non- Cited Violations Noted.Major Areas Inspected:Aspects of Licensee Operations,Maint & Engineering IR 05000327/19990021999-04-23023 April 1999 Insp Repts 50-327/99-02 & 50-328/99-02 on 990214-0327.No Violations Noted.Major Areas Inspected:Licensee Operations, Maint & Engineering IR 05000327/19990011999-03-15015 March 1999 Insp Repts 50-327/99-01 & 50-328/99-01 on 990103-0213. Violations Noted & Being Treated as non-cited Violations. Major Areas Inspected:Aspects of Licensee Operations,Maint & Engineering IR 05000327/19983021999-03-12012 March 1999 NRC Operator Licensing Exam Repts 50-327/98-302 & 50-328/98-302 (Including Completed & Graded Tests) for Test Administered on 980928-1001 ML20202J5471999-02-0101 February 1999 Notice of Violation from Insp on 981122-990102.Violation Noted:Following Unit 1 Rt on 981109,procedural Requirements of EOP ES0.1 Were Not Properly Implemented,In That RCS Temperatures Were Not Monitored & Steam Not Dumped IR 05000327/19980111999-02-0101 February 1999 Insp Repts 50-327/98-11 & 50-328/98-11 on 981122-990102. Violations Noted.Major Areas Inspected:Licensee Operations, Maint & Engineering IR 05000327/19980101998-12-0707 December 1998 Insp Repts 50-327/98-10 & 50-328/98-10 on 981011-1121.No Violations Noted.Major Areas Inspected:Operations,Maint & Engineering IR 05000327/19980141998-12-0404 December 1998 Insp Repts 50-327/98-14 & 50-328/98-14 on 981102-06.No Violations Noted.Major Areas Inspected:Observation & Evaluation of Biennial Emergency Preparedness Exercise for Sequoyah Nuclear Plan ML20196D6081998-11-24024 November 1998 Notice of Violation from Insp on 980914-1016.Violation Noted:As of 980916,requirements of 0-MI-MXX-061-001 Not Implemented IR 05000327/19980131998-11-24024 November 1998 Insp Repts 50-327/98-13 & 50-328/98-13 on 980914-1016. Violations Noted.Major Areas Inspected:Aspects of Licensee maint,testing,engineering,self-assessment & Problem Evaluations of Licensee Ice Condenser Sys ML20195G5521998-11-0909 November 1998 Notice of Violation from Insp on 980830-1010.Violation Noted:Licensee Failed to Assure That All Testing Required to Demonstrate That Safety Related Circuit Breakers Would Perform Satisfactorily in Svc IR 05000327/19980091998-11-0909 November 1998 Insp Repts 50-327/98-09 & 50-328/98-09 on 980830-1010. Violations Noted.Major Areas Inspected:Licensee Operations, Maint,Engineering Plant Support & Effectiveness of Licensee Controls in Identifying,Resolving & Preventing Problems IR 05000327/19980081998-09-18018 September 1998 Insp Repts 50-327/98-08 & 50-328/98-08 on 980719-0829.No Violations Noted.Major Areas Inspected:Operations,Maint, Engineering & Plant Support,Licensee Conducted Radiological Emergency Plan Drill IR 05000327/19980071998-08-0404 August 1998 Insp Repts 50-327/98-07 & 50-328/98-07 on 980607-0718. Violations Noted.Major Areas Inspected:Aspects of Licensee Operation,Maint,Engineering,Plant Support & Effectiveness of Licensee Controls in Identifying & Preventing Problems ML20237B1851998-08-0404 August 1998 Notice of Violation from Insp on 980606-0718.Violations Noted:On or Before 971103,conditions Adverse to Qualify Were Not Promptly Identified & Corrected,In That Licensee Failed to Correct &/Or Initiate Problem Evaluation Rept ML20236J6631998-06-26026 June 1998 Insp Repts 50-327/98-06 & 50-328/98-06 on 980426-0606. Violations Noted.Major Areas Inspected:Operations, Maintenance,Engineering & Plant Support ML20236J6591998-06-26026 June 1998 Notice of Violation from Insp on 980426-0606.Violation Noted:Inservice Testing of Valves Not in Accordance with Section XI of ASME Boiler & Pressure Vessel Code & Applicable Addenda as Required by 10CFR50.55a IR 05000327/19983001998-06-25025 June 1998 NRC Operator Licensing Exam Repts 50-327/98-300 & 50-328/98-300 (Including Completed & Graded Tests) for Tests Administered on 980601-02 IR 05000327/19980051998-06-12012 June 1998 Insp Repts 50-327/98-05 & 50-328/98-05 on 980504-08.No Violations Noted.Major Areas Inspected:Maint Procedure.Insp Team Comprised Region II & Headquarters Personnel.Switchgear & Surrounding Areas Found in Good Matl Condition ML20247L5781998-05-15015 May 1998 Notice of Violation from Insp on 980315-0425.Violation Noted:Licensee Failed to Perform Surveillance Requirement 4.8.1.1.1.a,within 1 H & at Least Once Per 8 H Thereafter IR 05000327/19980041998-05-15015 May 1998 Insp Repts 50-327/98-04 & 50-328/98-04 on 980315-0425. Violations Noted.Major Areas Inspected:Operations,Maint, Engineering & Plant Support ML20216H7841998-04-10010 April 1998 Insp Repts 50-327/98-03 & 50-328/98-03 on 980201-0314. Violations Noted.Major Areas Inspected:Operations,Maint, Engineering & Plant Support ML20216H7701998-04-10010 April 1998 Notice of Violation from Insp on 980201-0314.Violation Noted:License Failed to Rept an Adverse Condition on Work Request/Work Order &/Or Problem Evaluation Rept IR 05000327/19980991998-04-0101 April 1998 SALP Repts 50-327/98-99 & 50-328/98-99 for Period 960728- 980221 ML20217K3751998-03-30030 March 1998 Notice of Violation from Insp on 980126-0213.Violation Noted:On Listed Dates,Licensee Made Changes to Facility as Described in FSAR W/O Adequate Written SE Which Provides Bases for Determination That Changes Did Not Involve USQ ML20217K3801998-03-30030 March 1998 Insp Repts 50-327/98-01 & 50-328/98-01 on 980126-0213.No Violations Noted.Major Areas Inspected:Operations,Maint & Engineering IR 05000327/19980021998-03-0505 March 1998 Insp Repts 50-327/98-02 & 50-328/98-02 on 980202-06.No Violations Noted.Major Areas Inspected:Aspects of Licensee Operations & Maint.Review of Initial & Requalification Training Programs Were Also Conducted ML20203J5411998-02-19019 February 1998 Notice of Violation from Insp on 971231-980131.Violation Noted:On 980126 Individuals Failed to Monitor Themselves in Whole Body Contamination Monitor or W/Hand & Foot Frisk Monitor ML20203J5541998-02-19019 February 1998 Insp Repts 50-327/97-18 & 50-328/97-18 on 971221-980131. Violations Noted.Major Areas Inspected:Licensee Operations, Maint,Engineering,Plant Support & Effectiveness of Licensee Controls in Identifying & Resolving Problems ML20216D8431998-02-0606 February 1998 EN-97-109A:on 980206,informs of Withdrawal of Proposed Civil Penalty of $55,000 Issued to Licensee.Credit for Identification Appropriate to Recognize Diligence of TVA Training Instructor Who Discovered Vital Battery Problem IR 05000327/19970171998-01-16016 January 1998 Insp Repts 50-327/97-17 & 50-328/97-17 on 971109-1220.No Violations Noted.Major Areas Inspected:Operations,Maint, Engineering,Plant Support & Effectiveness of Licensee Controls in Identifying,Resolving & Preventing Problems IR 05000327/19970141997-12-0808 December 1997 Insp Repts 50-327/97-14 & 50-328/97-14 on 970928-1108.No Violations Noted.Major Areas Inspected:Operations,Maint, Engineering,Plant Support,Effectiveness of License Controls in Identifying,Resolving & Preventing Problems ML20197F5541997-12-0808 December 1997 Notice of Violation from Insp on 970725-0704 & Proposed Imposition of Civil Penalty in Amount of $55,000.Violation Noted:Sro Failed to Implement Step 8.4.8 of Soi 0-S0-250-1. Predecisional EC Agenda & Documentation Encl IR 05000327/19970161997-12-0505 December 1997 Insp Repts 50-327/97-16 & 50-328/97-16 on 971103-06.No Violations Noted.Major Areas Inspected:Evaluation of 971017 Wire Damage Event at Electrical Penetration 22 ML20197F6971997-12-0303 December 1997 EN-97-109:on 971208,notice of Proposed Imposition of Civil Penalty in Amount of $55,000 Issued to Licensee.Action Based on Severity Level III Problem Re Failure to Maintain Direct Current Vital Battery Channel Energized & Operable ML20199H1451997-11-0606 November 1997 Exam Repts 50-327/97-300 & 50-328/97-300 on 970919-1007. Exam Results:Four Out of Seven Candidates Passed Exam.One Candidate Was Marginal Performer IR 05000327/19970121997-10-24024 October 1997 Insp Repts 50-327/97-12 & 50-328/97-12 on 970824-0927.No Violations Noted.Major Areas Inspected:Operations,Maint, Engineering & Plant Support & Operator Requalification Program IR 05000327/19970151997-10-23023 October 1997 Insp Repts 50-327/97-15 & 50-328/97-15 on 970922-29.No Violations Noted.Major Areas Inspected:Emergency Preparedness PNO-II-97-055, on 971006,contaminated Person Transported from Sequoyah Nuclear Plant to Offsite Medical Facility,Following Apparent Heart Attack.Victim Pronounced Dead at Hosp,Due to Apparent Heart Attack.Licensee Responded to Media Inquirie1997-10-0606 October 1997 PNO-II-97-055:on 971006,contaminated Person Transported from Sequoyah Nuclear Plant to Offsite Medical Facility,Following Apparent Heart Attack.Victim Pronounced Dead at Hosp,Due to Apparent Heart Attack.Licensee Responded to Media Inquirie ML20211E2531997-09-22022 September 1997 Notice of Violation from Insp on 970706-0823.Violation Noted:On 970714,containment Isolation Valve 1-FCV-31C-229 Failed to Exhibit Required Change of Obturator Position & Was Not Repaired or Replaced & Data Not Analyzed IR 05000327/19970081997-09-22022 September 1997 Insp Repts 50-327/97-08 & 50-328/97-08 on 970706-0823. Violations Noted.Major Areas Inspected:Licensee Operations, Maint,Engineering,Plant Support & Effectiveness of Licensee Controls in Identifying,Resolving & Preventing Problems IR 05000327/19970091997-09-15015 September 1997 Insp Repts 50-327/97-09 & 50-328/97-09 on 970804-08.No Violations Noted.Major Areas Inspected:Operations,Maint & Engineering Re Effectiveness of Licensee Controls in Identifying,Resolving & Preventing Problems ML20198H7911997-09-11011 September 1997 Insp Repts 50-327/97-13 & 50-328/97-13 on 970725-0904. Violations Noted.Major Areas Inspected:Insp Scope,Event Synopsis & Observations & Findings ML20141H9581997-07-28028 July 1997 Insp Repts 50-327/97-06 & 50-328/97-06 on 970525-0705. Violations Noted.Major Areas Inspected:Operations,Maint, Engineering & Plant Support ML20141H9531997-07-28028 July 1997 Notice of Violation from Insp on 970525-0705.Violation Noted:Licensee Failed to Implement Prompt Corrective Actions to Resolve Condition Adverse to Quality ML20149L5671997-07-24024 July 1997 Notice of Violation from Insp on 970623-27.Violation Noted: on 960627,licensee Had Loss of Security Electronic Equipment & Failed to Post Officers in Position to Provide Surveillance of Entire Protected Area Perimeter IR 05000327/19970071997-07-24024 July 1997 Insp Repts 50-327/97-07 & 50-328/97-07 on 970623-27. Violations Noted.Major Areas Inspected:Aspects of Licensee Plant Support ML20149G8681997-07-10010 July 1997 Notice of Violation from Insp on 970324-0522.Violation Noted:Licensee Failed to Esatblish Measures to Assure That Significant Condition Adverse to Quality Was Promptly Identified & Corrected & C/A Taken to Preclude Repetition 1999-09-27
[Table view] |
Text
i ,
,
-
.. . ,
.
.
l U.S. NUCLEAR REGULATORY COMMISSION i l
0FFICE OF SPECIAL' PROJECTS l Report Nos.: 50-327/87-22; 50-328/87-22 Docket Nos.: 50-327, 50-328 License Nos.: DPR-77, DPR-79 Licensee: Tennersee Valley Authority 6N 38A Lookout Place *
1101 Market Street Chattanooga, Tennessee 37402-2801
Facility Name: Sequoyah Nuclear Plant, Units 1 and 2 Inspection At: Chattanooga, Tennessee Inspection Conducted: April 6-10, 1987 Inspector: - f/7 G. T. Hubbard, Equipment Qualification & Test /Date .
Engineer (EQ&TE)
Also participating in the inspection and contributing to the report were:
0. P. Gormley, EQ&TE, NRR J. B. Jacobson, Reactor Engineer, NRR A. B. Ruff, Reactor Inspector, RII J. W. Grossman, Member of Technical Staff, Sandia National Laboratories V. P. Bacanskas, Senior Engineer, Franklin Research Center Approved by: -(- A R. C. Pierson, Acting Chief, Plant Systems
$ll*l Date Q
Branch, OSP l
8706240125 870617 gDR ADOCK 05000327 PDR
-
. .. ..
.
.
\
.
.
INSPECTION SUMMARY ,
Inspection on April 6-10, 1987 (Inspection Report Nos. 50-327/87-22; 50-328/87-22)
Areas Inspected: Announced inspection to continue the review of the licensee's implementation of a program per the requirements of 10 CFR 50.49 for establish-ing and maintaining the qualification of electric equipment within the scope of 10 CFR 50.4 Results: The inspection identified no deficiencies in the SQN implementation of a program to meet the requirements of 10 CFR 50.49. Based on the inspection teams' reviews and evaluations, Potential Enforcement / Unresolved Items (PE/Uls)
50-327/86-01-15 and 50-328/86-01-16 are resolved; however, these PE/Uls along with seven previously resolved PE/Uls from Inspection Report 50-327,328/86-01 are subject to enforcement action (see below). Open Items 50-327,328/86-01-01 thru -04 were close While no deficiencies were identified in EQ program implementation, there are certain activities, which SQN has identified as needing completion before SQN is in compliance with 10 CFR 50.49. Two of the items needing completion are completion of Replacement Items Project (RIP) and resolution or staff approval of the main-steam-line break with superheat release and its effects on the environmental qualification of equipment in the east and west valve vault rooms (A1, A2, A10, and All). Since these items will be the subject of specific safety evaluations, they are not identified for follow-up in this inspection repor Two other items identified by SQN as needing completion are identified as inspection follow-up item Report Name Paragraph Item Number Violation Failure to Adequately 4.A.(2)(b) 50-327,328/87-22-01 )
Establish Qualification i for Certain Equipment ]
Inspection Follow-up Items: Qualification Requirements 4.C.(1) 50-327,328/87-22-02 for Certain Events Completion of EQ Fieldwork 4.C.(2) 50-327,328/87-22-03 i
i I
'
, - . ,( ,
.
.
l DETAILS PERSONS CONTACTED:
1.1 Tennessee Valley Authority (TVA)
L. M. Nobles, Plant Manager
- M. A. Purcell, Licensing Engineering
- M. R. Sedlacik, Modifications Section A Supervisor
- M. J. Peters, Modifications Section A Electrical Engineer 1
- P. R. Wallace, Site Directors Office
'
- R. H. Buchholz, Site Representative
- W. H. Mackay, Mechanical Test Supervisor
- T. L. Howard, QA Manager - Sequoyah (SQN)
- L. P. Woodley, Jr., EQ Project Section Supervisor
- W. H. Deen, EQ Project Section Supervisor
- B. W. Hooper, Electrical Maintenance
- C E. Lanstrom, Licensing Engineer
- G. B. Kirk, Compliance Licensing Manager
- S. M. Ar.thony, Licensing Engineer
- W. S. Wilburn, Assistant to Maintenance Superintendent
- R. F. Hansen, Licensing Engineer
- H. R. Rogers, Plant Operations Review Staff, Section Supervisor
- S. W. Littrell, EQ Coordinator
- A. E. Ives, Program Administrator
- S. D. Scott, Instrument Engineer
- B. M. Patterson, Maintenance Superintendent
- H. B. Rankin, Manager of Projects
- J. M. Blankship, Manager, Information Services A. H. Ritter, Engineering Assurance Engineer T. A. Flippo Quality Surveillance Supervisor
- M. A. Cooper, Licensing Engineer W. L. Elliott, EQ Project Manager H. D. Elkins, Instrument Maintenance Supervisor W. V. Horn, Deputy Manager, Modifications R. W. Olsen, Modification Supervisor F. Walker, Production Planner B. Bensing, QC Representative i
1.2 NRC S. D. Ebneter, Director, TVA Projects Division, OSP F. R. McCoy, Section Chief, Inspection Programs, OSP
.
l l
l 5 I
--
! .
.
.
.. .
P I
.
, PURPOSE:
The purpose of this inspection was to continue the review of the licensee's -
l implementation of a program to meet the requirements of 10 CFR 50.49 for Sequoyah Nuclear Plant (SQN), Units 1 and . BACKGROUND:
On August 21-22, 1985, TVA shutdown both units at SQN due to concerns that ,
documentation at TVA nuclear sites might be inadequate for environmental j qualification of electric equipment within the scope of 10 CFR 50.4 (
Since that time, TVA has initiated an indepth program to ensure that environmental qualification of electric equipment within the scope of 10 CFR 50.49 is established at SQN prior to restart (Note: Certain Regulatory Guide 1.97 equipment has been exempted for restart due to a later implementation date accepted by the NRC).
In order to evaluate the new program at SQN, the NRC has conducted four inspections of the SQN program and has documented the results in NRC Inspection Reports 50-327,328/86-01, dated August 15, 1986, and 50-327, 328/86-70, dated March 9, 1987. This inspection is a continuation of the NRC evaluation of the SQN equipment qualification (EQ) program and its implementation. This inspection focused on the activities completed since the last EQ inspection and included review of your corrective actions on deficiencies identified in the previous inspection . FINDINGS: Follow-up of Previous Inspection Findings The NRC inspectors reviewed SQN's corrective actions relative to some of the unresolved findings identified during the previous EQ inspections. Status of the unresolved items is discussed in the following paragraph (1) Open Items:
(a) (Closed) Completion of EQ Training (50-327,328/86-01-01)
After shutdown of Sequoyah plants because of EQ concerns, a new EQ program was developed by the licensee. This program is now in its final stages of implementatio To ensure that personnel involved in the new EQ program were aware of the importance of this 1ssue and to help ensure success of the new EQ program a training program was initiated. This program consisted of two separate parts (1) a general aware-ness for EQ for a large group of employees and (2) a training session on specific procedures for a smaller group of employees that needed more details. The NRC inspectors determined that the initial training has been accomplishe Over 650 employees received the general awareness training and over 150 employees received the specific procedural aspects of the training. The inspectors reviewed the attend-
- _
( .
.
-
.. ,
.
-
.
ance sheets for these training sessions. The licensee stated that additional awareness training sessions have been planned and should commence the latter part of Apri These new training sessions, to start in April, are to inform new SQN employees of the importonce of EQ. The i licensee stated that a long term and/or periodic trair.ing on EQ is to be developed for future use. This item is close (b) (Closed) Correction of Audit Corrective Actions (50-327,328/ l 86-01-02)
At completion of inspection 86-01, in June 1986, the licensee had performed three audits in the EQ area. The first was a TVA Management Review of the SQN plant Environmental Qualification Program performed by Westec Services and TV This was performed October 28-31, 1985. The second was a joint audit performed by TVA Division of Quality Assurance and Office of Engineering Quality Management Staff (Audit ReportQSS-A-86-004). This was issued in January 1986. The third audit (EA-Audit 86-22) was performed by Engineering Assurance (EA) during the Spring of 1986. The audits identified findings requiring corrective actions as well as some program enhancement items. Many of the findings per-tained to the TVA management organization. Based on the new TVA organization, these findings are no longer applicabl There are no outstanding action items with regard to the first and second audit. The nine deficiencies identified in the third audit have had corrective actions initiated and are considered closed; however, Engineering Assurance has not completed their review of five of the items and these remain open on the TVA Audit tracking system pending their concurrence to the resolutions. This item is close A recent Audit by the Nuclear Quality Audit and Evaluation Bronch (No. QSQ-A-87-0008) was performed February 23 to March 4, 1987. The items identified in this report are being resolved by the issuance and tracking of a Condition Adverse to Quality Report (CAQR). One of the CAQR items concerns general and/or specific EQ training for personne ,
TVA stated that over 650 employees have received a general awareness training. The lack of training cited in this
audit involved employees loaned from other TVA organizations {'
and/or sites. TVA stated that work plans involving EQ work which are prepared by these loaned employees are reviewed by engineers and supervisors who have had the EQ trainin Plant supervisors that implement activities affecting the EQ program are responsible to ensure that their workers are j informed about the EQ requirements and if necessary, to schedule EQ training for their new workers. The EQ coordi- !
nator indicated that the personnel in the mainstream of EQ r
-
'
.
- .
,
4 work have had the EQ training, but added that a new aware-ness training program'has been planned and will start the latter part cf April for these loaned employee (c) (Closed) Revision of Maintenance Procedure SQM-62 (50-327, 328/86-01-03)
The inspectors determined that Revision 3 of procedure l SQM-62, "10 CFR 50.49 Program Qualification Maintenance Data Sheets Implementation," added Appendix F entitled, "10 CFR 50.49 QMDS Recommendation Change Evaluation." Revision 6 to SQM 57, " Preventive Maintenance Program," deleted Attachment 3. " Evaluation for QMDS Recommenoations." Storage require-ments for EQ equipment are addressed in SQM-62 procedure under the "QMDS Review" Section. Environmentally qualified equipment that is placed in storage and that have QMDS storage requirements are scheduled and listed in Admin-istrative Instruction 36, " Storage, Handling, and Shipping of QA Material." The inspectors determined that NRC recom-mendeo changes were made; therefore, this item is close (d) (Closed) Com letion of Maintenance Program (50-327, 328/86-01-04 The licensee's program for the essential, recommended, and storage requirements for environmentally qualified equipment is identified in the QMDS section in the EQ binders. The licensee is in the final stages of completing and ensuring that the baseline essential requirements are complete for plant restart and ensuring that the periodic requirements will not impact operation after restart. The licensee's
"EQIS" computer program is used to identify QMDS requirements and it also provides a record of the documentation used for completion of these items. The licensee plans to imple- ;
ment a Quality Maintenance (QM) computer program for all QMDS items that will supplement the EQIS program. This program will provide a printout of QM procedures that are {
required to be performed periodically. It will indicate due dates to aid scheduling and performance of periodic QMDS items. This action is presently done manually by the planners and maintenance engineer The inspector reviewed the QMDS Requirements and Recommen-dations Implementation Log [ Required by Appendix C of SQM-62] to verify that items were signed off as complet In addition several work plans (WPs) and work requests (WRs)
[WP-11916,WR-11931,B200687andB200686] were reviewed to verify completion of some QMDS item Except for potential changes in the QMDS requirements, as a result of final stages of ongoing work in the Equipment Qualification Project (EQP), the QMDS essential requirements l
.
8 l l
- ____ _a
!
- '.
. 1
.
l
.
are approximately 98% complete (including electrical and instrumentationitems). The incomplete items are being i followed by the licensee's P/2 computer tracking system and i when new or revised QMDS items are identified, these are l added to the P/2 tracking system. These items are identi- '
fied as restart items and require sign off by several super-visors, including the EQ coordinator, before they are removed front the tracking system. Based on the inspectors reviews, j this item is close (2) Potential Enforcement / Unresolved Items:
(a) (Closed) Raychem Splices / Breakouts (50-327/86-01-15; 50-328/86-01-16)
During the June 1986 EQ walkdown inspection, the NRC inspec-tors identified instances of improperly installed Raychem splices on 10 CFR 50.49 qualified cables. These problems included numerous minimum bend radius deficiencies as well as improperly installed oversleeves. Due to these identified deficiencies SQN conducted a splice qualification test program to qualify configurations of Raychem splices installed at SQN. In addition, SQN initiated a splice inspection program to inspect all 10 CFR 50.49 splices and Class 1E penetration splices prior to restar During this inspection, the inspectors followed the guide-lines of NRC Temporary Instruction (TI) 2500/17, " Inspection Guidance for Heat Shrinkable Tubing." The inspectors reviewed documentation associated with the SQN EQ splice activities as well as performing a walkdown inspection of a sample of the splice The inspectors reviewed the SQN methodology for identifying splices and determined that a preliminary splice list was prepared by the SQN electrical design group. This list was developed by reviewing " splice cards" and end device connect-ing diagrams. Since a complete list did not exist, the inspectors raised concern that not all splices would be inspected during the current program. In fact, some unlisted and unqualified Amp butt splices were located during TVA SQN inspections. The inspectors reviewed a draft walkdown procedure which was written to look for similar splice Additionally, the inspectors reviewed spacial maintenance instructions (SMI-2-317-39) for end devices and (SMI-2-302-1)
for penetration enclosures. These instructions were written to inspect and evaluate the various Raychem installations in Unit The inspectors determined that SQN had reviewed 962 Class 1E EQ splices and over 900 have been determined to be deficient and are being replaced. The inspectors reviewed maintenance
-
L
( i
.
'
, . : ,
,
.
instruction (M-AI-7) which is the applicable instruction for 4 splice rcplacement. This instruction contains explicit f
instructions concerning splice design, installation, and inspection criteria. The inspectors also reviewed data sheets used to record splice measurements and configuration Information recorded on the sheets included part numbers for all parts required for the splice, a sketch of the splice, lot numbers for the Raychem material, micrometer ncmbers, dimensions, and sign-offs for craftsman and Quality Control ,
'
(QC). The inspector noted that prior to February 15, 1987, measurements supplied to engineering for splice design were taken by craftsmen without benefit of QC verificatio After this date, a change was made to M-Al-7 which required i QC verification of these measurements. SQN is currently !
evaluating whether splices made without QC measurement verification will require additional inspectio The inspectors reviewed qualification binders SQN-EQ-MCK-001, '
Raychem NMCK Motor Connection Kit; SQN-EQ-MCK-002 Raychem NPKV Motor Connection Kit; and SQN-EQ-SPLC-001, Raychem WCSF-N Splice. The inspector raised one question concerning test anomaly number two of binder MCK-001. This anomaly involved the failure of all four aged splice samples to complete the entire LOCA test with 1000 volts AC applie The failure was attributed to the test cables and not the splices; however, no aged splice samples were ever retested in a LOCA chamber. TVA was able to resolve this concern by demonstrating that the time the splices must withstand (
1000 volts AC for the SQN's plant EQ profile was encompasset by an aged splice test specimen that withheld voltage for the required time perio The inspectors walkdown inspection included visual observation ,
of various installed splices in Unit 2 to determine adequate l implementation of SQN's Raychem program. The following 1 component splices were reviewed and found to be acceptable:
Temperature Switch 30-96 - two splices located inside a condulet Electrical Penetrations Nos. 8 and 45 - over two dozen j inline instrumentation and power caole splices Solenoid Valve FSV-65-9 - two splices In addition to these splices, the inspectors visually observed several other splices during their inspection of other equip-ment. The inspectors did observe questionable splices on i safety injection system pump cooler 2 MTR 030179B in that the splices were installed over braided motor lead insulatio The inspector determined that this deviation was addressed in qualification binder M0T-001 for Reliance motors and the splices were appropriate for the applicatio 'y g (_*
-
..
Lt ~ $ '
Based on the inspectors review of documentation, observation of installed splice configurations, and review of the SQN
, _
program implementation, it was. determined that SQN is .imple-
'
menting a program to identify all 10 CFR 50.49 splices and ;
ensure their qualification. Based on the inspectors' findings
'
-
that, controls are inplace at SQN for completing this activity, only splice fieldwork remains and it is being tracked ~by SQN, and fieldwork completion will be verified by the NRC prior to restart, this item is considered close Since the guidance of TI 2500/17 was followed during this inspection, the requirement for the performance of the T1 is I
, considered satisfied for SQN. It is pointed out that even though the physical inspection only concentrated on Unit 2, the findings are equally applicable to Unit 1; therefore, credit.for completion of this TI on Unit 1 is also take (b) While the NRC has reviewed and accepted the corrective actions on closure of the Raychem splice PE/UI above and the other PE/Uls identified in Inspection Report 50-327,328/86-01.during previous inspections, enforcement action relative to some of the PE/UIs is considered {
!
appropriate. Based on an evaluation of the eleven PE/UIs identified in the inspection report the NRC has determined that in eight of the PE/UIs, TVA failed to adequately establish qualification of certain electric equipment important to safety. This failure to adequately establish qualification of certain electric equipment important to safety is identified as a Violation (50-327,328/87-22-01)
of 10 CFR 50.49 requirements. The PE/Uls which provide a basis for this violation are listed below:
Essex Power and Control Cable 50-327/86-01-08; 50-328/86-01-08 ASCO Solenoid, Valve, Model 206-381 50-327/86-01-09; 50-328/86-01-09 Nutherm 32K Air Duct Feater 50-327/86-01-10; 50-328/86-01-10 GA Technologies RD-23 Radiation 50-327/86-01-11; Detector / Brand-Rex Coaxial Cable 50-328/86-01-11 Eaton Multiconductor Signal Cable 50-327/86-01-12; 50-328/86-01-12 Limitorque Motor Valve Operators 50-327/86-01-13; 50-328/86-01-13 Barton Transmitter, Lot 7-764 50-328/86-01-15
'
F .
.
e l
_,
,
Raychem Splices /8reakouts 50-327/86-01-15; 50-328/86-01-16 Since the NRC has accepted TVA's corrective action on the above PE/VIs, no response will be required to the violation and these PE/Uls are considered close TVA's corrective actions for the other three PE/UIs, 50-327,328/86-01-06, -07, -014, are considered acceptable; therefore, they are considered close B. Draft SER Confirmatory Items The draft safety evaluation for SQN, Units 1 and 2, transmitted to TVA on December 5, 1986 contained nine confirmatory items which required certification of completion. These items were addressed in Enclosure 2 to TVA's letter to Mr. S. Ebneter, NRC, from R. l.. Gridley, dated March 24, 1987, subject, "Sequoyah Nuclear Plant (SQN) -
~
Compliance with 10 CFR 50.49, Environmental Qualification of Electrical Equipment Important to Safety for Nuclear Power Plants." The NRC inspectors reviewed TVA's certification for the nine confirmatory items and discussed the responses with TVA during the inspectio Based on the review and the discussions, the following comments are provide Confirmatory Items:
(1) (0 pen) Resolution or staff approval of the main-steam-line break with superheat release and its effect on the environmental quali-fication of equipment in the east and west valve vault rooms (A1, A2, A10, and All).
Comment: TVA's resolution is currently undergoing stoff review dnd will be the subject of a SER dealing with the issue. In dnticipation of approval of the TVA proposed resolution, TVA hos already implemented or is implementing EQ changes required by their resolution of this issu (2) (0 pen) Completion of All EQ Fieldwork Comment: During the inspection the NRC inspectors reviewed scheduled completion dates for outstanding fieldwork and deter-mined that TVA still has several items of fieldwork to complet The inspectors also determined that TVA has a tracking system to assure completion of the work prior to restart. Completion of fieldwork remains as an open confirmatory item (see discussion inparagraph4.C.(2)).
I *
.
.- .
.
,
(3) (Closed)MainsteamVaultSubmergenceReview Comment: During the inspection, the NRC inspectors reviewed significant condition reports (SCR) SQNEQP8635, Revision 2, and SQNEQP8661, Revision 1, and determined that only fieldwork remains regarding this item. In addition during the June 1986 EQ inspection, the inspectors reviewed eight EQ binders relative I to this item. Since only fieldwork remains for resolution of )
this item and it is being tracked by TVA as part of the field- l work of item 2 above, this item is closed as a separate i confirmatory item. Resolution of this item will be followed as part of the fieldwork confirmatory ite (4) (Closed) Management Review of EQ Binders Comment: During the four EQ inspections of 1986 and this inspection the NRC inspectors determined that SQN EQ binders have undergone management review. TVA's response is acceptabl (5) (Closed) Supplemental Vendor Information Comment: The inspectors reviewed SCR SQNEQP8542, Revision 1, and "10 CFR 50.49 Cable and Splice List," SQN-CASL-001, dated March 27, 1987, and determined that this confirmatory item was complete. TVA's response is acceptabl (6) (Closed) Cable Load Study Comment: The inspectors reviewed Quality Information Request /
Release (QIR) SQP-87-169 and a sample of the April 3,1987, computer printout for the " Cable Average Conductor Temperature Analysis Testing (CACTAT) Study for mild-harsh-mild and harsh 50.49 cables." Additionall (SQN-EQ-CABL-016 and of -032)
the sixyEQ thebinders inspectors which reviewed were two affected by changes in cable ampacity tables and determined that appropriate revisions were included in the binder Completion of this item is acceptabl (7) (Closed) Inside Containment Flood Analysis for 5-minute Operability Comment: The inspectors reviewed SCR SQNEQP8515, Revision 0, and its asscoiated SCR completion verification; as weil as, Office of Engineering calculation number EQP-27 pertaining to this confirmatory item. The inspectors determined that this item is complete. TVA's response is acceptabl F .- -
-
. ,
'
l
.
(8). (Closed) Verification of Instrument Accuracy Calculation Comment: The NRC inspectors reviewed the three EQ binders (5QN-EQ-XMTR-001 and -004 and SQN-EQ-IPT-002) affected by this confirmatory item during the June 1986 and April 1987 inspec-tions and determined that this item was complete. TVA's confirmatory response is acceptable, j (9) (Closed) Finalization of the EQ Master List Consnent: The inspectors reviewed the TVA letter from J. Domer to V. Stello, Jr., dated August 13, 1986 which included the 10 CFR 50.49 list for SQN. In addition during the January 1986 inspection., the NRC inspectors reviewed the Master List f that existed at that time; as well as, the SQN methods of I controlling the list. Since the reviews have identified no problems with either the January list or the August list and i no deficiencies with the methods of controlling the list, TVA's J confirmatory response is acceptabl C.. Techaical and Field Open Items (1) Technical Open Items:
The NRC inspectors reviewed TVA's letter to Nr. S. Ebneter, NRC, from R. L. Gridley, dated March 24, 1987. Enclosure 1 Attach-ment B to the above letter identified two open EQ technical items I which are being addressed by SQN. One item deals with the review {
of piece parts purchased as "QA Level II" and is being addressed l
'
by the TVA Replacement Items Project (RIP). Since RIP will be the subject of a separate NRC inspection, the inspectors did not review the RIP activitie The other technical item pertained to the qualification require-ments for containment cooling for certain events. The NRC l inspectors reviewed documentation and held discussions with SQN concerning this item. As a result of a TVA generic review of significant condition report (SCR), SCRWBNNEB8637 for Watts Bar Nuclear Plant, TVA documented the issue for SQN in SCRSQNNEB861 This SCR documented a postulated event which would result in environmental conditions not previously identified for safety-related equipment located in reactor containment. The licensee determined that a high energy line break (HELB) in the auxiliary building could create environmental effects in localized areas (pressurizer and lower compartment) of containment where safety-related equipment is located. While reviewing this problem, the licensee identified concerns with regard to the main-steam-line break (MSLB) profile for a MSLB inside containment. This concern was addressed in condition adverse to quality report, CAQR-870349. The initial analysis indicates that certain localized temperatures (pressurizer and lower compartment)
l
'l I
'
14 ;
1
.. .:', *
.
l for the time period of i day and beyond after event initiation was not enveloped by existing qualification profiles. The maximum deviation from the existing profiles was approximately 17 degrees Fahrenhei The licensee is investigating several resolutions to -these issue One involves the use of containment coolers to mitigate the effects of.an event; however, the coolers (including air return fans) are not environmentally qualified and would have to be qualifie Another method involves using containment spray for coolin This item is identified as Inspection Follow-up Item 50-327,328/
~87-22-02, which will be reviewed during a future NRC inspectio prior to SQN restar (2) Fieldwork Open Item: The NRC inspectors reviewed the fieldwork open item identified in the letter from R. L. Gridley, dated March 24,1987, and determined that the items are being tracked by TV At the time of the inspection most of the items identified had not been completed. The latest scheduled item for completion was " replacing cables based on revised ampacity tables" wit a completion dated of May 24, 1987. Completion of identified -
fieldwork will be reviewed by the NRC prior to restart; there- .
fore, fieldwork completion is identified as Inspection Follow-up Item, 50-327,328/87-22-0 Environmental Qualification Files The NRC inspectors reviewed three new environmental qualification binders (SQN-EQ-CABL-030. -050, and -051) which had been generated since the previous NRC EQ inspections. In addition, the inspectors reviewed binders SQN-EQ-CABL 016, -032, and -043 to evaluate revisions to the binders which had been made since the other inspections. The binder revisions reviewed pertained to the issues of main steam valve vault " Hot Spots," superheat in the main steam valve vault, "ABGT5" filter modifications, and electric cable ampacity table change The new binders were reviewed to compare plant service conditions with qualification test data and to verify the basis for these condi tion Additionally, the inspectors reviewed areas such as required post-accident operating time compared to the duration of time the equipment had been demonstrated to be qualified; similarity of tested equipment to that installed in the plant (e.g., insulation class, materials of components of the equipment, test configuration compared to installed configuration, and documentation of both; evaluation of adequacy of test conditions; aging calculations for qualified life and replacement interval determination; effects of decreases in insulation resistance on equipment performance; adequacy of demonstrated accuracy; evaluation of test anomalies; and appli-cability of EQ problems reported in IE ins / Bulletins and their resolutio '
.i, 1 l
.
The revised binders were reviewed to ensure that the revisions did not change the qualification st'atus of the equipment covered by the binders. The review also determined whether the revisions were properly implemente In addition to the binder reviews discussed above, binders for equipment selected for walkdown inspection were reviewed to identify information which could be verified during the walkdown. This information included such things as mounting configurations, orientations, interfaces, model numbers, and ambient environment During the binder reviews, the intpectors identified minor file concerns / inconsistencies and made recommendations to TVA for binder improvements to clarify informati6n in the binders. These concerns /
inconsistencies and recommendations were not considered significant by the inspectors and qualification of the equipment covered in the binders was considered established; however, the licensee agreed to make changes to the binders as discussed with the inspectors. Binders identified for changes included: (1)SQN-EQ-CABLE-030,Okonite"EPR" Cable;(2)SQN-EQ-CABLE-050, Brand-Rex"XLPE" Cable;(3)SQN-EQ-SOL-004, Gould/ Allied (MSIVActuatorManifoldAssembly);(4)SQN-EQ-PENE-004, WestinghouseCannisterPenetrations;and(5)SQN-EQ-PENE-005,Conax Modular Penetration. Since the changes were considered to be minor .
!
and qualification was supported, the changes are not identified for inspection followu E. Plant Physical Inspection i The NRC inspectors selected 18 pieces of equipment for physical inspection during the plant walkdown. The 18 items inspected covered 10 different equipment types which included solenoid valves, {
resistance temperature detectors, transmitters, and penetration l The equipment types were selected on the basis taat they had not j been physically inspected during previous EQ inspection During the physical inspection, the inspectors examined characteristics such as mounting configuration, orientation, interfdces, model number, ambient environment, and physical condition. No deficiencies were identified during the plant walkdown inspection. In addition to the f above, Raychem splices were inspected as part of the closeout effort associated with the Potential Enforcement / Unresolved Item on Raychem splices / breakouts. Activities associated with the Raychem inspections are discussed in paragraph 4.A.
I ASCO Solenoid Valve, Model NP8316 I
I During the inspection, the inspectors received a copy of a TVA letter from R. Gridley, Director, Nuclear Safety and Licensing, subject:
"Sequoyah Nuclear Plant (SQN) Units 1 and 2 - NRC-0!E Region II Inspection Report Nos. 50-327/86-42 and 50-328/86-42 - Denial f
j of Violation," dated April 6, 1987. At the request of the Senior
' i 16 l
!
-
,. :
'
.' -l
.
l I
Resident Inspector (SRI), the inspectors reviewed the response and ]
held discussions with the licensee relative to violation 50-327,328/ 1 86-42-01 concerning ASCO Model NP8316 solenoid valve The violation cited SQN for failure to following Administrative Instruction 19, Revision 12, " Plant Modifications After Licensing,"
concerning Work Plan 11806. The Work Plan did not give adequate instructions for craft personnel to reconfigure 10 CFR 50.49 qualified ASCO solenoid valves for proper installation and did not specify the 4 j
impact of improper actions associated with modifying the valve Specifically, the violation was for failure to establish, in the work plan, valve bonnet bolt torque and sequence requirements in dCCorddnce with vendor documentatio During the discussions the licensee provided additio'nal information supporting the points made in the denial of the violation. The inspectors reviewed the information including information demon-strating that the solenoid valves in question are installed in the ,
I plant in fail-safe applications. The inspectors determined that even though SQN feels that their procedures were adequate and the violation is not valid, they have tightened the bolts in accordance with vendor documentation on the questioned valves. Since the bolts have been tightened in accordance with vendor documentation this issue will not delay restart. A decision regarding the validity of the violation will be made by the NRC following evaluation of information in the letter, information reviewed during the inspection, and other available information relative to the issu G. Employee Concerns The inspectors reviewed lists of employee concerns from the TVA Employee Concerns Program to identify those that appeared to have potential effects on the SQN EQ Program. The inspectors selected ten concerns, which were reviewed to determine if they affected the EQ Progra If it was determined that they affected the EQ program, they were evaluated to determine if they had adequately been resolved in the SQN EQ Program. The concerns which affected the EQ program are discussed below:
(1) MAS-86-002: This concern is discussed in Element Report 301.05 dnd deals with the improper mounting of limit switches in I
valve 2-FCV-30-15. The report determined that a work request was written to correct the deficiency. These limit switches are included on the 10 CFR 50.49 list. The NRC reviews of the SQN EQ program have determined the program includes provisions to ensure that specific environmental qualification mounting requirements for environmentally qualified equipment are identified and verified for compliance. The inspectors deter-mined that the generic aspects of this concern are being adequately addressed by the EQ progra I
. - \
.. .t' .'
.
(2) TAK-85-001: This concern.is discussed in Element Report 302.01 and deals with problems of Raychem splice installations. This concern is EQ related and was verified as a problem at SQN in inspection report 50-327,328/86-01. Raychem installation problems were identified as Potential Enforcement / Unresolved
'
Items in the report. Resolution of this issue is discussed in paragraph 4. A of this repor (3) TAK-85-004: This concern is addressed by Element Report 30 and states that Beacon 325 grease supplied in the geared limit switches of Limitorque motor valve operators hardens. The resolution given in the element report was that,the grease in all Unit 2 and most Unit 1 safety-related Limitorque limit switches was changed to Mobil 28. The inspectors determined that use of Beacon 325 or Mobil 28 grease.in the limit switches is discussed in the qualification binders for Limitorque operators. The hardening of the Beacon 325 is specifically addressed and the binders recommend the grease be changed to Mobil 28 when hardening of the Beacon 325 is observed. The inspectors determined that this concern was adequately addressed by the EQ progra