IR 05000327/1987010

From kanterella
Jump to navigation Jump to search
Ack Receipt of Informing NRC of Steps Taken to Correct Violations Noted in Insp Repts 50-327/87-10 & 50-328/87-10
ML20214K121
Person / Time
Site: Sequoyah  Tennessee Valley Authority icon.png
Issue date: 05/18/1987
From: Zech G
NRC OFFICE OF SPECIAL PROJECTS
To: White S
TENNESSEE VALLEY AUTHORITY
References
NUDOCS 8705280330
Download: ML20214K121 (1)


Text

r I

-

May 1914R7 Tennessee Valley Authority

/ ATTN: Mr. S. A. White Manager of Nuclear Power 6N 38A Lookout Place 1101 Market Street Chattanooga, TN 37402-2801 Gentlemen:

SU8dECT: NRC INSPECTION REPORT NOS. 50-327/87-10 AND 50-328/87-10 Thank you for your response of April 14, 1987, to our Notice of Violation issued on March 18, 1987, concerning activities conducted at your Sequoyah facilit We have evaluated your response and found that it meets the requirements of 10 CFR 2.201. We will examine the implementation of your corrective actions during future inspection We appreciate your cooperation in this matte

Sincerely, Gary G. Zech, Assistant Director Regional Inspections Division of TVA Projects Office of Special Programs cc: 4. L. Abercrombie, Site Director Sequoyah Nuclear Plant d. A. Kirkebo, Acting Director, Nuclear Engineering vR. L. Gridley, Director vff. Nuclear Safety R. Harding, and Site Licensing Licensing Manager bec: J. N. Grace, RII vd. G. Keppler, OSP v5. D. Ebneter, OSP ud. A. Zwolinski, OSP 4. D. Liaw, OSP v5. D. Richardson, OSP v$. R. Connelly. 01A K. P. Barr, OSP/RII JRC Resident Inspector NRC Document Control Desk State of Tennessee RI R RII f RII / RI reh [/ TD ecker D ins - S r $b$ Bafr 5/vf/87 5/ef/87 5/g/8 5/g/87 5/7/87 5/[g/87 8705280330 870518 0 PDR ADOCK 05000327 G PDR JEol