IR 05000285/2003011

From kanterella
Jump to navigation Jump to search
IR 05000285-03-011; 11/03 - 12/12/2003; Fort Calhoun Station; Evaluation of Changes, Tests, or Experiments, and Safety System Design and Performance Capability
ML040090374
Person / Time
Site: Fort Calhoun Omaha Public Power District icon.png
Issue date: 01/09/2004
From: Marschall C
NRC/RGN-I/DRS/EB
To: Ridenoure R
Omaha Public Power District
References
IR-03-011
Download: ML040090374 (28)


Text

January 9, 2004

SUBJECT:

FORT CALHOUN STATION - NRC INSPECTION REPORT 05000285/2003-011

Dear Mr. Ridenoure:

On November 21, 2003, the US Nuclear Regulatory Commission (NRC) completed the onsite portion of an inspection at your Fort Calhoun Station. In-office inspection was continued through December 12, 2003, to review issues associated with the potential impacts of a long-term loss of instrument air. The enclosed report documents the inspection findings, which were discussed on November 21, 2003, with you and members of your staff.

This inspection was an examination of activities conducted under your license as they relate to safety and compliance with the Commissions rules and regulations and with the conditions of your license. Within these areas, the inspection consisted of selected examination of procedures and representative records, observations of activities, and interviews with personnel.

Based on the results of this inspection, the NRC has identified two findings of very low safety significance (Green). This report also documents one finding concerning the ability to operate with a prolonged loss-of-instrument air. This finding has potential safety significance greater than very low significance. The latter finding does not present an immediate safety concern because the procedure was changed to address the issue appropriately during the inspection.

The NRC has also determined that violations are associated with each of these findings. Two violations are being treated as a noncited violations, consistent with Section VI.A of the Enforcement Policy. The other violation will be dispositioned once a significance determination has been completed. The noncited violations are described in the subject inspection report. If you contest the violations or significance of the noncited violations, you should provide a response within 30 days of the date of this inspection report, with the basis for your denial(s), to the U.S. Nuclear Regulatory Commission, ATTN: Document Control Desk, Washington, DC 20555-0001, with copies to the Regional Administrator, U.S. Nuclear Regulatory Commission, Region IV, 611 Ryan Plaza Drive, Suite 400, Arlington, Texas 76011; the Director, Office of Enforcement, U.S. Nuclear Regulatory Commission, Washington, DC 20555-0001; and the NRC Resident Inspector at the Fort Calhoun Station.

-2-In accordance with 10 CFR 2.790 of the NRCs "Rules of Practice," a copy of this letter, its enclosure, and your response will be made available electronically for public inspection in the NRC Public Document Room or from the NRCs document system (ADAMS), accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html. To the extent possible, your response should not include any personal privacy, proprietary, or safeguards information so that it can be made available to the Public without redaction.

Sincerely,

/RA/

Charles S. Marschall, Chief Engineering and Maintenance Branch Division of Reactor Safety Docket No. 50-285 License No. DPR-40

Enclosure:

Inspection Report

REGION IV==

Docket:

50-285

License:

DPR-40

Report No.:

05000285/2003-011

Licensee:

Omaha Public Power District

Facility:

Fort Calhoun Station

Location:

Fort Calhoun Station

FC-2-4 Adm.

P.O. Box 399, Hwy. 75 - North of Fort Calhoun

Fort Calhoun, Nebraska

Dates:

November 3 through December 12, 2003

Team Leader:

N. OKeefe, Senior Reactor Inspector, Engineering and Maintenance Branch

Inspectors:

L. Ellershaw, Senior Reactor Inspector, Engineering and Maintenance Branch

C. Paulk, Senior Reactor Inspector, Engineering and Maintenance Branch

P. Goldberg, Reactor Inspector, Engineering and Maintenance Branch

J. Mateychick, Reactor Inspector, Engineering and Maintenance Branch

J. Taylor, Reactor Inspector, Engineering and Maintenance Branch

Accompanying

Personnel:

J. Adams, Reactor Inspector, Engineering and Maintenance Branch

Approved By:

Charles S. Marschall, Chief

Engineering and Maintenance Branch

Division of Reactor Safety

-2-

SUMMARY OF FINDINGS

IR 05000285/2003-11; 11/03 - 12/12/2003; Fort Calhoun Station; Evaluation of Changes, Tests, or Experiments, and Safety System Design and Performance Capability The NRC conducted an inspection with six regional inspectors. The inspection identified two Green noncited violations. The significance of most findings is indicated by its color (Green,

White, Yellow, Red) using Inspection Manual Chapter 0609, "Significance Determination Process." Findings for which the significance determination process does not apply may be "Green" or be assigned a severity level after NRC management review. The NRCs program for overseeing the safe operation of commercial nuclear power reactors is described in NUREG-1649, "Reactor Oversight Process," Revision 3, dated July 200

NRC-Identified and Self Revealing Findings

Cornerstone: Barrier Integrity

  • TBD. The team identified a violation for an inadequate procedure having potential safety significance greater than very low significance. Abnormal Operating Procedure AOP-17, "Loss of Instrument Air," Revision 5, a procedure required by Technical Specification 5.8 and Regulatory Guide 1.33, did not provide sufficient information for operators to respond to a prolonged loss of instrument air. Select valves were equipped with air accumulators or backup nitrogen supplies to maintain the valves operable after a loss of instrument air. The team identified some specific scenarios where valves would reposition to their failed position once the accumulators were exhausted and cause undesirable flow diversions in emergency core cooling systems.

This finding was unresolved pending completion of a Phase 3 significance determination because the conditions of concern could not be evaluated using a Phase 2 assessment.

This finding was more than minor because it affected objectives of both the mitigating systems and a barrier integrity cornerstones. Specifically, failure to maintain valves in their required positions following a loss of instrument air had the potential to impact the containment barrier function and mitigating system equipment availability.

(Section 1R21.2)

Cornerstone: Mitigating Systems

Green.

A noncited violation of Technical Specification 5.8, Procedures, and Criterion III of Appendix B to 10 CFR Part 50 was identified for inadequate procedures.

Abnormal Procedure AOP-17 requires operators to monitor select backup nitrogen supply bottle pressures with the intent to replace the bottles as necessary to maintain the pressure supply to the air operated valves. The valves affected were containment spray header isolation valves and the safety injection and refueling water tank outlet valves. The supply of spare nitrogen bottles was not procedurally controlled and was found to be insufficient to implement the procedure. This issue was entered into the licensees corrective action program under Condition Report 200305298.

This finding was more than minor because the barrier integrity cornerstone objective of maintaining the containment as a physical barrier to the release of radionuclides was affected by the procedure quality attribute. Specifically, the lack of spare nitrogen bottles had the potential to affect the leakage out of containment via the emergency core cooling system after a loss of instrument air. The finding screened as being of very low safety significance because it represented only a potential degradation of the radiological barrier function. (Section 1R21.2)

Green.

The team identified a finding of very low safety significance involving a noncited violation of Criterion III of Appendix B to 10 CFR Part 50 for the failure to correctly translate design information into calculations. Containment Piping Penetrations M-9 and M-12 contained steam generator drain lines with valves that were normally locked closed prior to plant startup, trapping cold water. The licensee did not consider the possible substantial pressure increase when the associated steam generators reach normal operating conditions in two calculations that assessed containment piping penetrations for potential over pressurization, EA-FC-90-082 and FC05994. The licensee concluded that the installed valves would allow enough seat leakage to prevent over-pressurizing the penetration, but this small leakage capability constitutes a design feature which is required to be documented and maintained. The licensee determined that the two calculations need to be revised. This finding was entered into the licensees corrective action program under Condition Report 200305161.

This finding affected the containment barrier cornerstone because of the potential for the loss of integrity of piping penetrating the containment vessel. This finding was more than minor because it was similar to Example 2.f of Appendix E of Manual Chapter 0612, in that the engineering staff had to perform a reanalysis and an operability evaluation due to this condition. This issue had very low safety significance because it did not represent an actual open pathway from the containment.

(Section 1R21.5)

REPORT DETAILS

REACTOR SAFETY

Introduction The NRC conducted an inspection to verify that the licensee adequately preserved the facility safety system design and performance capability and that the licensee preserved the initial design in subsequent modifications of the system selected for review. The scope of the review included any necessary nonsafety-related structures, systems, and components that provided functions to support safety functions. This inspection also reviewed the licensees programs and methods for monitoring the capability of the selected systems to perform the current design basis functions. This inspection verified aspects of the initiating events, mitigating systems, and barrier cornerstones.

The licensee based the probabilistic risk assessment model for the Fort Calhoun Station on the capability of the as-built safety systems to perform their intended safety functions successfully. The inspectors determined the area and scope of the inspection by reviewing the licensees probabilistic risk analysis models to identify the risk significant systems, structures, and components. The inspectors established this according to their ranking and potential contribution to dominant accident sequences and/or initiators. The inspectors also used a deterministic approach in the selection process by considering recent inspection history, recent problem area history, and all modifications developed and implemented.

The team reviewed in detail the components and subsystems that perform the containment functions, and safety-related portions of the instrument air system. The primary review prompted parallel review and examination of support systems, such as, electrical power, instrumentation, cooling water, and related structures and components.

The instrument air system is a non-safety grade system which supports the operation of engineered safeguards equipment. Air-operated valves and dampers in engineered safeguards systems are to be designed to fail in their accident-required (safe) position or be equipped with safety-grade air-accumulators or nitrogen backup systems. The team reviewed the safety-grade portion of the instrument air system for a sample of air-operated valves and level instrumentation bubblers. The team reviewed design basis documents, abnormal and emergency operating procedures, system analyses, drawings, calculations, and testing procedures for a sample of valves and instrumentation equipped with air accumulators or nitrogen backup bottles.

The team assessed the adequacy of calculations, analyses, engineering processes, and engineering and operating practices that the licensee used for the selected safety system and the necessary support systems during normal, abnormal, and accident conditions. Acceptance criteria used by the NRC inspectors included NRC regulations, the technical specifications, applicable sections of the Updated Safety Analysis Report, applicable industry codes and standards, and industry initiatives implemented by the licensees programs.

1R02 Evaluations of Changes, Tests, or Experiments

a. Inspection Scope

The team reviewed six licensee-performed safety evaluations to verify that licensee personnel had appropriately considered the conditions under which changes to the facility or procedures or the conduct of tests or experiments may be conducted without prior NRC approval. The subject evaluations had been performed since the last NRC inspection of these activities, which was documented in NRC Inspection Report 05000285/2002-03.

The team reviewed an additional 10 licensee-performed safety-evaluation screenings in which licensee personnel determined that evaluations were not required, to ensure that the exclusion of a full evaluation was consistent with the requirements of 10 CFR 50.59, "Evaluations of Changes, Tests, or Experiments." The team also reviewed five licensee-performed safety-evaluation applicability determinations in which licensee personnel determined that screenings, as allowed by the regulations, were not required.

The team reviewed and evaluated the most recent safety-evaluation program self-assessment and 10 corrective action documents written since the last NRC inspection of this area to determine whether there were sufficient in-depth analyses of the program to allow for the identification and subsequent resolution of problems or deficiencies.

A list of the specific documents reviewed is provided in the Attachment to this report.

The required sample sizes for this biennial inspection are 5 to 7 licensee evaluations required by 10 CFR 50.59; and 10 to 15 changes, tests, or experiments that were screened out.

b. Findings

No findings of significance were identified.

1R21 Safety System Design and Performance Capability

.1 System Requirements

a. Inspection Scope

Inspection Procedure 71111.21 requires that one or two risk-significant systems be reviewed. The team inspected the following attributes of the containment and safety-related portions of the instrument air systems:

(1) process medium (water, steam, and air),
(2) energy sources,
(3) control systems, and
(4) equipment protection. The team examined the procedural instructions to verify instructions were consistent with actions required to meet, prevent, and/or mitigate design basis accidents. The team also considered requirements and commitments identified in the Updated Safety Analysis Report, technical specifications, design basis documents, and plant drawings.

b. Findings

Introduction:

The team was unable to verify that the component cooling water system was able to provide the required flow to safety-related components, or that the containment air coolers were capable of removing their design heat loads. This is an unresolved item pending additional review of analyses and/or testing results by the NRC.

Description:

The containment coolers are designed to remove heat from containment during accident conditions. They are specifically credited in the Fort Calhoun Updated Safety Analysis, Chapter 14, for limiting the peak containment pressure and temperature to within design limits during a main steam line break accident.

The team attempted to verify that the containment coolers were capable of removing the design heat load necessary to maintain containment pressures and temperatures within design limits by reviewing design and testing data. However, licensee engineers were unable to supply documentation that adequately demonstrated this capability to the team.

Specifically, the licensee engineers could not show:

  • The minimum component cooling water flow that was necessary for the coolers to remove the design heat load, or
  • Test data, which demonstrated that the component cooling water system performance was verified to achieve the necessary flows to each of the vital loads under accident conditions In addition, the team determined that some nonsafety-related loads cooled by component cooling water were intended to be isolated during accidents to allow more flow to vital loads. However, the isolation valves for some of these non-vital loads were fail-open valves, operated by instrument air without backup accumulators. Since the instrument air system is neither safety-related nor seismically qualified, it cannot be considered to be available under accident conditions. The team was concerned that the potential reduction in component cooling water flow to vital loads caused by flow diversions to non-vital loads could prevent fulfilment of one or more safety functions. For example, the team noted that the spent fuel pool cooling system would divert about 1100 gpm of component cooling water flow from vital loads on a loss of instrument air pressure. This represented a substantial portion of the total system flow, where one or two pumps would each be expected to supply 4,300 gpm flow to the system.

The licensee engineers provided information on flow modeling of the component cooling water system. The team reviewed the following calculations related to component cooling water flow rates:

Calculation FC 05669, "Component cooling water Flow Rates," Revision 3 Calculation FC 05660, "Check of Component cooling water Flow Model Against Measured Data," Revision 0 Calculation FC 06723, "Component cooling water and RW Input Data for ABB-CE Containment Analysis," Revision 0 Calculation FC 05780, "Component cooling water System Maximum DBA Heat Removal Rate," Revision 1 Due to time constraints and lack of documentation, the team was not able to verify the validity of the results of this modeling, nor whether they demonstrated adequate flow to attain the required heat removal in vital loads. However, the team was concerned that the model results were never validated by direct comparison to actual system performance while the system was aligned as it would be during the limiting accident.

In fact, the team noted that the component cooling water system had never been tested in an accident alignment to demonstrate that the required system flow rates to vital loads could be achieved. The team reviewed the following construction-era tests and noted that the system alignments did not reflect accident alignments:

  • POTP.22, "Fort Calhoun Unit No. 1 Pre-operational Test Procedure Component Cooling Water System," dated April 10, 1972
  • OT-PP-22, "Fort Calhoun Station Unit No. 1 Post-Core Hot Functional Test Procedure," dated July 6, 1973 On December 4 and 5, 2003, conference calls were held between licensee representatives and Region IV to discuss why the licensee concluded that the system would perform its intended function in light of the fact that it had never been tested to demonstrate that capability. The basis for reaching that conclusion was documented in Condition Report 200305471. The team reviewed the issue and concluded that the licensee had a reasonable basis to conclude the system was operable, primarily because the system was designed to have a large excess capacity. However, the standard for an operability evaluation is that the licensee must have a reasonable expectation that the system will perform as intended when a question about that capability exists. The licensee is required by various regulations, most notably 10 CFR Part 50, Appendix B, Criterion III, Design Control, to establish design control measures, including tests, which demonstrate that design requirements have been correctly translated into actual plant performance capability. The team concluded that additional inspection is necessary to determine whether this requirement has been satisfied and documented in the design of the component cooling water system.

The licensee initiated Condition Report 200305293, which acknowledged that there were no flow tests that would verify the component cooling water flow rates developed in calculations.

Analysis:

The potential risk associated with this issue will be evaluated upon completion of additional inspection. This item is unresolved pending receipt of additional information from the licensee concerning the results of their review of the maximum required flow rate and the heat removal requirements to meet design basis accident requirements. No immediate safety concern existed, as discussed above, because the system had a large excess capacity.

Enforcement:

Appendix B to 10 CFR Part 50, Criterion III, Design Control, states that measures shall be established to assure the design basis as defined in paragraph 50.2 and as specified in the license application, for those systems and components to which this appendix applies, are correctly translated into specifications, drawings, procedures, and instructions. The design control measures shall provide for verifying or checking the adequacy of design, such as by the performance of design reviews, by the use of alternate or simplified calculational methods, or by the performance of a suitable testing program.

Additional information from the licensee was needed in order to determine whether the component cooling water system was adequately designed and verified to be capable of supplying adequate flow to vital loads during accident conditions, and to determine whether the containment coolers were capable of removing the required heat from containment during accident conditions. This issue will be tracked as an unresolved item (URI 05000285/2003011-01) pending additional inspection of this issue.

.2 System Condition and Capability

a. Inspection Scope

The team reviewed testing procedures for the selected systems to verify that the capabilities of the systems were verified periodically. The team also reviewed the systems' operations by conducting system walkdowns; reviewing normal, abnormal, and emergency operating procedures; and reviewing the Updated Final Safety Analysis Report, technical specifications, design calculations, drawings, and procedures.

b. Findings

b1. Inadequate Nitrogen Backup Supplies Introduction The team identified a finding of very low safety significance involving a noncited violation of Technical Specification 5.8, Procedures, and Criterion III of Appendix B to 10 CFR Part 50. Specifically, the team identified that the procedure for loss of instrument air included the requirement to maintain backup nitrogen supplies for select valves without sufficient procedural guidance to assure the required replacement nitrogen bottles would be available.

Description Abnormal Procedure AOP-17, Loss of Instrument Air, Revision 5, requires that the pressure of the backup nitrogen bottles for four valves equipped with safety grade nitrogen backup systems be checked every 2 hours2.314815e-5 days <br />5.555556e-4 hours <br />3.306878e-6 weeks <br />7.61e-7 months <br />. These valves are LCV-383-1 and LCV-383-2 (safety injection and refueling water tank (SIRWT) outlet valves); and HCV-344 and HCV-345 (containment spray header isolation valves). All of these valves fail open on loss of air pressure, and the backup nitrogen supplies are provided to hold the valves closed.

Procedure AOP-17 did not contain steps to replace the backup nitrogen bottles.

Technical Basis Document TBD-AOP-17, clearly stated that the intent was to maintain these valves functional by checking and replacing the nitrogen bottles as necessary. The Updated Safety Analysis Report (USAR), Section 6.3.4.2, explains that one of the containment spray header isolation valves is required to stay shut to prevent pump runout if less than the full three containment spray pumps are running.

The team concluded that the SIRWT outlet valves were required to stay shut to prevent the loss of emergency core cooling system water from containment back to the tank.

Therefore, the team concluded that performance of Abnormal Procedure AOP-17, Loss of Instrument Air, for a prolonged period would require that replacement nitrogen bottles be available. The team identified that licensee personnel did not establish a dedicated reserve of spare nitrogen bottles for this purpose. The procurement program allowed the general inventory to be as low as three nitrogen bottles before reordering. Therefore, a sufficient supply of spare nitrogen bottles to allow even one round of replacements per Abnormal Procedure AOP-17 was not assured of being available.

Analysis The performance deficiency associated with this finding is that the procedure for responding to a loss of instrument air contained the intent to maintain some valves functional for a mission time that exceeded the capacity of the installed backup nitrogen supply. The procedure was inadequate, in that it did not contain explicit instructions to replace the nitrogen bottles prior to losing the function, and the station did not assure that spare bottles would actually be available to perform this action.

This issue was more than minor because the ability of nitrogen backup supplies to maintain valves in their required positions affected the procedure quality attribute of the barrier integrity cornerstone objective of providing reasonable assurance that physical design barriers (fuel cladding, reactor coolant system, and containment) protect the public from radionuclide releases caused by accidents or events. Failure to maintain Valves LCV-383-1 and LCV-383-2 in their required positions has the potential to impact the containment barrier integrity by allowing increased leakage out of containment via the emergency core cooling systems during the containment sump recirculation mode of operation.

This issue was determined to have very low safety significance. The finding screened as being of very low safety significance because it represented only a potential degradation of the radiological barrier function The two systems affected by this finding were mitigating systems. However, the team concluded that the impact on the mitigating system cornerstone was minor. For the containment spray valves, emergency operating procedures provided guidance to verify that pumps were not in a runout condition. For the SIRWT suction valves, check valves provided protection against gross loss of water from containment, so the mitigating system function would not be challenged. For both, time was available for the condition to be recognized and the bottles replaced.

Enforcement Technical Specification 5.8.1 and Regulatory Guide 1.33, Revision 2, Appendix A, require written procedures for combating emergencies and other significant events, including loss of instrument air. Abnormal Operating Procedure 17 implements this requirement at Fort Calhoun Station.

Criterion III of Appendix B to 10 CFR Part 50 states, in part, that "[m]easures shall be established to assure that applicable regulatory requirements and the design basis, as defined in § 50.2 and as specified in the license application, for those structures, systems, and components to which this appendix applies are correctly translated into specifications, drawings, procedures, and instructions."

Contrary to the above, the measures established to assure that design information was correctly translated into procedures were inadequate, in that, the requirement to maintain backup nitrogen supplies to select valves on loss of instrument air was identified but a method of assuring the necessary spare nitrogen bottles to implement the requirement was not incorporated into a procedure. The engineering staff issued Condition Report 200305298 and entered this finding into the corrective action program.

Because of the very low safety significance of the finding, and because the finding has been entered into the corrective action program, the team treated this as a noncited violation, consistent with Section VI.A.1 of the NRC Enforcement Policy.

(NCV 05000285/2003011-002)b.2 Inadequate Abnormal Operating Procedure a.

Introduction The team identified a violation with undetermined significance of Technical Specification 5.8 and Criterion III of Appendix B to 10 CFR Part 50. Specifically, the team identified that the abnormal operating procedure for loss of instrument air did not contain sufficient information for addressing a loss of instrument air over an extended period of time.

Description Abnormal Procedure AOP-17 provides guidance for attempting to restore instrument air and the alignment of air-operated valves if system pressure cannot be restored to normal. The Fort Calhoun Station USAR accident analysis assumes that the nonsafety grade portions of the instrument air system will not be available. Valves and instruments, which will require air pressure for continued operation are provided safety grade air accumulators or backup nitrogen supplies. Abnormal Procedure AOP-17, Attachment E, Air Operated Valves Operable Following Loss of Instrument Air, lists valves with backup air accumulators or nitrogen supplies, the length of time the valves will remain operable, and the failure position of the valves on loss of pressure.

The Appendix E failure positions of the valves on loss of pressure are considered to be the fail-safe positions of the valves. The establishment of the fail-safe position of a valve was determined by the accident mitigating function of its system. The desired valve position is dependent on the assumed plant conditions being addressed. The long-term desired position of a valve after its backup air or nitrogen supply is exhausted may not be the same as its fail-safe position for initially responding to a design basis accident.

Further, the analyses and calculations establishing the air accumulator or backup nitrogen operability times for air-operated valves do not fully address the required post-accident operating times for their respective systems.

For example, Valves HCV-385 and HCV-386 isolate the safety injection and containment spray pump recirculation to the SIRWT. Theses valves are normally open and remain open during the emergency core cooling system injection mode for a loss-of-coolant accident. Upon transfer to the containment sump recirculation mode, these valves are closed. These valves are equipped with air accumulators and are operable for 13 hours1.50463e-4 days <br />0.00361 hours <br />2.149471e-5 weeks <br />4.9465e-6 months <br /> after the loss-of-instrument air and fail open on loss-of-air pressure.

Reopening Valves HCV-385 and HCV-386 during the containment sump recirculation mode would divert emergency core cooling system inventory from the containment building sump to the SIRWT. The reduction in containment sump inventory available to the safety injection and containment spray pumps would impact long-term emergency core cooling system operation due to insufficient net positive suction head for continued pump operation. The increased leakage from the containment to the SIRWT would be greater than the limit used in the analysis of USAR Section 14.15.8, "Radiological Consequences of a LOCA," therefore, the resulting dose assessment would also be increased.

Abnormal Procedure AOP-17 did not include any information about the expected effects of the valves listed in Appendix E going to their failure position after the backup air or nitrogen supplies are exhausted, or actions neccessary to address expected undersirable effects.

Analysis The performance deficiency associated with this finding is the issuance of a procedure, which does not adequately address the long-term effects of a loss-of-instrument air. The team considered this finding to be more than minor because both the mitigating systems cornerstone and the barrier integrity cornerstone objectives were affected by the procedure quality attribute.

The ability of air accumulators and backup nitrogen supplies to maintain valves in their required positions affects the mitigating systems cornerstone objective to ensure the availability, reliability, and capability of systems that respond to initiating events to prevent undesirable consequences (i.e., core damage). The ability of air accumulators and backup nitrogen supplies to maintain valves in their required positions affects the barrier integrity cornerstone objective to provide reasonable assurance that physical design barriers (fuel cladding, reactor coolant system, and containment) protect the public from radio nuclide releases caused by accidents or events.

The finding of inadequate procedures is associated with the procedure quality attribute of both the mitigating systems and barrier integrity cornerstones. The attribute is applicable to operating (post-event) procedures (e.g., abnormal operating procedures and emergency operating procedures), which includes Abnormal Procedure AOP-17.

Failure of air accumulators and backup nitrogen supplies to maintain valves in their required positions following a loss of instrument air has the potential to impact the availability and reliability of multiple plant systems. The analyses for loss of instrument air do not demonstrate the valves will remain in their required positions throughout the periods their respective systems are required to operate. Further, the procedures do not address potential system operability problems and required operator actions beyond the periods that the air accumulators and backup nitrogen supplies will maintain pressure.

This issue was not an immediate safety concern because the licensee took compensatory measures to ensure the affected valves would be manually positioned prior to their accumulators being depleted by making a procedure change.

The team found that this issue resulted from a performance deficiency with the potential to be greater than very low safety significance (Green) because of the potential loss of accident mitigation equipment associated with this finding.

Enforcement Technical Specification 5.8.1 states, in part, that [w]ritten procedures and administrative policies shall be established, implemented and maintained covering the following activities: a. The applicable procedures recommended in Regulatory Guide 1.33, Revision 2, Appendix A, 1978;... Regulatory Guide 1.33, Appendix A, lists typical safety-related activities that should be covered by written procedures. Appendix A, Section 6, Procedures for Combating Emergencies and Other Significant Events, includes loss-of-instrument air.

Criterion III of Appendix B to 10 CFR Part 50 states, in part, that "[m]easures shall be established to assure that applicable regulatory requirements and the design basis, as defined in §50.2 and as specified in the license application, for those structures, systems, and components to which this appendix applies are correctly translated into specifications, drawings, procedures, and instructions."

Contrary to the above, the measures established to assure that design information was correctly translated into procedures were inadequate, in that, the requirement to maintain air operated valves in their desired positions on loss of instrument air was not addressed beyond the initial system responses when backup air accumulators and nitrogen supplies are available. The engineering staff issued Condition Report 200305311 and entered this finding into the corrective action program.

Because of the final safety significance of the finding has not yet been determined, and because the finding has been entered into the corrective action program, the team treated this as an unresolved item. (URI 05000285/2003011-003)

.3 Identification and Resolution of Problems

a. Inspection Scope

The team reviewed a sample of problems for the selected systems identified by the licensee in the corrective action program to evaluate the effectiveness of corrective actions related to design issues. The sample included open and closed condition reports for the past 3 years and are listed in the attachment to this report. Inspection Procedure 71152, "Identification and Resolution of Problems," was used as guidance to perform this part of the inspection. Older condition reports that were identified while performing other areas of the inspection were also reviewed.

b.

Issues and Findings No findings of significance were identified.

.4 System Walkdowns

a. Inspection Scope

The team performed walkdowns of the accessible portions of the selected systems and required support systems. Inspectors focused on the installation and configuration of switchgear, motor control centers, manual transfer switches, field cabling, raceways, piping, components, and instruments. During the walkdowns, the team assessed:

  • The placement of protective barriers and systems;
  • The susceptibility to flooding, fire, or environmental conditions;
  • The physical separation of trains and the provisions for seismic concerns;
  • The accessibility and lighting for any required local operator action;
  • The materiel condition and preservation of systems and equipment; and
  • The conformance of the currently-installed system configurations to the design and licensing bases.

b. Findings

No findings of significance were identified.

.5 Design Review

a. Inspection Scope

The team reviewed the current as-built instrument and control, electrical, and mechanical design of the selected systems. These reviews included an examination of design assumptions, calculations, required system thermal-hydraulic performance, electrical power system performance, protective relaying, control logic, and instrument setpoints and uncertainties. The team also performed selected single-failure evaluations of individual components and circuits to determine the effects of such failures on the capability of the system to perform its design safety functions. The team also reviewed the licensees calculations and methodology for ensuring the component cooling water system was protected against seismic, flooding, fire, and high energy line break events.

The team reviewed calculations, drawings, specifications, vendor documents, Updated Final Safety Analysis Report, technical specifications, emergency operating procedures, and temporary and permanent modifications.

b. Findings

Introduction The team identified a finding of very low safety significance involving a non-cited violation of Criterion III of Appendix B to 10 CFR Part 50 for the failure to correctly translate design information into calculations to prevent potential over-pressurization of isolated containment penetrations.

Description Fort Calhoun Station engineers performed Calculations EA-FC-90-082, Potential Over-pressurization of Containment Penetration Piping Following a Main Steam Line Break in Containment, Revision 3; and FC05994, Over-pressure Analysis of Penetrations M-7, M-9, & M-12 Under MSLB & LOCA Conditions, Revision 1, in response to Generic Letter 96-06, "Assurance of Equipment Operability And Containment Integrity During Design-basis Accident Conditions," Supplement 1. The team found that the calculations did not consider the effects of normal plant operation on the assumed starting pressures for Penetrations M-9 and M-12.

The subject piping in Penetration M-9 is a steam generator drain located between locked closed isolation Valves FW-181 and FW-686. For Penetration M-12, the steam generator drain piping is between locked closed isolation Valves FW-179 and FW-687.

These penetrations were evaluated in Calculations EA-FC-90-082 and FC-05994. The team found that those calculations used a starting pressure that was non-conservative compared to what could be expected under normal operating conditions. After the team identified this issue, a design engineer initiated Condition Report 200305161. The engineer determined that the two calculations needed to be revised. The engineer also performed an operability assessment for the current condition and concluded that the penetrations were operable. The team reviewed the licensees analysis, compared it to vendor-supplied valve performance data, and concluded that the existing design would prevent over pressurization of the pipe.

Analysis The team found the containment barrier cornerstone was affected because of the potential of for the loss-of-integrity of piping penetrating the containment vessel. The issue affected the attributes of design control and human performance. The team considered this finding more than minor since the finding was similar to Example 2.f of Appendix E of Manual Chapter 0612, "Power Reactor Inspection Reports," June 20, 2003, in that, the engineering staff had to perform a re-analysis and an operability evaluation due to this condition.

The team found that this issue resulted from a performance deficiency of very low safety significance. The team assessed this finding as Green because did not represent an actual open pathway from the containment. The finding was also found to be of very low safety significance because there was no actual loss of the containment barrier. Fort Calhoun Station personnel implemented corrective actions to ensure continued operability.

Enforcement Criterion III of Appendix B to 10 CFR Part 50, "Design Control," states, in part, that

"[m]easures shall be established to assure that applicable regulatory requirements and the design basis, as defined in §50.2 and as specified in the license application, for those structures, systems, and components to which this appendix applies are correctly translated into specifications, drawings, procedures, and instructions.... The design control measures shall provide for verifying or checking the adequacy of design, such as, by the performance of design reviews, [or] by the use of alternate or simplified calculational methods..."

Contrary to the above, the measures established to perform such verification were inadequate, in that, engineering personnel failed to correctly translate the normal plant values into calculations to determine the effects of an accident condition inside containment on the internal pressures of two piping penetrations. An engineer initiated Condition Report 200305161 and entered this finding into the corrective action program.

Because of the very low safety significance of the finding, and because the finding has been entered into the corrective action program, the team treated this as a noncited violation, consistent with Section VI.A.1 of the NRC Enforcement Policy.

(NCV 05000285/2003011-004)

.6 Safety System Inspection and Testing

a. Inspection Scope

The team reviewed the program and procedures for testing and inspecting selected components in the component cooling water system. The review included the results of surveillance tests required by the technical specifications and selective review of Class 1E control circuits for capability to test system functions.

b. Findings

No findings of significance were identified.

.7 Administrative Control of Containment Integrity

a. Inspection Scope

The team inspected the licensees administrative practices for controlling containment integrity during nominal reactor conditions. They reviewed USAR (Section 5.9, Structures, Containment Penetrations) and technical specification (Technical Specification 2.6 Containment System) requirements governing the establishment/surveillance of containment integrity and implementing operating instructions (Operating Instruction OI-CO-5, Containment Integrity, Revision 21; and Operating Instruction OI-CO-1 Containment Closeout, Revision 25). The team compared containment penetration figures in the USAR with the checklists included in Operating Instruction OI-CO-5 to determine whether the checklists adequately ensure containment integrity following an outage. They also performed walkdowns to verify that the USAR figures accurately reflect as-built conditions and to inspect the materiel condition of the penetrations. They compared current containment isolation valve lineups with the recorded lineups on the checklists and reconciled differences.

b. Findings

No findings of significance were identified.

OTHER ACTIVITIES

4OA6 Meetings, Including Exit

On November 21, 2003, the inspectors presented the inspection results to Mr. R. Ridenoure and other members of his staff, who acknowledged the findings. A followup telephone call was made on December 12, 2003, with Mr. G. Cavenaugh to status the inspection findings. The inspectors confirmed that proprietary information which was examined during this inspection was returned to the licensee.

ATTACHMENT KEY POINTS OF CONTACT Licensee personnel D. Bannister, Plant Manager G. Cavanaugh, Supervisor, Station Licensing R. Clemens, Division Manager, Nuclear Assessments M. Core, Manager, Systems Engineering A. Hackerot, Supervisor, Systems Analysis K. Hyde, Supervisor, Design Engineering A. Koenig, System Engineer R. Lentz, Senior Licensing Engineer, 10 CFR 50.59 Coordinator S. Lindquist, Operations R. Luikens, Operations C. Linden, Air-Operated Valve Program Coordinator J. Nejad, Corporate Health Physics R. Phelps, Division Manager, Nuclear Engineering R. Ridenoure, Division Manager, Nuclear Operations G. Seier, Procurement Engineering D. Taylor, Design Engineer Mechanical NRC Personnel J. Kramer, Senior Resident Inspector L. Willoughby, Resident Inspector LIST OF ITEMS OPENED AND CLOSED Opened 05000285/2003011001 URI Verify Design Flow and Heat Removal Capability of Component Cooling Water (Section 1R21.1)05000285/2003011003 URI Failure to Provide Means to Assure Proper Emergency Core Cooling System Alignment During Prolonged Loss of Instrument Air (Section 1R21.2).

Opened and Closed 05000285/2003011002 NCV Inadequate Procedure for Long-term Loss of Instrument Air (Section 1R21.2).

05000285/2003011004 NCV Failure to Translate Design Basis for Preventing Containment Penetration Over-pressurization into Design Basis (Section 1R21.5).

LIST OF

DOCUMENTS REVIEWED

Calculations

NUMBER

TITLE

REVISION

Generic Air Accumulators Using Propane Tanks Built

to DOT Spec 4BA-240

EA-FC-90-082

Potential Overpressurization of Containment

Penetration Piping Following a Main Steam Line Break

in Containment

EA-FC-93-022

MFIV Stroke Time Evaluation/Containment Response

EA-FC-95-012

Effect of Post-DBA CCW Temperature Transient on

Components

EA-FC-98-034

Electrical Penetration Design Basis Verification for

Continuous Load Current, Overload Protection and

Short Circuit Protection ELM-2.1-L1SC1

EA-FC-02-002

Containment Response to MSLB with Gothic

FC-88-017

Addition of a Third AFW Pump

May 4, 1990

FC01274

Minimum Accumulator Pressure Required

FC01438

Air Accumulator Capacity For IA-41, 42, 43, and 44

FC02007

Accumulator Sizing

FC04074

N2 Cylinder Sizing for HCV-438B/D, LCV-383-1/2,

HCV-344/345 to Provide 1000 Hr Valve Actuation

Supply

C

FC05346

Accumulator Sizing for Auxiliary Feedwater Control

Valves HCV-1107A&B, HCV-1108A&B, HCV-1105,

HCV-1106, FCV-1368, FCV-1369

FC05375

Pressure Between Aux. Feedwater Penetration Valves

After a Main Steam Line Break

-3-

Calculations

NUMBER

TITLE

REVISION

FC05525

Containment Penetration Overpressure Analysis for M-

7, M-8, M-11, M-15, M-18, M-19, M-53, M-80 Post-

LOCA or MSLB

FC05660

Check of CCW Flow Model Against Measured Data

FC05669

CCW Flow Rates

FC05691

Air Accumulator Operable Time Requirements

FC05693

Component Cooling Water System Design Heat Loads

and Flows

FC05780

CCW System Maximum Design Basis Heat Removal

Rate

FC05977

ABB-CE Evaluation of Containment Spray Pump Net

Positive Suction Head Accounting for Sump Subcooling

FC05994

Overpressure Analysis of Penetrations M-7, M-9, & M-

Under MSLB & LOCA Conditions

FC06040

N2 Cylinder Sizing for HCV-400 Series Valves

FC06209

Containment Air Cooling Coils Post-Accident Heat

Removal Performance

FC06676

Post-RAS NPSH Adjustments for CS and HPSI Pumps

FC06708

YCV-1045 Maximum Allowable Stroke Time Evaluation

FC06723

CCW and RW Input Data for ABB-CE Containment

Analysis

FC06731

Containment Basement Water Level

FC06734

Injection Phase NPSH Adjustments for CS and HPSI

Pumps

FC06742

Accumulator Sizing and Seismic Support for HCV-298

Accumulator

-4-

Calculations

NUMBER

TITLE

REVISION

FC06747

SI Pump Room (Room 21 & 22) Heat-up During Pump

Operation Computer Analysis: GOT-5.0(QA)C-PI

FC06927

Analysis of Liner Panel of Fort Calhoun (Unit 1)

Containment Vessel

O-MPS-CALC-008

Containment Spray Flow Rates in Various System

Configurations

Condition Reports (CRs)

199701715

199901893

200100470

200100494

200101368

200101484

200101509

200101675

200101820

200101845

200102108

200102462

200102723

200103362

200200613

200200716

200200973

200201396

200201494

200201531

200201836

200201983

200203460

200204397

200204398

200300377

200300977

200301548

200302523

200303701

200303771

200304395

200304448

200304535

200304557

200305054

200305056

200305088

200305161

200305224

200305245

200305248

200305251

200305261

200305267

200305268

200305271

200305284

200305291

200305293

200305298

200305311

200304957

200305275

200305516

200305674

Design Basis Documents

NUMBER

TITLE

REVISION

PLDBD-IC-30

Instrumentation Installation

PLDBD-IC-32

Instrumentation and Control Systems

SDBD-CA-IA-105

Instrument Air

SDBD-AC-CCW-100

Component Cooling Water

SDBD-AC-RW-101

Raw Water

SDBD-DG-112

Emergency Diesel Generators

SDBD-FW-AFW-117

Auxiliary Feedwater

-5-

Design Basis Documents

NUMBER

TITLE

REVISION

SDBD-MS-125

Main Steam and Turbine Steam Extraction

SDBD-SI-CS-131

Containment Spray

SDBD-SI-132

High Pressure Safety Injection

SDBD-SI-LP-133

Low Pressure Safety Injection System

SDBD-VA-CON-139

Containment HVAC

SDBD-VA-SI-CS-131

Containment Spray

Drawings

NUMBER

TITLE

REVISION

177B2371,

Sh 316A

MCC 3B1 Data Sheet

11405-E-180,

Sh 24

Electrical Penetration C-6 Wiring Diagram

11405-E-180,

Sh 25

Electrical Penetration C-6 Wiring Diagram

11405-M-1, Sh 2

Containment Heating, Cooling & Ventilating Flow

Diagram P&ID

11405-M-1, Sh 1

Containment Heating, Cooling & Ventilating Flow

Diagram

11405-M-40, Sh 1

Auxiliary Coolant Component Cooling System Flow

Diagram P&ID

11405-M-42, Sh 1

Nitrogen, Hydrogen, Methane, Propane and Oxygen

Gas Flow Diagram P&ID

11405-M-263

Composite Flow Diagram Compressed Air P&ID

11405-M-263, Sh 1

Flow Diagram Compressed Air P&ID

-6-

Drawings

NUMBER

TITLE

REVISION

11405-M-263, Sh 2

Flow Diagram Compressed Air P&ID

11405-M-264

Composite Flow Diagram Instrument Air Diagram

11405-M-264, Sh 1

Instrument Air Diagram Auxiliary Building & Containment

P&ID

11405-M-264, Sh 2

Instrument Air Diagram Turbine Building & Intake

Structure P&ID

11405-M-264, Sh 3

Instrument Air Diagram Riser Details P&ID

11405-M-264, Sh 4

Instrument Air Diagram Riser Details P&ID

11405-M-264, Sh 5

Instrument Air Diagram Riser Details P&ID

161F615

SIRW Tank LO Level 2/4 Matrix - Initiation Matrix A & B

Schematic

25-7682, Sh 1

Medium Voltage Power Penetration Assys

H

25-7682, Sh 4

Medium Voltage Power Penetration Assys

C

25-7683

Coaxial and Triaxial Penetration Assemblies

F

25-7684

Low Voltage Power, Control, Instrumentation, and

Thermocouple Penetration Assemblies, Sheet 1 of 83

A-1388

Composite Model 12-W-204 Safety Valve

D-4062

Containment Hydrogen Purge System - Control Cable

Isometric Layout Sheet 1 of 2

D-4069

Jack Screw Component Cooling Water Control Valves

D-4246

CQE Piping Isometrics Seismic Subsystem #VA-3026A

E-23866-210-130,

Sh 1

Safety Injection and Containment Spray System

-7-

Drawings

NUMBER

TITLE

REVISION

E-23866-210-130,

Sh 2

Safety Injection and Containment Spray System

EM-400, Sh 1

Instrument and Control Equipment List

EM-743/744, Sh 1

Instrument and Control Equipment List

EM-745, Sh 1

Instrument and Control Equipment List

EM-783/786, Sh 1

Instrument and Control Equipment List

EM-783/786, Sh 2

Instrument and Control Equipment List

GE 161F615

Containment High Press-2/4 Matrix Initiation Matrix - A &

B Schematic

SPEC No. 11.30

Auxiliary Coolant System Control Valves

Miscellaneous Documents

NUMBER

TITLE/DESCRIPTION

REVISION

Safety Evaluation by the Office of Nuclear Reactor

Regulation Supporting Amendment No. 52 to

Facility Operating License No. DPR-40 Omaha

Public Power District Fort Calhoun Station, Unit No.

Docket No. 50-285

October 14,

1980

Safety Evaluation Related to Amendment No. 121

for Fort Calhoun Station

April 26, 1989

Visual Examination of Data Form VT-3, IWE

Containment Vent Systems and Surfaces

September 17,

2003

EA-FC-91-014

Effect of Loss of Cooling Water on SI/CS Pumps

LIC-79-0113

Evaluation of Fort Calhoun Safety Injection Pump

Room Temperature Following a Loss of Coolant

Accident

September 6,

1979

-8-

Miscellaneous Documents

NUMBER

TITLE/DESCRIPTION

REVISION

LIC-96-0164

Initial Response to NRC Generic Letter 96-06

October 30,

1996

LIC-96-0179

Licensee Event Report 96-012 Revision 0 for the

Fort Calhoun Station

December 11,

1996

LIC-97-006

Response to Generic Letter 96-06 (TAC Number

M96813)

January 24,

1997

LIC-98-0095

Response to Request for Additional Information

Related to Generic Letter 96-06 Response (TAC

No. M96813)

July 24, 1998

LIC-98-0132

Revised Response to Generic Letter 96-06 (TAC

Number 96813)

October 21,

1998

LIC-99-0056

Additional Information to Support NRC Review of

OPPD Response to Generic Letter 96-06 (TAC

Number M96813)

June 22, 1999

LIC-02-0121

CFR 50.59 Report and Updated Safety Analysis

Report (USAR) Revision for Fort Calhoun Station

November 15,

2002

LIC-03-0001

Fort Calhoun Station Unit No. 1 License

Amendment Request, Containment Pressure

Analysis using the Gothic Computer Code

January 27,

2003

LIC-03-0103

Response to Requests for Additional Information on

License Amendment Request

August 1, 2003

NPM-220

Commercial Grade Item Evaluations

OSAR No. 87-10

GSE Request - Determine Which Valves with Air

Accumulators are Required for Safe Shutdown

April 6, 1988

PDB-9

Relief Valve Program, Section 1.2.21, VA-287/288'

PE Evaluation

18328

Valve, Check, Poppet, Body & Poppet 316SS/A479,

Tube Conn 1/2 IN (In & Out), Working Pressure 3000

PSIG, Cracking Press 1 PSI

-9-

Miscellaneous Documents

NUMBER

TITLE/DESCRIPTION

REVISION

Standing Order

SO-O-21

Shutdown Operations Protection Plan

Technical Specification 2.6

Containment System

Amendment

No. 185

Topical Report

AAF-TR-7101

Design and Testing or Fan Cooler Filter Systems for

Nuclear Applications

February 20,

1972

Volume 19

Engineered Safeguard Controls System Training

Manual

Procedures

NUMBER

TITLE

REVISION

AOP-11

Loss of Component Cooling Water

AOP-12

Loss of Containment Integrity

AOP-17

Loss of Instrument Air

ARP-AI-65A/A65A

Annunciator Response Procedure A65A Control

Room Annunciator A65A Containment/RCGVS

ARP-CB-1,2,3/A1

Annuniciator Response Procedure

EOP-03

Loss of Coolant Accident

EOP-05

Uncontrolled Heat Extraction

EOP-20

Functional Recovery Procedure

10, 11

FCSG-23

Guideline-10 CFR 50.59 Resource Manual

IC-CP-01-0744

Calibration of Containment Pressure Loop P-744

IC-CP-01-0745

Calibration of Containment Pressure Loop P-745

-10-

Procedures

NUMBER

TITLE

REVISION

IC-CP-01-0786

Calibration of Containment Narrow Range Pressure

Loop P-786

IC-PM-EX-1000

Verification of Electrical Penetration Nitrogen Seal

Pressure

IC-ST-AFW-3002

Instrument Air Accumulator/Check Valve Operability

Test

IC-ST-IA-3001

Safety Injection Refueling Water Tank Air

Accumulator Check

IC-ST-IA-3002

CVCS Instrument Air Accumulator Check Valve Test

IC-ST-IA-3005

Instrument Air Accumulator Check Valve

IA-HCV-2987-C Operability Test

IC-ST-IA-3009

Operability Test of IA-YCV-1045-C Instrument Air

Accumulator

IC-ST-VA-0003

Channel Calibration of Containment Wide Range

Pressure Loop P-783

IC-ST-VA-0013

Calibration of Containment Air Cooling and Filtering

Units Flow and Pressure Drop

March 15,

2001

IP-PM-CCW-0350

Backup Nitrogen Supply Systems

IP-ST-SI-0002

Channel Calibration of SIRWT Low Level Monitoring

Switches

NL-14

Instructions for Processing Proposed Changes to the

Updated Safety Analysis Report and Inclusion Into the

50.59 Report

NOD-QP-3

CFR 50.59 Reviews

NOD-QP-16

Updated Safety Analysis Report (USAR)

OI-CC-1

Component Cooling System Normal Operation

-11-

Procedures

NUMBER

TITLE

REVISION

OI-CO-1

Containment Closeout

OI-CO-4

Containment Closure

OI-CO-5

Containment Integrity

OI-NG-1

Nitrogen System Normal Operation

OP-PM-CCW-0901

Preventive Maintenance Procedure CCW Inservice

Flush of Containment Cooling Coils VA-1A/B and

VA-8A/B

OP-PM-RW-0001

Raw Water System Interface Valve Actuation Test

OP-ST-AFW-3010

Auxiliary Feedwater System Category A and B Valve

Exercise Test

OP-ST-CCW-3005A

Component Cooling Category A & B Valve Exercise

Test

OP-ST-CCW-3005B

Component Cooling Category A & B Valve Exercise

Test

OP-ST-ESF-0001

Diesel Auto Start Initiating Circuit Check

OP-ST-MS-3001

Main Steam System Category B and C Valve

Exercise Test

OP-ST-SI-3002

Safety Injection System Category A, B and C Valve

Exercise Test

OP-ST-VA-0008

Containment Ventilation System Containment Fans

and Dampers Exercise Test

OT-PP-2

Post-Core Hot Functional Test Procedure

July 11,

1993

PE-ST-VX-3010

ASME Section XI Code Relief Valve Test for the

Hydrogen Purge Ventilation System

-12-

Procedures

NUMBER

TITLE

REVISION

POTP-22

Pre-Operational Test Procedure Component Cooling

Water System

April 27,

1972

SP-CP-08-D1-TC

Functional Checkout of the protective Relays in Diesel

Generator Number One Circuit

SO-R-2

Condition Reporting and Corrective Action

Safety Evaluations

EC 26232

EC 26606

EC 28515

EC 33214

EC 33320

EC 33321

Safety Evaluation Screenings

EC 28131

EC 30288

EC 33197

EC 33282

EC 33401

EC 33417

EC 33571

EC 33589

EC 33602

EC 33626

Safety Evaluation Applicability Determinations

EC 29917

EC 30762

EC 32934

EC 33043

EC 33208

Surveillance Test Results

NUMBER

TITLE

REVISION

OP-ST-ESF-0009

Recirc. Actuation Signal Logic and Switch Test

October 6,

2003

OP-ST-ESF-0019

Channel A SI, CS and Recirc. Actuation Signal Test

October 22,

2003

PE-ST-VX-3010

ASME Section XI Code Relief Valve Test for the

Hydrogen Purge Ventilation System, Valve VA-288

October 23,

1988

-13-

Surveillance Test Results

NUMBER

TITLE

REVISION

PE-ST-VX-3010

ASME Section XI Code Relief Valve Test for the

Hydrogen Purge Ventilation System, Valve VA-287

November 4,

1988

and

October 25,

2001

UFSAR

SECTION

DESCRIPTION

REVISION

5.9

Structures, Containment Penetrations

6.2

Engineered Safeguards - Safety Injection System

6.3

Engineered Safeguards -Containment Spray System

6.4

Engineered Safeguards -Containment Air Cooling and

Filtering System

8.4

Electrical Systems - Diesel-Generators

9.4

Auxiliary Systems - Auxiliary Feedwater System

9.7

Auxiliary Systems - Component Cooling Water System

9.8

Auxiliary Systems - Raw Water System

9.12

Auxiliary Systems - Compressed Air System

Work Orders

00013736

00123775

00123812

00125219

00125303

00125394

00151217

00157699

00157817

00157900