IA-86-744, Submits Daily Highlight.On 860930,util Commenced Unloading Spent Fuel from Unit 1 Into Original Racks,Reinstalled Into Unit 1 Pool.On 861001,fuel Assembly Element in Reactor Vessel Tipped Into Unloaded Assemblies.No Fuel Damage

From kanterella
(Redirected from IA-86-744)
Jump to navigation Jump to search
Submits Daily Highlight.On 860930,util Commenced Unloading Spent Fuel from Unit 1 Into Original Racks,Reinstalled Into Unit 1 Pool.On 861001,fuel Assembly Element in Reactor Vessel Tipped Into Unloaded Assemblies.No Fuel Damage
ML20215D091
Person / Time
Site: Diablo Canyon  Pacific Gas & Electric icon.png
Issue date: 10/03/1986
From: Schierling H
Office of Nuclear Reactor Regulation
To: Harold Denton, Lyons J, Vollmer R
NRC
Shared Package
ML20197G068 List:
References
FOIA-86-744 NUDOCS 8610100655
Download: ML20215D091 (1)


Text

___ __. . _ _ _ _ _ _ _ _ _ __ _ ______ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _

.. s October 3,1986 y

Docket Nos. 50-275 and 50-323

'y.

MEMORANDUM FOR: H. Denton* R. W. Houston F. Rosa DIJeng R. Vollmer* D. Crutchfield V. Benaroya L. Chandler J. Lyons* E. Rossi B. Clayton H. McGurren H. Thompson

  • G. Lainas L. Rubenstein*

F. Miraglia* T. Speis G. Lear R. Bernero* W. Russell B. J. Youngblood G. Holahan* J. Milhoan S. Varga .

s .

T. Novak R. Ballard V. Noonan , ' ' i F. Schroeder C. Berlinger F. Rinaldi- .

3

, THRU: Steven A. Varga, Director DISTRIBUTION . ~ ,.

! Project Directorate #3 Docket FD e f Division of PWR Licensing-A PD#3 Rdg. File *O -

H. Schierling FROM: Hans E. Schierling, Senior Project Manager C.Vohan s m Q

Project Directorate #3 ' '

Division of PWR Licensing-A R

%. q

SUBJECT:

DAILY HIGHLIGHT - FUEL HANDLING INCIDENT AT a I

DIABLO CANYON UNIT 1 ,

Diablo Canyon Nuclear Power Plant , <

On September 30, 1986 PG8E commenced unloading spent fuel from Unit 1 ints 4

-f the original racks, reinstalled into the Unit 1 pool. In the morning'of. ,. j October 1 a fuel assembly element in the reactor vessel tipped by apprcximately ,' '

2 feet, at the top, into the open space of 3 assemblies which already had been _' ,

unloaded. The licensee stopped further refueling operations. The licensee infonned us that no increase in airborne radioactivity had been measured and ,

no fuel damage was apparent. (AsimilarincidenthadoccurredatBeaverValley).

~

Region V informed us this morning that the tipped assembly was successfully transferred last night to the spent fuel pool. The operation was performed using special procedures and under strict administrative controls. ,

Stiginal sisned by:

Hans E. Schierling, Senior Project Manager.

Project Directorate #3 -'

Division of PWR Licensing-A

)

(kg r

PD#3 HSchte 10/$ 6

  • THESE COPIES MUST BE HANDCARRIED 6101gogs 1 i

A ,

SGptember 18, 1986 Docket Nos. 50-275 and 50-323 V 1, MEMORANDUM FOR: H. Denton* R. W. Houston F. Rosa R. Vollmer* D. Crutchfield V. Benaroya J. Lyons* E. Rossi B. Clayton 4 H. Thompson

  • G. Lainas L. Rubenstein*

" " F. Miraglia* T. Speis G. Lear R. Bernero* W. Russell B. J. Youngblood G. Holahan* J. Milhoan S. Varga T. Novak R. Ballard V. Noonan F. Schroeder C. Berlinger

. t.

3 5 THRU: Steven A. Varga, Director DISTRIBUTION

~' M o. Project Directorate #3 55ctet File

- M Division of PWR Licensing-A PDf3 Rdg.

Hans E. Schierling, Project Manager H. Schierling C. Vogan FROM:

Project Directorate #3 Division of PWR Licensing-A 4

'N

SUBJECT:

DAILY HIGHLIGHT - MEETING WITH PACIFIC GAS AND ELECTRIC

^ COMPANY ON SPENT FUEL POOL Diablo Canyon Nuclear Power Plant A meeting will be held tomorrow, Friday, September 19, 1986 with Pacific Gas and Electric Company to discuss in further detail the reinstallation of the original racks into the Unit I spent fuel pool. The meeting will begin at 9:00 a.m. in Room P-422 and will continue on Saturday, if necessary. H. McGurren j (OGC) was advised of the meeting in order to inform the parties of the rerack t issue.

s -

~ , Hans E. Schierling, Project Manager i Project Directorate #3 Division of PWR Licensing-A i

PDf 3 . .

  • y HSch erling j 9/18/86 i
  • THESE COPIES MUST BE HANDCARRIED

[ 75 ,