ML20197J432
| ML20197J432 | |
| Person / Time | |
|---|---|
| Site: | Diablo Canyon |
| Issue date: | 03/29/1985 |
| From: | Schierling H Office of Nuclear Reactor Regulation |
| To: | Harold Denton, Edison G, Eisenhut D Office of Nuclear Reactor Regulation |
| Shared Package | |
| ML20197G068 | List:
|
| References | |
| FOIA-86-744 NUDOCS 8504120104 | |
| Download: ML20197J432 (1) | |
Text
. __
MAR 2 91l(
MEMORANDUM FOR:
H. Denton, NRR D. Eisenhut, NRR' G. Edison, TOSB, NRR H. Thompson, DL F. Miraglia, DL l
T. Novak, DL W. Russell, Acting Director, DHFS J. Knight, Acting Director, DE R. Bernero, DSI T. Speis, DST
- 8. Snyder, THIPO, NRR G. Holahan, ORAB G. Lainas, DL---
D. Crutchfield, DL THRU:
George W. Knighton, Chief Licensing Branch No. 3 Division of Licensing FROM:
Hans Schierling, Project Manager Licensing Branch No. 3 Division of Licensing J
SUBJECT:
DAILY HIGHLIGHT Diablo Canyon Unit 1 PG&E completed the 100 hour0.00116 days <br />0.0278 hours <br />1.653439e-4 weeks <br />3.805e-5 months <br /> acceptance test for Unit 1 on March 28 at 6:20 am PST. The reactor was tripped at 9:30 pm PST to initiate the natural circulation boron mixing test. Natural circulation was established on March 29 at 12:45 am PST.
Baron concentration was verified. Cool down was initiated at 4:45 am PST.
Cool down to RHR mode is estimated to be completed at 1:00 pm PST March 29, 1985.
kr Cidy EaAb Hans Schierling, Project Manager Licensing Branch No. 3 Division of Licensing Distribution:
Docket File 50-275 LBf3 Reading JLee HSchierling CEarly EWeinkam JLyons S81ack (f3hDL:LBf3 D
H3 HSchierling/yt G
ighton 03Ag /85 03/4/85 1
Y SE.,
-