ML20215D091
| ML20215D091 | |
| Person / Time | |
|---|---|
| Site: | Diablo Canyon |
| Issue date: | 10/03/1986 |
| From: | Schierling H Office of Nuclear Reactor Regulation |
| To: | Harold Denton, Lyons J, Vollmer R NRC |
| Shared Package | |
| ML20197G068 | List:
|
| References | |
| FOIA-86-744 NUDOCS 8610100655 | |
| Download: ML20215D091 (1) | |
Text
___ __.
s October 3,1986
.y Docket Nos. 50-275 and 50-323
'y.
MEMORANDUM FOR:
H. Denton*
R. W. Houston F. Rosa DIJeng R. Vollmer*
D. Crutchfield V. Benaroya L. Chandler J. Lyons*
E. Rossi B. Clayton H. McGurren H. Thompson
- G. Lainas L. Rubenstein*
F. Miraglia*
T. Speis G. Lear R. Bernero*
W. Russell B. J. Youngblood G. Holahan*
J. Milhoan S. Varga s
T. Novak R. Ballard V. Noonan, ' ' i F. Schroeder C. Berlinger F. Rinaldi-3 THRU:
Steven A. Varga, Director DISTRIBUTION.
~
Project Directorate #3 Docket FD e f
Division of PWR Licensing-A PD#3 Rdg. File *O H. Schierling Q
FROM:
Hans E. Schierling, Senior Project Manager C.Vohan m
s Project Directorate #3 R
Division of PWR Licensing-A q
SUBJECT:
DAILY HIGHLIGHT - FUEL HANDLING INCIDENT AT a
DIABLO CANYON UNIT 1 I
Diablo Canyon Nuclear Power Plant On September 30, 1986 PG8E commenced unloading spent fuel from Unit 1 ints
-f 4
the original racks, reinstalled into the Unit 1 pool.
In the morning'of.
j October 1 a fuel assembly element in the reactor vessel tipped by apprcximately 2 feet, at the top, into the open space of 3 assemblies which already had been unloaded. The licensee stopped further refueling operations. The licensee infonned us that no increase in airborne radioactivity had been measured and no fuel damage was apparent.
(AsimilarincidenthadoccurredatBeaverValley).
~
Region V informed us this morning that the tipped assembly was successfully transferred last night to the spent fuel pool. The operation was performed using special procedures and under strict administrative controls.
Stiginal sisned by:
Hans E. Schierling, Senior Project Manager.
Project Directorate #3 Division of PWR Licensing-A r
)
PD#3
(
HSchte kg 10/$
6 THESE COPIES MUST BE HANDCARRIED 6101gogs 1
i
A SGptember 18, 1986 Docket Nos. 50-275 and 50-323 V
1, MEMORANDUM FOR:
H. Denton*
R. W. Houston F. Rosa R. Vollmer*
D. Crutchfield V. Benaroya J. Lyons*
E. Rossi B. Clayton 4
H. Thompson
- G. Lainas L. Rubenstein*
F. Miraglia*
T. Speis G. Lear R. Bernero*
W. Russell B. J. Youngblood G. Holahan*
J. Milhoan S. Varga T. Novak R. Ballard V. Noonan F. Schroeder C. Berlinger
. t.
5 THRU:
Steven A. Varga, Director DISTRIBUTION 3
~' M o.
Project Directorate #3 55ctet File M
Division of PWR Licensing-A PDf3 Rdg.
H. Schierling FROM:
Hans E. Schierling, Project Manager C. Vogan Project Directorate #3 Division of PWR Licensing-A 4
'N
SUBJECT:
DAILY HIGHLIGHT - MEETING WITH PACIFIC GAS AND ELECTRIC
^
COMPANY ON SPENT FUEL POOL Diablo Canyon Nuclear Power Plant A meeting will be held tomorrow, Friday, September 19, 1986 with Pacific Gas and Electric Company to discuss in further detail the reinstallation of the original racks into the Unit I spent fuel pool. The meeting will begin at 9:00 a.m. in Room P-422 and will continue on Saturday, if necessary.
H. McGurren (OGC) was advised of the meeting in order to inform the parties of the rerack j
t issue.
s -
Hans E. Schierling, Project Manager
~
i Project Directorate #3 Division of PWR Licensing-A i
PDf 3..
- HSch erling y
j 9/18/86 i
THESE COPIES MUST BE HANDCARRIED
[
75
-