Text
_,
e.-
Docket No.:
50-275 DISTRIBUTION N E3hu C Docket File 50-27 D m, system M.\\2S W LBf3 Reading MEMORANDUM FOR:
H. R. Denton HSchierling E. G. Case JLee G. Edison Attorney, OELD D. Eisenhut R. Purple H. Thompson R. Vollmer R. Mattson T.-Spis -
~ ~ ~ ~
J. Taylor G. Holohan T. Novak G. Lainas F. Miraglia THRU:
George W. Knighton, Chief Licensing Branch No. 3 Division of Licensing FROM:
Hans Schierling, Project Manager Licensing Branch No. 3 Division of Licensing
SUBJECT:
DAILY HIGHLIGHT Diablo Canyon On early Saturday (April 21,1984) a seal water leak of approximately 2 gpm was identified at a reactor main coolant pump of Diablo Canyon Unit 1.
The reactor was in Mode 3 (Hot Standby) at about 900 psig and 430"F in preparation for criticality (Tech. Spec. allowable identified leakage is 10 gpm).
PG&E suspects that the leak is around an "0" rin and the seal package (see attached drawing)g seal between the RC pump housing
. On Sunday morning PG8E decided to cool the system down and replace the "0" ring seal.
PG8E expects the replacement to be completed late Tuesday and to go critical 2 to 3 ' days later.