ML20197G272
| ML20197G272 | |
| Person / Time | |
|---|---|
| Site: | Diablo Canyon |
| Issue date: | 02/28/1984 |
| From: | Schierling H Office of Nuclear Reactor Regulation |
| To: | Carter J, Case E, Harold Denton NRC |
| Shared Package | |
| ML20197G068 | List:
|
| References | |
| FOIA-86-744 NUDOCS 8403140298 | |
| Download: ML20197G272 (1) | |
Text
-____ _______________________________________________________ _ ________________
February 28, 1984 Docket No. :
50-275 Distribution MEMORANDUM FOR:
H. Denton Doewe., s Cm.u ui (50:27'f)'
E.' Case LBf3 Reading J. Carter HSchierling J. Sniezek JLee D. Eisenhut Attorney, OELD R. Purple SBlack H. Thompson R. Vollmer R. Mattson T. Speis N. Grace J. Taylor G. Holohan T. Novak i
G. Lainas F. Miraglia THRU:
George W. Knighton, Chief Licensing Branch No. 3 Division of Licensing FROM:
Hans Schierling, Project Manager Licensing Branch No. 3 Division of Licensing
SUBJECT:
DAILY HIGHLIGHT Diablo Canyon Unit 1 - Status February 20 - February 24, 1984 Unit 1 RCS heatup was achieved using RCS pump heat.
Mode 4 (hot shutdown) was reached on 2/20/84 pm at primary loop pressure of 350 psi and temperature of 250*F.
for inspection of piping interference. Pressure and temperaturd were maintained was raised to 340*F.
On 2/22/84 pm, primary loop temperature RCS piping snubbers.
During inspection minor interference was identified on above 350*F) was expected for 2/24/84They appear to be not significant. Mode 3 (R on lower end turns of motor.During this period RCS pump 1-3 was out of service Preliminary analysis indicates that motor can be repaired at site.
Hot System testing is planned for week of 2/26/84 Information is current as of 2/24/84 pm.
Originalstoned by Hans SchletUng :
Hans Schierling, Project Manager 0298 4
- ADOCK 0500097 Licensing Branch No. 3 F
Division of Licensing cc:
DL BC's LBf3:DL L
l Hans S fe
- f Mighton
( 4 84 g/p/84
[
DISThaduTION
. Document Control (50-275)*
L PDR I
NRC PDR i
Docket No.: 50-275 PRC System
. DEC 0
- M3 LB!3 Reading JLee MEtiORANDUM FOR:
H. Denton H5chierling E. Case GWKnighton J. Carter Attorney, OELD D. Eisenhut J. P. Knight R. Purple J. Wenniel H. Thompson R. Vollmer R. Mattson T. Speis J. Sniezek T. Ippolito T. Novak G. Lainas F. Miraglia G. Holohan FROM:
Hans Schierling, Project Manager Licensing Branch No. 3 Division of Licensing
SUBJECT:
DAILY HIGHLIGHT Status of Diablo Canyon, Unit i 1.
Control rod testing approximately 70% complete, I&C still worktng on position indicator problem with one drive assembly.
2.
Between 12/8/83 and 12/12/83 reactor temperature will be increased to approximately 165*.
Chemical control will be established on the primary loop in' preparation:.for heat-up arid criticality.' phase.. '
To assure positive control of oxygen, all exposed areas will be inerted with nitrogen.
3.
Condensate flush preparations are in progress and program is scheduled to start on 12/12/83.
4.
Cold system tests scheduled for completion on 12/15/83.
Infonnation is current as of December 8,1983.
[G!nst e,g s,.
t.t:ss S?
~
pY$$fo$$5 Hans Schierling, Project Manager P
PDR Licensing Branch No. 3 5-Division of Licensing cc:
S. Black DL B/Cs DL:LB#3 g
I HSchierl n9:ft igh ton L
I f
d / \\/83 p /q /83
)
DISTRIBUTION Docket Nos.: 50-275 DEC 0 71983 escumentTontrol.(50-275/32 6 and
~50-323 L PDR NRC PDR PRC System MEMORANDUM FOR:
H. Denton LBi3 Reading E. Case JLee J. Carter HSchierling D. Eisenhut BBuckley H. Thompson GWKnighton R. Vollmer Attorney, OELD R. Mattson T. Speis
'~
J. Sniezek T. Ippolito T. Novak G. Lainas F. Miraglia G. Holohan FROM:
Hans Schierling, Project Manager Licensing Branch No. 3 Division of Licensing
SUBJECT:
DAILY HIGHLIGHT Diablo Canyon, Unit 1, 1.
The primary system is " solid" at 400 psi. Reactor Coolant pumps have been operated on the 1-minute and 10-minute cycles.
2.
The missile shield is in place and remaining modification work has been started on the dome service crane.
3.
The condenser hydrotest is complete. Several condenser tubes have leaks in the rolled joint on the tube sheet (tubes can be rerolled tostopleakage).
4.
Testing of the control rod drives has been started (current test, coil current test and rod drop test).
The information is current as of December 6,1983.
M tt:* 2 se by:
Dv Gai&3 &3invr N5 EsW TIDR ADOCK 05000275 P
PDR Hans Schierling Project Manager Licensing Branch No. 3 Division of Licensing
/)q}8 cc:
S. Black
.DL B/Cs DL:LB#3 DL:L 3 HSchi
- ft h5 tin h
83 (2/ /h83
Docket Nos.: 50-275 and 50-323 DISTRIBUTION Document Control (50-275/237 ~
L PDR MEMORANDUM FOR:
H. Denton NRC PDR E. Case PRC System J. Carter.
LBf3 Reading D. Eisenhut JLee R. Purple Attorney, OELD H. Thompson GWKnighton R. Vollmer BBuckley.
R. Mattson HSchierling T. Speis J. Sniezek T. Ippolito T. Novak G. Lainas F. Miraglia THRU:
George W. Knighton, Chief Licensing Branch No. 3 Division of Licensing 4
FROM:
Bart C. Buckley, Project Manager Licensing Branch No. 3 Division of Licensing
SUBJECT:
DAILY HIGHLIGHT Diablo Canyon, Unit 1 Diablo' Canyon, Unit 1 is currently in mode 5 (. cold shutdownl. The reactor vessel head bolts are fully tensioned. The reactor coolant pumps (RCPs) have been coupled and the RCP seal injection flow has been established.
Limited construction activities associated with items that need to be completed prior to proceedin to initial criticality is being performed below elevation 140 within the containment. The main condenser is being filled to perform a hydrostatic test.in preparation for condensate flush operation.
On al sleed by:
='i=~=7
- :=
PDR ADOCK 05000275 g,,MW7 N
Bart C. Buckley, Project Manager o
Licensing Branch No. 3 Division of Licensing cc:
S. Black l
DL BC's l
DL 3
(Dtl Bf3 BBuckley:ft
'iHil ighton ll / /83
}l / /83
%i
ITRIBUTION (Lef::t-ControF-(50 79Q T FLR NRC PDR N O V 2 8 E l3 PRC System Docket Nos.: 50-275 LB#3 Reading and.
50-323 Attorney, OELD JLee JWilson MEMORANDUM FOR:
H. Denton HSchierling
@se -
GWKnighton J. Carter D. Eisenhut R. Purple H. Thompson R. Vollmer R. Mattson T. Speis J. Sniezek T. Ippolito T. Novak-G. Lainas F. Miraglia THRU:
George W. Knighton, Chief Licensing Branch No. 3 Division of Licensing FROM:
Jim Wilson, Project Manager Licensing Branch No. 3 Division of Licensing
SUBJECT:
DAILY HIGHLIGHT Diablo Canyon Units 1 & 2 The reactor vessel head is installed 'and the first pass of the bolt tensioning is complete. The only problem with installation of reactor intervals was with two control rod clusters that were slightly bowed, did not pass the drag test and had to be replaced. After-the second pass of bolt' tensioning is done and the reactor coolant pumps operable, the plant will be ready for cold testing.
Driginal signed by-J. M. Wusos M ! M"^?*a n?!1 =
PDR ADOCK'05000575 Jim Wilson,. Project Manager P
PDR Licensing Branch No. 3 Division of Licensing cc:
S. Black
'DL BC's I
JW(on:ft & ns D(.
GWKilkjhton t(/M /83
(\\ ////83
)aY i
l
NOV 2 31983 distribution Docket Nos::
50-275 Document Control (50-275/323)=
and 50-323 L PDR-NRC PDR i
PRC System MEMORANDUM FOR:
H. Denton LBf3 Reading E. Case JLee J. Carter BBuckley D. Eisenhut HSchierling R. Purple GWKnighton H. Thompson Attorney, OELD R. Vollmer
~R. Mattson T. Speis J. Sniezek i
T. Ippolito T. Novak.
G. Lainas F. Miraglia THRU:
George W. Knighton, Chief Licensing Branch No. 3 1
Division of Licensing I
FROM:
Bart C. Buckley, Project Manager Licensing Branch No. 3 Division of Licensing
SUBJECT:
DAILY HIGHLIGHT Diablo Canyon. Unit 1 In-Core Flux Thimbles & upper vessel internals have been installed.
Control rods have been coupled and tested.
Installation of head expected to be completed today, November 23,.1983 and entering into operati mal mode 5 is scheduled for Monday, No % r 28,1983.
Onginal signed b$
B. C. Bu:k!eV l
Bart C. Buckley, Project Manager
~
Licensing Branch No. 3 Division of Licensing cc:
S. Black DL BC's
(
V 1
K.
h 3
B8t kley:ft G
F ghton p /p /83 K M /83 m
,n,,
,,,,, gg gDR'ADocnOSOMg C
- ~
NOV 2123 DISTRIBUTION Docket Nos.: 50-275
.cocumsatWbtroP(50-tMrtS23t*-
and 50-323 L PDR s
NRC PDR PRC System MEMORANDUM FOR:
H. Denton LBf3 hading E. Case JLee
~
J. Carter GWKnighton
~
D. Eisenhut HSchierling R. Purple Attorney, OELD H. Thompson R. Mattson T. Speis R. Vollmer T. Novak F. Miraglia J. Sniezek G.-Lainas T. Ippolito FROM:
George W. Knighton, Chief Licensing Branch No. 3
'~"
Division of Licensing
SUBJECT:
DAILY HIGE.IGHT
~
6 DIABLO CANYON. UNIT 1 P6&E has advised us that at 2307 hours0.0267 days <br />0.641 hours <br />0.00381 weeks <br />8.778135e-4 months <br /> on November 20,1983, they completed loading fuel in Diablo Canyon, Unit 1.
They are presently
~,
video taping the core to verify and record proper loading. They s
are scheduled to have the reactor head installed this week.
Onginal s:ym ey:
EcM6s W.Knighton George W. Knighton, Chief Licensing Branch No. 3 Division of Licensing cc:
S. Black t
DL BC's G
ght'on ~
llllll83
^.oetettetu ani2i
~~
PDR ADOCK 05000275 p
PDR 1
QO i
k
~
DISin BUTION IN L POR NRC PDR 4
Il0V 181983 PRC System f
LBf3 Reading Docket Nos.: 50-275 Attorney, OELD and M
JLee JWilson HSchierling i
MEMORANDIM FOR:
H. Denton GWKnighton E. Case J. Carter D. Purple H. Thompson R. Mattson T. Speis R. Vollmer T. Novak F. Miraglia J. Snierek G. Lainas T. Ippolito FROM:
George W. Knighton, Chief a ~
Licensing Branch No. 3 Division of Licensing
SUBJECT:
DAILY HIGHLIGHT DIABLO CANYON. UNIT 1 PG8E began fuel load at Diablo Canyon, Unit 1 on November 15, 1983.
All contruction activities inside containment have been halted until fuel loading has been completed and the vessel head put into place.
Asof0700(PST)onNovember 17, 1983, 50 fuel element assemblies had been loaded. By 0700 (PST) on November 18, 1983, a total of 77 fuel element assemblies have been loaded. Approximately 119 fuel element assemblies remain to be loaded. There has been a delay due to the air drive motor on the transfer trolley seizing. The motor s
is being replaced and fuel load restart is anticipated to begin at 1200(PST) November 18, 1983.
4 d by:
\\
Geirge W.'Knightos
\\
George W. Knighton, Chief
\\
LicejingBranchNo.3
-\\
Divis on of Licensing i
cc:
S. Black
\\
i
~
DL BC's
~\\
- i. f i
h ni i
DL:LBf
%(3;3 s
i,ghton k
JWils ft
// //
3
/4 / J/83 T
O
\\
PDR ADOCK 05000275 P
PDR j;
i
DISTRIBUTION 90c'---t '--t=? _'50 OM L PDR NOV16 23 NRC PDR Docket Nos.: 50-275 PRC System and
_50 000 LBf3 Reading i
Attorney, OELD JLee MEMORANDUM FOR:
H. Denton HSchierling E. Case GWKnighton J. Carter i
D. Efsenhut I
R. Purple
{
H. Thompson i
R. Mattson
{
T. Speis t
R. Vollmer T. Novak F. Miraglia J. bierek G. Lainas T. Ipp611to 1
FROM:
George W. Knighton, Chief Licensing Branch No. 3 Division of Licensing
SUBJECT:
DAILY HIGHLIGHT DIABLO CANYON. UNIT 1 On November 15,1983, the US$$ Court of Appeals of the District of Columbia denied (by a vote of 2 to 1) the stay requested by the Joint Intervenors of the Comissions's Memorandum and Order CLI-83-27, issued November 8,1983 reinstatingiin Pacific Gas and Electric Company's license the authorization fm fuel loading and pre-criticality testing at Diablo Canyon, Unit 1.
Pacific Gas and Electric Company began fuel loading operations on November 15, 1983.
1 s
l Yoo8jhy George W. Inighton. Chief PER LicensDG B anch No. 3 Did s 4s o? Licensing cc:
S. Black DL BC's D
- 3 DM J
- ft GWN1 ;g/6/83hton
///
}
//
/83 j
- - _ _ _ _ _ - _ _ - - -