HNP-04-169, November 2004 Monthly Operating Report for Shearon Harris Nuclear Power Plant

From kanterella
(Redirected from HNP-04-169)
Jump to navigation Jump to search
November 2004 Monthly Operating Report for Shearon Harris Nuclear Power Plant
ML043560175
Person / Time
Site: Harris Duke Energy icon.png
Issue date: 12/13/2004
From: Corlett D
Progress Energy Carolinas
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
HNP-04-169
Download: ML043560175 (3)


Text

Progress Energy DEC 1 3 2004 SERIAL: HNP-04-169 United States Nuclear Regulatory Commission ATTENTION: Document Control Desk Washington, DC 20555 SHEARON HARRIS NUCLEAR POWER PLANT DOCKET NO. 50-400/LICENSE NO. NPF-63 MONTHLY OPERATING REPORT Ladies and Gentlemen:

In accordance with Technical Specification 6.9.1.5 for the Harris Nuclear Plant, Carolina Power &

Light Company, doing business as Progress Energy Carolinas, Inc., is providing the enclosed report of operating statistics and shutdown experience for the month of November 2004.

Sincerely, David H. Corlett Supervisor, Licensing/Regulatory Programs Harris Nuclear Plant DHC/mgw Enclosure c: Mr. R. A. Musser (NRC Senior Resident Inspector, HNP)

Mr. C. P. Patel (NRC Project Manager, HNP)

Dr. W. D. Travers (NRC Regional Administrator, Region II)

Progress Energy Carolinas, Inc.

Harris Nuclear Plant P.O. Box 165 New Hill, NC 27562

Enclosure to Serial HNP-04-169 Page 1 of 2 OPERATING DATA REPORT DOCKET NO. 050-400 UNIT NAME Shearon Harris Nuclear Power Plant DATE December 7, 2004 COMPLETED BY Michael S. Matheny TELEPHONE (919) 362-2335 REPORTING PERIOD November 2004 (Month/Year)

YEAR TO MONTH DATE CUMULATIVE

1. Design Electrical Rating: 941.7 NIA N/A (MWe-Net)
2. Maximum Dependable Capacity: 900.0 N/A N/A (MWe-Net)
3. Number of Hours the Reactor Was 372.3 7,002.7 133,146.8 Critical:
4. Number of Hours the Generator Was On 323.5 6,945.0 131,976.5 Line:
5. Unit Reserve Shutdown Hours: 0.0 0.0 0.0
6. Net Electrical Energy (MWH): 268,635.0 6,314,878.0 112,114,315.0

Enclosure to Serial HNP-04-169 Page 2 of 2 APPENDIX B UNIT SHUTDOWNS DOCKET NO. 050400 UNIT NAME Shearon Harris Nuclear Power Plant DATE December 7, 2004 COMPLETED BY Michael S. Matheny TELEPHONE (919) 362-2335 REPORTING PERIOD November 2004 (Month/Year)

TYPE METHOD OF l DATE F: FORCED DURATION SHUTTING CAUSE/CORRECTIVE ACTIONS NO. (yymmdd) S: SCHEDULED (HOURS) REASON (1) DOWN (2) COMMENTS04-002 041015 S 396.5 C 4 Scheduled shutdown for RFO-12.

SUMMARY

The unit was shutdown for refueling on 10/15/04. The outage was extended by approximately one week due to unplanned repairs on the Main Feedwater Isolation Valves. The unit was returned to service on 11/17/2004.

(1) Reason: (2) Method:

A - Equipment Failure (Explain) I - Manual B - Maintenance or Test 2 - Manual Trip/Scram C - Refueling 3 - Automatic Trip/Scram D - Regulatory Restriction 4 - Continuation E - Operator Training/License Examination 5 - Other (Explain)

F - Administrative G - Operational Error (Explain)

H - Other (Explain)