August 2002 Monthly Operating Report for Shearon Harris
ML022680469
Person / Time
Site: Harris Duke Energy icon.png
Issue date: 09/13/2002
From: Caves J
Carolina Power & Light Co
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
HNP-02-127
Download: ML022680469 (3)


Text

SEP 1 3 2002 Serial: HNP-02-127 United States Nuclear Regulatory Commission ATTENTION: Document Control Desk Washington, DC 20555 SHEARON HARRIS NUCLEAR POWER PLANT DOCKET NO. 50-400/LICENSE NO. NPF-63 MONTHLY OPERATING REPORT

Dear Sir or Madam:

In accordance with Carolina Power & Light Company's Harris Nuclear Plant Technical Specification 6.9.1.5, the report of operating statistics and shutdown experience for the month of August 2002 is provided.

Sincerely, John R. Caves Supervisor, Licensing Harris Nuclear Plant SGR Enclosure c:

Mr. J. B. Brady (NRC Senior Resident Inspector, HNP)

Mr. L. A. Reyes (NRC Regional Administrator, Region II)

Mr. R. Subaratnam (NRC Project Manager, HNP)

Harris Nuclear Plant 5413 Shearon Harris Road New Hill. NC 27562 SCPU&

A Progress Energy Comparny

Enclosure to Serial HNP-02-127 Page 1 of 2 OPERATING DATA REPORT DOCKET NO.

050-400 UNIT NAME Shearon Harris Nuclear Power Plant DATE September 9, 2002

-COMPLETED BY_ Sheila G. Rogers_

TELEPHONE (919) 362-2573 REPORTING PERIOD

1. Design Electrical Rating:

(MWe-Net)

2.

Maximum Dependable Capacity:

(MWe-Net)

3.

Number of Hours the Reactor Was Critical:

4.

Number of Hours the Generator Was On Line:

5

-Unit Reserve Shutdown Hours:-_------

August 2002 (Month/Year)

YEAR TO MONTH DATE CUMULATIVE 941.70 N/A N1A 718.2 5,779.2 5,714.6 115,050.1 114,019.9

6.

Net Electrical Energy (MWH):

0

-0 633,905

  • -:5,122,371 95,849,848

t Enclosure to Serial HNP-02-127 "Page 2 of 2 APPENDIX B UNIT SHUTDOWNS DOCKET NO.

UNIT NAME DATE COMPLETED BY TELEPHONE 050-400 Shearon Harris Nielear Power Plant September 9, 200i Sheila G. Rogers (919) 362-2573 REPORTING PERIOD August 2002 (Month/Year)

SUMMARY

Other than the Automatic Trip on 8/15/02, there were no other significant events to report. Plant was operated at 100%

power for the remainder of August 2002.

(1) Reason:

A - Equipment Failure (Explain)

B - Maintenance or Test C - Refueling D - Regulatory Restriction E - Operator Training/License Examination F - Administrative

( - Operational Error (Explain)

H - Other (Explain)

(2) Method:

1 - Manual 2 - Manual Trip/Scram 3 - Automatic Trip/Scram 4 - Continuation 5 - Other (Explain)

TYPE METHOD OF DATE F: FORCED DURATION SHUTTING CAUSE/CORRECTIVE ACTIONS NO.

(yymmdd)

S: SCHEDULED (HOURS)

REASON (1)

DOWN (2)

COMMENTS02-003 020815 F

25.8 H

3 Harris experienced an automatic trip 08/15/02 at 21:26 due to nromentary low voltage on the offsite power system. During the outage, maintenance was performed on the "A" Condensate Booster Pump. The unit was returned to service 08/16/02 at 23:13. At approximately 50% power a condenser tube leak was identified. Power wasireduced to 30%, the leaking tubes were plugged and the plant was returned to 100% power on 08/18/02.

_LEIk 02-03 will document event and is due by 10/14/02.