HNP-02-084, May 2002 Monthly Operating Report for Harris Nuclear Pant
| ML021710603 | |
| Person / Time | |
|---|---|
| Site: | Harris |
| Issue date: | 06/12/2002 |
| From: | Holt J Carolina Power & Light Co |
| To: | Document Control Desk, Office of Nuclear Reactor Regulation |
| References | |
| HNP-02-084 | |
| Download: ML021710603 (3) | |
Text
CP&L.
Serial: HNP-02-084 JUN 1 2200Z United States Nuclear Regulatory Commission ATTENTION: Document Control Desk Washington, DC 20555 SHEARON HARRIS NUCLEAR POWER PLANT DOCKET NO. 50-400/LICENSE NO. NPF-63 MONTHLY OPERATING REPORT
Dear Sir or Madam:
In accordance with Carolina Power & Light Company's Harris Nuclear Plant Technical Specification 6.9.1.5, the report of operating statistics and shutdown experience for the month of May 2002 is provided.
Sincerely, Manager, Support Services Harris Nuclear Plant SGR Enclosure c:
Mr. J. B. Brady (NRC Senior Resident Inspector, HNP)
Mr. J. M. Goshen (NRC Project Manager, HNP)
Mr. L. A. Reyes (NRC Regional Administrator, Region II)
Harris Nuclear Plant 5413 Shearon Harris Road New Hill NC 27552
Enclosure to Serial HNP-02-084 Sheet 1 of 2 CP&L CO.
RUN DATE 06/04/02 RUN TIME 08:14:29 OPERATING STATUS PLANT PERFORMANCE DATA SYSTEM OPERATING DATA REPORT HARRIS UNIT 1 DOCKET NO.
050-400 COMPLETED BY SHEILA ROGERS TELEPHONE (919)362-2573 UNIT NAME:
HARRIS UNIT 1 REPORTING PERIOD: MAY 02 LICENSED THERMAL POWER (MWT):
2900 NAMEPLATE RATING (GROSS MWE):
950.9 DESIGN ELECTRICAL RATING (NET MWE):
MAX DEPENDABLE CAPACITY (GROSS MWE):
MAX DEPENDABLE CAPACITY (NET MWE):
IF CHANGES OCCUR IN CAPACITY RATINGS GIVE REASONS:
941.7 960.0 900.0 (ITEMS 3 THRU 7)
SINCE LAST REPORT,
- 9.
POWER LEVEL TO WHICH RESTRICTED IF ANY (NET MWE):
- 10. REASONS FOR RESTRICTION IF ANY:
THIS MONTH HOURS IN REPORTING PERIOD NUMBER OF HOURS REACTOR CRITICAL REACTOR RESERVE SHUTDOWN HRS HOURS GENERATOR ON LINE UNIT RESERVE SHUTDOWN HOURS GROSS THERMAL ENERGY GEN.
(MWH)
GROSS ELEC.
ENERGY GEN (MWH)
NET ELEC.
ENERGY GENERATED (MWH)
UNIT SERVICE FACTOR UNIT AVAILABILITY FACTOR UNIT CAP.
FACTOR (USING MDC NET)
UNIT CAP.
FACTOR (USING DER NET)
UNIT FORCED OUTAGE RATE SHUTDOWNS SCHED.
OVER NEXT 6 MONTHS 744.00 744.00
.00 744.00
.00 2156799.60 727182.00 685426.00 100.00 100.00 102.36 97.83
.00 (TYPE,
- DATE, 3623.00 132216.00 3605.25 112876.15
.00
.00 3566.13 111871.38
.00
.00 10172610.72 302271039.90 3449498.00 100596386.00 3244447.00 93971924.00 98.43 84.61 98.43 84.61 99.50 82.54 95.10 75.47
.00 2.64 AND DURATION OF EACH):
- 25.
IF SHUTDOWN AT END OF REPORT PERIOD, ESTIMATED DATE OF START UP:
- 26.
UNITS IN TEST STATUS (PRIOR TO COMMERCIAL OPERATION): FORECAST ACHIEVED INITIAL CRITICALITY INITIAL ELECTRICITY COMMERCIAL OPERATION 1.16 -
9 PAGE 1
RPD36-000
- 1.
- 2.
- 3.
- 4.
- 5.
- 6.
- 7.
8.
YR TO DATE
- 11.
- 12.
- 13.
- 14.
- 15.
- 16.
- 17.
- 18.
- 19.
- 20.
- 21.
- 22.
- 23.
24.
CUMUL ATIVE
Enclosure to Serial: HNP-02-084 Sheet 2 of 2 CP&L CO.
RUN DATE 06/04/02 RUN TIME 08:14:29 PLANT PERFORMANCE DATA SYSTEM APPENDIX B -
AVERAGE DAILY POWER LEVEL HARRIS UNIT 1 PAGE 1
RPD39-000 DOCKET NO.
050-400 COMPLETED BY SHEILA ROGERS TELEPHONE (919)362-2573 MAY 2002 DAY AVG.
DAILY POWER LEVEL (MWE-NET) 1 922 2
910 3
925 4
933 5
933 6
926 7
915 8
912 9
907 10 914 11 925 12 916 13 911 14 929 15 929 16 922 DAY AVG.
DAILY POWER LEVEL (MWE-NET) 17 914 18 920 19 934 20 933 21 934 22 933 23 931 24 922 25 917 26 917 27 918 28 917 29 916 30 913 31 912 1.16 -
8