HNP-04-077, April 2004 Monthly Operating Report for Shearon Harris

From kanterella
Jump to navigation Jump to search
April 2004 Monthly Operating Report for Shearon Harris
ML041340251
Person / Time
Site: Harris Duke Energy icon.png
Issue date: 05/06/2004
From: Caves J
Progress Energy Carolinas
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
HNP-04-077
Download: ML041340251 (3)


Text

Cj Progress Energy MAY 0 6 2004 SERIAL: HNP-04-077 United States Nuclear Regulatory Commission ATTENTION: Document Control Desk Washington, DC 20555 SHEARON HARRIS NUCLEAR POWER PLANT DOCKET NO. 50-400/LICENSE NO. NPF-63 MONTHLY OPERATING REPORT Ladies and Gentlemen:

In accordance with Technical Specification 6.9.1.5 for the Harris Nuclear Plant, Carolina Power &

Light Company doing business as Progress Energy Carolinas, Inc. is providing the enclosed report of operating statistics and shutdown experience for the month of April 2004.

Sincerely, X zzK.

John R. Caves Cd'a66,

Supervisor, Licensing/Regulatory Programs Harris Nuclear Plant MGW/mgw Enclosure c:

Mr. R. A. Musser (NRC Senior Resident Inspector, HNP)

Mr. L. A. Reyes (NRC Regional Administrator, Region II)

Mr. C. P. Patel (NRC Project Manager, HNP)

Progress Energy Carolinas, Inc.

Harris Nuclear Plant P 0. 0ox 165 New Hill, NC 27562 H:fe-Li

Enclosure to Serial HNP-04-077 Page I of 2 OPERATING DATA REPORT DOCKET NO.

UNIT NAME DATE COMPLETED BY TELEPHONE 050-400 Shearon Harris Nuclear Power Plant May 4, 2004 Michael S. Matheny (919) 362-2335 REPORTING PERIOD April 2004 (Month/Year)

1. Design Electrical Rating:

(MWe-Net)

2.

Maximum Dependable Capacity:

(MWe-Net)

3.

Number of Hours the Reactor Was Critical:

4.

Number of Hours the Generator Was On Line:

5.

Unit Reserve Shutdown Hours:

MONTH 941.7 900.0 719.0 719.0 0.0 YEAR TO DATE N/A N/A 2,903.0 2,903.0 0.0 CUMULATIVE N/A N/A 129,047.1 127,934.5 0.0

6.

Net Electrical Energy (MWH):

640,461.0 2,679,145.0 108,478,582.0

Enclosure to Serial HNP-04-077 Page 2 of 2 APPENDIX B UNIT SHUTDOWNS DOCKET NO.

UNIT NAME DATE COMPLETED BY TELEPHONE 050-400 Shearon Harris Nuclear Power Plant May 4, 2004 Michael S. Matheny (919) 362-2335 REPORTING PERIOD April 2004 (Month/Year)

TYPE METHOD OF DATE F: FORCED DURATION SHUTTING CAUSE/CORRECTIVE ACTIONS NO.

(yymmdd)

S: SCHEDULED (HOURS)

REASON (1)

DOWN (2)

COMMENTS N/A N/A N/A N/A N/A N/A N/A

SUMMARY

There were no plant shutdowns during the month of April 2004.

(1) Reason:

(2) Method:

A - Equipment Failure (Explain) 1 - Manual B - Maintenance or Test 2 - Manual Trip/Scram C - Refueling 3 - Automatic Trip/Scram D - Regulatory Restriction 4 - Continuation E - Operator Training/License Examination 5 - Other (Explain)

F - Administrative G - Operational Error (Explain)

H - Other (Explain)