August 2004 Monthly Operating Report for Shearon Harris
ML042600337
Person / Time
Site: Harris Duke Energy icon.png
Issue date: 09/10/2004
From: Corlett D
Progress Energy Carolinas
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
HNP-04-131
Download: ML042600337 (3)


Text

Progress Energy SEP 1 0 2004 SERIAL: HNP-04-131 United States Nuclear Regulatory Commission A'ITENTION: Document Control Desk Washington, DC 20555 SHEARON HARRIS NUCLEAR POWER PLANT DOCKET NO. 50-400/LICENSE NO. NPF-63 MONTHLY OPERATING REPORT Ladies and Gentlemen:

In accordance with Technical Specification 6.9.1.5 for the Harris Nuclear Plant, Carolina Power &

Light Company, doing business as Progress Energy Carolinas, Inc., is providing the enclosed report of operating statistics and shutdown experience for the month of August 2004.

Sin ly, David H. Corlett Supervisor, Licensing/Regulatory Programs Harris Nuclear Plant MGW/mgw Enclosure c:

Mr. R. A. Musser (NRC Senior Resident Inspector, HNP)

Mr. C. P. Patel (NRC Project Manager, HNP)

Dr. W. D. Travers (NRC Regional Administrator, Region II)

Progress Energy Carolinas, Inc.

Harris Nuclear Plant P.O. Box 165 New Hill, NC 27562

-- e

Enclosure to Serial HNP-04-131 Page I of 2 OPERATING DATA REPORT DOCKET NO.

UNIT NAME DATE COMPLETED BY TELEPHONE 050-400 Shearon Harris Nuclear Power Plant September 7, 2004 Chase S. Thomas (919) 362-2589 REPORTING PERIOD August 2004 (Month/Year)

YEAR TO DATE N/A MONTH 941.7 CUMULATIVE N/A

1. Design Electrical Rating:

(MWe-Net)

2.

Maximum Dependable Capacity:

(MWe-Net)

3.

Number of Hours the Reactor Was Critical:

4. Number of Hours the Generator Was On Line:
5.

Unit Reserve Shutdown Hours:

900.0 744.0 744.0 0.0 N/A 5,550.4 5,541.6 0.0 N/A 131,694.5 130,573.1 0.0

6.

Net Electrical Energy (MWH):

676,491 5,063,609 110,863,046

Enclosure to Serial HNP-04-131 Page 2 of 2 APPENDIX B UNIT SHUTDOWNS DOCKET NO.

UNIT NAME DATE COMPLETED BY TELEPHONE 050-400 Shearon Harris Nuclear Power Plant September 7, 2004 Chase S. Thomas (919) 362-2589 REPORTING PERIOD August 2004 (Month/Year)

TYPE METHOD OF DATE F: FORCED DURATION SHUTTING CAUSE/CORRECTIVE ACTIONS NO.

(yymmdd)

S: SCHEDULED (HOURS)

REASON (1)

DOWN (2)

COMMENTS N/A N/A N/A N/A N/A N/A N/A

SUMMARY

There were no plant shutdowns during the month of August 2004.

(1) Reason:

(2) Method:

A - Equipment Failure (Explain)

I - Manual B - Maintenance or Test 2 - Manual Trip/Scram C - Refueling 3 - Automatic Trip/Scram D - Regulatory Restriction 4 - Continuation E - Operator Training/License Examination 5 - Other (Explain)

F - Administrative G - Operational Error (Explain)

H - Other (Explain)