SCP&L A Progress Energy Comnpany Serial: HNP-02-154 NOV 1 3 2002 United States Nuclear Regulatory Commission ATTENTION: Document Control Desk Washington, DC 20555 SHEARON HARRIS NUCLEAR POWER PLANT DOCKET NO. 50-400/LICENSE NO. NPF-63 MONTHLY OPERATING REPORT

Dear Sir or Madam:

In accordance with Carolina Power & Light Company's Harris Nuclear Plant Technical Specification 6.9.1.5, the report of operating statistics and shutdown experience for the month of October 2002 is provided.

Sincerely, John R. Caves Supervisor, Licensing and Regulatory Programs Harris Nuclear Plant SGR/sgr Enclosure c: Mr. J. B. Brady (NRC Senior Resident Inspector, HNP)

Mr. L. A. Reyes (NRC Regional Administrator, Region II)

Mr. R. Subaratnam (NRC Project Manager, HNP)

Harris Nuclear Plant 5413 Shearon Hams Road XV New Hill, NC 27562

United States Nuclear Regulatory Commission Page 2 bc: Mr. W. F. Conway Mr. G. W. Davis Mr. R. J. Duncan II Mr. K. N. Harris Ms. T. A. Hardy (PE&RAS File)

Mr. C. S. Hinnant Mr. James Holt Mr. H. L. James Mr. W. D. Johnson

. . -Mr. R. D. Martin Mr. T. C. Morton Mr. W. S. Orser Mr. J. Scarola Mr. J. M. Taylor Mr. B. C. Waldrep Mr. W. G. Wendland (American Nuclear Insurers)

Licensing Files (2)

Nuclear Records

Enclosure to Serial HNP-02-154 Page 1 of 2 OPERATING DATA REPORT DOCKET NO. 050-400 UNIT NAME Shearon Harris Nuclear Power Plant DATE November 6, 2002 COMPLETED BY Charles L. George

-TELEPHONE-- -(919) 362-2937- - .....

REPORTING PERIOD October 2002 (Month/Year)

YEAR TO MONTH DATE CUMULATIVE

1. Design Electrical Rating: 941.7 N/A N/A (MWe-Net)
2. Maximum Dependable Capacity: 900 N/A N/A (MWe-Net) 745.0 7,244.2 116,515.1
3. Number of Hours the Reactor Was Critical:
4. Number of Hours the Generator Was On 745.0 7,179.6 115,484.9 Line:

0 0 0

5. Unit Reserve Shutdown Hours:

6.Net Electrical Bner-(MW - '- -687,635 6,467,-216 97,194,693

Enclosure to Serial HNP-02-154 Page 2 of 2 APPENDIX B UNIT SHUTDOWNS DOCKET NO. 050-400 UNIT NAME Shearon Harris Nuclear Power Plant DATE November 6, 2002 COMPLETED BY Charles L. George TELEPHONE (919) 362-2937 REPORTING PERIOD October 2002 (Month/Year)

- -- I II TYPE 4, METHOD OF DATE F: FORCED DURATION SHUTTING CAUSE/CORRECTIVE ACTIONS (yymmdd) I- S: SCHEDULED (HOURS) REASON (1) DOWN (2) COMMENTS NO.

NIA N/A NIA N/

N/A N/

N/A

/

N/A IN/A

SUMMARY

There were no significant events to report for the month of October 2002. The plant operated at 100% for the entire reporting period.

(1) Reason: (2) Method:

A - Equipment Failure (Explain) I - Manual B - Maintenance or Test 2 - Manual Trip/Scram C - Refueling 3 - Automatic Trip/Scram D - Regulatory Restriction 4 - Continuation E - Operator Training/License Examination 5 - Other (Explain)

F - Administrative G - Operational Error (Explain)

H - Other (Explain)

I