HNP-03-128, October 2003 Monthly Operating Report for Shearon Harris
| ML033210162 | |
| Person / Time | |
|---|---|
| Site: | Harris |
| Issue date: | 11/06/2003 |
| From: | Caves J Progress Energy Carolinas |
| To: | Document Control Desk, Office of Nuclear Reactor Regulation |
| References | |
| HNP-03-128 | |
| Download: ML033210162 (3) | |
Text
Cn Progress Energy NOV 6 2003 Serial: HNP-03-128 United States Nuclear Regulatory Commission ATTENTION: Document Control Desk Washington, DC 20555 SHEARON HARRIS NUCLEAR POWER PLANT DOCKET NO. 50400/LICENSE NO. NPF-63 MONTHLY OPERATING REPORT Ladies and Gentlemen:
In accordance with Technical Specification 6.9.1.5 for Progress Energy Carolinas, Inc's Harris Nuclear Plant, the report of operating statistics and shutdown experience for the month of October 2003 is provided.
Sincerely, John R. Caves Supervisor, Licensing/Regulatory Programs Harris Nuclear Plant MGW/mgw Enclosure C:
Mr. R. A. Musser (NRC Senior Resident Inspector, HNP)
Mr. L. A. Reyes (NRC Regional Administrator, Region II)
Mr. C. P. Patel (NRC Project Manager, HNP)
Progress Energy Carolinas, Inc.
Harris Nuclear Plant P.O. Cox 165 New Hill, NC 27562
,-- Cf
11
Enclosure to Serial HNP-03-128 Page 1 of 2 OPERATING DATA REPORT DOCKET NO.
UNIT NAME DATE COMPLETED BY TELEPHONE 050-400 Shearon Harris Nuclear Power Plant November 5, 2003 Charles L. George (919) 362-2937 REPORTING PERIOD October 2003 (Month/Year)
- 1. Design Electrical Rating:
(MWe-Net)
- 2.
Maximum Dependable Capacity:
(MWe-Net)
- 3.
Number of Hours the Reactor Was Critical:
- 4.
Number of Hours the Generator Was On Line:
- 5.
Unit Reserve Shutdown Hours:
MONTH 941.7 900.0 745.0 745.0 0.0 YEAR TO DATE N/A N/A 6,701.0 6,618.6 0.0 CUMULATIVE N/A N/A 124,680.1 123,567.5 0.0
- 6. Net Electrical Energy (MWH):
690,227.0 5,873,089.0 ---
-. 104,435,602.0
I Ir 1 Enclosure to Serial HNP-03-128 Page 2 of 2 APPENDIX B UNIT SHUTDOWNS DOCKET NO.
UNIT NAME DATE COMPLETED BY TELEPHONE 050-400 1
Shearon Harris Nuclear Power Plant November 5, 2003 Charles L. George (919) 362-2937 REPORTING PERIOD October 2003 (Month/Year)
TYPE METHOD OF DATE F: FORCED DURATION SHUTTING CAUSE/CORRECTIVE ACTIONS NO.
(yymmdd)
S: SCHEDULED (HOURS)
REASON (1)
DOWN (2)
COMMENTS N/A N/A N/A N/A N/A N/A I N/A
SUMMARY
- There were no significant events to report for the month of October 2003.
The plant operated at full power for the entire reporting period.
(1) Reason:
A - Equipment Failure (Explain)
B - Maintenance or Test C - Refueling D - Regulatory Restriction E - Operator Training/License Examination F-Administrative 0 - Operational Error (Explain)
H - Other (Explain)
I1 (2) Method:
1 - Manual 2 - Manual Trip/Scram 3 - Automatic Trip/Scram 4 - Continuation 5 - Other (Explain)
(