HNP-02-094, June 2002 Monthly Operating Report for Shearon Harris

From kanterella
Jump to navigation Jump to search
June 2002 Monthly Operating Report for Shearon Harris
ML021910415
Person / Time
Site: Harris Duke Energy icon.png
Issue date: 07/02/2002
From: Holt J
Carolina Power & Light Co
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
HNP-02-094
Download: ML021910415 (3)


Text

SCP&L A Progress Energy Company 1JaL 2 8}0(

Serial: HNP-02-094 United States Nuclear Regulatory Commission ATTENTION: Document Control Desk Washington, DC 20555 SHEARON HARRIS NUCLEAR POWER PLANT DOCKET NO. 50-400/LICENSE NO. NPF-63 MONTHLY OPERATING REPORT

Dear Sir or Madam:

In accordance with Carolina Power & Light Company's Harris Nuclear Plant Technical Specification 6.9.1.5, the report of operating statistics and shutdown experience for the month of June 2002 is provided.

Sincerely, James Holt Manager, Support Services Harris Nuclear Plant SGR Enclosure c:

Mr. J. B. Brady (NRC Senior Resident Inspector, HINP)

Mr. J. M. Goshen (NRC Project Manager, HNP)

, Mr.

Lr;A,- Reyes (NRC Regional Administrator, Region II) z, J

Harris Nuclear Plant A-C 5413 Shearon Harris Road New Hill, NC 27562 N O

Enclosure to Serial HNP-02-094 Sheet 1 of 2 CP&L CO.

RUN DATE 07/01/02 RUN TIME 09:11:32 OPERATING STATUS PLANT PERFORMANCE DATA SYSTEM OPERATING DATA REPORT HARRIS UNIT 1 DOCKET NO.

050-400 COMPLETED BY SHEILA ROGERS TELEPHONE (919)362-2573 UNIT NAME:

HARRIS UNIT 1 REPORTING PERIOD: JUNE 02 LICENSED THERMAL POWER (MWT):

2900 NAMEPLATE RATING (GROSS MWE):

950.9 DESIGN ELECTRICAL RATING (NET MWE):

MAX DEPENDABLE CAPACITY (GROSS MWE):

MAX DEPENDABLE CAPACITY (NET MWE):

IF CHANGES OCCUR IN CAPACITY RATINGS GIVE REASONS:

941.7 960.0 900.0 (ITEMS 3 THRU 7)

SINCE LAST REPORT,

9.

POWER LEVEL TO WHICH RESTRICTED IF ANY (NET MWE):

10. REASONS FOR RESTRICTION IF ANY:

THIS MONTH HOURS IN REPORTING PERIOD NUMBER OF HOURS REACTOR CRITICAL REACTOR RESERVE SHUTDOWN HRS HOURS GENERATOR ON LINE UNIT RESERVE SHUTDOWN HOURS GROSS THERMAL ENERGY GEN.

(MWH)

GROSS ELEC.

ENERGY GEN (MWH)

NET ELEC.

ENERGY GENERATED (MWH)

UNIT SERVICE FACTOR UNIT AVAILABILITY FACTOR UNIT CAP.

FACTOR (USING MDC NET)

UNIT CAP.

FACTOR (USING DER NET)

UNIT FORCED OUTAGE RATE 720.00 720.00

.00 720.00

.00 2087484.96 697301.00 656254.00 100.00 100.00 101.27 96.79

.00 4343.00 4325.25

.00 4286.13

.00 12260095.68 4146799.00 3900701.00 98.69 98.69 99.80 95.38

.00 132936.00 113596.15

.00 112591.38

.00 304358524.86 101293687.00 94628178.00 84.70 84.70 82.65 75.59 2.62

24.

SHUTDOWNS SCHED.

OVER NEXT 6 MONTHS (TYPE,

DATE, AND DURATION OF EACH):
25.

IF SHUTDOWN AT END OF REPORT PERIOD, ESTIMATED DATE OF START UP:

26.

UNITS IN TEST STATUS (PRIOR TO COMMERCIAL OPERATION): FORECAST ACHIEVED INITIAL CRITICALITY INITIAL ELECTRICITY COMMERCIAL OPERATION 1.16 - 9 PAGE 1

RPD36-000

1.
2.
3.
4.
5.
6.
7.

8.

11.
12.
13.
14.
15.
16.
17.
18.
19.
20.
21.
22.

23.

YR TO DATE CUMUL ATIVE

Enclosure to Serial: HNP-02-094 Sheet 2 of 2 CP&L CO.

RUN DATE 07/01/02 RUN TIME 09:11:31 PLANT PERFORMANCE DATA SYSTEM APPENDIX B -

AVERAGE DAILY POWER LEVEL HARRIS UNIT 1 PAGE 1

RPD39-000 DOCKET NO.

050-400 COMPLETED BY SHEILA ROGERS TELEPHONE (919)362-2573 2002 AVG.

DAILY POWER LEVEL (MWE-NET) 910 907 914 910 907 907 917 923 922 916 913 909 907 908 914 917 DAY AVG.

DAILY POWER LEVEL (MWE-NET) 17 917 18 914 19 914 20 913 21 914 22 913 23 910 24 25 26 27 28 29 30 906 905 906 906 907 908 909 1.16 -

8 JUJNE DAY 1

2 3

4 5

6 7

8 9

10 11 12 13 14 15 16