Text

Q brn 4 Progress Energy OCT 1 2 2004 SERIAL: HNP-04-143 United States Nuclear Regulatory Commission ATTENTION: Document Control Desk Washington, DC 20555 SHEARON HARRIS NUCLEAR POWER PLANT MONTHLY OPERATING REPORT DOCKET NO. 50-400LICENSE NO. NPF-63 Ladies and Gentlemen:

In accordance with Technical Specification 6.9.1.5 for the Harris Nuclear Plant, Carolina Power &

Light Company, doing business as Progress Energy Carolinas, Inc., is providing the enclosed report of operating statistics and shutdown experience for the month of September 2004.

Sincerely, David H. Corlett Supervisor, Licensinghtegulatory Programs Harris Nuclear Plant MGWImgw Enclosure c:

Mr. R. A. Musser (NRC Senior Resident Inspector, HNP)

Mr. C. P. Pate1 (NRC Project Manager, HNP)

Dr. W. D. Travers (NRC Regional Administrator, Region 11)

Progress Energy Carolinas, Inc.

Harris Nuclear Plant P 0 Box 165 New Hill, NC 21562

Enclosure to Serial HNP-04-143 Page 1 of 2 OPERATING DATA REPORT DOCKET NO.

050-400 UNIT NAME Shearon Harris Nuclear Power Plant DATE October 4, 2004 COMPLETED BY Michael S. Matheny TELEPHONE (919) 362-2335 REPORTING PERIOD September 2004 (Month/Year)

MONTH YEAR TO DATE CUMULATIVE

1. Design Electrical Rating:

(MWe-Net) 941.7 N/A N/A

2. Maximum Dependable Capacity:

(MWe-Net) 900.0 N/A N/A

3. Number of Hours the Reactor Was Critical:

720.0 6,270.4 132,414.5

4. Number of Hours the Generator Was On Line:

720.0 6,261.6 131,293.1

5. Unit Reserve Shutdown Hours:

0.0 0.0 0.0

6. Net Electrical Energy (MWH):

658,386.0 5,721,995.0 111,521,432.0

Enclosure to Serial HNP-04-143 Page 2 of 2 APPENDIX B UNIT SHUTDOWNS DOCKET NO.

050-400 UNIT NAME Shearon Harris Nuclear Power Plant DATE October 4, 2004 COMPLETED BY Michael S. Matheny TELEPHONE (919) 362-2335 REPORTING PERIOD September 2004 (Month/Year)

NO.

DATE (yymmdd)

TYPE F: FORCED S: SCHEDULED DURATION (HOURS)

REASON (1)

METHOD OF SHUTTING DOWN (2)

CAUSE/CORRECTIVE ACTIONS COMMENTS N/A N/A N/A N/A N/A N/A N/A

SUMMARY

There were no plant shutdowns during the month of September 2004.

(1) Reason:

A - Equipment Failure (Explain)

B - Maintenance or Test C - Refueling D - Regulatory Restriction E - Operator Training/License Examination F - Administrative G - Operational Error (Explain)

H - Other (Explain)

(2) Method: