AVEr CP&L A Progress Energy Company Serial: HNP-02-114 AUG 15 2002 United States Nuclear Regulatory Commission ATTENTION: Document Control Desk Washington, DC 20555 SHEARON HARRIS NUCLEAR POWER PLANT DOCKET NO. 50-400ALICENSE NO. NPF-63 MONTHLY OPERATING REPORT
Dear Sir or Madam:
In accordance with Carolina Power & Light Company's Harris Nuclear Plant Technical Specification 6.9.1.5, the report of operating statistics and shutdown experience for the month of July 2002 is provided.
Sincerely, James Holt Manager, Support Services Harris Nuclear Plant SGR Enclosure c:
Mr. J. B. Brady (NRC Senior Resident Inspector, HNP)
Mr. J. M. Goshen (NRC Project Manager, HNP)
Mr. L. A. Reyes (NRC Regional Administrator, Region II)
Harris Nuclear Plant 5413 Shearon Harris Road New Hill, NC 27562
Enclosure to Serial HNP-02-114 Sheet 1 of 3 CP&L CO.
RUN DATE 08/12/02 RUN TIME 08:58:10 OPERATING STATUS PLANT PERFORMANCE DATA SYSTEM OPERATING DATA REPORT HARRIS UNIT 1 DOCKET NO.
050-400 COMPLETED BY SHEILA ROGERS TELEPHONE (919)362-2573 UNIT NAME:
HARRIS UNIT 1 REPORTING PERIOD: JULY 02 LICENSED THERMAL POWER (MWT):
2900 NAMEPLATE RATING (GROSS MWE):
950.9 DESIGN ELECTRICAL RATING (NET MWE):
MAX DEPENDABLE CAPACITY (GROSS MWE):
MAX DEPENDABLE CAPACITY (NET MWE):
IF CHANGES OCCUR IN CAPACITY RATINGS GIVE REASONS:
941.7 960.0 900.0 (ITEMS 3 THRU 7)
SINCE LAST REPORT,
- 9.
POWER LEVEL TO WHICH RESTRICTED IF ANY (NET MWE):
- 10. REASONS FOR RESTRICTION IF ANY:
THIS MONTH HOURS IN REPORTING PERIOD NUMBER OF HOURS REACTOR CRITICAL REACTOR RESERVE SHUTDOWN HRS HOURS GENERATOR ON LINE UNIT RESERVE SHUTDOWN HOURS GROSS THERMAL ENERGY GEN.
(MWH)
GROSS ELEC.
ENERGY GEN (MWH)
NET ELEC.
ENERGY GENERATED (MWH)
UNIT SERVICE FACTOR UNIT AVAILABILITY FACTOR UNIT CAP.
FACTOR (USING MDC NET)
UNIT CAP.
FACTOR (USING DER NET)
UNIT FORCED OUTAGE RATE 744.00 725.67
.00 710.25
.00 1909872.72 628525.00 587765.00 95.46 95.46 87.78 83.89 4.54 5087.00 5050.92
.00 4996.38
.00 14169968.40 4775324.00 4488466.00 98.22 98.22 98.04 93.70
.67 133680.00 114321.82
.00 113301.63
.00 306268397.58 101922212.00 95215943.00 84.76 84.76 82.68 75.64 2.64
- 24.
SHUTDOWNS SCHED.
OVER NEXT 6 MONTHS (TYPE,
- DATE, AND DURATION OF EACH):
- 25.
IF SHUTDOWN AT END OF REPORT PERIOD, ESTIMATED DATE OF START UP:
- 26. UNITS IN TEST STATUS (PRIOR TO COMMERCIAL OPERATION):
FORECAST ACHIEVED INITIAL CRITICALITY INITIAL ELECTRICITY COMMERCIAL OPERATION 1.16 - 9 PAGE 1
RPD36-000
- 1.
- 2.
- 3.
- 4.
- 5.
- 6.
- 7.
8.
- 11.
- 12.
- 13.
- 14.
- 15.
- 16.
- 17.
- 18.
- 19.
- 20.
- 21.
- 22.
23.
YR TO DATE CUMUL ATIVE
[-
Enclosure to Serial: HNP-02-114 Sheet 2 of 3 CP&L CO.
RUN DATE 08/12/02 RUN TIME 08:58:10 PLANT PERFORMANCE DATA SYSTEM APPENDIX B -
AVERAGE DAILY POWER LEVEL HARRIS UNIT 1 PAGE I
RPD39-000 DOCKET NO.
050-400 COMPLETED BY SHEILA ROGERS TELEPHONE (919)362-2573 2002 AVG.
DAILY POWER LEVEL (MWE-NET) 907 906 905 906 905 910 912 913 906 903 915 919 7
55 150 164 DAY AVG.
DAILY POWER LEVEL (MWE-NET) 17 553 18 891 19 900 20 908 21 908 22 906 23 907 24 909 25 910 26 908 27 905 28 902 29 899 30 899 31 905 1.16 -
8 JULY DAY 1
2 3
4 5
6 7
8 9
10 11 12 13 14 15 16
Enclosure to*
Serial: HNP-02-114 Sheet 3 of 3 UNIT SHUTDOWNS AND POWER REDUCTION UNIT NAME:
Harris DATE.
08/12/02 COMPLETED BY: S. G. Rogers TELEPHONE:
(919) 362-2573 REPORT MONTH: February 2002 CAUSE AND CORRECTIVE ACTION TO METHOD OF LICENSEE PREVENT RECURRENCE DURATION SHUTTING DOWN EVENT SYSTEM COMPONENT NUMBER DATE TYPE I
(HOURS)
REASON 2 REACTOR 3 REPORT #
CODE 4 CODE 5 A manual reactor trp was initated 02-002 07/13/02 F
33.75 A
2 02-02-00 HA INSTRU 07/13/02 @ 01:10 due to a turbine valve DEH control system malfunction during initiation of a down power for scheduled turbine valve testing. The DEH control system was repaired. The unit was returned online 07/14/02 @ 10 55.
Dunng a 30% hold for chemistry monitonng, a condenser tube leak was identified Tubes were plugged and the plant was returned to 100%
power on 7/18/02.
2 Reason:
A-Equipment Failure (Explain)
B-Maintenance or Test C-Refueling D-Regulatory Restriction E-Operator Training & License Examination F-Administrative G-Operational Error (Explain)
H-Other (Explain) 3 Method:
1-Manual 2-Manual Scram 3-Automatic Scram 4-Continued 5-Reduced Load 6-Other 4
Exhibit G-Instructions for Preparation of Data Entry Sheets for Licensee Event Report (LER) File (NUREG-0161) 5 Exhibit 1 - Same Source I
F: Forced S: Scheduled