HNP-02-161, November 2002 Monthly Operating Report for Shearon Harris

From kanterella
Jump to navigation Jump to search
November 2002 Monthly Operating Report for Shearon Harris
ML023600287
Person / Time
Site: Harris Duke Energy icon.png
Issue date: 12/12/2002
From: Caves J
Carolina Power & Light Co
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
HNP-02-161
Download: ML023600287 (4)


Text

SCP&L e1,A Progress Energy Company DEC 1 2 2002 Serial: HNP-02-161 United States Nuclear Regulatory Commission ATTENTION: Document Control Desk Washington, DC 20555 SHEARON HARRIS NUCLEAR POWER PLANT DOCKET NO. 50-400[LICENSE NO. NPF-63 MONTHLY OPERATING REPORT

Dear Sir or Madam:

In accordance with Carolina Power & Light Company's Harris Nuclear Plant Technical Specification 6.9.1.5, the report of operating statistics and shutdown experience for the month of November 2002 is provided.

Sincerely, John R. Caves Supervisor, Licensing and Regulatory Programs Harris Nuclear Plant SGR/sgr Enclosure c:

Mr. J. B. Brady (NRC Senior Resident Inspector, HNP)

Mr. L. A. Reyes (NRC Regional Administrator, Region II)

Mr. R. Subaratnam (NRC Project Manager, HNP)

Harris Nuclear Plant 5413 Shearon Harris Road New Hill, NC 27562 J

641ý 4a

United States Nuclear Regulatory Commission Page 2 bc:

Mr. T. C. Bell Mr. Steven Carr Mr. W. F. Conway Mr. G. W. Davis Mr. R. J. Duncan II Mr. K. N. Harris Ms. T. A. Hardy (PE&RAS File)

Mr. C. S. Hinnant Mr. H. L. James Mr. R. D. Martin Mr. T. C. Morton

-7Mf..W:S7-Orser Mr. J. Scarola Mr. J. M. Taylor Mr. B. C. Waldrep Mr. W. G. Wendland (American Nuclear Insurers)

Licensing Files (2)

Nuclear Records

Enclosure to Serial HNP-02-161 Page 1 of 2 OPERATING DATA REPORT DOCKET NO.

UNIT NAME DATE COMPLETED BY TELEPHONE 050-400 Shearon Harris Nuclear Power Plant December 9, 2002 Charles L. George (919) 362-2937 REPORTING PERIOD

1. Design Electrical Rating:

(MWe-Net)

2.

Maximum Dependable Capacity:

(MWe-Net)

3.

Number of Hours the Reactor Was Critical:

4.

Number of Hours the Generator Was On Line:

5.

Unit Reserve Shutdown Hours:

6.

Net Electrical Energy (MWH):

November 2002 (Month/Year)

MONTH 941.7 900 720.0 720.0 0

YEAR TO DATE N/A N/A 7,964.2 7,899.6 0

CUMULATIVE N/A N/A 117,235.1 116,204.9 0

7,138,114 I

670,898 97,865,591

DOCKET NO.

UNIT NAME DATE COMPLETED BY TELEPHONE UN 050-400 Shearon Hamis Nuclear Power Plant December 4, 2002 Charles L. George (919) 362-2937 REPORTING PERIOD APPENDIX B

[IT SHUTDOWNS November 2002 (Month/Year)

Enclosure to Serial HNP-02-161 Page 2 of 2 TYPE METHOD OF DATE F: FORCED DURATION SHUTTING CAUSE/CORRECTIVE ACTIONS NO.

(yymmdd)

S: SCHEDULED (HOURS)

REASON (1)

DOWN (2)

COMMENTS N/A N/A N/A N/A N/A N/A N/A

SUMMARY

There were no significant events to report for the month of October 2002. The plant operated at 100% for the entire reporting period.

(1) Reason:

A - Equipment Failure (Explain)'

B - Maintenance or Test C - Refueling D - Regulatory Restriction E - Operator Training/License Examination F - Administrative G - Operational Error (Explain)

H - Other (Explain)

(2) Method:

1 - Manual 2 - Manual Trip/Scram 3 - Automatic Trip/Scram 4 - Continuation 5 - Other (Explain)

)

V