HNP-02-161, November 2002 Monthly Operating Report for Shearon Harris

From kanterella
Jump to navigation Jump to search
November 2002 Monthly Operating Report for Shearon Harris
ML023600287
Person / Time
Site: Harris Duke Energy icon.png
Issue date: 12/12/2002
From: Caves J
Carolina Power & Light Co
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
HNP-02-161
Download: ML023600287 (4)


Text

e1,A SCP&L Progress Energy Company DEC 1 2 2002 Serial: HNP-02-161 United States Nuclear Regulatory Commission ATTENTION: Document Control Desk Washington, DC 20555

.----- SHEARON HARRIS NUCLEAR POWER PLANT DOCKET NO. 50-400[LICENSE NO. NPF-63 MONTHLY OPERATING REPORT

Dear Sir or Madam:

In accordance with Carolina Power & Light Company's Harris Nuclear Plant Technical Specification 6.9.1.5, the report of operating statistics and shutdown experience for the month of November 2002 is provided.

Sincerely, J 641ý 4a John R. Caves Supervisor, Licensing and Regulatory Programs Harris Nuclear Plant SGR/sgr Enclosure c: Mr. J. B. Brady (NRC Senior Resident Inspector, HNP)

Mr. L. A. Reyes (NRC Regional Administrator, Region II)

Mr. R. Subaratnam (NRC Project Manager, HNP)

Harris Nuclear Plant 5413 Shearon Harris Road New Hill, NC 27562

United States Nuclear Regulatory Commission Page 2 bc: Mr. T. C. Bell Mr. Steven Carr Mr. W. F. Conway Mr. G. W. Davis Mr. R. J. Duncan II Mr. K. N. Harris Ms. T. A. Hardy (PE&RAS File)

Mr. C. S. Hinnant Mr. H. L. James Mr. R. D. Martin Mr. T. C. Morton

-7Mf..W:S7-Orser Mr. J. Scarola Mr. J. M. Taylor Mr. B. C. Waldrep Mr. W. G. Wendland (American Nuclear Insurers)

Licensing Files (2)

Nuclear Records

Enclosure to Serial HNP-02-161 Page 1 of 2 OPERATING DATA REPORT DOCKET NO. 050-400 UNIT NAME Shearon Harris Nuclear Power Plant DATE December 9, 2002 COMPLETED BY Charles L. George TELEPHONE (919) 362-2937 REPORTING PERIOD November 2002 (Month/Year)

I YEAR TO MONTH DATE CUMULATIVE

1. Design Electrical Rating: 941.7 N/A N/A (MWe-Net)
2. Maximum Dependable Capacity: 900 N/A N/A (MWe-Net)
3. Number of Hours the Reactor Was 720.0 7,964.2 117,235.1 Critical:
4. Number of Hours the Generator Was On 720.0 7,899.6 116,204.9 Line:
5. Unit Reserve Shutdown Hours: 0 0 0
6. Net Electrical Energy (MWH): 670,898 7,138,114 97,865,591

)

V Enclosure to Serial HNP-02-161 Page 2 of 2 APPENDIX B UN[IT SHUTDOWNS DOCKET NO. 050-400 UNIT NAME Shearon Hamis Nuclear Power Plant DATE December 4, 2002 COMPLETED BY Charles L. George TELEPHONE (919) 362-2937 REPORTING PERIOD November 2002 (Month/Year)

TYPE METHOD OF DATE F: FORCED DURATION SHUTTING CAUSE/CORRECTIVE ACTIONS NO. (yymmdd) S: SCHEDULED (HOURS) REASON (1) DOWN (2) COMMENTS N/A N/A N/A N/A N/A N/A N/A

SUMMARY

There were no significant events to report for the month of October 2002. The plant operated at 100% for the entire reporting period.

(1) Reason: (2) Method:

A - Equipment Failure (Explain)' 1 - Manual B - Maintenance or Test 2 - Manual Trip/Scram C - Refueling 3 - Automatic Trip/Scram D - Regulatory Restriction 4 - Continuation E - Operator Training/License Examination 5 - Other (Explain)

F - Administrative G - Operational Error (Explain)

H - Other (Explain)