HNP-03-030, February 2003 Monthly Operating Report for Shearon Harris
| ML030780840 | |
| Person / Time | |
|---|---|
| Site: | Harris |
| Issue date: | 03/11/2003 |
| From: | Caves J Progress Energy Carolinas |
| To: | Document Control Desk, Office of Nuclear Reactor Regulation |
| References | |
| HNP-03-030 | |
| Download: ML030780840 (4) | |
Text
4 Progress Energy MAR 112003 Serial: HNP-03-030 United States Nuclear Regulatory Commission ATTENTION: Document Control Desk
-Washington, DC 20555 SHEARON HARRIS NUCLEAR POWER PLANT DOCKET NO. 50-400/LICENSE NO. NPF-63 MONTHLY OPERATING REPORT
Dear Sir or Madam:
In accordance with Techi6cal Spbcification 6.9.1.5 for,Progress Energy Carolinas, Inc's (altemately 6oxn as Caroliftf Pd6wer and Light Co.) Harris Nuclear Plant, the report of operating statistics*aind 'shiitd6wvii Vxperience. for the month of Febhary 2003 is provided.
Sincerely, John R. Caves Supervisor,
--Licensing and-Regulatory Programs.
Harris Nuclear Plant SGR/sgr Enclosure c:.T Mr..J.. BBrady, (NRC Senior Resident Inspetor.,, RNP)
"Mr-L.)A Res (NRC Regionai Ad M
e
". Pate'l(NRC ProjectManager* I-INV),, 1
)Progress Energy Cardlnas, Inc Harris Nuclear Plant P 0 Box 165
United States Nuclear Regulatory Commission Page 2 bc:
Mr. Tom C. Bell Mr. Stephen Carr Mr. W. F. Conway Mr. G. W. Davis Mr. R. J. Duncan II Mr. K. N. Harris Mr. C. S. Hinnant Mr. H. L. James Mr. R. D. Martin Mr. T. C. Morton 4--Mr.-W. S. Orser-Mr. J. Scarola Mr. J. M. Taylor Mr. B. C. Waldrep Mr. W. G. Wendland (American Nuclear Insurers)
Licensing Files (2)
Nuclear Records
Enclosure to Serial HNP-03-030 Page 1 of 2 DOCKET NO.
UNIT NAME DATE COMPLETED BY TELEPHONE OPERATING DATA REPORT 050-400 Shearon Harris Nuclear Power Plant March 6, 2003 Charles L. George (919) 362-2937 REPORTING PERIOD
- 1. Design Electrical Rating:
(MWe-Net)
- 2.
Maximum Dependable Capacity:
(MWe-Net)
- 3.
Number of Hours the Reactor Was Critical:
- 4.
Number of Hours the Generator Was On Line:
- 5.
Unit Reserve Shutdown Hours:
February 2003 (Month/Year)
MONTH 941.7 900.0 672.0 672.0 0.0 YEAR TO DATE N/A N/A 1416.0 1416.0 0.0 CUMULATIVE N/A N/A 119,395.1 118,364.9 0.0
- 6.
Net Electrical Energy (MWH):
628,360.0---1,326,158.0-
-99,888,67-1.0----
A Enclosure to Serial HNP-03-030 Page 2 of 2 DOCKET NO.
UNIT NAME DATE COMPLETED BY TELEPHONE APPENDIX B UNIT SHUTDOWNS 050-400 Shearon Hardr Nuclear Power Plant March 6, 2003 Charles L. George (919) 362-2937 REPORTING PERIOD February 2003 (Month/Year)
TYPE METHOD OF DATE F: FORCED DURATION SHUTTING CAUSE/CORRECTIVE ACTIONS NO.
(yymmdd)
S: SCHEDULED (HOURS)
REASON (1)
DOWN (2)
COMMENTS N/A N/A N/A r
N/A N/A N/A N/A
SUMMARY
- There were no significant events to report for the month of February, 2003. During the reporting period, the plant had a scheduled downpower for turbine valve testing. For the remainder of the reporting period, the plant operated at 100% power.
(1) Reason:
A - Equipment Failure (Explain)
B - Maintenance or Test C - Refueling D - Regulatory Restriction E - Operator Training/License Examination F-Administrative G - Operational Error (Explain)
H - Other (Explain)
(2) Method:
1 - Manual 2 - Manual Trip/Scram 3 - Automatic Trip/Scram 4 - Continuation 5 - Other (Explain)