HNP-02-135, September 2002 Monthly Operating Report for Shearon Harris

From kanterella
Jump to navigation Jump to search
September 2002 Monthly Operating Report for Shearon Harris
ML022960219
Person / Time
Site: Harris Duke Energy icon.png
Issue date: 10/14/2002
From: Caves J
Carolina Power & Light Co
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
HNP-02-135
Download: ML022960219 (4)


Text

OCT 14 2M Serial: HNP-02-135 United States Niilear Regulatory Commission ATTENTION: Document Control Desk Washington, DC 20555 SHEARON HARRIS NUCLEAR POWER PLANT DOCKET NO. 50-400/LICENSE NO. NPF-63 MONTHLY OPERATING REPORT

Dear Sir or Madam:

In accordance with Carolina Power & Light Company's Harris Nuclear Plant Technical Specification 6.9.1.5, the report of operating statistics and shutdown experience for the month of September 2002 is provided.

Sincerely, F1 John R. Caves Supervisor, Licensing and Regulatory Programs Harris Nuclear Plant SGR/sgr Enclosure c:

Mr. J. B. Brady (NRC Senior Resident Inspector, HNP)

Mr. L. A. Reyes (NRC Regional Administrator, Region II)

Mr. R. Subaratnam (NRC Project Manager, HNP)

Harris Nuclear Plant 5413 Shearon Harris Road New Hill, NC 27562 C"Oo CP&L WA Progress Energy Company

United States Nuclear Regulatory Commission Page 2 bc:

Mr. W. F. Conway Mr. G. W. Davis Mr. R. J. Duncan II Mr. K. N. Harris Ms. T. A. Hardy (PE&RAS File)

Mr. C. S. Hinnant Mr. James Holt Mr. H. L. James

-Mr.

W.-D. Johnson -..........

Mr. R. D. Martin Mr. W. S. Orser Ms. S. G. Rogers Mr. J. Scarola Mr. J. M. Taylor Mr. B. C. Waldrep Mr. W. G. Wendland (American Nuclear Insurers)

Licensing Files (2)

Nuclear Records

Enclosure to Serial HNP-02-135 Page 1 of 2 OPERATING DATA REPORT DOCKET NO.

UNIT NAME DATE

.COMPLETED BY-TELEPHONE 050-400 Shearon Harris Nuclear Power Plant October 2, 2002

-Sheila G. Rogers -.----

(919) 362-2573 REPORTING PERIOD

1. Design Electrical Rating:

(MWe-Net)

2.

Maximum Dependable Capacity:

(MWe-Net)

3.

Number of Hours the Reactor Was Critical:

4.

Number of Hours the Generator Was On Line:

5. - Unit Reserve Shutdown Hours:
6.

Net Electrical Energy (MWH):

Ii September 2002 (Month/Year)

YEAR TO MONTH DATE CUMULATIVE 941.7 ~

N/A 900 720.0 720.0 I A N/A 6,499.2 6,434.6 1Z'7 '7AQI N/A 115,770.1 114,739.9 Qr A'7 nZQ

Enclosure to Serial HNP-02-135 Page 2 of 2 APPENDIX B UNIT SHUTDOWNS DOCKET NO.

UNIT NAME DATE COMPLETED BY TELEPHONE 050-400 Shearon Harris Nuclear Power Plant October 2, 2002 Sheila G. Rogers (919) 362-2573 REPORTING PERIOD TYPE METHOD OF DATE F: FORCED DURATION SHUTTING CAUSE/CORRECTIVE ACTIONS NO.

(yymmdd)

S: SCHEDULED

,(HOURS)

REASON (1)

DOWN (2)

COMMENTS N/A N/A N/A N/A N/A N/A N/A

SUMMARY

There were no significant events to report for the month of September 2002. Plant o "erated at 100% for the reporting period.

(1) Reason:

A - Equipment Failure (Explain)

B - Maintenance or Test C - Refueling D - Regulatory Restriction E - Operator Training/License Examination F - Administrative G - Operational Error (Explain)

H - Other (Explain)

(2) Method:

1 - Manual 2 - Manual Trip/Scram 3 - Automatic Trip/Scram 4 - Continuation 5 - Other (Explain)

September 2002 I