June 2004 Monthly Operating Report for Shearon Harris Nuclear Power Plant
ML041950363
Person / Time
Site: Harris Duke Energy icon.png
Issue date: 07/13/2004
From: Caves J
Progress Energy Carolinas
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
HNP:04-102
Download: ML041950363 (3)


Text

b-L P rogress Energy JUL 1 3 2004 SERIAL: HNP 102 United States Nuclear Regulatory Commission ATTENTION: Document Control Desk Washington, DC 20555 SHEARON HARRIS NUCLEAR POWER PLANT MONTHLY OPERATING REPORT DOCKET NO. 50-400lLICENSE NO. NPF-63 Ladies and Gentlemen:

In accordance with Technical Specification 6.9.1.5 for the Harris Nuclear Plant, Carolina Power &

Light Company, doing business as Progress Energy Carolinas, Inc., is providing the enclosed report of operating statistics and shutdown experience for the month of June 2004.

Sincerely, John R. Caves Supervisor, Licensing/Regulatory Programs Harris Nuclear Plant MGWImgw Encl osure c:

Mr. R. A. Musser (NRC Senior Resident Inspector, 3")

Mr. C. P. Pate1 (NRC Project Manager, HNP)

Dr. W. D. Travers (NRC Regional Administrator, Region 11)

Progress Energy Carolinas, Inc.

Harris Nuclear Plant P 0 Box 165 New Hill, NC 27562

Enclosure to Serial HNP-04-102 Page 1 of 2 OPERATING DATA REPORT DOCKET NO.

050-400 UNIT NAME Shearon Harris Nuclear Power Plant DATE July 6, 2004 COMPLETED BY Michael S. Matheny TELEPHONE (919) 362-2335 REPORTING PERIOD June 2004 (Month/Year)

MONTH YEAR TO DATE CUMULATIVE

1. Design Electrical Rating:

(MWe-Net) 941.7 N/A N/A

2. Maximum Dependable Capacity:

(MWe-Net) 900.0 N/A N/A

3. Number of Hours the Reactor Was Critical:

720.0 4,062.4 130,206.5

4. Number of Hours the Generator Was On Line:

720.0 4,053.6 129,085.1

5. Unit Reserve Shutdown Hours:

0.0 0.0 0.0

6. Net Electrical Energy (MWH):

655,523.0 3,713,000.0 109,512,437.0

Enclosure to Serial HNP-04-102 Page 2 of 2 APPENDIX B UNIT SHUTDOWNS DOCKET NO.

050-400 UNIT NAME Shearon Harris Nuclear Power Plant DATE July 6, 2004 COMPLETED BY Michael S. Matheny TELEPHONE (919) 362-2335 REPORTING PERIOD June 2004 (Month/Year)

NO.

DATE (yymmdd)

TYPE F: FORCED S: SCHEDULED DURATION (HOURS)

REASON (1)

METHOD OF SHUTTING DOWN (2)

CAUSE/CORRECTIVE ACTIONS COMMENTS N/A N/A N/A N/A N/A N/A N/A

SUMMARY

There were no plant shutdowns during the month of June 2004.

(1) Reason:

A - Equipment Failure (Explain)

B - Maintenance or Test C - Refueling D - Regulatory Restriction E - Operator Training/License Examination F - Administrative G - Operational Error (Explain)

H - Other (Explain)

(2) Method: