ELV-03884, Forwards Corrected Data Point Library for Erds,Initially Submitted in .Encl Corrects Section 3.6 Re Administrative Implementation Requirements,Per Rev 1 to NUREG-1394

From kanterella
Jump to navigation Jump to search
Forwards Corrected Data Point Library for Erds,Initially Submitted in .Encl Corrects Section 3.6 Re Administrative Implementation Requirements,Per Rev 1 to NUREG-1394
ML20102B201
Person / Time
Site: Vogtle  Southern Nuclear icon.png
Issue date: 07/20/1992
From: Mccoy C
GEORGIA POWER CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
RTR-NUREG-1394 ELV-03884, ELV-3884, NUDOCS 9207280252
Download: ML20102B201 (4)


Text

-

,* ,. Geyga N u nrcon,.4m 40 imerrm Ce : Pv& A b

. Pw 0% bc 1:35

. En m y:vv. /4Drc3 4 '01 Mephs a 235 87771'"'

y C. K. McCo'/ khCOI* d hCWCf pce be&

  • Na

e '

wee o July 20, 1992 ' >

ELV-03884 49Gi Dcc.ket Nos. 50-424 50-425 U. S. Nuclear Regulatory Commission ATTN: Document Control Desk Yashington, D. C. 20555 Gentlemen:

V0GTLE ELECTRIC GENERATING PLANT EMERGENCY RESPONSE DATA SYSTEM (ERDS)

E POINT LIBRARY __q0RRCCTION ibis 'ietter is .in regard to the carrent rule regt *ing near real-time plant computer data _be transmitted to the NRC's Operatirl Center as de:cribed in NUREG-13?4 Revision I and the August 13, 1991, Fim # Rule published in the Federal Register, Georgia Power Company's initial implementation plan which was submitted to you previously on October 2E,1991, stated that Vogtle Electric

- Generating (!cnt would comply with all raquirements stipulated under the above mentioned articles in a time fra.te commensurate with approved NRC deadlines.

The purpose of this letter is to iderra you of a cor rectius to our Data Point Library (DPL) previonsly submitted to you in our March 17, 1992 letter. Per R.MG-1394 = Revision 1, section 3.6 " Administrative Implementation Requirements" and the August 13, 1991, publication of the Final P.ule in the Federal Register, section VI. Emergency Response Data System, ' Any hardware ano software thanges that affect the transmitted data points ioentified in the ERDS Data Point ,

Library (site specific data base residing on the ERDS computer) most be subraitted to the N'RC within-30 days after the changos 2.re completod,'

The initial DPL ' incorrectly if sted: Emergency Re:;oonse f acilities Computer ; aint R6253 at '"RE -014 MAIN ' PLANT VENT RAD 10 GAS MIGH RNG." The correct point is R6379 "RE-12444E.PIANT VENT RADIO 0AS-HI-RANGE." (See attached Data Point Library Reference File forms far Units 1 and 2 with marked up changes.)

Please contact this office if you have any questions.

Sincerely, Mf ' '

C. K. McCoy l

CKM/JGM/clr Enc 1ocures '

V 9207200232 920720 l PDR ADOCK 05000424 F

PDR

f ..

Georgia Power.$h Page 2 ELV-03884 xc: Georoia Pgyer Comoany Mr. W. B. Shipman tir. ' d. Sheibani NLRHS U. S. Nuclear Reculatory Commission Mr. S. D. Ebneter, Regional.Administratcr Mr. D. S. Hood, Licensing Project Manager, NRR Mr. B. R. Bonser, Senior Resident inspector, Vogtle

  1. 4981 1

$ s 1

h

-I y $

ELV-03884-Lergtancy Response Data Systent (ERDS) Pago :

  • Dsta Point Library - VIEP Unit 1 Report Date : 06/26/92 m

DATn  : 06/26 92 RFACIDR U UT  :

DATA TEIDDI .: N/A. ,

.NRC DOS PAPATTER  : yRGAS E RAD"~ ~

PODE ID

~

R637T)

PIIMF SPEC ICD 4 DESC  :< RE-12444E PIRE VDE MDIOCAS-HI-RAfCE GDiERIC/00t4D DESC  : - JOAC I NED CASLS ANAIJ0G/ DIGITAL  : A DG UUTS/ DIG STATES  : uCI/CC DG UUTS CQWERSION  : O.O to 5.SE404 CI/CC

, MD4 DAN D1 SIR RA?CE  : O.

W.XD2 INSIR PNGE  : BE+04 ZDO IODE REFERI"CE  : N/

'RDTRDJCE PODE IUIES  : N/A PROC OR SDIS  : S hWBIR OF SD4 SORS  : N/A I M PROCESSFD  : N/A 'IHIS IS A DIRECT SDEOR DiPUT SD1SOR IDCATIQ1S  : VntrTt ATIO1 STAG AI1MI/ TRIP SEITODES  : V7AIABII NI IWER CUT OFF  :-N/A NI I G ER TLR4 Ctf  : N/A INSHO4DE FAIIERE FODE : N/A TD4P GNPDISATIQ1  : '

IH'EL REFIRDiCE IIG  : N/A QUQUE SYSTDi DESC

'Ulis poir.t provides irdication of all radioactivity releases thrcogh the mi.: plant vent. It is lccated in the stack beyord

'the last point of gaseous radioactivity addition *w the effluent path.

l.

u i

1 a>'**- ELV-03884 l

- Dwttjercy Response tuta System (2RDS) Pago :

Data Ibint I;ibrary - VIEl< Unit 2 Report Into :/ /92 l DVTE  :

REACIOR LNrr  : VO2 ' ~

DATA FEEDER  : N/A NRC DOS PARAMErD1  : EFE GAS PJO PODTP ID  : R637E b - ^ ~

w PIANT SPfr PODTP DESC  : RE-12444E PLRTP VDir RADIOGAS-HI-RAIGE GDfERIC/COND DESC  : TCdCTIVITY OF RELTASED G7h MDdDG/ DIGITAL  : A D ER QiITS/ DIG STATES. : uCI/CC DER LNITS COtNDRSION  : 0.0 to 5.8E+04 uCI/CC MINDEM INSIR RA?CE  : 0.0 MAXDiUti INSTR RA?CE  : 5.8E+04 ZDO IORT REFERDJCE :1 ,

REFERDICE PODIP IUTES  : N/A l PROC OR SDIS  : S NGEIR OF SDiSORS  : N/A ,

ID? PIOCESSID  : N/A 'DUS IS A DIRIrr SDiSOR INPlTP i SDiSCR LOCATIONS  : VIlfrIIATION SIACK AIAPJi/'IRIP SLTPODTIS  :(fAPlABLE NI FOWER CUT OFF  : N/A NI' POWER 'IURN Q1.  : N/A_ ,

. INSIRLMDTP FAllDRE ?DDE : N/A '

TDtP COMPDISATICN  : I LEVEL REFERDICE LED  : N/A l

'LNICUE SYSTD4 DESC

'D11s po$nt provides irdication of all radioactivity releases through the niin plant vent. It is located in the ri 4 beyond

- the last paint of gaseous radjoactivity addition to the effluent path.

L y

p

'i s

m -_._ . _ _. ._.