DCL-04-090, Response to NRC Regulatory Issue Summary 2004-10; Preparation and Scheduling of Operator Licensing Examinations

From kanterella
(Redirected from DCL-04-090)
Jump to navigation Jump to search
Response to NRC Regulatory Issue Summary 2004-10; Preparation and Scheduling of Operator Licensing Examinations
ML042100448
Person / Time
Site: Diablo Canyon  Pacific Gas & Electric icon.png
Issue date: 07/22/2004
From: Becker J
Pacific Gas & Electric Co
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
DCL-04-090, OL-DPR-80, OL-DPR-82, RIS-04-010
Download: ML042100448 (2)


Text

PacificGas and Electic Company James R.Becker Diablo Canyon Power Plant Vice President -Diablo Canyon PO. Box 56 Operations and Station Director Avila Beach, CA 93424 July 22, 2004 805.545.3462 Fax: 805.545.4234 PG&E Letter DCL-04-090 U.S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, DC 20555-0001 Docket No. 50-275, OL-DPR-80 Docket No. 50-323, OL-DPR-82 Diablo Canyon Units 1 and 2 Response to NRC Regulatory Issue Summary 2004-10: Preparation and Scheduling of Operator Licensing Examinations

Dear Commissioners and Staff:

Pursuant to the request for voluntary information identified in NRC Regulatory Issue Summary 2004-10, a completed NRC Form 536, "Operator Licensing Examination Data," is enclosed.

If you have further questions, please contact David Bums at (805) 545-3173.

Sincer I James R. Becker snf/4509 Enclosure cc: David L. Burns Bruce s. Mallett David L. ProuIx Girija S. Shukla

,Y0 A member of the STARS (Strategic Teaming and Resource Sharing) Alliance Callaway

  • Comanche Peak
  • Diablo Canyon
  • Palo Verde
  • Wolf Creek

NRC FORM 536 U.S. NUCLEAR REGULATORY COMMISSION APPROVED BY OMB NO. 3150-0131 EXPIRES: 0713112005 Estimated burden per response to comply with this voluntary Information collection request: 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br />. This Information collection Is used to plan budgets and resources for operator examinations. Send comments regarding burden OPERATOR LICENSING estimate to the Records Management Branch (T4 ES), U.S. Nuclear Regulatory Commission, Washington, DC 205554001, or by Internet e-mail to EXAMINATION DATA bJslanrcgov, and to the Desk Officer, Office of Information and Regulatory AffaIrs, NEOB-10202, (31504131), Office of Management and Budget, Washington, DC 20503. If a means used to Impose an Information collection does not display a currently valid OMB control number, the NRC may not conduct or sponsor, and a person Is not required to respond to, the Information collecton.

FACILTY NRC REGION Diablo Canyon Nuclear Power Plant IV A. PROPOSED EXAMINATION PREPARATION SCHEDULE PROPOSED NUMBER CY 2005 CY 2006 CY 2007 CY 2008 ESTIMATED NUMBER OF LICENSEE-PREPARED 1 , 1 EXAMINATIONS ESTIMATED NUMBER OF NRC-PREPARED . . .

EXAMINATIONS B. INITIAL OPERATOR LICENSE EXAMINATIONS PROPOSED NUMBER CY 2005 CY 2006 CY 2007 CY 2008 NUMBER OF REACTOR OPERATORS 4 10 NUMBER OF SENIOR REACTOR OPERATORS - INSTANT 9 . 3 NUMBER OF SENIOR REACTOR OPERATORS - UPGRADE 2 . 2 NUMBER OF SENIOR REACTOR OPERATORS - UMITED . . .

PROPOSED DATES . . .

PRIMARY DATE 2105 3/07 ALTERNATE DATE 4107 C. PROPOSED GENERIC FUNDAMENTALS EXAMINATION (GFE) SCHEDULE PROPOSED CY2005 CY 2006 NUMBER MARCH JUNE SEPTEMBER DECEMBER MARCH JUNE SEPTEMBER DECEMBER ESTIMATED NUMBER 13 OFCANDIDATES _ , .