MONTHYEARIR 05000413/20240032024-11-0404 November 2024 Integrated Inspection Report 05000413/2024003 and 05000414/2024003 ML24297A6222024-10-11011 October 2024 PCA Letter to NRC Catawba Hurricane Helene IR 05000413/20240112024-10-0101 October 2024 Biennial Problem Identification and Resolution Inspection Report 05000413/2024011 and 05000414/2024011 ML24255A8312024-09-23023 September 2024 Project Manager Assignment ML24261B9782024-09-19019 September 2024 Notification of an NRC Fire Protection Team Inspection NRC Inspection Report 05000413-2024010, 05000414-2024010 and Request for Information IR 05000414/20240912024-09-0505 September 2024 Final Significance Determination of a White Finding and Nov and Assessment Followup Letter-NRC Inspection Report 05000414-2024091 IR 05000413/20240052024-08-26026 August 2024 Updated Inspection Plan for Catawba Nuclear Station (Report 05000413/2024005 & 05000414/2024005) ML24235A1542024-08-22022 August 2024 Notification of Target Set Inspection and Request for Information (NRC Inspection Report 05000413-2024402 and 05000414-2024402) IR 05000413/20240022024-08-0808 August 2024 Integrated Inspection Report 05000413-2024002 and 05000414-2024002 and Apparent Violation IR 05000413/20244032024-08-0101 August 2024 Information Request for the Cybersecurity Baseline Inspection, Notification to Perform Inspection 05000413/2024403; 05000414/2024403 ML24183A0972024-07-12012 July 2024 ISFSI; Catawba 1, 2 & ISFSI; McGuire 1, 2 & ISFSI; Oconee 1, 2, 3 & ISFSI; Shearon Harris 1; H. B. Robinson 2 & ISFSI; and Radioactive Package Shipping Under 10 CFR 71 (71-266 & 71-345) – Review of QA Program Changes EPID L-2024-LLQ-0002 ML24178A0552024-06-26026 June 2024 Requalification Program Inspection – Catawba Nuclear Station IR 05000414/20240902024-06-24024 June 2024 NRC Inspection Report 05000414/2024090 and Preliminary White Finding and Apparent Violation ML24170A8632024-06-11011 June 2024 Flowserve June 11, 2024, Part 21 Notification - Redacted Version for Publishing ML24149A1772024-05-28028 May 2024 NRC Response to Duke Energy 2025 FOF Schedule Change Request (Catawba and McGuire) ML24144A1162024-05-28028 May 2024 Notification of Inspection and Request for Information for NRC Problem Identification and Resolution Inspection ML24141A0482024-05-17017 May 2024 EN 56958_1 Ametek Solidstate Controls, Inc IR 05000413/20240012024-05-10010 May 2024 Integrated Inspection Report 05000413/2024001 and 05000414/2024001 and Apparent Violation ML24095A1072024-04-0808 April 2024 – Review of the Spring 2023 Steam Generator Tube Inspection Report (C1R27) IR 05000413/20243012024-03-12012 March 2024 – Notification of Licensed Operator Initial Examination 05000413/2024301 and 05000414/2024301 ML24017A0652024-03-0808 March 2024 Issuance of Amendment Nos. 319 and 315 to Technical Specification 3.7.11, Control Room Area Chill Water System (Cracws) 05000414/LER-2024-001, Condition Prohibited by Technical Specifications and Loss of Safety Function Due to Failed Damper Controller for the 2A1 Emergency Diesel Generator Room Ventilation Fan2024-03-0404 March 2024 Condition Prohibited by Technical Specifications and Loss of Safety Function Due to Failed Damper Controller for the 2A1 Emergency Diesel Generator Room Ventilation Fan IR 05000413/20230062024-02-28028 February 2024 Annual Assessment Letter for Catawba Nuclear Station Units 1 and 2 - (NRC Inspection Report 05000413/2023006 and 05000414/2023006) IR 05000413/20230042024-02-0202 February 2024 – Integrated Inspection Report 05000413-2023004 and 05000414-2023004 ML24005A2512024-01-26026 January 2024 Exemption from Select Requirements of 10 CFR Part 73 - Security Notifications, Reports, and Recordkeeping and Suspicious Activity Reporting ML23317A3462023-11-14014 November 2023 Duke Fleet - Correction Letter to License Amendment Nos. 312 & 340 Issuance of Amendments Regarding the Adoption of Technical Specifications Task Force Traveler TSTF-554, Revision 1 IR 05000413/20230102023-10-11011 October 2023 NRC Inspection Report 05000413/2023010 and 05000414/2023010 ML23256A0882023-09-25025 September 2023 Issuance of Alternative to Steam Generator Welds ML23195A0782023-08-29029 August 2023 Issuance of Amendments Regarding the Adoption of Technical Specifications Task Force Traveler TSTF-554, Revision 1 IR 05000413/20230052023-08-25025 August 2023 Updated Inspection Plan for Catawba Nuclear Station Units 1 and 2 (Report 05000413/2023005 and 05000414/2023005) ML23233A1692023-08-17017 August 2023 EN 56683 - Curtiss Wright, Interim Notification Report for PotentialPurt2l IR 05000413/20230022023-07-25025 July 2023 Integrated Inspection Report 05000413/2023002 and 05000414/2023002 ML23207A0762023-07-14014 July 2023 EN 56557 - Update to Part 21 Report Re Potential Defect with Trane External Auto/Stop Emergency Stop Relay Card Pn: XI2650728-06 ML23237A2672023-06-13013 June 2023 June 13, 2002 - Meeting Announcement - McGuire and Catawba Nuclear Stations 50-369, 50-370 and 50-413, 50-414 ML23159A0052023-06-0505 June 2023 56557-EN 56557 - Paragon - Redlined IR 05000413/20230012023-05-0505 May 2023 – Integrated Inspection Report 05000413/2023001 and 05000414/2023001 ML23118A0762023-05-0101 May 2023 Approval for Use of Specific Provision of a Later Edition of the American Society of Mechanical Engineers Boiler and Pressure Vessel Code, Section XI IR 05000413/20230112023-04-25025 April 2023 Focused Engineering Inspection Report 05000413/2023011 and 05000414/2023011 ML23107A2542023-04-14014 April 2023 301 Examination Report Letter and Report (Merged) ML22332A4932023-03-10010 March 2023 William States Lee III 1 and 2 - Issuance of Amendments Regarding the Relocation of the Emergency Operations Facility IR 05000413/20234012023-03-0101 March 2023 – Security Baseline Inspection Report 05000413 2023401 and 05000414 2023401 IR 05000413/20220062023-03-0101 March 2023 Annual Assessment Letter for Catawba Nuclear Station, Units 1 and 2 (NRC Inspection Report 05000413/2022006 and 05000414/2022006) IR 05000413/20233012023-02-17017 February 2023 Operator Licensing Examination Approval 05000413/2023301 and 05000414/2023301 IR 05000413/20220042023-01-31031 January 2023 Integrated Inspection Report 05000413/2022004 and 05000414/2022004 05000414/LER-2022-003, Manual Reactor Trip and Auxiliary Feedwater System Actuation2022-12-23023 December 2022 Manual Reactor Trip and Auxiliary Feedwater System Actuation IR 05000413/20220112022-12-15015 December 2022 Biennial Problem Identification and Resolution Inspection Report 05000413/2022011 and 05000414/2022011 ML22356A0512022-12-14014 December 2022 Curtiss-Wright Nuclear Division, Letter Regarding Potential Efect in a Configuration of the 11/2 Inch Quick Disconnect Connector Cable Assemblies Supplied to Duke Energy (See Attached Spreadsheet) for a Total of 460 of Connectors Only Suppl 05000414/LER-2022-002, Indications Identified During Reactor Vessel Head Penetration Embedded Flaw Repair Surface Examination2022-12-0606 December 2022 Indications Identified During Reactor Vessel Head Penetration Embedded Flaw Repair Surface Examination ML22096A0032022-11-18018 November 2022 McGuire Nuclear Station and Shearon Harris Nuclear Power Plant Authorization of RA-19-0352 Regarding Use of Alternative for RPV Head Closure Stud Examinations ML22256A2532022-11-14014 November 2022 Issuance of Amendments Regarding the Adoption of Technical Specifications Task Force Traveler TSTF-541, Rev. 2 2024-09-05
[Table view] Category:Operating Report
MONTHYEARML13071A6322010-02-21021 February 2010 Monthly Operating Reports Data ML0921804072009-08-0303 August 2009 Report Pursuant to 10 CFR 50.46, Changes to or Errors in an ECCS Evaluation Model ML0502403712005-01-17017 January 2005 Steam Generator Outage Summary Report for End of Cycle 13 Refueling Outage ML0430706162004-10-21021 October 2004 Steam Generator Tube Plugging Report 2 End of Core (EOC) 13 ML0402105022004-01-12012 January 2004 January 2004 Cycle 13 Core Operating Limits Report Revision 23 ML0222401232002-07-31031 July 2002 Duke Energy Corp., Core Operating Report for Catawba Unit 2 Cycle 12, Revision 21 2010-02-21
[Table view] |
Text
Duke GARY R. PETERSON Vice President O Power Catawba Nuclear Station A Duke Energy Company Duke Power CN01 VP / 4800 Concord Rd.
York, SC 29745 803 831 4251 803 831 3221 fax grpeters@duke-energy. corn July 31, 2002 U.S. Nuclear Regulatory Commission ATTENTION: Document Control Desk Washington, D.C. 20555-0001
Subject:
Duke Energy Corporation Catawba Nuclear Station Unit 2 Docket No.: 50-414 Core Operating Limits Report (COLR)
Catawba Unit 2 Cycle 12, Revision 21 Attached, pursuant to Catawba Technical Specification 5.6.5, is an information copy of the Core Operating Limits Report for Catawba Unit 2 Cycle 12, Revision 21.
This letter and attachment do not contain any commitments.
Please direct any questions or concerns to George Strickland at (803) 831-3585.
G. R. Peterson Attachment www. duke-energy.corn
U. S. Nuclear Regulatory Commission July 31, 2002 Page 2 xc w/att:
L. A. Reyes U. S. Nuclear Regulatory Commission Regional Administrator, Region II Atlanta Federal Center 61 Forsyth St., SW, Suite 23T85 Atlanta, GA 30303 C. P. Patel NRC Senior Project Manager (CNS)
U. S. Nuclear Regulatory Commission Mail Stop 0-8H12 Washington, DC 20555-0001 D. J. Roberts Senior Resident Inspector (CNS)
U. S. Nuclear Regulatory Commission Catawba Nuclear Site
CNEI-0400-25 Page 1 of 27 Revision 21 Catawba Unit 2 Cycle 12 Core Operating Limits Report Revision 21 July 2002 Duke Power Company Date Prepared By: ~%GV~A) r:) bZL 7/:Z.VY/o Checked By:
7AM 2-Checked By: A(-z~
Approved By:
QA Condition 1 The information presented in this report has been prepared and issued in accordance with Catawba Technical Specification 5.6.5.
CNEI-0400-25 Page 2 of 27 Revision 21 Catawba 2 Cycle 12 Core Operating Limits Report IMPLEMENTATION INSTRUCTIONS FOR REVISION 21 Revision 21 of the Catawba Unit 2 COLR must be implemented to meet the requirements of Technical Specification Amendment 192.
CNEI-0400-25 Page 3 of 27 Revision 21 Catawba 2 Cycle 12 Core Operating Limits Report REVISION LOG Revision Effective Date Pages Affected COLR Revisions 1-13 N/A N/A C2C06 - C2C09 Revision 14 August 1998 N/A C2C 10 COLR Revision 15 October 1998 N/A C2C 10 COLR rev 1 Revision 16 December 1998 N/A C2C10 COLR rev 2 Revision 17 February 2000 N/A C2CI1 COLR Revision 18 February 2001 N/A C2C11 COLR rev 1 Revision 19 September 2001 ALL C2C12 COLR Revision 20 September 2001 1,2,3,4,25,26,27 C2C12 COLR rev I Revision 21 July 2002 1-4, 5a, 5b, 5c C2C 12 COLR rev 2
CNEI-0400-25 Page 4 of 27 Revision 21 Catawba 2 Cycle 12 Core Operating Limits Report INSERTION SHEET FOR REVISION 21 Remove pages Insert Rev. 21 pages 1,2,3,4 1,2,3,4,5a,5b,5c
CNEI-0400-25 Page 5a of 27 Revision 21 Catawba 2 Cycle 12 Core Operating Limits Report 1.1 Analytical Methods The analytical methods used to determine core operating limits for parameters identified in Technical Specifications and previously reviewed and approved by the NRC are as follows.
- 1. WCAP-9272-P-A, "WESTINGHOUSE RELOAD SAFETY EVALUATION METHODOLOGY," (W Proprietary).
Revision 0 Report Date: July 1985 Not Used for C2C12
- 2. WCAP-10054-P-A, "Westinghouse Small Break ECCS Evaluation Model using the NOTRUMP Code, "(_W Proprietary).
Revision 0 Report Date: August 1985
- 3. WCAP-10266-P-A, "THE 1981 VERSION OF WESTINGHOUSE EVALUATION MODEL USING BASH CODE", (W Proprietary).
Revision 2 Report Date: March 1987 Not Used for C2C12
- 4. WCAP-12945-P-A, Volume I and Volumes 2-5, "Code Qualification Document for Best Estimate Loss of Coolant Analysis," (W Proprietary).
Revision: Volume 1 (Revision 2) and Volumes 2-5 (Revision 1)
Report Date: March 1998
- 5. BAW-10168P-A, "B&W Loss-of-Coolant Accident Evaluation Model for Recirculating Steam Generator Plants," (B&W Proprietary).
Revision 1 SER Date: January 22, 1991 Revision 2 SER Dates: August 22, 1996 and November 26, 1996.
Revision 3 SER Date: June 15, 1994.
Not Used for C2C12
CNEI-0400-25 Page 5b of 27 Revision 21 Catawba 2 Cycle 12 Core Operating Limits Report 1.1 Analytical Methods (continued)
- 6. DPC-NE-3000PA, "Thermal-Hydraulic Transient Analysis Methodology," (DPC Proprietary).
Revision 2 SER Date: October 14, 1998
- 7. DPC-NE-3001PA, "Multidimensional Reactor Transients and Safety Analysis Physics Parameter Methodology," (DPC Proprietary).
Revision 0 Report Date: November 1991
- 8. DPC-NE-3002A, "FSAR Chapter 15 System Transient Analysis Methodology".
Revision 3 SER Date: February 5, 1999
- 9. DPC-NE-2004P-A, "Duke Power Company McGuire and Catawba Nuclear Stations Core Thermal-Hydraulic Methodology using VIPRE-01," (DPC Proprietary).
Revision I SER Date: February 20, 1997
- 10. DPC-NE-2005P-A, "Thermal Hydraulic Statistical Core Design Methodology," (DPC Proprietary).
Revision I SER Date: November 7, 1996
- 11. DPC-NE-2008P-A, "Fuel Mechanical Reload Analysis Methodology Using TACO3," (DPC Proprietary).
Revision 0 SER Date: April 3, 1995
- 12. DPC-NE-2009-P-A, "Westinghouse Fuel Transition Report," (DPC Proprietary).
Revision 0 SER Date: September 22, 1999
- 13. DPC-NE-1004A, "Nuclear Design Methodology Using CASMO-3/SIMULATE-3P."
Revision I SER Date: April 26, 1996
CNEI-0400-25 Page 5c of 27 Revision 21 Catawba 2 Cycle 12 Core Operating Limits Report 1.1 Analytical Methods (continued)
- 14. DPC-NF-2010A, "Duke Power Company McGuire Nuclear Station Catawba Nuclear Station Nuclear Physics Methodology for Reload Design."
Revision 0 Report Date: June 1985
- 15. DPC-NE-201 IPA, "Duke Power Company Nuclear Design Methodology for Core Operating Limits of Westinghouse Reactors," (DPC Proprietary).
Revision 0 Report Date: March 1990