American Electric Power Cook Nudear Plant One Cook Place Brdgman, M149106 6164655901 AMERICAN ELECTRIC POWER July 12, 2002 AEP:NRC:2691-16 DocketNos.
50-315 50-316 U. S. Nuclear Regulatory Commission Attn: Document Control Desk Mail Stop O-Pl-17 Washington, DC 20555-0001 Donald C. Cook Nuclear Plant Units 1 and 2 MONTHLY OPERATING REPORT Pursuant to the requirements of Donald C. Cook Nuclear Plant Unit 1 and Unit 2 Technical Specification 6.9.1.8, the attached Monthly Operating Report for June 2002 is submitted.
Sincerely, Scot A. Greenlee Director, Nuclear Technical Services INJ/pae Attachments 0 :.- A l,/d,()h:,
U. S. Nuclear Regulatory Commission Page 2 c: ANI Nuclear Engineering Department G. P Arent A. C. Bakken, III L. Brandon - Department of Health G. T. Gaffney - Canton S. A. Greenlee S. Hamming - Department of Labor RAF Harris INPO Records Center B. Lewis - McGraw-Hill Companies D. H. Malin B. A. McIntyre NRC Project Manager - NRR NRC Region III NRC Resident Inspector D. W. Paul - Columbus J. E. Pollock W. H. Schalk AEP:NRC:2691-16
N.R.C. OPERATING DATA REPORT DOCKET NO.
50-315 DATE 7/2/02 COMPLETED BY RAF Harris TELEPHONE 616-465-5901 OPERATING STATUS
- 1. Unit Name D. C. Cook Unit 1 Notes:
- 2. Reporting Period Jun-02
- 3. Licensed Thermal Power (MWt) 3250
- 4. Name Plate Rating (Gross MWe) 1152
- 5. Design Electrical Rating (Net MWe) 1020
- 6. Maximum Dependable Capacity(GROSS MWe' 1056
- 7. Maximum Dependable Capacity (Net MWe) 1000
- 8. If Changes Occur in Capacity Ratings (Items no. 3 through 7) Since Last Report Give Reasons
- 9. Power Level To Which Restricted. If Any (Net MWe)
- 10. Reasons For Restrictions.
This Mo.
Yr. to Date
- 11. Hours in Reporting Period 720.0 4343.0
- 12. No. of Hrs. Reactor Was Critical 459.2 3410.3
- 13. Reactor Reserve Shutdown Hours 0.0 0.0
- 14. Hours Generator on Line 426.5 3366.5
- 15. Unit Reserve Shutdown Hours 0.0 0.0
- 16. Gross Therm. Energy Gen. (MWH) 1156568.4 10539812.4
- 17. Gross Elect. Energy Gen. (MWH) 361430.0 3419170.0
- 18. Net Elect. Energy Gen. (MWH) 346465.0 3305357.6
- 19. Unit Service Factor 59.2 77.5
- 20. Unit Availability Factor 59.2 77.5
- 21. Unit Capacity Factor (MDC Net) 48.1 76.1
- 22. Unit Capacity Factor (DER Net) 47.2 74.6
- 23. Unit Forced Outage Rate 16.8 2.8
- 24. Shutdowns Scheduled over Next Six Months (Type,Date,and Duration):
Cumm.
241031.0 162931.6 463.0 160271.9 321.0 476045119.4 154651990.0 148839651.5 67.0 67.0 63.2 62.0 19.6
- 25. If Shut Down At End of Report Period, Est'd Date of Startup:
- 26. Units in Test Status (Prior to Commercial Operation):
INITIAL CRITICALITY INITIAL ELECTRICITY COMMERCIAL OPERATION Forecast Achieved
AVERAGE DAILY POWER LEVEL (MWe-Net)
DOCKET NO.
UNIT DATE COMPLETED BY TELEPHONE 50-315 ONE 02-Jul-02 RAF Harris 616-465-5901 MONTH Jun-02 AVERAGE DAILY POWER LEVEL DAY 0
0 0
0 0
0 0
0 38 194 377 612 712 489 0
0 AVERAGE DAILY POWER LEVEL 6117/02 6/18/02 6/19/02 6120/02 6/21/02 6/22/02 6/23/02 6/24/02 6/25/02 6/26/02 6/27/02 6/28/02 6/29/02 6/30/02 0
274 749 986 1005 1013 1008 1003 1001 998 993 980 1004 1000 DAY 6/1/02 6/2/02 6/3/02 6/4/02 6/5/02 6/6/02 6/7/02 6/8/02 6/9/02 6/10/02 6/11/02 6/12/02 6/13/02 6114/02 6/15/02 6/16/02
DOCKET NO.
UNIT NAME DATE COMPLETED BY TELEPHONE PAGE 50- 315 D.C. Cook Unit 1 July 2, 2002 N Jackiw 616-465-5901 1 of 1 UNIT SHUTDOWNS AND POWER REDUCTIONS - June 2002 METHOD OF SHUTTING LICENSEE DURATION DOWN EVENT SYSTEM COMPONENT CAUSE AND CORRECTIVE ACTION NO.
DATE TYPE' HOURS REASON2 REACTOR' REPORT NO.
CODE 4 CODE 5 TO PREVENT RECURRENCE 0204 020504 S
207.5 C
2 Scheduled Unit 1 Refueling Outage (UIC18).
0207 020614 F
86.0 A
2 2002-005 SJ P
Unit 1 shutdown due to feedwater pump trip attributed to debris. Outage extended to perform maintenance on steam generator stop valve and control rod system.
"1 IYP-'E:
F: Forced S: Scheduled 2 REASON:
A: Equipment Failure (Explain)
B: Maintenance or Test C: Refueling D: Regulatory Restriction E: Operator Training and License Examination F: Administrative G: Operational Error (Explain)
H: Other (Explain) 3 METHOD:
1: Manual 2: Manual Scram 3: Automatic Scram 4: Other (Explain) 4 SYSTEM:
Exhibit G - Instructions for preparation of data entry sheets for Licensee Event Report (LER) File (NUREG 0161) 5 COMPONENT:
Exhibit I: Same Source
N.R.C. OPERATING DATA REPORT DOCKET NO.
50-316 DATE 7/2/02 COMPLETED BY RAF Harris TELEPHONE 616-465-5901 OPERATING STATUS
- 1. Unit Name D.C. Cook Unit 2 Notes:
- 2. Reporting Period Jun-02
- 3. Licensed Thermal Power (MWt) 3411
- 4. Name Plate Rating (Gross MWe) 1133
- 5. Design Electrical Rating (Net MWe) 1090
- 6. Maximum Dependable Capacity(GROSS MWe 1100
- 7. Maximum Dependable Capacity (Net MWe) 1060
- 8. If Changes Occur in Capacity Ratings (Items no. 3 through 7) Since Last Report Give Reasons
- 9. Power Level To Which Restricted. If Any (Net MWe)
- 10. Reasons For Restrictions.
This Mo.
Yr. to Date
- 11. Hours in Reporting Period 720.0 4343.0
- 12. No. of Hrs. Reactor Was Critical 706.8 3226.9
- 13. Reactor Reserve Shutdown Hours 0.0 0.0
- 14. Hours Generator on Line 690.5 3124.4
- 15. Unit Reserve Shutdown Hours 0.0 0.0
- 16. Gross Therm. Energy Gen. (MWH) 2316988.6 10154336.9
- 17. Gross Elect. Energy Gen. (MWH) 745220.0 3319970.0
- 18. Net Elect. Energy Gen. (MWH) 720284.5 3211880.3
- 19. Unit Service Factor 95.9 71.9
- 20. Unit Availability Factor 95.9 71.9
- 21. Unit Capacity Factor (MDC Net) 94.4 69.8
- 22. Unit Capacity Factor (DER Net) 91.8 67.8
- 23. Unit Forced Outage Rate 4.1 7.5
- 24. Shutdowns Scheduled over Next Six Months (Type,Date,and Duration):
- 25. If Shut Down At End of Report Period, Est'ed Date of Startup:
- 26. Units in Test Status (Prior to Commercial Operation):
Forecast Achieved INITIAL CRITICALITY INITIAL ELECTRICITY COMMERCIAL OPERATION Cumm.
215177.0 137331.9 0.0 133526.3 0.0 416981686.2 135146480.0 130276934.2 62.7 62.7 58.3 56.7 24.3
AVERAGE DAILY POWER LEVEL (MWe-Net)
DOCKET NO.
UNIT DATE COMPLETED BY TELEPHONE 50-316 TWO 2-Jul-02 RAF Harris 616-465-5901 MONTH Jun-02 AVERAGE DAILY POWER LEVEL DAY 0
306 1009 1084 1076 1093 1088 1081 1089 1071 1077 1066 1076 1078 1065 1064 AVERAGE DAILY POWER LEVEL 6/17/02 6/18/02 6/19/02 6/20/02 6/21/02 6/22/02 6/23/02 6/24/02 6/25/02 6/26/02 6/27/02 6/28/02 6/29/02 6/30/02 1056 1061 1064 1060 1052 1051 1047 1055 1038 1038 1044 1047 1036 1042 DAY 6/1/02 612/02 6/3/02 6/4/02 6/5/02 6/6/02 6/7/02 6/8/02 6/9/02 6/10/02 6/11/02 6/12/02 6/13/02 6/14/02 6/15/02 6/16/02
DOCKET NO.
UNIT NAME DATE COMPLETED BY TELEPHONE PAGE 50 -316 D.C. Cook Unit 2 July 2, 2002 IN Jackiw 616-465-5901 1 of 1 UNIT SHUTDOWNS AND POWER REDUCTIONS - June 2002 METHOD OF SHUTTING LICENSEE DURATION DOWN EVENT SYSTEM COMPONENT CAUSE AND CORRECTIVE ACTION NO, DATE TYPE1 HOURS REASON 2 REACTOR 3 REPORT NO.
CODE4 CODE 5 TO PREVENT RECURRENCE 0206 020525 F
29.5 A
2 SB ISV Unit was shutdown due a turbine stop "valve body steam leak.
1 TYPE:
F: Forced S: Scheduled 2 REASON:
A: Equipment Failure (Explain)
B: Maintenance or Test C: Refueling D: Regulatory Restriction E: Operator Training and License Examination F: Administrative G: Operational Error (Explain)
H: Other (Explain) 3 METHOD:
1: Manual 2: Manual Scram 3: Automatic Scram 4: Other (Explain) 4 SYSTEM:
Exhibit G - Instructions for preparation of data entry sheets for Licensee Event Report (LER) File (NUREG 0161) 5 COMPONENT:
Exhibit I: Same Source