June 2002 Monthly Operating Report for Donald C Cook Nuclear Plant Units 1 and 2
ML021960456
Person / Time
Site: Cook  American Electric Power icon.png
Issue date: 07/12/2002
From: Greenlee S
American Electric Power Co
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
AEP:NRC:2691-16
Download: ML021960456 (8)


Text

American Electric Power Cook Nudear Plant One Cook Place Brdgman, M149106 6164655901 AMERICAN ELECTRIC POWER July 12, 2002 AEP:NRC:2691-16 DocketNos.

50-315 50-316 U. S. Nuclear Regulatory Commission Attn: Document Control Desk Mail Stop O-Pl-17 Washington, DC 20555-0001 Donald C. Cook Nuclear Plant Units 1 and 2 MONTHLY OPERATING REPORT Pursuant to the requirements of Donald C. Cook Nuclear Plant Unit 1 and Unit 2 Technical Specification 6.9.1.8, the attached Monthly Operating Report for June 2002 is submitted.

Sincerely, Scot A. Greenlee Director, Nuclear Technical Services INJ/pae Attachments 0 :.- A l,/d,()h:,

U. S. Nuclear Regulatory Commission Page 2 c: ANI Nuclear Engineering Department G. P Arent A. C. Bakken, III L. Brandon - Department of Health G. T. Gaffney - Canton S. A. Greenlee S. Hamming - Department of Labor RAF Harris INPO Records Center B. Lewis - McGraw-Hill Companies D. H. Malin B. A. McIntyre NRC Project Manager - NRR NRC Region III NRC Resident Inspector D. W. Paul - Columbus J. E. Pollock W. H. Schalk AEP:NRC:2691-16

N.R.C. OPERATING DATA REPORT DOCKET NO.

50-315 DATE 7/2/02 COMPLETED BY RAF Harris TELEPHONE 616-465-5901 OPERATING STATUS

1. Unit Name D. C. Cook Unit 1 Notes:
2. Reporting Period Jun-02
3. Licensed Thermal Power (MWt) 3250
4. Name Plate Rating (Gross MWe) 1152
5. Design Electrical Rating (Net MWe) 1020
6. Maximum Dependable Capacity(GROSS MWe' 1056
7. Maximum Dependable Capacity (Net MWe) 1000
8. If Changes Occur in Capacity Ratings (Items no. 3 through 7) Since Last Report Give Reasons
9. Power Level To Which Restricted. If Any (Net MWe)
10. Reasons For Restrictions.

This Mo.

Yr. to Date

11. Hours in Reporting Period 720.0 4343.0
12. No. of Hrs. Reactor Was Critical 459.2 3410.3
13. Reactor Reserve Shutdown Hours 0.0 0.0
14. Hours Generator on Line 426.5 3366.5
15. Unit Reserve Shutdown Hours 0.0 0.0
16. Gross Therm. Energy Gen. (MWH) 1156568.4 10539812.4
17. Gross Elect. Energy Gen. (MWH) 361430.0 3419170.0
18. Net Elect. Energy Gen. (MWH) 346465.0 3305357.6
19. Unit Service Factor 59.2 77.5
20. Unit Availability Factor 59.2 77.5
21. Unit Capacity Factor (MDC Net) 48.1 76.1
22. Unit Capacity Factor (DER Net) 47.2 74.6
23. Unit Forced Outage Rate 16.8 2.8
24. Shutdowns Scheduled over Next Six Months (Type,Date,and Duration):

Cumm.

241031.0 162931.6 463.0 160271.9 321.0 476045119.4 154651990.0 148839651.5 67.0 67.0 63.2 62.0 19.6

25. If Shut Down At End of Report Period, Est'd Date of Startup:
26. Units in Test Status (Prior to Commercial Operation):

INITIAL CRITICALITY INITIAL ELECTRICITY COMMERCIAL OPERATION Forecast Achieved

AVERAGE DAILY POWER LEVEL (MWe-Net)

DOCKET NO.

UNIT DATE COMPLETED BY TELEPHONE 50-315 ONE 02-Jul-02 RAF Harris 616-465-5901 MONTH Jun-02 AVERAGE DAILY POWER LEVEL DAY 0

0 0

0 0

0 0

0 38 194 377 612 712 489 0

0 AVERAGE DAILY POWER LEVEL 6117/02 6/18/02 6/19/02 6120/02 6/21/02 6/22/02 6/23/02 6/24/02 6/25/02 6/26/02 6/27/02 6/28/02 6/29/02 6/30/02 0

274 749 986 1005 1013 1008 1003 1001 998 993 980 1004 1000 DAY 6/1/02 6/2/02 6/3/02 6/4/02 6/5/02 6/6/02 6/7/02 6/8/02 6/9/02 6/10/02 6/11/02 6/12/02 6/13/02 6114/02 6/15/02 6/16/02

DOCKET NO.

UNIT NAME DATE COMPLETED BY TELEPHONE PAGE 50- 315 D.C. Cook Unit 1 July 2, 2002 N Jackiw 616-465-5901 1 of 1 UNIT SHUTDOWNS AND POWER REDUCTIONS - June 2002 METHOD OF SHUTTING LICENSEE DURATION DOWN EVENT SYSTEM COMPONENT CAUSE AND CORRECTIVE ACTION NO.

DATE TYPE' HOURS REASON2 REACTOR' REPORT NO.

CODE 4 CODE 5 TO PREVENT RECURRENCE 0204 020504 S

207.5 C

2 Scheduled Unit 1 Refueling Outage (UIC18).

0207 020614 F

86.0 A

2 2002-005 SJ P

Unit 1 shutdown due to feedwater pump trip attributed to debris. Outage extended to perform maintenance on steam generator stop valve and control rod system.

"1 IYP-'E:

F: Forced S: Scheduled 2 REASON:

A: Equipment Failure (Explain)

B: Maintenance or Test C: Refueling D: Regulatory Restriction E: Operator Training and License Examination F: Administrative G: Operational Error (Explain)

H: Other (Explain) 3 METHOD:

1: Manual 2: Manual Scram 3: Automatic Scram 4: Other (Explain) 4 SYSTEM:

Exhibit G - Instructions for preparation of data entry sheets for Licensee Event Report (LER) File (NUREG 0161) 5 COMPONENT:

Exhibit I: Same Source

N.R.C. OPERATING DATA REPORT DOCKET NO.

50-316 DATE 7/2/02 COMPLETED BY RAF Harris TELEPHONE 616-465-5901 OPERATING STATUS

1. Unit Name D.C. Cook Unit 2 Notes:
2. Reporting Period Jun-02
3. Licensed Thermal Power (MWt) 3411
4. Name Plate Rating (Gross MWe) 1133
5. Design Electrical Rating (Net MWe) 1090
6. Maximum Dependable Capacity(GROSS MWe 1100
7. Maximum Dependable Capacity (Net MWe) 1060
8. If Changes Occur in Capacity Ratings (Items no. 3 through 7) Since Last Report Give Reasons
9. Power Level To Which Restricted. If Any (Net MWe)
10. Reasons For Restrictions.

This Mo.

Yr. to Date

11. Hours in Reporting Period 720.0 4343.0
12. No. of Hrs. Reactor Was Critical 706.8 3226.9
13. Reactor Reserve Shutdown Hours 0.0 0.0
14. Hours Generator on Line 690.5 3124.4
15. Unit Reserve Shutdown Hours 0.0 0.0
16. Gross Therm. Energy Gen. (MWH) 2316988.6 10154336.9
17. Gross Elect. Energy Gen. (MWH) 745220.0 3319970.0
18. Net Elect. Energy Gen. (MWH) 720284.5 3211880.3
19. Unit Service Factor 95.9 71.9
20. Unit Availability Factor 95.9 71.9
21. Unit Capacity Factor (MDC Net) 94.4 69.8
22. Unit Capacity Factor (DER Net) 91.8 67.8
23. Unit Forced Outage Rate 4.1 7.5
24. Shutdowns Scheduled over Next Six Months (Type,Date,and Duration):
25. If Shut Down At End of Report Period, Est'ed Date of Startup:
26. Units in Test Status (Prior to Commercial Operation):

Forecast Achieved INITIAL CRITICALITY INITIAL ELECTRICITY COMMERCIAL OPERATION Cumm.

215177.0 137331.9 0.0 133526.3 0.0 416981686.2 135146480.0 130276934.2 62.7 62.7 58.3 56.7 24.3

AVERAGE DAILY POWER LEVEL (MWe-Net)

DOCKET NO.

UNIT DATE COMPLETED BY TELEPHONE 50-316 TWO 2-Jul-02 RAF Harris 616-465-5901 MONTH Jun-02 AVERAGE DAILY POWER LEVEL DAY 0

306 1009 1084 1076 1093 1088 1081 1089 1071 1077 1066 1076 1078 1065 1064 AVERAGE DAILY POWER LEVEL 6/17/02 6/18/02 6/19/02 6/20/02 6/21/02 6/22/02 6/23/02 6/24/02 6/25/02 6/26/02 6/27/02 6/28/02 6/29/02 6/30/02 1056 1061 1064 1060 1052 1051 1047 1055 1038 1038 1044 1047 1036 1042 DAY 6/1/02 612/02 6/3/02 6/4/02 6/5/02 6/6/02 6/7/02 6/8/02 6/9/02 6/10/02 6/11/02 6/12/02 6/13/02 6/14/02 6/15/02 6/16/02

DOCKET NO.

UNIT NAME DATE COMPLETED BY TELEPHONE PAGE 50 -316 D.C. Cook Unit 2 July 2, 2002 IN Jackiw 616-465-5901 1 of 1 UNIT SHUTDOWNS AND POWER REDUCTIONS - June 2002 METHOD OF SHUTTING LICENSEE DURATION DOWN EVENT SYSTEM COMPONENT CAUSE AND CORRECTIVE ACTION NO, DATE TYPE1 HOURS REASON 2 REACTOR 3 REPORT NO.

CODE4 CODE 5 TO PREVENT RECURRENCE 0206 020525 F

29.5 A

2 SB ISV Unit was shutdown due a turbine stop "valve body steam leak.

1 TYPE:

F: Forced S: Scheduled 2 REASON:

A: Equipment Failure (Explain)

B: Maintenance or Test C: Refueling D: Regulatory Restriction E: Operator Training and License Examination F: Administrative G: Operational Error (Explain)

H: Other (Explain) 3 METHOD:

1: Manual 2: Manual Scram 3: Automatic Scram 4: Other (Explain) 4 SYSTEM:

Exhibit G - Instructions for preparation of data entry sheets for Licensee Event Report (LER) File (NUREG 0161) 5 COMPONENT:

Exhibit I: Same Source