j Florida Power A Progress Energy Company Crystal River Nuclear Plant Docket No. 50-302 Operating License No. DPR-72 Ref: ITS 5.7.1.2 June 12, 2002 3F0602-04 U.S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, DC 20555-0001

Subject:

Crystal River Unit 3 - Monthly Operating Report

Dear Sir:

Florida Power Corporation hereby submits the Crystal River Unit 3 (CR-3) May 2002 Monthly Operating Report in accordance with CR-3 Improved Technical Specification 5.7.1.2.

If you have any questions regarding this submittal, please contact Mr. Sid Powell, Supervisor, Licensing and Regulatory Programs at (352) 563-4883.

Sincerely, ZJ. A. Franke Plant General Manager JAF/ff Attachment xc:

Regional Administrator, Region II Senior Resident Inspector NRR Project Manager Crystal River Nuclear Pla it i 5760 V Po wer Liwe Street Crys al River, FL 34428

APPENDIX A OPERATING DATA REPORT DOCKET NO.

UNIT NAME DATE COMPLETED BY TELEPHONE REPORTING PERIOD (Month/Year):

50-302 FLCRP-3 June 3, 2002 J.E. Lane '

ý70 (352) 795-6486 x3698 May 2002 MONTH DESIGN ELECTRICAL. RATING (MWe-Net)

MAXIMUM DEPENDABLE CAPACITY (Mwe-Net)

NUMBER OF HOURS REACTOR WAS CRITICAL NUMBER OF HOURS THE GENERATOR WAS ON LINE UNIT RESERVE SHUTDOWN HOURS NET ELECTRICAL ENERGY GENERATED (MWH) 1 2

3 4

5 6

YEAR TO DATE 825 834 CUMULATIVE 725.0 717.4 0.0 594,143 3,604.0 3,596.4 0.0 3,037,149 153,011 150,719 0

117,006,412

APPENDIX B UNIT SHUTDOWNS DOCKET NO.

UNIT NAME DATE COMPLETED BY TELEPHONE 50-302 FLCRP-3 June 3, 2002 J. E. Lane (352) 795-6486 x3698 REPORTING PERIOD:

May 2002

SUMMARY

Crystal River Unit 3 operated at full power for the majority of the month of May.

There was a planned outage from 5/17/02 to 5/19/02 to repair an oil leak on Reactor Coolant Pump 1A (RCP-1A) motor.

(1) Reason:

A-EQUIPMENT FAILURE (Explain)

B-MAINTENANCE OR TEST C-REFUELING D-REGULATORY RESTRICTION E-OPERATOR TRAINING / LICENSE EXAMINATION F-ADMINISTRATIVE G-OPERATIONAL ERROR (Explain)

H-OTHER (Explain)

(2) Method:

1-MANUAL 2-MANUAL TRIP / SCRAM 3-AUTO TRIP / SCRAM 4-CONTINUATION 5-OTHER (Explain)

No.

Date Type Duration Reason Method of Cause / Corrective Actions F: Forced (Hours)

(1)

Shutting S: Scheduled Down (2)

Comments 2002-01 5/18/02 S

26.6 B

1 The unit was taken off-line to repair an oil leak on RCP-1A motor lower oil reservoir. Total generation lost was 34,543 MWHs. During the ramp down, 5,013 MWHs were lost, 23,582 MWHs were lost while at 0%

power, and 5,948 MWHs were lost during escalation back to 100% power.