ML050950302
| ML050950302 | |
| Person / Time | |
|---|---|
| Site: | Ginna |
| Issue date: | 03/30/2005 |
| From: | Korsnick M Constellation Energy Group |
| To: | Skay D Document Control Desk, Office of Nuclear Reactor Regulation |
| References | |
| Download: ML050950302 (12) | |
Text
Maria Korsnick 1503 Lake Road Vice President Ontario, New York 14519-9364 585.771.3494 585.771.3943 Fax maria.korsnick@ constellation.com Constellation Energy R.E. Ginna Nuclear Power Plant March 30, 2005 Ms. Donna M. Skay Office of Nuclear Reactor Regulation U.S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, D.C. 20555-0001
Subject:
Transmittal of Core Operating Limits Report (COLR)
R.E. Ginna Nuclear Power Plant Docket No. 50-244
Dear Ms. Skay:
In accordance with the R.E. Ginna Nuclear Power Plant Improved Technical Specification 5.6.5, which requires the submittal of revisions to the COLR, the attached report is hereby submitted.
Should there be any questions, please contact Thomas L. Harding at (585)-771-3384 for additional information.
Very truly yours, M G.
snic Attachment xc:
Ms. Donna M. Skay (Mail Stop 0-8-C2)
Project Directorate I Division of Licensing Project Management Office of Nuclear Reactor Regulation U.S. Nuclear Regulatory Commission 11555 Rockville Pike Rockville, MD 20852 Regional Administrator, Region 1 U.S. Nuclear Regulatory Commission 475 Allendale Road King of Prussia, PA 19406 U.S. NRC Ginna Senior Resident Inspector
/OO/P2fro1
COLR Cycle 32 Constellation Energyo R.E. Ginna Nuclear Power Plant R.E. Ginna Nuclear Power Plant Core Operating Limits Report COLR Cycle 32 Revision 0 Responsible Manager, George Wrobel Effective Date:
3-
- Z - Os 03-29-2005 Controlled Copy No.
Record Cat.# 4.43.2 R.E. Ginna Nuclear Power Plant COLR-1 Revision 0
COLR Cycle 32 1.0 CORE OPERATING LIMITS REPORT This Core Operating Limits Report (COLR) for the R.E. Ginna Nuclear Power Plant has been prepared in accordance with the requirements of Technical Specification 5.6.5.
The Technical Specifications affected by this report are listed below:
3.1.1 SHUTDOWN MARGIN (SDM) 3.1.3 MODERATOR TEMPERATURE COEFFICIENT (MTC) 3.1.5 Shutdown Bank Insertion Limit 3.1.6 Control Bank Insertion Limits 3.2.1 Heat Flux Hot Channel Factor (FQ(Z))
3.2.2 Nuclear Enthalpy Rise Hot Channel Factor (FN AH) 3.2.3 AXIAL FLUX DIFFERENCE (AFD) 3.4.1 RCS Pressure, Temperature, and Flow Departure from Nucleate Boiling (DNB)
Limits 3.9.1 Boron Concentration R.E. Ginna Nuclear Power Plant COLR-2 Revision 0
COLR Cycle 32 2.0 OPERATING LIMITS The cycle-specific parameter limits for the specifications listed in Section 1.0 are presented in the following subsections. These limits have been developed using the NRC approved methodologies specified in Technical Specification 5.6.5. All items that appear in capitalized type are defined in Technical Specification 1.1, Definitions.
2.1 SHUTDOWN MARGIN' (LCO 3.1.1) 2.1.1 The SHUTDOWN MARGIN in MODE 2 with Keff < 1.0 and MODES 3 and 4 shall be greater than or equal to the limits specified in Figure COLR - 1 for the number of reactor coolant pumps in operation (non main feedwater operation).
2.1.2 The SHUTDOWN MARGIN in MODE 4 when both reactor coolant pumps are not OPERABLE and in operation and in MODE 5 shall be greater than or equal to the one loop operation curve of Figure COLR - 1.
2.1.3 The SHUTDOWN MARGIN required in LCO 3.1.4, LCO 3.1.5, LCO 3.1.6, LCO 3.1.8, and LCO 3.4.5 shall be greater than the limits specified in Figure COLR -
I for the number of reactor coolant pumps in operation and the status of the main feedwater system.
2.2 MODERATOR TEMPERATURE COEFFICIENT 1 (LCO 3.1.3) 2.2.1 The Moderator Temperature Coefficient (MTC) limits are:
The BOL ARO/HZP - MTC shall be less positive than +5.0 pcm/0F for power levels below 70% RTP and less than or equal to 0 pcm/OF for power levels at or above 70% RTP.
The EOL ARO/RTP - MTC shall be less negative than -42.9 pcm/OF.
where:
ARO stands for All Rods Out BOL stands for Beginning of Cycle Life EOL stands for End of Cycle Life HZP stands for Hot Zero Power RTP stands for RATED THERMAL POWER R.E. Ginna Nuclear Power Plant COLR-3 Revision 0
COLR Cycle 32 2.3 Shutdown Bank Insertion Limitl (LCO 3.1.5) 2.3.1 The shutdown bank shall be fully withdrawn which is defined as 2 221 steps.
2.4 Control Bank Insertion Limits1 (LCO 3.1.6) 2.4.1 The control banks shall be limited in physical insertion as shown in Figure COLR-2.
2.4.2 The control banks shall be moved sequentially with a 100 (i 5) step overlap between successive banks.
2.5 Heat Flux Hot Channel Factor (FQ(Z)) 2 (LCO 3.2.1) 2.5.1 FQ(Z) * ((F0) *K(Z) / P) when P > 0.5 FQ(Z) * ((FQ) *K(Z) / 0.5) when P
- 0.5 where:
Z is the height in the core, FQ = 2.45, K(Z) is provided in Figure COLR - 3, and P = THERMAL POWER / RATED THERMAL POWER 2.6 Nuclear Enthalpy Rise Hot Channel Factor (FNH)l (LCO 3.2.2) 2.6.1 F NAH
- FRTPAH * (1 + P FAH * (1-P))
where:
FRTPAH= 1.75, PFAH = 0.3, and P = THERMAL POWER / RATED THERMAL POWER R.E. Ginna Nuclear Power Plant COLR-4 Revision 0
COLR Cycle 32 2.7 AXIAL FLUX DIFFERENCE 3 (LCO 3.2.3) 2.7.1 The AXIAL FLUX DIFFERENCE (AFD) target band is +/- 5%. The actual target bands are provided by Procedure RE-11.1.
2.7.2 The AFD acceptable operation limits are provided in Figure COLR - 4.
2.8 RCS Pressure, Temperature, and Flow Departure from Nucleate Boiling (DNB)
Limits4 (LCO 3.4.1) 2.8.1 The pressurizer pressure shall be 2 2205 psig.
2.8.2 The RCS average temperature shall be
- 577.5 "F.
2.8.3 The RCS total flow rate shall be 2 177,300 gpm (includes 4% minimum flow uncertainty per Revised Thermal Design Methodology).
2.9 Boron Concentration1 (LCO 3.9.1) 2.9.1 The boron concentrations of the hydraulically coupled Reactor Coolant System, the refueling canal, and the refueling cavity shall be 2 2300 ppm.
3.0 REFERENCES
- 1.
WCAP-9272-P-A, Westinghouse Reload Safety Evaluation Methodology, July 1985.
- 2.
WCAP-10054-P-A and WCAP-10081-A, "Westinghouse Small Break ECCS Evaluation Model Using the NOTRUMP Code," August 1985.
- 3.
WCAP-10924-P-A, Volume 1, Revision 1, "Westinghouse Large-Break LOCA Best-Estimate Methodology, Volume 1: Model Description and Validation Responses to NRC Questions," and Addenda 1,2,3, December 1988.
- 4.
WCAP-10924-P-A, Volume 2, Revision 2, "Westinghouse Large-Break LOCA Best-Estimate Methodology, Volume 2: Application to Two-Loop PWRs Equipped with Upper Plenum Injection," and Addendum 1, December 1988.
R.E. Ginna Nuclear Power Plant COLR-5 Revision 0
COLR Cycle 32
- 5.
WCAP-10924-P-A, Volume 1, Revision 1, Addendum 4, "Westinghouse Large-Break LOCA Best-Estimate Methodology, Volume 1: Model Description and Validation, Addendum 4: Model Revisions," March 1991.
- 6.
WCAP-1 3677-P-A, "10 CFR 50.46 Evaluation Model Report: WCOBRAITRAC Two-Loop Upper Plenum Injection Model Updates to Support ZIRLOTM Cladding Option,"
February 1994.
- 7.
WCAP-12610-P-A, "VANTAGE + Fuel Assembly Reference Core Report," April 1995.
- 8.
WCAP-8385, "Power Distribution Control and Load Following Procedures - Topical Report,", September 1974.
- 9.
WCAP-1 1397-P-A, "Revised Thermal Design Procedure", April 1989.
R.E. Ginna Nuclear Power Plant COLR-6 Revision 0
COLR Cycle 32
£2.5 OPERATION (0245)
-(02.40)
Z (1(1.AD) 1500 1000 500 0
COOLANT BORON CONCENTRATION (ppm)
.l OeLoopOpeabon -
TwoLOopOperation-nonMFW --
Two Loop Operaon -MFW NOlE:
Two Loop Opertbni n-n MFW nma MMt to maln tedwaltr Sytn1 la not Wopt" Sam g1enn.
TWo Loop OpaMs n - UFW Means tat toe ma& fhwater ayn is aup~ln the Ueair QUWZr t.
Figure COLR - I REQUIRED SHUTDOWN MARGIN R.E. Ginna Nuclear Power Plant COL-R-7 Revision 0
COLR Cycle 32 z 220
=
it
-=-
B 200 v XC 180 1.
~160 (hn CL 140-
- 4 C
AD Ban
, g100 o 80 -
- 60 7 60 m40--------
0 200 0
10 20 30 40 50 60 70 80 90 100 Core Power (Percent of 1520 MWT)
- The fully withdrawn position is defined as 2 221 steps.
Figure COLR -2 CONTROL BANK INSERTION LIMITS R.E. Ginna Nuclear Power Plant COLR-8 Revision 0
COLR Cycle 32 1.2 -
Z1.0 -
.W 0
U
'L 0.8
.6 m
E 0.2 IL.
0
<0.0 E0.0 to_
to Total F0 = 2.450 Eevaton (ft)
K 0.0 1.0 11.783 1.0 I
I I
, I I
I 2.0 4.0 6.0 Elevation (ft)
G 10.0 11.783 fICRE 3 Figure COLR - 3 K(Z) - NORMALIZED FQ(Z) AS A FUNCTION OF CORE HEIGHT R.E. Ginna Nuclear Power Plant COLR-9 Revision 0
COLR Cycle 32 100
-I_
DO NOT OPERATE IN THIS AREA WITH AFD OUTSIDE THE TARGET BAND
(.11,90)
(11.0) 80i.\\
/_
ACCEPTABLE OPEATION WITH AFD T.'
O DE THE..........
a
/
TARGET BAND WITH 1I IR 0
0
.PENALTY 0 o 6DEVIATION e_._
(4{1,60) p1.90) i40 ACCEPTABLE OPERATION 20
-30
-20
-0 0
10 20 30 AXIAL FLUX DIFFERENCE (%)
FT1tIRF A Figure COLR -4 AXIAL FLUX DIFFERENCE ACCEPTABLE OPERATION LIMITS AS A FUNCTION OF RATED THERMAL POWER R.E. Ginna Nuclear Power Plant COLR-1 0 Revision 0
COLR Cycle 32 END NOTES
- 1.
(Limits generated using Reference 1)
- 2.
(Limits generated using References I through 7)
- 3.
(Limits generated using References 1 and 8)
- 4.
(Limits generated using Reference 9)
R.E. Ginna Nuclear Power Plant C01-R-1 I Revision 0