BSEP-86-1536, Monthly Operating Repts for Oct 1986

From kanterella
Jump to navigation Jump to search
Monthly Operating Repts for Oct 1986
ML20212K902
Person / Time
Site: Brunswick  Duke Energy icon.png
Issue date: 10/31/1986
From: Dietz C, Harrison F
CAROLINA POWER & LIGHT CO.
To: Scroggins R
NRC OFFICE OF RESOURCE MANAGEMENT (ORM)
References
BSEP-86-1536, NUDOCS 8701290233
Download: ML20212K902 (12)


Text

.

DOCKET NO.: 050-0325 UNIT: Brunswick 1 DATE: November 1986 COMPLETED BY: Frances Harrison OPERATIONS

SUMMARY

BRUNSWICK UNIT 1 Brunswick Unit 1 operated at a 100 percent availability factor for the month of October with a 96.23 percent capacity factor. There were two power reductions.

Details are in the Unit Shutdowns and Power Reductions sheet.

There are 840 BWR and 160 PWR spent fuel bundles in the Brunswick Unit 1 fuel pool.

8701290233 861 %

PDR ADOCK 05000J24 R PDR -

V

,. ;r c; -

~

jf.'

u ,,

t i ,

CP&L CO- PL NT PERFORMANCE DATA SYSTEM PAGE z i f'

i

RUN DATE=lit/03/06 RUN
TIME. 714:00:51 APPENDIX' B -- ' AVERAGE DAILY POWER LEVEL.

BRUNSWICKLUNIT'i-RPD39

j. Q.

i ,

l DOCKET NO. 050-0325 l~ COMPLETED.BY FRANCES HARRISON

[ , . :r ~J ,

TELEPHONE-(919)457-9521 1

a .

r -t.

-0CTOBER '1986

!, - DAY. AVG 1_ DAILY POWER LEVEL DAY AVG. DAILY. POWER LEVEL-

!' OiWE-NETt (MWE-NET) i 1 -766, i7 773

'2-.v s

,764.

i8 769 3 , 765, 19 777-t i 4- 749 20 776 p .

! 'i . 750 21 773 I

l: '6 767 22 772

!~

769

. 7' 771 23 l l 7 .

i. .

'S 771 24 -754 l

. .)

-9 768 25 745 +

i

?

!~ 10- 770 26 747 ,

t- -,

. - 11. -714 2'l 744 i-

12 ' 773 28 745 l .

?

!. 13 770 29 744

!! . 14' 769 '30 740 l l :. Y i i t

j. is 770 31 728  :

i- .

16 772 4

I 1

5- '!

?.  !

f 1- 1.16 - 8 I

i k >

4

--,.-e-ww, _. . - . - - - _ _ . _ . - - - _ _ _ _ _ . - - ~ . + - --- +-- - -e-

CP6L CO PLANT PERFORMANCE DATA SYSTEM 'PAGE. 1 LRUN'DATE 11/03/86 OPERATING DATA REPORT RPD36 RUN TIME 13:20:40 BRUNSWICK UNIT i DOCKET NO. 050-0325 COMPLETED BY FRANCES HARRISON OPERATING STATUS TELEPHONE (919)457-9521

1. UNIT NAME: BRUNSWICK UNIT i i NOTES i
2. REPORTING PERIOD: OCTOBER 86 1 i 3.. LICENSED THERMAL POWER (MWT): 2436 i i
4. NAMEPLATE RATING (GROSS MWE) 867.0 1 1 5.-DESIGN ELECTRICAL RATING (NET MWE). 821.0 t i
6. MAX DEPENDABLE CAPACITY (GROSS MWE): 815.0 l l

.7 . MAX DEPENDABLE CAPACITY (NET MUE)* 790.0

~


--~~-------------------

8. IF CHANGES DCCUR IN CAPACITY RATINGS (ITEMS 3 THRU 7.) SINCE LAST REPORT, GIVE REASONS:
9. POWER LEVEL TO WHICH RESTRICTED IF ANY (NET MWE):
10. REASONS FOR~ RESTRICTION IF ANY:

THIS YR TU CUMUL MONTH DATE ATIVE

11. HOURS IN REPORTING PERIOD 745.00 7296.00 9436i.00

- 12. NUMBER OF HOURS REACTOR CRITICAL 745.00 6905.26 53736.74

13. REACTOR RESERVE SHUTDOWN HRS .00 .00 1647.10 1 4 .. HOURS GENERATOR ON LINE 745.00 6699.42 50836.80
15. UNIT-RESERVE SHUTDOWN HOURS .00 .00 .00
16. GROSS THERMAL ENERGY GEN. (MWH) 1793856.76 15881546.82 105988210.47
17. GROSS ELEC. ENERGY GEN. (MWH) 584195.00 5190574.00 34941047.00
18. NET ELEC. ENERGY GENERATED (MWH) 566354.00 5029170.00 33587875.00
19. UNIT SERVICE FACTOR 100.00 91.82 60.26

'20. UNIT AVAILADILITY FACTOR 100.00 91.82 60.26

21. UNIT CAP. FACTOR (USING MDC NET) 96.23 G7.25 50.40
22. UNIT CAP. FACTOR (USING DER NET) 92.60 83.96 40.50
23. UNIT FORCED OUTAGE RATE .00 8.18 18.61
24. SHU1 DOWNS SCHED. OVER NEXT 6 MONTHS (TYPE, DATE, AND DURATION OF EACH)
25. IF SHUTDOWN AT END OF REPORT PERIOD, ESTIMATED DATE OF START UP:
26. UNITS IN TEST STATUS (PRIOR TO COMMERCIAL OPERATION) FORCAST ACHEIVED INITIAL CRITICALITY -------- ---- ---

INITIAL ELECTRICITY -------- --------

COMMERCIAL UPERATION - - - - - - ----- --

1.16 7

UNIT SHUTDOWNS AND POWER REDUCTIONS DOCK'ET NO. 050-325 UNIT NAME Brunswick I DATE November 1986 REPORTMONTH 0 ctober 1986 COMPLETED BY Frances Harrison TELEPHONE 919-457-9521

'l n.

i N" Ib'c

, [? '*

h 5') Licensee je, h. Cause & Correceive i 5?  ? 2i5 Everu :s T o. T

$ E jgg Report e N0 V Aciam so Prevent Recurrence c5 86-061 861011 S 00 B 5 N/A Reduced power to perform PT-14.1, Control Rod Operability; PT-8.1.6, Suppression Pool I.evel Indication Operability; and PT-12.6, Breaker Alignment Surveillance.

4 I.

i i

l 2 F: Forced 3 -

4 Reason S Scheduled Method:

A Equipment Failure (Explain) 1-Manual Exhibis G . Instructions B Maintenance of Test for Preparation of Data j 2-Manual Scram. Entry Sheets for Licensee C Refueling D-Regulatory Restriction 3 Automatic Scram. Event Report (LER) File (NUREG-E-Operator Training & License Examination le-Continuations 0161) i F Administralise 5-Load Reductions 1 5 r

G-Operational Error (Explain) (,-Other (9/771 li-Other ( E splainli Exhibit I Same Source i

UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKET NO. 050-0325 -

UNIT NAME Brunswick I DATE November 1986 REPORT MONTif oct ober 1986 COMPLETED BY Francem Harriman TELEPHONE 919-l. s7-9 s ? I

= ~

=_ .

~

u. : 5

, i: E 7 5X Licensee gg g". Cause & Correceive II

i.

5? 4 2sE Event =T q Acn.m so d

$E E j di g Report e NC U Prevent Recurrence 6

4 1 86-062 861'020 S 00 H 5 Loaa reduction (Core Coastdown) o=

i I 2 F: Forced 3 -

4 Reason:

S: Scheduled Method:

A Equipment Failure (Explain) l-Manual Exhibit G Instructisms B. Maintenance of Test for Preparatiini of Data 2-Manual Scram.

C Refueling Entr> Sheers for Licensee 3 Automatic Scram. Event Report (LER) File (NUREG-D Regulatory Restriction E Operator Training & License Examination 4-Continuations 01611 F-Administrative 5-Load Reductions s G Operational Enror (Explain) 6-Gther l'#/77 ) II-Other (E splain) Exhibit I Same Source

.c

-DOCKET NO.: 050-0324 UNIT: Brunswick 2 DATE: November-~1986

' COMPLETED BY: Frances Harrison OPERATIONS

SUMMARY

' BRUNSWICK UNIT'2 Brunswick. Unit-2 operated at a 42.34 percent capacity factor'and a 47.21 percent availability. factor. There was one power reduction and two off-line outages.

- Details are in the Unit Shutdowns and Power Reductions sheet.

.There are 756 BWR and_144 PWR spent fuel bundles-in the Brunswick Unit 2 fuel pool.

DP&L CO PLANT PERFORMANCE DATA SYSTEM PAGE 2 RUN DATE 11/03/06 APPENDIX B - AVERAGE DAILY POWER LEVEL _RPD39 lRUN TIME- 14:00:51 BRUNSWICK UNIT 2 DOCKET NO. 050-0324 i COMPLETED BY FRANCES HARRISON TELEPHONE (919)457-9521 OCTOBER .1986 DAY AVG. DAILY POWER LEVEL DAY AVG. DAILY POWER LEVEL (MWE-NET) (MUE-NET) 1 701 17 732 2 595 18 10 3 -12 19 -7 4 -14 20 -7 5 240 21 -6 6 661 22 -7 7 724 23 -6 8 764 24 -6 9 769 25 -7 10 769 26 -0 ii 739 27 -10 12 765 28 -11 13 761 2Y -12 14 760 30 -13 15 761 31 -14 16 764 1.16 - 0

CP&L.CO- PLANT PERFORMANCE DATA SYSTEM PAGE- 2.

RUM.DATE 11/03/06. OPERATING DATA REPORT RPD36 RUN TIME 14:00:52 BRUNSWICK UNIT 2 DOCKET NO. 050-0324 COMPLETED BY FRANCES HARRISON

' OPERATING STATUS TELEPHONE (919)457-9521

1. UNIT NAME: DRUNSWICK UNIT 2- 1 NOTES I
2. REPORTING PERIOD: OCTOBER 86 1 -l
3. LICENSED THERMAL POWER (MWT): 2436 i  !
4. NAtiEPLATE RATING (GROSS MWE). 867.0 1 1
5. DESIGN. ELECTRICAL RATING (NET MWE)- 821.0 l 1
6. MAX DEPENDABLE CAPACITY (GROSS MWE). 815.0 l l
7. MAX DEPENDADLE CAPACITY ~ (NET MWE)- 790.0 ------------------------------ -
8. IF-CHANGES OCCUR IN CAPACITY RATIiiGS (ITEMS 3 THRU 7) SINCE LAST REPORT, GIVE REASONS- :

9~.-POWER LEVEL TO WilICH RESTRICTED 1F ANY (NET MlvEl 10.. REASONS FOR RESTRICTION IF ANY:

THIS YR TO C U tiU'-

MONTH DATE ATIVE

11. HOURS IN REPORTING PERIOD 745.00 7296.00 96385.00
12. NUMBER OF HOURS REACTOR CRITICAL 386.83 2768.57 57200.93

-13. REACTOR REGERVE SHUIDOWN HRS .00 .00 .00

14. HOURS GENERATOR ON LINE 351.68 2509.34 53600.43 Li 5. UNIT RESERVE SHUTDOWN HOURS .00 .00' .00
16. GROSS THERMAL ENERGY GEN. (MUH) 804552.34 5972144.37 104802016.90-
17. GROSS ELEC. ENERGY GEN. (MWH) 261564.00 1713421.00 34700905.00
18. NET ELEC. ENERGY GENERATED (MWH) 249175.00 1813920.00 33251919.00
19. UNIT SERVICE FACTOR 47.21 35.49 55.61
20. UNIT AVAILABILITY FACTOR 47.21 35.49 55.61 1
21. UNIT CAP. FACTOR (USING MDC NET) 42.34 31.47 43.67
22. UNIi CAP. FACTOR (USING DER NET) 40.74 30.28 42.02 r
23. UNIT FORCED OUTAGE RATE 14.48 10.56 15.25
24. SHllTDOWNS SCHED.'0VER NEXT 6 MONTHS (TYPE, DATE, AND DURATION OF EACH):

' 25. IF SHUTDOWN AT END OF REPORT PERIOD, ESTIMATED DATE OF START UP 11/02/06

, 26. UNITS IN TEST STATUS (PRIOR TO COMhERCIAL OPERATION) FORCAST ACilEIVED INIIIAL CRITICALITY ---- ---

INITIAL ELEC1RICITY -- --

COMMERCIAL OPERATION ------- -- - ---

i.16 - 9

050-0324 .

UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKET UNIT NAME NO. Brunswick 2 DATE November 1986 REPORT MONTH 0 ctober 1986 COMPLETED BY Frances Harrison TELEPHONE 919-457-952I I

- ,, =.5 E g []  ; EX lscensee ,E-t, g * ,- Cause & Currective N" I)J'c i 5?  ? }2 s;,E Event s? E-3

, Acen,n ti,

$5 $ j@g Report * *E 0 g' Prevent Recurrence 6

86-031 861002 F 00 A 5 N/A 2A reactor recirculation pump tripped.

i  : 3 4

F: Forced Reason : Method:

S: Scheduled Exhibis G -Instructions A Equipment Failure (Explain) 1. Manual for Preparation of Data B-Maintenance of Test 2 Manual Scram. Entry Sheets for Licensee C-Refueling 3 Automatic Scram. Event Report (LER) File (NUREG.

D Regulatory Restriction 0161)

E-Operator Training & License Examination 4-Continuations i F Administrative 5-Load Reductions s G-Operational Error (Explain) 6-Other Exhibit I - Same Source

(**/77 ) Il-Ot her (E xplain)

~

UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKET NO 050-0324 UNIT NAME Brunswick 2 DATE unv.-h. ions REPORTMONTH O ctober 1986 COMPLETED BY Frances Harrison l

i TELEPHONE 919-457-952I 1

1 ~. ,

! =_ ,. .5

. E t

N" Date $. j { j ensce ,he Cause & Curreceive

C 5 C 5ga Evens g7 7 v

g c,,, ,,

2O $mj Repon = een v Preveni Recurrence i 6 i

16-032 861003 F 59.6 A 2 i Reactor shut down to meet the

} restarting conditions for the

! ' reactor recirculation pump.

x

' (temperature differential between the reactor coolant within the s dome and the bottom head)

J d

i I

1 .

f I 2 1

F: Fusced 3

  • 4 Reason i S: Scheduled Method:

A Equipment Failure (Explain) Exhibie G. Instructiims l-Manual for Preparation of Data B-Maintenance of Test 2 Manual Scram.

C Refueling Entry Shecis for Licensee i

3 Automatic Scram- Event Report (LER) File INUREG-D-Regulatory Reseriction E-Operator Training & License Examination le-Continuations 01611 s F-Adminisitative 5-Load Reductions s G Operatiinal Error (Explaini 6-Other (9/771 Il-Other (E splaini Eshibii 1 - Same Source

UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKET NO. n n n _n n a' UNIT NAME Brunswick 2 DATE Novamher 1986 REPORTMONTH _ october 1986 COMPLETED BY Pra wa = na rri sor TELEPHONE oto-an7_on91 I

= . ~ =. : .

5 y,, g,,' y 5 _s  ! 25d l'.'*"5" 5*. ga. Cause & Correvive 3

3j 3 f 3 a: Event il . Aaron in o= x 317, g Report e u) U g Prevent Recurrence d

86-039 R6101R S In Progress B .2 -

Stitveillance Outace

,+

I  : 3

  • F: Forced Reason: 4 Method:

5: Scheduled A Equipment Failure (Explain) Exhibit G Instructions l-Manual for Preparation of Data B Maintenance of Test.

C Refueling 2-Manual Scram. Entry Shecis for Licensee D Regulatory Restriction 3-Automatic Scram. Event Report (LER) File (NUREG-E-Operator Training & License Examination 1s-Continuations 0161)

\ F. Administrative G-Operational Error (Explain) 5-Load Reduetions 5 j 1"/77) Il Other (Explaini 6-Other E xhibit I - Ssme Source l -

1 i

CD&L Carolina Power & Light Company Brunswick Steam Electric Plant P. O. Box 10419 Southport, NC 28461-0429 November 3, 1986 FILE: B09-13510C SERIAL: BSEP/86-1536 Mr. R. M. Scroggins, Director Office of Resource Management U.S. Nuclear Regulatory Commission Washington, DC 20555 BRUNSWICK STEAM ELECTRIC PLANT UNITS 1 AND 2 DOCKET NOS. 50-325 AND 50-324 LICENSE NOS. DPR-71 AND DPR-62 MONTHLY OPERATING REPORT

Dear Mr. Scroggins:

In accordance with Technical Specification 6.9.1.6 for the Brunswick Steam Electric Plant, Units 1 and 2, Carolina Power & Light Company herewith submits the report of operating statistics and shutdown experience for the month of October 1986.

Very truly yours, fDJ.Ch n CR0 C. R. Dietz, General Manager Brunswick Steam Electric Plant FH/mbh MSC/85-0014 Enclosures cc: Mr. M. R. Beebe Dr. J. N. Grace Mr. M. D. Hill Mr. P. W. Howe Mr. C. F. Lassiter Mr. R. G. Oehl Ms. H. M. Shaver Ms. D. J. Vicks INPO f>;,