BECO-LTR-94-117, Forwards Response to 941019 RAI Re Reactor Core Shroud at Plant.Proprietary Response to Question 4 Also Encl. Proprietary Response Withheld

From kanterella
Jump to navigation Jump to search
Forwards Response to 941019 RAI Re Reactor Core Shroud at Plant.Proprietary Response to Question 4 Also Encl. Proprietary Response Withheld
ML20076L430
Person / Time
Site: Pilgrim
Issue date: 10/28/1994
From: Olivier L
BOSTON EDISON CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
Shared Package
ML19312B535 List:
References
BECO-LTR-94-117, NUDOCS 9411030222
Download: ML20076L430 (12)


Text

,

~!

G Boston Edison Pilgrim Nuclear Power Station .

Rocky Hi!I Road Plyrnouth. Massachusetts 02360 L. J. Olivler Vice President Nuclear operations October 28, 1994 and station oirector BECo Ltr. #94-117 U.S. Nuclear Regulatory Commission Attention: Document Control Desk Washington, DC 20555 Docket No. 50-293 License No. DPR-35 NRC Request for Additional Information Pilarim Shroud Analysis Attached is our response to the October 19,1994 request for additional information regarding

. the Reactor Core Shroud at Pilgrim Nuclear Power Station. This response, in draft from, was transmitted to the NRC on October 24,1994. This response is based on inputs from General Electric Company.

We have also provided a response to two additional concerns raised by the staff in the October 19, 1994 conference call, included with this letter is an affidavit covering the proprietary nature of the information supplied in the response to Question 4. Please refer any questions or comments concerning these responses to either Mr. R. V. Fairbank or me.

  • a J. Olivier ETB/ RAH /nas/ Rap 94/SHROUDLT Attachment cc: Mr. R. Eaton, Project Manager '

Division of Reactor Projects - l/11 Mail Stop: 14D1 U S. Nuclear Regulatory Commission 1 White Flint North 11555 Rockville Pike Rockville, MD 20852 U.S. Nuclear Regulatory Commission Region 1 475 Allendale Road King of Prussia, PA 19406 Senior Resident inspector Pilgrim Nuclear Power Station

[

y 9411030222 941028 1

,, PDR ADOCK 05000293 i c ., v u e J p_ PDR \

\

h

.i General Electric Company AFFIDAVIT t

h I,- George B. Stramback, being duly sworn, depose and state as follows:

(1) I am Project Manager, Licensing Services, General Electric Company ("GE") and have been delegated the function of reviewing the information described in paragraph (2) which is sought to be withheld, and have been authodzed to apply for its withholding.

(2) The information sought to be withheld is contained in the GE proprietary attachments to GE-NE Letter # Pilgrim 17, John W. Lukas to Dave Heard , Response to NRC Questions to EECo, dated October 26, 1994 The proprietary information is delineated by bars marked in the margin adjacent to the specific material.

(3) In making this application for withholding of proprietary information of which it is the owner, GE relies upon the exemption from disclosure set forth in the Freedom of Information Act ("FOIA"), 5 USC Sec. 552(b)(4), and the Trade Secrets Act,18 USC . Sec.1905, and NRC tegulations 10. CFR 9.17(a)(4), 2.790(aX4), and

  • 2.790(d)(1) for " trade secrets and commercial or financial information obtained from a person and privileged or confidential" (Exemption 4).. The material for which exemption from disclosure is here sought is all " confidential commercial information",. 1 and some portions also qualify under the narrower definition of" trade secret", within the meanings assigned to those terms for. purposes of FOIA Exemption 4 in, respectively, Critical Mass Feav Project v. Nuclear Reelatory Commiaion.

975F2d871 (DC Cir.1992), and Public Citizen Health Research Group v.' FDA.

704F2d1280 (DC Cir.1983).

(4) Some examples of categories of information which fit into the definition of proprietary information are: ,

a. Information that discloses a process, method, or apparatus, including supporting data and analyses, where prevention ofits use by General Electric's competitors without license from General Electric constitutes a competitive economic advantage over other companies;
b. Information which, if used by a competitor, would reduce his expenditure of resources or improve his competitive position in the design, manufacture, shipment, installation, assurance of quality, or licensing of a similar product-s f

AffidavitPage 1 ,

afP.cCoi.aw 1 6t/E'd P6, 82 100' EESP S26 BOP id3010dd/DAS))ON M:9P:60

2 I

I

c. Information which reveals cost or price information, production capacities, y budget levels, or commercial strategies of General Electric, its customers, or its suppliers;
d. Information which reveals aspects of past, present, or future General Electric customer funded development plans an'd programs, of potential commercial value to GeneralElectric;
e. Information which discloses pat-atable subject matter for which it may be desirable to obtain patent protection.

The information sought to be withheld is considered to be proprietary for the reasons set forth in both paragraphs (4)a. and (4)b., above.

(5) The information sought to be withheld is being submitted to NRC in confidence. The information is of a sort customarily held in confidence by GE, and is in fact so held.

The infonnation sought to be withheld has, to the best of my knowledge and belief, consistently been held in con 6dence by GE, no public disclosure has been made, and it is not available in public sources All disclosures to third parties including any required transmittals to NRC, have been made, or must be made, pursuant to regulatory provisions or proprietary agreements which provide for maintenance of the infonnation in confidence Its initial designation as proprietary information, and the subsequent steps taken to prevent its unauthorized disclosure, are as set forth in v paragraphs (6) and (7) following.

(6) Initial approval of proprietary treatment of a dm==nt is made by the manager of the originating component, the person most likely to be acquainted with the value and sensitivity of the information in relation to industry knowledge. Access to such documents within GE is limited on a "need to know" basis.

(7) The procedure for approval of external release of such a document typically requires review by the staff manager, project manager, principal scientist or other equivalent authority, by the manager of the cognizan; marketing function (or his delegate), and by the Legal Operation, for technical content, competitive effect, and determination of the accuracy of the proprietary designation. Disclosures outside GE are limited to regulatory bodies, customers, and potential customers, and their agents, suppliers, and licensees, and others with a legitimate need for the information, and then only in accordance with appropriate regulatory provisions or proprietary agreements.

(8) The information identified in paragraph (2), above, is classified as proprietary because it contains detailed results of analytical models, metlais and processes, including computer codes, which GE has developed and applied to perform evaluations of the BWR. The TRACG code and the PLEDGE model are two of these analytical tools developed by GE and used in these evaluations. The development and approval of these system, component, and thermal hydraulic models and computer codes aiBECol. doc Affidavit Page 2 61/P'd EESP G26 80P id3G f0hDAS TJnN WOSP:60 P6, 82 100

T\

I (TRACG) was achieved at a signi6 cant cost to GE. The PLEDGE model was 4

y developed and compiled by GE firom 1972 to 1994 at a sgnibad cost to GE. It  :

contains detailed histodcal data and ana!y,tical results not available elsewhere. The 1 alpb=* cost to GE for these analytical tools was on the order of several million '

dollars.

% development of the evaluation process along with the interpretation and j application of the analytical results is derived from the extensive experience database that constitutes a major GE asset. -

(9) Public disclosure of the information soughs to be withheld is likely to cause )

substantial harm to GE's competitive position and foreciose or reduce the availability. l ofprofit-making opportunities. The information is part of GE's comprehensive BWR l safety and technology base, and its commercial value extends beyond the odginal development cost. % value of the technology base goes beyond the extensive physical database and analytical methodology and kMs development of the expertise to determine and apply the appropriate evaluation process. In addition, the technology base includes the value derived from providing analyses done with NRC-approved methods.

1

% research, development, engineering, analytical and NRC review costs comprise a substantialinvestment of time and money by GE.

V W precise value of the expertise to devise an evaluation process and apply the correct analytical methodology is difficult to quantify, but it clearly is submW GE's competitive advantage will be lost ifits competitors are able to use the results of i the GE experience to normalize or verify their own process or if they are able to

laim an equivalent under*+enAng by demonstrating that they can arrive at the same ,

or similar conclusions. l l

h value of this information to GE would be lost if the information were disclosed to the public. Making such information available to competitors without their having  ;

1 been required to undertake a similar expenditure of resources would unfairly provide competitors with a windfall, and deprive GE of the opportunity to exercise its competitive advantage to seek an adequate return on its large investment in i developing these very valuable analytical tools.

1 I

V Affidsvit Page 3 afBECol. doc 6T/S'd

  • EESP S26 BOP id30 f08dcAS ~DnN WO1P:60 #6, 82 100

'l l l

V STATE OF CALIFORNIA ) ,

) as COUNTY OF SANTA CLARA )

George B. Stramback, being duly sworn, deposes and says: l That he has read the foreBoing afBdavit and the matters stated therein are true and correct to the best of his knowledge, information, and belict Executed at San Jose, California, this ;,26

  • day of $ bb$br> 1994 N.

Oc6rg6 B. Stramhark General Electric Company Subscribed and sworn before me this 24/A day of __ ) b 1994.

.~ ~. i tary Public, State of Cahg W

fjf .r1 '.

Bhnf . M:,_ M,

.t g - . e .7; g ....m

' *~1 &

$ "$$f ..

N , '% 3E JUDE A CURTS E

. C- -

COMM. # 074657 E5 }

  • 'J ', '

~ ' '

. , - r'. $.Q'y';J f Notary Pubic - Colfornio g

N,.

,~-

, _ .E # ?

7

-^f j SANTA CLARA COUNTY My Comm. Expres SEP 30,1996 v

Affidasit Page 4 afBECol. doc 6T/9'd EESP S26 GOP id3G f0dd'3AS DrN WO4r:60 P6, 82 130

g PNPS Shroud Safety Assessment - NRC Questions on 10/13/94 Submittal Question 1:

The licensee stated that the core shroud is calculated to tip due to a postulated recirculation line break (RLB) lateral blowdown load. The assumption is made that tipping at the H7 weld would provide the maximum tipping displacement. Provide the calculation which is the basis for determining that the shroud will tip instead of sliding laterally without tipping. What is the necessary coefficient of friction at H7 to assure tipping and what is the net minimum downward force during the blowdown at the point of friction? Include the calculation of the load distribution on the shroud structure and how the resulting load was applied in determining the resulting moment. Provide a l similar assessment for the Design Basis Earthquake (DBE event).  !

I Answer 1: )

Our October 13th response to Question 1 needs clarification. A conventional tipping calculation was not prepared. The basis for shroud tipping, rather than sliding, is the i assumption of an irregular profile characteristic of stress corrosion cracking and the l conservative assumption that the shroud weight is balanced by the upward pressure from inside the shroud at the beginning of the RLB event. For PNPS, this condition will exist either for a 360 degree through wall crack at low core flow operation or for a limited ligament condition at high core flow operation in either case, the shroud at the H7 weld is not separated, and will not separate because there are no additional upward forces introduced by the RLB event. In fact, the RLB event exerts an almost instantaneous downward pull on the shroud. Based on the above postulated model the net minimum downward force and friction forces are not applicable to the tipping assumptions. Tipping will occur as a result of the existing ligament or the irregular surface associated with the crack.

The horizontal force required to resist the sliding movement must equal or exceed the integrated lateral force exerted by the RLB blowdown on the shroud above the weld to assure that tipping will occur. This force is 77 kips at the H7 weld location. For either condition discussed above, this reaction force will be produced by the interaction of the two shroud surfaces, and sliding movement would only occur if the force on the shroud exceeds the shear strength of the cracked surface. The shroud is not expected to slide because only 1% of the shroud area is sufficient to produce the required reaction force (minimum ligament integrity required based on shear stress).

The required area is determined by solving for the maximum shroud inside radius which will produce the shear stress:

Shear Stress = Yield Stress / 2 = Force / [Pi*(Ro2 - Ri2)].

Where: Yield Stress = 18.8 ksi Force = 77 kips Ro = 92 inches Then: Ri = 91.986 inches,

bI I

and % ligament is 0.014*100/1.5=0.945% <1%.

l The eccentricity of the applied load and the reaction force at the base would cause l tipping to occur. l l

The tipping moments are listed in the table provided in response to Question 2. Note that the vertical force created by the intemal pressure will result in the initial overtuming moment which is caused by the lateral blowdown force. Additionally, the internal i pressure on the shroud will be decreased by both the loss of core flow due to the RLB l (within one second) and the flow escaping through the gap created by the tipping.

Thus, the restoring moment will overcome the blowdown moment and return the shroud to its original upright position.

Alternatively, the shroud could be postulated to translate rather than tip. In this case the l distance the shroud is allowed to move laterally toward the Recirculation Line Suction Nozzle is limited by the Jet Pump Riser Braces. These Braces are located at 30 degrees on each side of the nozzle. The distance from the Vessel Wall to the Riser Pipe Canter is 11.25 inches, the OD of the Riser Pipe is 10.75 inches, and the thickness of the brace in front of the Riser Pipe is 2.12 inches. Therefore, since the clearance between the shroud and the vessel is 20 inches, the clearance between the brace and the shroud is as follows:

Clearance = 20 - 11.25 - 10.75 /2 - 2.12 = 1.255 inches Also, since the shroud will move toward the Recirculation Line Suction Nozzle rather than the Jet Pump Riser Brace, with a 30 degree angle, the actuallateral displacement is 1.255/COS(30) = 1.45 inches.

Therefore, even if the shroud were to translate laterally rather than tip under a RLB event, the upper section of the shroud would remain in contact with the lower surface because the total allowable translation is less than the 1.5" thickness of the shroud. As no significant gap would exist and the pressures across the shroud following an RLB are small, the leakage would be minimal, and the refloodable volume would be maintained. The yield stress of the braces is not exceeded during this transient. (See Question 3).

The DBE has been evaluated as resulting in a one inch vertical and one inch horizontal motion (General Electric design record file #L1200819 Vol. 4 section 11) (See pg. 33 of the Pilgrim Shroud Safety Assessment GENE 523-A119-0894) and does not alter the previous discussion.

Under normal operating conditions in the presence of a postulated 360 through wall crack, the shroud may separate as indicated in our initial safety assessment for all welds. This condition should be detectable for all welds based on the following analysis of the limiting H7 weld:

1. The shroud differential pressure (DP) necessary to initiate separation is calculated to be 5.8 psid which corresponds to approximately 95% reactor power.

7

.2. The shroud DP at 100% flow is calculated to be 6.5 psid. As core flow is increased to raise reactor power above 95%, the shroud will begin to lift and

. reactor power will remain approximately constant if shroud separation has occurred.

3. When 100% core flow is achieved, there will be approximately a 4% power anomaly that will be detectable.
4. If the separation occurs while operating at 100% flow, reactor power will' decrease approximately 4% and remain approximately constant. This power anomaly will be detectable.

The load distribution on the shroud is based on the attached " Core Shroud Blowdown Load Calculation During Recirculation Suction Line Break by TRACG Analysis for Dresden Nuclear Power Station, Units 2 and 3, and Quad Cities Nuclear Power Station, Units 1 and 2" dated September 1994. This report is applicable to all BWRs.

l l

1 l

> I 1

J f

4 A

j l 1

l: ,

l General Electric Cotapany AFFIDAVIT  ;

l I, George B. Strataback, being duly sworn, depose and state as follows: l I

(1) I am Project Manaaer, Licensing Savices, General Electric Company ("GE') and I have been ddegated the fhnetion of reviewing the inktmation described in paragraph I (2) which is sought to be withheld, and have been authorhed to apply for its i mthholding. l l

(2) The information sought to be withheld is contained in the GE proprietary repert GENE.L12 00819-05, Core Aroud Blomfow Loaf Cakulation Arirgt Recirculan~on Suction Dne Break by TRACG Amx>sts)6r Drrsdrn }helear Power Stanon, lhdis 2 and 3, ed Quad Ciths Nuclear Powr Statim ihnr 1 auf 2, C1 ass 3 (GE Cornpany Proprietary Infbrmatica), dated September 1994. This document, taken as a whole, constitutes a proprietary compilation ofinformation, some of h also independently proprietary, prepared by the General Bectric Company. The independently proprietary eternents are delineated by bars marked in the margin adjacent to the specifle material.

(3) In raating this application for withholding of proprietary infbrmselon of which it is l the own<r, GE relies upon the exemption Rom disclosure act fbrth in the Freedom of informaths Act ("FOIA"), $ USC Sec. $$2(bX4), and the Trade Boarets Act,18 USC Sec.1905, and NRC regulations 10 CIS, 9.17(a)(4), 2.790(a)(4), and 2 790(d)(1) for " trade secrets and commertist or Aaaaelal indbrmation obtained kom a peraon and privueged or con 8dential" (Exornptica 4). The insterial lbr widch l c>:cmption Rom disclosure is here sought is at " confidential comunercial lufbnnsbon',

and some portions also qualify under the narrower Ananhion of " trade secret', within the meanings sadgned to thoes terms tr purposes of POIA Exempdon 4 in, respecAlwly, Crkkd Mana E.mi PreM v. Fr"- Ran== W e Cc -w 975F2d871 (DC Cir.1992), and P_$na m.an fema % n.=amh Grous v. PDA.

704P2dl280 (DC Cir.1983).

1 (4) Sorne enmples of ostegories of information which fit irtto the definition of j proprietary information am: ,

1

a. Infonnadon that discloses a process, method, or apparatus, includmg supporting data and analyses, where prevention ofits use by General Hectric's cornpetitors without license &om General Electric constitutes a competitive ecccomic advarsage owr other companies; IL1333RTH AS4adt Page 1 p . ._-- .

a

'l b Infbra ation which, if used by a compedtor, would reduce his expendnure of rososces or improve his competitive position in the design, manufheture, ship.wmt, installation, assurance of quality, or licertmas of a similar product; l

c Infbrmadon which reveals cost or price informatloa, production capacities, budget levelt, or commercial strategies of General Electric ks customers, or ks suppliers; d Information whloh reveals aspects of past, presem, or ibture General Electrie customer fbnded development plans and programs, of potential commcreial value to Ocneral Electde; e Information which disdoses patertable subiect matter for which it may be desi able to obtain patent protection.

B ith the cornpliation as a whole and the madood Indepei-4.dy pmprietary elements incorporsted in that compitstion are considered propdetary tbr the reason described in items (4)a. and (4)b., above.

(5) The information sought to be withheld la being submitted to NRC in con 8dence.-

nat Informadon is of a sort customarty held in con 6dence by 2, and has, to the best of my Icnowledge, consistently been held ki con 8dence by GB, has not been publicly disclosed, and is not available in public sources. AH declosures to third pmies t Mag any required transmittals to NRC, have bem made, or must be made, pursuant to regulatory provialons or proprietary agreements wblah provide for maintenares of the information in confidence Its initial designaden as proprietary infortnation, and the subsequent steps taken to prevent its unamtwined disclosure, sie as set forth in paragraphs (6) and (7) fb8owing.

(6) IrAlal approval of proprietary trestraset of a dooument is made by the mana6er of the originating component, the person most Hkely to be acquainted with the value and sensitivity of the information in relation to industry knowledge, Access to such documeras within GE is limbed on a "need to know" basis.

(7) The procedure for approval of external release of such a haimat typically requires review by the stafr manager, project murager, principal scientist or other equivalent authority, by the manager of the cognizant raarketing ihnedon (or his delegate), and by the Legal Operation, for technical content, ccGisodda effect, and determination of the accuracy of the proprietary designation. Disclosures outade GE are limited to rrgulatory bodies, customera, and potantial customers, and their agents, suppliers, sad licensees, and others whh a legidmete need fbr the tafbrmation, and then only in accordance with .gsprists regulatory ydicrd or proprietary agreements. 4 1

numam Affidriit Pase 2

. . _ _ _ _ _ _ _ _ _ _ _ . . _ _ _ _ . _ _ _ _ _ _ _ _ _ _ . . _ _ . _ _ _ _ _ . _ _ _ . _ _ _ . _ _ .I

ao (S) The information identi6ed by bars in the margm is classified as proprietary because it contains detailed results and conclusions born these evaluatioris, utilizing analytical i models and methods, including computer codes, which GE has developed, obtained NRC app oval of, and applied to perfonn evahations of transier:t and sooident evens in the GE Bolling Water Ratctor ("BWR"). The dsr@' and appoval of these system, cornponent, and thermal bydraulic models and computer codes was achieved at a signi6 cant cost to GE, on the order of several million douars.

b dera,, ::.: of the evaluation process along whb the interpesention and appucation of the analytical and inspection results is derived &oem tbc outonsive experience database that const!tutes a makt GB asset.

(9) Public disclosure of the information sought to be withheld is likely to cause substantial harm to GE's competitive poeltion and foreclose or reduce the availability of pio6t-making opportunities. The infbemation le part of GE's oornprehensive BWR technology bass, and its commerdal value extends beyond the odginal developmsat cost. The value of the technology bass goes beyond the attensive physical Mahana and analytical methodology and includes developenant of the ecpertise to determine and apply the appropriate evaluation process. In Ni, the technology base include. the value derived 9.m providing analyses done with NRC grad methods, induding jusdfications ihr not inchding certain analyses in appumations to change the licensing basis.

GE's empetitiva advantage will be lost ifits competitors are able to use the results of the GE caperience to avoid Guitless avenues, or to nonnaEse or verify their own process, or to claim an equivalent understandag by demonstrating that they can arrive at the same or similar ooactusicas while some of the undedybe analyses, and some of the gross structure of the process, may at various tknas how been puhEely revealed, enough of both the analyses and the desaned structural Sunework of the process han i,ae held in con 6dence that this inRamados, in this con 95ed iban, condanes to have great competitive value to GE. This vakas would be lost if the indbrmation as a wMe, in the context and level of detaB provided in the subject GB document, were to be disclosed to the pubuo. Maidag such indbemation avallable to cosupetitors wi hout thdr having been required so undertake a sindlar capenditure of resources, inchaEng that regdred to determine the areas that are ag( siheted by a power uprate and are therefore blind aleys, would unfhidy provide competitors with a windfau, and deprive on of the opportunhy to ==cise ks compedtin advantage to seek an

.d.quaes return on its large lovesement in developang ha analytloal procesa.

imuni Am4.w

iI STATE OF CALIFORNIA )

) as:

COUNTY OF SANTA CLARA )

Ooorge B. Stramback, being duly sworn, deposes and says:

That he has read the foregoing affidavit and the rnetters stated therein are true and correct to the best of his knowledge, infbrmadon, and beEaC r.xecuted at San Josg California, this [sr day of MA

/

1 ,

l l

1 d

'~ OeMB!Strarnback l OeneralElecole Company U n NN h C

' f l

/ h-  %

otwyPubk State o(K l nh GANIACLAM COWM

-- u >

i IArCerun,tairesIS M 1996 >

4 5

..