Forwards Description of Util Plans for Implementation of Emergency Response Data Sys,Per Rev 1 to NUREG-1394.Station Operating,Emergency Planning & Engineering Procedures Will Be Revised for Conformance w/10CFR50,App E
ML20079L108
Person / Time
Site: Pilgrim
Issue date: 10/25/1991
From: Gina Davis
BOSTON EDISON CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
RTR-NUREG-1394 BECO-91-146, NUDOCS 9111060085
Download: ML20079L108 (8)


Text

. - _ _ _ _ _ - _ _ - - _ _ _ _

10CfR50 gg Appendix E.4 a BOSTON EDISON

, Pilgrim Nuclear Power Station Rocky Hill Road Plyrmouth, Massachusetts o236o George W. Davis senior Vce Prescent - Nuclear october 25, 1991 BECo 91-146 U.S. Nuclear Regulatory Commission Document Control Desk Hashington, DC 20555 License DPR-35 Docket 50-293 bar_aency Resoonse Data System Imolementation Proaram Plan This letter transmits Boston Edison's plans for implementation of an Emergency Response Data System at Pilgrim Station, y v

The planned schedule for implementation is contained in Attachment A.

Attachment B is the completed Appendix B form from NUREG-1394, Rev, 1, Emeraency Resoonse Data System (ERDS) Imolementation and contains information regarding our computer system configuration and interfaces. He plan to revise Station Operating, Emergency Planning, anL Engineering procedures as necessary to assure tne Emergency Response Data System meets the requirements of 10CFR50, Appendix E for operation, testing, maintenance, and configuration control. The schedule for these procedure changes is shown in Attachment A.

As discussed at the October 16, 1991 meeting in Region I, we are interested in being a test plant for your " SEND" system. Should you have any questions, the contact personnel for the various aspects of this project are shown in Attachment B,

/

/

{

).

h.m.m

/ "G. H. vis MTL/cic/6326 Attachments cc: (See page 2)

~

M l

fiiid6coes 9y0)!b93 PDR ADOCK g r PDR F

.. z ~ _

BOSTON EDISON COMPANY D. S. Nuclear Regulatory Connission Page 2 cc: Mr. R. Eaton, Projet't Manager Division of Reactor Projects - I/II Office of Nur. lear Reactor Degulation Mail Stop: 1401 U. S. Nuclear Regulatory Conimission 1 White flint Noi>th 11555 Rockville Pike Rockville, MD 20852 U. S. Nuclear Regulatory Commission Region I 475 Allendale Road King of Prussia, PA 19406 Senior NRC Resident Inspector Pilgrim Nuclear Power Station Mr. J. R. Jolicoeur EROS Project Manager U. S. Nuclear Regulatory Commission Mail Stop MNBB3206 Hashington, DC 20555

PILGRIM STATIQfi -

IMPLEMEI4TATION PLAN FOR EMERGENCY RESPONSE _ DATA SYSTEM _(LTP 579)

+ 1991 + w ---

tugt - _

ACTIVITY l NOV l DEC l JAN l FEB_l MAR l APR l MAY l JUNE l JULY l AtJG l Edison Prepares / Returns Cata Point i g Library (DPL) to E!(Gi El Develops PC/ EROS Software interface l I Edison Orders / Installs PC I I El Develops Software for DPL (6) l l Edison Develops EPIC /PC Interface l l Software (7)

Edison Prepares!!ssues Plar't Design L J Change Package NRC Insta!is Data Transmission Line [ l and Modem at PNPS (4)

Edison Develops Procedure l 1 Changes to incorporate EROS Testing of Edison-Developed Softwarc C Preliminary Software Test: El-Edison (8)

Fina! Software Test: El-Edison (9) O Edison-NRC System Test (10)

Edison ERDS On-Une (11) ,

  • Numbers correspond te NUREG 1394, Page A-2, A-3 step r"mbers ATTACHMENT A CHM - 1o/7/9;

. ATTACHMENT B Page 1 of 3 I. Contacts l Note: Please provide name, title, mailing address, and phone number.

A. Survey Coordinator (i.e., contact for later clarification of questionnaire answers):

Mr. Charles H. Hinott (Project Manager), (617) 849-8875 **

- Mr. Robert E. M CMahon (Project Engineer), (617) 849-8829 Boston Edison Company 25 Braintree Hill Office Park

-Braintree, MA 02184 B. Computer Hardware Specialist (s):

Mr. Dion Alley

  • Computer Engineer Pilgrim Nuclear Power Station .

L RFD #1 Rocky Hill Road l

Plymouth, MA 02360 (508) 747-8213 C. Systems Software Specialist (s):

Mr. Paul Coffey*

Sr. Computer Applications Engineer-Pilgrim Nuclear Power Station RfD #~l Rocky Hill Road Plymouth, MA 02360

.(60 1 747-8585 0 Application-level Software Specialist (s):

Mr. Paul Coffey*

l Sr. Computer Applications Engineer l-Pilgrim Nuclear Power Station RfD #1 Rocky Hill Road PlymouthJ MA 02360 (508) 747-8585 u

E. Telephone Sysems Specialist (s):

,. Mr. Richard J.-Cavicchf.

L Telecomivnications Specialist Boston. Edison Company l -800 Boylston Street - P293A l Boston, HA 02199 L

(617) 424-2445 L

  • Mr. Dohn fiumara is the supervisur for the asterisked positions above.

. Telephone (508) 747-8587

    • Please_ add to distribution for all written ERDS correspondence from NUREG-1394, Rev. 1 Page B-2 i

. A11ACHMENT u Page 2 of 5 l III. Selection of Data fecders A. How many data feeders are there (six maximum)?

One B. Identify the sei9cted data feeders and provide the following for each:

(1) a short description of the categories of data points it will provide '

(e.g., met, rao, or plant data points, by unit) and (2) the rationale for selecting it if another system can also provide its categories of data cointe.

N/A - only one feeder C. Which data feeder is the site time determining feeder? This should be the feeder which is providing the majority of the data points.

N/A - only one feeder ,

i l

from NUREG-1394, Rev. 1 Page B-7

l

, ATTACHMENT D ,

Page 3 of 5 j IV. Data feeder Information i

Note: A new Section IV must be filled out for each feeder system selected.

General Questions

1. Identification of Data feeder
a. What is the name in local parlance given to this data feeder (e.g., ,

Emergency Response Information System)? Please give both the acronym '

and the words forming it.

EPIC ([mergency and Erocess information Computer)

b. Is this the site time determining feeder?

i Yes

c. How often will this feeder transmit an update set to the ERDS (in seconds)?

60

2. Hardware / Software Envircnment
a. Identify the manufacturer and model number of the data feeder hardware.

VAX 8550

b. Identify the operating system j bMS V4.7 -

i

c. What m' thod of timekeeping is implemented on this feeder system (Daylight Savings, Standard, Greenwich)?

Daylight Selings Time

d. In what time zone is is feeder located?

Eastern from NUREG-1394, Rev. 1 -

Page B-8

, ATTACHMENT B Page 4 of 5

3. Data Communichtion Details
a. Can this data feeder provide asynchronous serial data communication (RS-232-C) with full-modem control?

Yes

b. Hill this feeder transmit in ASCII or EBCDIC 7 ASCII
c. Can this feeder transmit at a serial baud rate of 2400 bps? If not, at what baud rate can it transmit?

Yes

d. Does the operating system support XON/X0FF flow control?

Yes

1. Are any problems foreseen with the NRC using XON/X0FF to control the transmission of data?

No

e. If it is not feasible to reconfigure a serial port for the ERDS linkup (i.e., change the baud rate, parity, etc.), plese explain why.

N/A

f. Do any ports currently exist for the ERDS linkup?

Yes

1. If not, is it possible to add additional ports?

N/A from NUREG-1394, Rev. 1 Page B-9

- __. . - - - ..-_. . - - - - . - - - - - -. - - . - - - .~.. - - .- - -. - .-

+

, ATTACHMENT D

~

  • Page 5 of 5
2. If yes, will the port be used soley by the ERDS or shared with other non-emergency-time users? Give details.

ERDS only 1

4. Data reeder Physical Environment and Management
a. Where is the data feeder located in terms of the ISC, E0f, and control room?

TSC

b. Is the data feeder protected from loss of supply of electricity?

Yes i

c. Is there a human operator for this data feeder? I Yes l 1
1. If so, how many hours a day is the feeder attended?

8 hours9.259259e-5 days <br />0.00222 hours <br />1.322751e-5 weeks <br />3.044e-6 months <br /> /5 days per week during normal operations from NUREG-1394, Rev. I-Page B-10 l- _ _ .