Category:CORRESPONDENCE-LETTERS
MONTHYEARML20217K3161999-10-19019 October 1999 Forwards Amend 195 to License DPR-61 & Safety Evaluation. Amend Deletes Certain TSs Either No Longer Applicable to Permanently Shutdown & Defueled State of Reactor or Duplicate Regulatory Requirements CY-99-137, Notifies NRC of Intent to Apply Haddam Neck Plant 10CFR50 App B,Qa Program to Activities Related to Development of ISFSI at Haddam1999-10-12012 October 1999 Notifies NRC of Intent to Apply Haddam Neck Plant 10CFR50 App B,Qa Program to Activities Related to Development of ISFSI at Haddam DD-99-11, Informs That Time Provided by NRC Regulation within Which Commission May Act to Review Director'S Decision (DD-99-11) Expired & That Commission Declined Any Review.Decision Became Final Action on 9910041999-10-0808 October 1999 Informs That Time Provided by NRC Regulation within Which Commission May Act to Review Director'S Decision (DD-99-11) Expired & That Commission Declined Any Review.Decision Became Final Action on 991004 ML20212L1261999-10-0404 October 1999 Forwards Viewgraphs Presented by Licensee at 990923 Meeting with Nrc,In Response to Request ML20212D0341999-09-20020 September 1999 Expresses Appreciation for Accepting NRC Request for Tour of Haddam Neck Facility During on 991014.Invites R Mellor to Participate in NRC 1999 Decommissioninng Power Reactor Work- Shop:Nrc Insp Program at Decommissioning Power Reactors CY-99-111, Submits Clarification of Changes Made to Connecticut Yankee QA Program,Per Util 990810 Submittal.Change Will Be Submitted to NRC in Dec 1999 as Part of Annual Update1999-09-0202 September 1999 Submits Clarification of Changes Made to Connecticut Yankee QA Program,Per Util 990810 Submittal.Change Will Be Submitted to NRC in Dec 1999 as Part of Annual Update ML20211E8051999-08-20020 August 1999 Forwards Insp Rept 50-213/99-02 on 990420-0719.No Violations Noted.Completion of Corrective Actions for Spent Fuel Bldg Ventilation Issues Adequate ML20210J6021999-08-0202 August 1999 Informs That Info Re Orise Technical Survey Assistance to NRC at CT Yankee Is to Include Copies of Listed Documents CY-99-048, Forwards Cyap Rept CY-HP-0031,Rev 0, Bounding Dose Assessment for Offsite Radioactive Matls1999-07-29029 July 1999 Forwards Cyap Rept CY-HP-0031,Rev 0, Bounding Dose Assessment for Offsite Radioactive Matls CY-99-066, Forwards Revised Plan for Recovery of Licensed Matl from Offsite Locations.Completion of Implementation of Plan During Summer of 1999 Is Planned,Contingent on Support Extended by Property Owners,Weather & Uncontrolled Factors1999-07-20020 July 1999 Forwards Revised Plan for Recovery of Licensed Matl from Offsite Locations.Completion of Implementation of Plan During Summer of 1999 Is Planned,Contingent on Support Extended by Property Owners,Weather & Uncontrolled Factors ML20210C1491999-07-0101 July 1999 Responds to ,Which Responded to NRC Ltr & NOV & Informs That Engagement in Any Similar Wrongdoing in Future May Result in More Significant Enforcement Action. No Further Action Will Be Taken at This Time ML20209C3911999-06-30030 June 1999 Forwards TS Page 6-3 for Haddam Neck Plant ML20195H1741999-06-15015 June 1999 Forwards Original & Copy of Request for Approval of Certain Indirect & Direct Transfer of License & Ownership Interests of Montaup Electric Co (Montaup) with Respect to Nuclear Facilities Described as Listed ML20195F9011999-06-0909 June 1999 Ack Receipt of Informing NRC of Steps Taken to Correct Violations Noted in Insp 50-213/98-06 on 990226. Util Did Not Agree with Disposition of Issue Cited as Severity Level IV Violation.Violation Will Be Noncited ML20195H3591999-06-0202 June 1999 Responds to NRC Re Violations Noted in Insp of License DPR-61.Corrective Actions:Disciplinary Actions Were Taken by Util Against Jm Foley & Individual & Departmental Emphasis Is Placed on New HP Stds & Expectations ML20207E9031999-06-0202 June 1999 Informs That NRC Office of Nuclear Reactor Regulation Reorganized Effective 990328.As Part of Reorganization,Div of Licensing Project Mgt Created.Mt Masnik Will Be Section Chief for Haddam Neck.Organization Chart Encl ML20207B9301999-05-25025 May 1999 Responds to 990114 Correspondence Re Changes to Plant Defueled Physical Security Plan Rev 1 Submitted Under 10CFR50.54(p).Implementation of Changes Subj to Insp to Confirm Changes Have Not Decreased Security Plan ML20207G1761999-05-21021 May 1999 Forwards Insp Rept 50-213/99-01 on 980119-990419 & Closure of CAL 1-97-010.No Violations Noted.Conduct of Activities Associated with Control of Radiological Work at Haddam Neck Generally Characterized as Careful & Thorough ML20206R7221999-05-12012 May 1999 Refers to Investigation 1-97-031 on 970616-0718 & Forwards Nov.Investigation Found That Recipient Deliberately Did Not Follow Radiation Protection Procedures,Falsified Documents & Provided Incomplete & Inaccurate Info to NRC ML20206R8051999-05-12012 May 1999 Responds to 3 Investigations,Repts 1-97-031,008 & 1-98-008 Between 970314 & 980722 as Well as Insp Conducted Between 980720 & 1102.Forwards Synopsis of 3rd OI Investigation ML20206R7021999-05-12012 May 1999 Refers to Investigation 1-97-008 Conducted by Region I & Forwards Notice of Violation.Investigation Found That Recipient Deliberately Attempted to Conceal Release of Contaminated Video Equipment ML20206J2801999-04-30030 April 1999 Forwards 1998 Annual Financial Repts for CT Light & Power Co,Western Ma Electric Co,Public Svc Co of Nh,North Atlantic Energy Corp,Northeast Nuclear Energy Co & North Atlantic Energy Svc Corp,License Holders CY-99-057, Forwards 1998 Annual Radioactive Effluent Rept for HNP, & Rev 10 to Remodcm. with Summary of Quantities of Solid Radwaste & Liquid & Gaseous Effluents,As Well as Summary of Assessment of Max Individual Dose1999-04-30030 April 1999 Forwards 1998 Annual Radioactive Effluent Rept for HNP, & Rev 10 to Remodcm. with Summary of Quantities of Solid Radwaste & Liquid & Gaseous Effluents,As Well as Summary of Assessment of Max Individual Dose ML20206C8631999-04-28028 April 1999 Forwards Amend 194 to License DPR-61 & Safety Evaluation. Amend Authorizes Relocation of Requirements Related to Seismic Monitoring Instrumentation from TSs to Technical Requirements Manual ML20206A6871999-04-22022 April 1999 Informs of Completion of Review of Re Nepco in Capacity as Minority Shareholder in Vermont Yankee Nuclear Power Corp,Yaec,Myap & Connecticut Yankee Atomic Power Co ML20210V5221999-04-0808 April 1999 Discusses Continued Performance of Technical Assistance Activities for NRC & Environ Survey & Site Assessment Program (Essap) Survey Assistance at Cy IR 05000213/19960121999-04-0505 April 1999 Discusses NRC Insp Repts 50-213/96-12 & 50-213/98-04 on 961102-27 Re Airborne Radioactivity Contamination Event That Occurred in Fuel Transfer Canal & Reactor Cavity in Nov 1996.Notice of Violation Encl ML20205J7931999-04-0505 April 1999 Discusses NRC Insp Repts 50-213/96-12 & 50-213/98-04 on 961102-27 Re Airborne Radioactivity Contamination Event That Occurred in Fuel Transfer Canal & Reactor Cavity in Nov 1996.Notice of Violation Encl CY-99-042, Provides Info on Status of Decommissioning Funding for Haddam Neck Plant1999-03-31031 March 1999 Provides Info on Status of Decommissioning Funding for Haddam Neck Plant CY-99-024, Responds to Violations Noted in Insp Rept 50-213/98-06. Corrective Actions:Meetings Were Held with Contractor Mgt, Disciplinary Action Against Worker Was Taken & Notices Alerting Workers to HRA Controls Were Posted1999-03-29029 March 1999 Responds to Violations Noted in Insp Rept 50-213/98-06. Corrective Actions:Meetings Were Held with Contractor Mgt, Disciplinary Action Against Worker Was Taken & Notices Alerting Workers to HRA Controls Were Posted ML20206A6951999-03-29029 March 1999 Request Confirmation That No NRC Action or Approval,Required Relative to Proposed Change in Upstream Economic Ownership of New England Power Co,Minority Shareholder in Vermont Yankee Nuclear Power Corp,Yaec,Myap & Connecticut Yankee B17697, Notifies NRC of Amount of Property Insurance Coverage, Effective 990401,for HNP & Mnps,Units 1,2 & 3,per Provisions of 10CFR50.54(w)1999-03-12012 March 1999 Notifies NRC of Amount of Property Insurance Coverage, Effective 990401,for HNP & Mnps,Units 1,2 & 3,per Provisions of 10CFR50.54(w) CY-99-032, Clarifies Info Re TRM Change Submitted with Re Proposed Rev to TSs on Seismic Monitoring1999-03-0909 March 1999 Clarifies Info Re TRM Change Submitted with Re Proposed Rev to TSs on Seismic Monitoring ML20207B6641999-02-26026 February 1999 Forwards Insp Rept 50-213/98-06 on 981103-990118 & Notice of Violation Re Locked High Radiation Area Doors That Were Found Unlocked by Staff.Security Program Was Also Inspected ML20204C6901999-02-22022 February 1999 Informs That Public Citizen Waives Copyright for 5th Edition of Nuclear Lemon So NRC May Reproduce for Purpose of Contributing to NRC Recommended Improvements to Oversight Process for Nuclear Power Reactors ML20203H9621999-02-17017 February 1999 Responds to to Dk Rathbun Which Forwarded Number of Questions from Constituent Re Spent Fuel Decommissioned Nuclear plants.NUREG-1628, Staff Responses to Frequently Asked Questions Re Decommissioning of NPPs Encl.W/O Encl CY-99-005, Responds to NRC 981221 RAI Re Amend 193 to License to Reflect Permanent Shutdown Condition of Plant.Licensee Withdrawing 981030 (CY-98-199) Request & Will Submit Corrections in Future Proposed Rev to TS1999-01-29029 January 1999 Responds to NRC 981221 RAI Re Amend 193 to License to Reflect Permanent Shutdown Condition of Plant.Licensee Withdrawing 981030 (CY-98-199) Request & Will Submit Corrections in Future Proposed Rev to TS CY-99-023, Provides Summary of Understandings Reached During 990108 Meeting Between Util & CT Dept of Environ Protection Re Dike Area Rainwater Reporting Protocol1999-01-28028 January 1999 Provides Summary of Understandings Reached During 990108 Meeting Between Util & CT Dept of Environ Protection Re Dike Area Rainwater Reporting Protocol ML20203H9711999-01-21021 January 1999 Requests Response to Concerns Raised by Constitutent M Marucci Re Spent Fuel at Decommissioned Nuclear Plants CY-99-002, Forwards Response to NRC 981203 RAI Re Proposed License Amend to Relocate Requirements for Seismic Monitoring Instrumentation from Section 3/4.3.3.3 of TS to Trm. Supporting TSs Encl1999-01-18018 January 1999 Forwards Response to NRC 981203 RAI Re Proposed License Amend to Relocate Requirements for Seismic Monitoring Instrumentation from Section 3/4.3.3.3 of TS to Trm. Supporting TSs Encl CY-99-010, Provides Special Rept Concerning Potential of Radiation Exposure Due to Hypothetical Explosive Attack to Facility. Without Encl1999-01-14014 January 1999 Provides Special Rept Concerning Potential of Radiation Exposure Due to Hypothetical Explosive Attack to Facility. Without Encl CY-99-009, Forwards Rev 1 to Haddam Neck Plant Defueled Physical Security Plan,Per 10CFR50.54(p).Rev Does Not Decrease Effectiveness of Plan.Encl Withheld,Per 10CFR73.21 & 2.7901999-01-14014 January 1999 Forwards Rev 1 to Haddam Neck Plant Defueled Physical Security Plan,Per 10CFR50.54(p).Rev Does Not Decrease Effectiveness of Plan.Encl Withheld,Per 10CFR73.21 & 2.790 ML20206R6051999-01-11011 January 1999 Ack Receipt of Submiting Sf Mgt Plan.Staff Has Reviewed Plan & Notes Plan to Store Sf in SFP Until DOE Takes Physical Possession of Fuel DD-98-12, Informs That Time Provided by NRC Regulation within Which Commission May Act to Review Director'S Decision DD-98-12 Has Expired.Decision Became Final Agency Action on 981211. with Certificate of Svc.Served on 9812221998-12-22022 December 1998 Informs That Time Provided by NRC Regulation within Which Commission May Act to Review Director'S Decision DD-98-12 Has Expired.Decision Became Final Agency Action on 981211. with Certificate of Svc.Served on 981222 CY-98-142, Forwards Proposed Rev 2 of Cyap QAP for Info & Approval of Exception Number 8 of App E of Cy Qap.Copy of Rev 2 Showing Changes from Rev 1 Also Included1998-12-22022 December 1998 Forwards Proposed Rev 2 of Cyap QAP for Info & Approval of Exception Number 8 of App E of Cy Qap.Copy of Rev 2 Showing Changes from Rev 1 Also Included ML20198R1321998-12-21021 December 1998 Forwards Insp Rept 50-213/98-05 on 980720-1102.No Violations Noted.Insp Completes Review of Licensee Actions Described in ,In Response to NOV & Proposed Imposition of Civil Penalties ML20198K8651998-12-21021 December 1998 Ack Receipt of ,Requesting Corrected Pages to Be Issued for License Amend 193,issued on 980630.Informs That Inconsistencies Found When Comparing Corrected Pages Submitted on 981030 & License Amend Application CY-98-201, Provides Clarification of NRC Staff SE for Amend 193 Which Approved HNP Defueled TSs1998-12-0303 December 1998 Provides Clarification of NRC Staff SE for Amend 193 Which Approved HNP Defueled TSs IR 05000213/19980041998-11-27027 November 1998 Forwards Special Insp Rept 50-213/98-04 of Licensee Performance During Reactor Coolant Sys Chemical Decontamination ML20195J3571998-11-19019 November 1998 Forwards Exemption from Certain Requirements of 10CFR50.54(w) & 10CFR140.Exemption Submitted in Response to 971007 Application & Suppls & 1218,requesting Reduction in Amount of Insurance Required for Facility 1999-09-20
[Table view] Category:INCOMING CORRESPONDENCE
MONTHYEARCY-99-137, Notifies NRC of Intent to Apply Haddam Neck Plant 10CFR50 App B,Qa Program to Activities Related to Development of ISFSI at Haddam1999-10-12012 October 1999 Notifies NRC of Intent to Apply Haddam Neck Plant 10CFR50 App B,Qa Program to Activities Related to Development of ISFSI at Haddam CY-99-111, Submits Clarification of Changes Made to Connecticut Yankee QA Program,Per Util 990810 Submittal.Change Will Be Submitted to NRC in Dec 1999 as Part of Annual Update1999-09-0202 September 1999 Submits Clarification of Changes Made to Connecticut Yankee QA Program,Per Util 990810 Submittal.Change Will Be Submitted to NRC in Dec 1999 as Part of Annual Update CY-99-048, Forwards Cyap Rept CY-HP-0031,Rev 0, Bounding Dose Assessment for Offsite Radioactive Matls1999-07-29029 July 1999 Forwards Cyap Rept CY-HP-0031,Rev 0, Bounding Dose Assessment for Offsite Radioactive Matls CY-99-066, Forwards Revised Plan for Recovery of Licensed Matl from Offsite Locations.Completion of Implementation of Plan During Summer of 1999 Is Planned,Contingent on Support Extended by Property Owners,Weather & Uncontrolled Factors1999-07-20020 July 1999 Forwards Revised Plan for Recovery of Licensed Matl from Offsite Locations.Completion of Implementation of Plan During Summer of 1999 Is Planned,Contingent on Support Extended by Property Owners,Weather & Uncontrolled Factors ML20209C3911999-06-30030 June 1999 Forwards TS Page 6-3 for Haddam Neck Plant ML20195H1741999-06-15015 June 1999 Forwards Original & Copy of Request for Approval of Certain Indirect & Direct Transfer of License & Ownership Interests of Montaup Electric Co (Montaup) with Respect to Nuclear Facilities Described as Listed ML20195H3591999-06-0202 June 1999 Responds to NRC Re Violations Noted in Insp of License DPR-61.Corrective Actions:Disciplinary Actions Were Taken by Util Against Jm Foley & Individual & Departmental Emphasis Is Placed on New HP Stds & Expectations CY-99-057, Forwards 1998 Annual Radioactive Effluent Rept for HNP, & Rev 10 to Remodcm. with Summary of Quantities of Solid Radwaste & Liquid & Gaseous Effluents,As Well as Summary of Assessment of Max Individual Dose1999-04-30030 April 1999 Forwards 1998 Annual Radioactive Effluent Rept for HNP, & Rev 10 to Remodcm. with Summary of Quantities of Solid Radwaste & Liquid & Gaseous Effluents,As Well as Summary of Assessment of Max Individual Dose ML20206J2801999-04-30030 April 1999 Forwards 1998 Annual Financial Repts for CT Light & Power Co,Western Ma Electric Co,Public Svc Co of Nh,North Atlantic Energy Corp,Northeast Nuclear Energy Co & North Atlantic Energy Svc Corp,License Holders ML20210V5221999-04-0808 April 1999 Discusses Continued Performance of Technical Assistance Activities for NRC & Environ Survey & Site Assessment Program (Essap) Survey Assistance at Cy CY-99-042, Provides Info on Status of Decommissioning Funding for Haddam Neck Plant1999-03-31031 March 1999 Provides Info on Status of Decommissioning Funding for Haddam Neck Plant ML20206A6951999-03-29029 March 1999 Request Confirmation That No NRC Action or Approval,Required Relative to Proposed Change in Upstream Economic Ownership of New England Power Co,Minority Shareholder in Vermont Yankee Nuclear Power Corp,Yaec,Myap & Connecticut Yankee CY-99-024, Responds to Violations Noted in Insp Rept 50-213/98-06. Corrective Actions:Meetings Were Held with Contractor Mgt, Disciplinary Action Against Worker Was Taken & Notices Alerting Workers to HRA Controls Were Posted1999-03-29029 March 1999 Responds to Violations Noted in Insp Rept 50-213/98-06. Corrective Actions:Meetings Were Held with Contractor Mgt, Disciplinary Action Against Worker Was Taken & Notices Alerting Workers to HRA Controls Were Posted B17697, Notifies NRC of Amount of Property Insurance Coverage, Effective 990401,for HNP & Mnps,Units 1,2 & 3,per Provisions of 10CFR50.54(w)1999-03-12012 March 1999 Notifies NRC of Amount of Property Insurance Coverage, Effective 990401,for HNP & Mnps,Units 1,2 & 3,per Provisions of 10CFR50.54(w) CY-99-032, Clarifies Info Re TRM Change Submitted with Re Proposed Rev to TSs on Seismic Monitoring1999-03-0909 March 1999 Clarifies Info Re TRM Change Submitted with Re Proposed Rev to TSs on Seismic Monitoring ML20204C6901999-02-22022 February 1999 Informs That Public Citizen Waives Copyright for 5th Edition of Nuclear Lemon So NRC May Reproduce for Purpose of Contributing to NRC Recommended Improvements to Oversight Process for Nuclear Power Reactors CY-99-005, Responds to NRC 981221 RAI Re Amend 193 to License to Reflect Permanent Shutdown Condition of Plant.Licensee Withdrawing 981030 (CY-98-199) Request & Will Submit Corrections in Future Proposed Rev to TS1999-01-29029 January 1999 Responds to NRC 981221 RAI Re Amend 193 to License to Reflect Permanent Shutdown Condition of Plant.Licensee Withdrawing 981030 (CY-98-199) Request & Will Submit Corrections in Future Proposed Rev to TS ML20203H9711999-01-21021 January 1999 Requests Response to Concerns Raised by Constitutent M Marucci Re Spent Fuel at Decommissioned Nuclear Plants CY-99-002, Forwards Response to NRC 981203 RAI Re Proposed License Amend to Relocate Requirements for Seismic Monitoring Instrumentation from Section 3/4.3.3.3 of TS to Trm. Supporting TSs Encl1999-01-18018 January 1999 Forwards Response to NRC 981203 RAI Re Proposed License Amend to Relocate Requirements for Seismic Monitoring Instrumentation from Section 3/4.3.3.3 of TS to Trm. Supporting TSs Encl CY-99-009, Forwards Rev 1 to Haddam Neck Plant Defueled Physical Security Plan,Per 10CFR50.54(p).Rev Does Not Decrease Effectiveness of Plan.Encl Withheld,Per 10CFR73.21 & 2.7901999-01-14014 January 1999 Forwards Rev 1 to Haddam Neck Plant Defueled Physical Security Plan,Per 10CFR50.54(p).Rev Does Not Decrease Effectiveness of Plan.Encl Withheld,Per 10CFR73.21 & 2.790 CY-99-010, Provides Special Rept Concerning Potential of Radiation Exposure Due to Hypothetical Explosive Attack to Facility. Without Encl1999-01-14014 January 1999 Provides Special Rept Concerning Potential of Radiation Exposure Due to Hypothetical Explosive Attack to Facility. Without Encl CY-98-142, Forwards Proposed Rev 2 of Cyap QAP for Info & Approval of Exception Number 8 of App E of Cy Qap.Copy of Rev 2 Showing Changes from Rev 1 Also Included1998-12-22022 December 1998 Forwards Proposed Rev 2 of Cyap QAP for Info & Approval of Exception Number 8 of App E of Cy Qap.Copy of Rev 2 Showing Changes from Rev 1 Also Included CY-98-201, Provides Clarification of NRC Staff SE for Amend 193 Which Approved HNP Defueled TSs1998-12-0303 December 1998 Provides Clarification of NRC Staff SE for Amend 193 Which Approved HNP Defueled TSs CY-98-191, Provides Notification That Util Implemented Defueled Emergency Plan for HNP on 981001.Util Completed Annual Exercise Required by Subj Plan & 10CFR50.471998-11-0505 November 1998 Provides Notification That Util Implemented Defueled Emergency Plan for HNP on 981001.Util Completed Annual Exercise Required by Subj Plan & 10CFR50.47 CY-98-140, Provides Commitment to Maintain Water Chemistry Requirements in HNP Technical Requirements Manual1998-11-0202 November 1998 Provides Commitment to Maintain Water Chemistry Requirements in HNP Technical Requirements Manual CY-98-183, Forwards Revised License Amend 193 TS Pages to Correct Amend Number on Pages Not Changed by Amend 193.No Commitments Contained within Ltr1998-10-30030 October 1998 Forwards Revised License Amend 193 TS Pages to Correct Amend Number on Pages Not Changed by Amend 193.No Commitments Contained within Ltr CY-98-199, Forwards Listing of Corrections Made & Revised Pages for Proposed License Amend 193.Ltr Also Transmits Repaginated Pages for TS Index & Section 1,per Request of NRC Project Manager1998-10-30030 October 1998 Forwards Listing of Corrections Made & Revised Pages for Proposed License Amend 193.Ltr Also Transmits Repaginated Pages for TS Index & Section 1,per Request of NRC Project Manager CY-98-062, Updates Info of Historical Nature in Response to Both NRC Historical Review Rept & NRC Insp Rept 50-213/97-11 Open Items1998-10-28028 October 1998 Updates Info of Historical Nature in Response to Both NRC Historical Review Rept & NRC Insp Rept 50-213/97-11 Open Items CY-98-154, Forwards Sf Mgt Plan for Haddam Neck Plant.Plan Submits Info on Mgt & Funding for Program to Safely Store Sf Following Permanent Cessation of Power Operations Until Title Is Transferred to DOE1998-10-28028 October 1998 Forwards Sf Mgt Plan for Haddam Neck Plant.Plan Submits Info on Mgt & Funding for Program to Safely Store Sf Following Permanent Cessation of Power Operations Until Title Is Transferred to DOE CY-98-129, Provides Supplemental Info to 980629 Response to 2.206 Petition Questions on Spent Fuel Cooling Methods.Util Pending Commitment Made within Ltr Stated1998-10-14014 October 1998 Provides Supplemental Info to 980629 Response to 2.206 Petition Questions on Spent Fuel Cooling Methods.Util Pending Commitment Made within Ltr Stated CY-98-186, Provides Notification of Organizational Changes Which Affect Cyap.Organization Chart,Biographical Profile of K Heider & Revised Distribution List for NRC Correspondence,Encl1998-10-0202 October 1998 Provides Notification of Organizational Changes Which Affect Cyap.Organization Chart,Biographical Profile of K Heider & Revised Distribution List for NRC Correspondence,Encl CY-98-153, Forwards Final Response to NRC 961009 RAI Re Configuration Mgt Project at Plant.No New Commitments Made within Ltr or Attachment1998-09-30030 September 1998 Forwards Final Response to NRC 961009 RAI Re Configuration Mgt Project at Plant.No New Commitments Made within Ltr or Attachment CY-98-157, Responds to NRC Request That Cyap Submit Proposed License Amend to Include Fuel Storage Pool Water Chemistry Program within Haddam Neck Plant Ts.Cyap Considers That Amend Is Not Necessary for Listed Reasons.Procedure Encl1998-09-28028 September 1998 Responds to NRC Request That Cyap Submit Proposed License Amend to Include Fuel Storage Pool Water Chemistry Program within Haddam Neck Plant Ts.Cyap Considers That Amend Is Not Necessary for Listed Reasons.Procedure Encl B17440, Corrects Errors in Ltrs & 980225 Re semi-annual Fitness for Duty Performance Data for Jan-June 1998 & July-Dec 19971998-09-24024 September 1998 Corrects Errors in Ltrs & 980225 Re semi-annual Fitness for Duty Performance Data for Jan-June 1998 & July-Dec 1997 CY-98-151, Responds to NRC Re Violations Noted in Insp Rept 50-213/98-03.Corrective Actions:Root Cause Team Has Determined That Shift Managers Initial Reportability Decision Was Not Correct1998-09-21021 September 1998 Responds to NRC Re Violations Noted in Insp Rept 50-213/98-03.Corrective Actions:Root Cause Team Has Determined That Shift Managers Initial Reportability Decision Was Not Correct ML20153G3891998-09-14014 September 1998 Informs That Union of Concerned Scientists Fully Supports Citizens Awareness Network Petition Filed Pursuant to 10CFR2.206,seeking to Revoke or Suspend License for Haddam Neck Nuclear Plant ML20154J9861998-09-11011 September 1998 Forwards for Service Upon Lj Callan,Jc Hoyle & Commission, Request for NRC to Revoke Connecticut Yankee Atomic Power Co License to Operate Haddam Neck Reactor Pursuant to 10CFR2.206 ML20154J9991998-09-11011 September 1998 Requests NRC Take Immediate Action to Revoke Util License to Operate Haddam Neck Nuclear Power Station Pursuant to 10CFR2.206 B17420, Forwards Semiannual fitness-for-duty Performance Data for Jan-June 1998,per 10CFR26.71(d)1998-08-31031 August 1998 Forwards Semiannual fitness-for-duty Performance Data for Jan-June 1998,per 10CFR26.71(d) CY-98-107, Forwards Decommissioning Cost Study for Connecticut Yankee Nuclear Power Plant. Adjustments to Cost Estimate Will Be Made as Necessary as Detailed Work Planning Progresses & Elements of Cost Estimate Periodically Reviewed & Updated1998-08-25025 August 1998 Forwards Decommissioning Cost Study for Connecticut Yankee Nuclear Power Plant. Adjustments to Cost Estimate Will Be Made as Necessary as Detailed Work Planning Progresses & Elements of Cost Estimate Periodically Reviewed & Updated B17384, Submits fitness-for-duty Program Rept for Investigations Re Unsatisfactory Performance Test Results,Per 10CFR26,App a, Subpart B,Section 2.8(e)(4).No New Commitments Are Contained in Ltr1998-08-20020 August 1998 Submits fitness-for-duty Program Rept for Investigations Re Unsatisfactory Performance Test Results,Per 10CFR26,App a, Subpart B,Section 2.8(e)(4).No New Commitments Are Contained in Ltr CY-98-141, Requests Postponement of Defueled Emergency Plan Exercise Until 980923.Ltr Contains No New Commitments1998-08-13013 August 1998 Requests Postponement of Defueled Emergency Plan Exercise Until 980923.Ltr Contains No New Commitments CY-98-145, Provides Remediation Plans for Offsite Location 9621.Work Associated W/Location 9621 Scheduled to Begin on 9808171998-08-13013 August 1998 Provides Remediation Plans for Offsite Location 9621.Work Associated W/Location 9621 Scheduled to Begin on 980817 CY-98-132, Provides NRC W/Addl Info on Plant Defueled Emergency Plan. Util Stores Resin Liners Inside Area Protected by Vehicle Barriers1998-07-31031 July 1998 Provides NRC W/Addl Info on Plant Defueled Emergency Plan. Util Stores Resin Liners Inside Area Protected by Vehicle Barriers CY-98-127, Provides Clarifying Info Re Spent Fuel Pool make-up Capability at Hnp.Conclusions Reached by NRC Staff in SER Contained in Issuance of License Amend 193 Not Impacted & & Remain Valid1998-07-30030 July 1998 Provides Clarifying Info Re Spent Fuel Pool make-up Capability at Hnp.Conclusions Reached by NRC Staff in SER Contained in Issuance of License Amend 193 Not Impacted & & Remain Valid CY-98-118, Informs NRC Staff That Rev 38 to Plant Emergency Plan Has Been Implemented1998-07-21021 July 1998 Informs NRC Staff That Rev 38 to Plant Emergency Plan Has Been Implemented CY-98-121, Responds to NRC Request for Addl Info on Recent Operational Events at Plant.Corrective Actions That Have Been Taken, Discussed1998-07-16016 July 1998 Responds to NRC Request for Addl Info on Recent Operational Events at Plant.Corrective Actions That Have Been Taken, Discussed ML20151Z0221998-07-10010 July 1998 Informs That R Bassilakis & Gejdenson Share Same Concerns Re Recent Incidents at Connecticut Yankee Reactor in Haddam Neck,Ct & Hope That NRC Address Concerns Promptly ML20236P0971998-07-0909 July 1998 Inquires About Truth of Cyap Having No Shift Compliment of Licensed Operators at Haddam Neck Reactor ML20239A0651998-07-0707 July 1998 Discusses 980620 Inadvertent Radwaste Discharge from Plant Reactor.Team of NRC Inspectors,Completely Independent of Region I,Requested to Investigate Region I Ability to Regulate Effectively 1999-09-02
[Table view] Category:UTILITY TO NRC
MONTHYEARB13622, Forwards Crdr Human Engineering Discrepancy Info for Plant1990-08-30030 August 1990 Forwards Crdr Human Engineering Discrepancy Info for Plant B13617, Requests NRC Revise Confirmatory Order for Plant to Specify New Completion Date of Cycle 16 Refueling Outage for Item II.E.1.2.Util Intends to Implement Design Change During Next Refueling Outage to Resolve Listed Issues1990-08-22022 August 1990 Requests NRC Revise Confirmatory Order for Plant to Specify New Completion Date of Cycle 16 Refueling Outage for Item II.E.1.2.Util Intends to Implement Design Change During Next Refueling Outage to Resolve Listed Issues B13615, Requests That 900705 Request for Amend to License DPR-61 Be Approved on Emergency Basis & That Temporary Waiver of Compliance from Tech Spec 4.4.6.2.1.g Be Given Until NRC Acts on Emergency Amend1990-08-20020 August 1990 Requests That 900705 Request for Amend to License DPR-61 Be Approved on Emergency Basis & That Temporary Waiver of Compliance from Tech Spec 4.4.6.2.1.g Be Given Until NRC Acts on Emergency Amend B13611, Forwards, Semiannual Radioactive Effluents Release Rept for Jan-June 19901990-08-16016 August 1990 Forwards, Semiannual Radioactive Effluents Release Rept for Jan-June 1990 B13595, Notifies NRC That Utils Volunteer to Participate in Emergency Response Data Sys Project for All Four Nuclear Units,Per Generic Ltr 89-15 & NUREG-13941990-08-14014 August 1990 Notifies NRC That Utils Volunteer to Participate in Emergency Response Data Sys Project for All Four Nuclear Units,Per Generic Ltr 89-15 & NUREG-1394 B13602, Submits Addendum to Plant Control Room Design Review Summary Rept,Per .Lists 10CFR50 App R-related Mods Outside Control Room That Could Not Be Reviewed Until After Final Implementation of Changes1990-08-14014 August 1990 Submits Addendum to Plant Control Room Design Review Summary Rept,Per .Lists 10CFR50 App R-related Mods Outside Control Room That Could Not Be Reviewed Until After Final Implementation of Changes B13580, Discusses Revised Tech Spec Conversion Program,Reflecting Conversion of Tech Spec to Westinghouse Sts.Future Upgrade of Tech Specs Should Be Conducted on Voluntary Basis Consistent W/Nrc Policy Statement1990-08-10010 August 1990 Discusses Revised Tech Spec Conversion Program,Reflecting Conversion of Tech Spec to Westinghouse Sts.Future Upgrade of Tech Specs Should Be Conducted on Voluntary Basis Consistent W/Nrc Policy Statement B13603, Withdraws 900731 Request for Temporary Waiver of Compliance W/Tech Spec 3.7.1.2 Re Inoperability of Auxiliary Feedwater Pumps1990-08-0202 August 1990 Withdraws 900731 Request for Temporary Waiver of Compliance W/Tech Spec 3.7.1.2 Re Inoperability of Auxiliary Feedwater Pumps B13601, Requests Temporary Waiver of Compliance from Tech Spec 3.7.1.2,allowing Plant to Remain in Mode 3 for Addl 14 Days Beyond Current Action Statement Limits W/One or of Two Auxiliary Feedwater Pumps Inoperable1990-07-31031 July 1990 Requests Temporary Waiver of Compliance from Tech Spec 3.7.1.2,allowing Plant to Remain in Mode 3 for Addl 14 Days Beyond Current Action Statement Limits W/One or of Two Auxiliary Feedwater Pumps Inoperable B13585, Provides Supplemental Response to Generic Ltr 89-19 Re Request for Action Concerning Resolution of Unresolved Safety Issue A-47.Plant Procedures Modified to Provide Operability Verification of Steam Generator Protection Sys1990-07-26026 July 1990 Provides Supplemental Response to Generic Ltr 89-19 Re Request for Action Concerning Resolution of Unresolved Safety Issue A-47.Plant Procedures Modified to Provide Operability Verification of Steam Generator Protection Sys B13571, Clarifies 900625 Tech Spec Change Request Re Limit of 160 Failed Fuel Rods for Cycle 16 Operation1990-07-19019 July 1990 Clarifies 900625 Tech Spec Change Request Re Limit of 160 Failed Fuel Rods for Cycle 16 Operation B13569, Forwards, Haddam Neck Plant Decommissioning Financial Assurance Certification Rept1990-07-18018 July 1990 Forwards, Haddam Neck Plant Decommissioning Financial Assurance Certification Rept ML20055E6791990-07-0606 July 1990 Responds to NRC Bulletin 88-008, Thermal Stresses in Piping Connected to Rcs. All Socket Welded Joints from Header Isolation motor-operated Valves to RCS for All 4 Loops Examined.No Recordable Indications Found ML20055D3461990-07-0303 July 1990 Responds to NRC Bulletin 90-001 Re Loss of Fill Oil Transmitters Mfg by Rosemount.Operability Determinations Performed & Documented for All Rosemount 1153 & 1154 Transmitters at Facility ML20055D7191990-06-29029 June 1990 Amends 900604 Rev 13 to QA Program B13564, Provides NRC W/Info Re Plant Pressurizer as follow-up to 900607 Meeting.Info Particularly Concerns Disposition of Three Indications on Pressurizer Inner Surface & Discussion of Resolution of Previous Indication1990-06-29029 June 1990 Provides NRC W/Info Re Plant Pressurizer as follow-up to 900607 Meeting.Info Particularly Concerns Disposition of Three Indications on Pressurizer Inner Surface & Discussion of Resolution of Previous Indication B13550, Responds to Generic Ltr 90-04, Request for Info on Status of Generic Safety Issues Resolved W/Imposition of Requirements or Corrective Actions. Implementation & Completion Tables for staff-imposed Requirements Encl1990-06-27027 June 1990 Responds to Generic Ltr 90-04, Request for Info on Status of Generic Safety Issues Resolved W/Imposition of Requirements or Corrective Actions. Implementation & Completion Tables for staff-imposed Requirements Encl B13364, Forwards Rev 19 to Modified Amended Security Plan.Rev Withheld (Ref 10CFR2.790(a))1989-10-0505 October 1989 Forwards Rev 19 to Modified Amended Security Plan.Rev Withheld (Ref 10CFR2.790(a)) B13376, Forwards Util Response to Generic Ltr 89-04 Re Guidance on Developing Acceptable Inservice Test Programs1989-10-0202 October 1989 Forwards Util Response to Generic Ltr 89-04 Re Guidance on Developing Acceptable Inservice Test Programs A08598, Provides Clarification of Util Position Re Emergency Notification Sys (ENS) & Health Physics Network (Hpn).Util Intends to Provide Two Separate Qualified Individuals for ENS & HPN Communications During Exercise Drills1989-10-0202 October 1989 Provides Clarification of Util Position Re Emergency Notification Sys (ENS) & Health Physics Network (Hpn).Util Intends to Provide Two Separate Qualified Individuals for ENS & HPN Communications During Exercise Drills B13375, Responds to Request for Addl Info Re Electrical Distribution Sys Design Associated W/New Switchgear Bldg.New Switchgear Bldg Provides Opportunity to Minimize Dependence on Motor Control Ctr 5 & Further Reduce Level of Risk1989-09-29029 September 1989 Responds to Request for Addl Info Re Electrical Distribution Sys Design Associated W/New Switchgear Bldg.New Switchgear Bldg Provides Opportunity to Minimize Dependence on Motor Control Ctr 5 & Further Reduce Level of Risk ML20248E4521989-09-29029 September 1989 Forwards Proposed Tech Spec Pages Omitted from 890728 Application for Amend to License DPR-61 Re Cycle 16 Reload B13374, Forwards Bimonthly Progress Rept 18 Re New Switchgear Bldg Const1989-09-27027 September 1989 Forwards Bimonthly Progress Rept 18 Re New Switchgear Bldg Const B13352, Requests Exemption from Certain Requirements of 10CFR50,App J to Assure That Containment Leakage During Design Basis Event Will Not Exceed Applicable Leakage Limits. Justification Encl1989-09-0808 September 1989 Requests Exemption from Certain Requirements of 10CFR50,App J to Assure That Containment Leakage During Design Basis Event Will Not Exceed Applicable Leakage Limits. Justification Encl A08170, Forwards Updated Schedules for Operator Licensing & Requalification Exams for Plants,Per Generic Ltrs 89-12 & 89-031989-08-30030 August 1989 Forwards Updated Schedules for Operator Licensing & Requalification Exams for Plants,Per Generic Ltrs 89-12 & 89-03 B13346, Forwards Tornado Missile Risk Analysis of Bleed & Feed & Auxiliary Feedwater Safe Shutdown Sys at Connecticut Yankee Atomic Power Station, Per SEP Topics III-2 & III-4.A1989-08-30030 August 1989 Forwards Tornado Missile Risk Analysis of Bleed & Feed & Auxiliary Feedwater Safe Shutdown Sys at Connecticut Yankee Atomic Power Station, Per SEP Topics III-2 & III-4.A B13351, Provides Clarifications of Util & NRC 890525 Insp Rept 50-213/89-200.Util Proposes to Extend Schedule for Completion of Sampling and Evaluation Program to 900930 & Valves That Fail Systematic Testing Will Be Replaced1989-08-28028 August 1989 Provides Clarifications of Util & NRC 890525 Insp Rept 50-213/89-200.Util Proposes to Extend Schedule for Completion of Sampling and Evaluation Program to 900930 & Valves That Fail Systematic Testing Will Be Replaced A08237, Confirms Receipt of Listed Invoices for Costs Incurred During Routine Insps1989-08-28028 August 1989 Confirms Receipt of Listed Invoices for Costs Incurred During Routine Insps B13340, Submits Results of Svc Water & Primary Auxiliary Bldg Equipment Operability Analyses Not Provided in 890428 Submittal of Results of ECCS Single Failure Analysis1989-08-24024 August 1989 Submits Results of Svc Water & Primary Auxiliary Bldg Equipment Operability Analyses Not Provided in 890428 Submittal of Results of ECCS Single Failure Analysis A08211, Ack Receipt of Listed Invoices for Cost Incurred During Routine Insps at Plants.Payment Will Be Made on 8909061989-08-22022 August 1989 Ack Receipt of Listed Invoices for Cost Incurred During Routine Insps at Plants.Payment Will Be Made on 890906 B13341, Forwards WCAP-12196, Svc Water Sys Design Basis Temp Increase to 95 F for Connecticut Yankee & Haddam Neck Plant, Per Request in Amend 112 to License DPR-61.Northeast Utils Svc Co Suppl to Rept Also Encl1989-08-21021 August 1989 Forwards WCAP-12196, Svc Water Sys Design Basis Temp Increase to 95 F for Connecticut Yankee & Haddam Neck Plant, Per Request in Amend 112 to License DPR-61.Northeast Utils Svc Co Suppl to Rept Also Encl B13339, Forwards Addl Info Re Util 881026 & 890306 Revised Tech Specs Requests,Per NRC Request.Existing 8 H Shift Frequency Does Not Provide Enough Latitude within 8 H Shift Whereas 12 H Shift Would1989-08-21021 August 1989 Forwards Addl Info Re Util 881026 & 890306 Revised Tech Specs Requests,Per NRC Request.Existing 8 H Shift Frequency Does Not Provide Enough Latitude within 8 H Shift Whereas 12 H Shift Would B13342, Provides Util Position Re Procurement of non-code Class Fasteners in ASME Code Class Applications from Mfg or Matl Suppliers,Per Util to NRC & Insp Rept 50-423/88-18.App B Program Assures Use of Equivalent Items1989-08-15015 August 1989 Provides Util Position Re Procurement of non-code Class Fasteners in ASME Code Class Applications from Mfg or Matl Suppliers,Per Util to NRC & Insp Rept 50-423/88-18.App B Program Assures Use of Equivalent Items A08186, Ack Receipt of Listed Invoices for Cost Incurred During Insps.Funds Will Be wire-transferred on 8908241989-08-0808 August 1989 Ack Receipt of Listed Invoices for Cost Incurred During Insps.Funds Will Be wire-transferred on 890824 B13336, Forwards Annual Occupational Exposure Rept 19881989-08-0808 August 1989 Forwards Annual Occupational Exposure Rept 1988 ML20247Q7691989-08-0303 August 1989 Forwards Rev 12 to QA Program Topical Rept B13323, Comments on Draft Reg Guide, Assuring Availability of Funds for Decommissioning Nuclear Reactors. Changes to Stated Phrases Re Certification Amounts Discussed1989-08-0303 August 1989 Comments on Draft Reg Guide, Assuring Availability of Funds for Decommissioning Nuclear Reactors. Changes to Stated Phrases Re Certification Amounts Discussed A08153, Advises That Payment for Invoices H1386,H1387,H1410 & H1411 Will Be wire-transferred on 890810,per NRC Instructions1989-08-0101 August 1989 Advises That Payment for Invoices H1386,H1387,H1410 & H1411 Will Be wire-transferred on 890810,per NRC Instructions B13321, Informs of Inability to Submit plant-specific Analyses for Util as Planned,Due to Delays Encountered in Completing Sensitivity & Break Spectrum Analysis.Meeting Between NRC & Util Representatives Arranged for 8908101989-08-0101 August 1989 Informs of Inability to Submit plant-specific Analyses for Util as Planned,Due to Delays Encountered in Completing Sensitivity & Break Spectrum Analysis.Meeting Between NRC & Util Representatives Arranged for 890810 A07974, Advises That No Agreements Restricting Employees to Inform NRC of Potential Safety Issues Exist,Per V Stello1989-07-31031 July 1989 Advises That No Agreements Restricting Employees to Inform NRC of Potential Safety Issues Exist,Per V Stello ML20248B7931989-07-31031 July 1989 Forwards Response to NRC Request for Addl Info Re Util 890421 Application for Amend to License DPR-61,revising Tech Spec 3.6, Eccs. Revised Tech Spec Also Encl B13307, Responds to Generic Ltr 89-06, Task Action Plan Item I.D.2 - SPDS - 10CFR50.54(f). SPDS for Plants Meet Applicable Requirements of Suppl 1 to NUREG-0737 & Consistent W/ Majority of Positions Provided in NUREG-13421989-07-21021 July 1989 Responds to Generic Ltr 89-06, Task Action Plan Item I.D.2 - SPDS - 10CFR50.54(f). SPDS for Plants Meet Applicable Requirements of Suppl 1 to NUREG-0737 & Consistent W/ Majority of Positions Provided in NUREG-1342 A08037, Responds to Generic Ltr 89-08, Erosion/Corrosion-Induced Pipe Wall Thinning. Plants Have Programs & Procedures in Place to Monitor Erosion/Corrosion for Both single-phase & two-phase Flow Sys1989-07-13013 July 1989 Responds to Generic Ltr 89-08, Erosion/Corrosion-Induced Pipe Wall Thinning. Plants Have Programs & Procedures in Place to Monitor Erosion/Corrosion for Both single-phase & two-phase Flow Sys A08007, Requests Extension of Deadline for Response to Generic Ltr 89-06, Task Action Plan Item I.D.2-SPDS-10CFR50.54(f), to No Later than 890721.Addl Time Needed to Allow for Completion of Thorough Internal Review of Response1989-07-12012 July 1989 Requests Extension of Deadline for Response to Generic Ltr 89-06, Task Action Plan Item I.D.2-SPDS-10CFR50.54(f), to No Later than 890721.Addl Time Needed to Allow for Completion of Thorough Internal Review of Response B13282, Forwards Response to 890501 Request for Addl Info Re Util Const of New Switchgear Bldg at Plant1989-07-10010 July 1989 Forwards Response to 890501 Request for Addl Info Re Util Const of New Switchgear Bldg at Plant A08093, Advises That Fourth Quarterly Installment of 1989 Annual Fees Will Be Wire Transferred on 890731 in Payment of Invoices H1146,H1222,H1190 & H1151,per 10CFR1711989-07-0707 July 1989 Advises That Fourth Quarterly Installment of 1989 Annual Fees Will Be Wire Transferred on 890731 in Payment of Invoices H1146,H1222,H1190 & H1151,per 10CFR171 A08111, Advises That Payment for 10CFR170 Fee Sent to Jm Rodriquez Re NRC Review of Rev 11 to QA Topical Rept1989-07-0707 July 1989 Advises That Payment for 10CFR170 Fee Sent to Jm Rodriquez Re NRC Review of Rev 11 to QA Topical Rept A07951, Responds to Suppl 3 to NRC Bulletin 88-008, Thermal Stresses in Piping Connected to Rcs. Issue Represents No Problem at Any Millstone Unit.Haddam Neck Valves Will Be Inspected for Leakage During Upcoming Refueling Outage1989-06-30030 June 1989 Responds to Suppl 3 to NRC Bulletin 88-008, Thermal Stresses in Piping Connected to Rcs. Issue Represents No Problem at Any Millstone Unit.Haddam Neck Valves Will Be Inspected for Leakage During Upcoming Refueling Outage B13268, Submits Addl Info Re 890425 Proposed Rev to Tech Specs Administrative Controls Section Concerning High Radiation Areas,Per NRC 890505 Conference Call1989-06-26026 June 1989 Submits Addl Info Re 890425 Proposed Rev to Tech Specs Administrative Controls Section Concerning High Radiation Areas,Per NRC 890505 Conference Call B13215, Advises That One Technically Qualified & Trained Individual Per Site Will Man Health Physics Network & Emergency Notification Sys Telephone Lines at Plants,Per NRC Ltrs1989-06-23023 June 1989 Advises That One Technically Qualified & Trained Individual Per Site Will Man Health Physics Network & Emergency Notification Sys Telephone Lines at Plants,Per NRC Ltrs 1990-08-30
[Table view] |
Text
_ _ _ - - _ _ _ - _ _ _ _ - - _
CONNECTICUT YANKEE ATO MIC POWER COMPANY B E R L I N, CONNECTICUT P O. BOX 270
((s"2 July 9,1987 Docket No. 50-213 B12590 Re: TMI Action Item II.D.1 l U. S. Nuclear Regulatory Commission 1
Attn: Document Control Desk Washington, D. C. 20555
Reference:
(1) F. M. Akstulewicz letter to E. 3. Mroczka, " Review of NUREG-0737, Item II.D.1, Performance Testing of Relief and Safety Valves for Haddam Neck," dated December 12,1986.
1 l
i Gentlemen:
Haddam Neck Plant Relief Valve and Safety Valve Testing In Reference (1), the NRC Staff requested that Connecticut Yankee Atomic Power Company (CYAPCO) provide additional information regarding NUREG 0737, Item II.D.1, the testing of pressurizer power operated relief valves (PORVs) and safety valves at the Haddam Neck Plant.
This additional information is provided in the attachment. A response to Question No. 5 is not yet available since supporting information must be obtained from a contractor in order for CYAPCO to fully address the question. As such, the response to Question No. 5 is scheduled to be submitted by September 1, 1987.
Please contact us if you have any questions.
Very truly yours, CONNECTICUT YANKEE ATOMIC POWER COMPANY 0Yh 2<W E. 3. Mr (J Seniorice (otzka President Attachment cc: W. T. Russell, Region I Administrator F. M. Akstulewicz, NRC Project Manager, Haddam Neck Plant P. D. Swetland, Resident Inspector, Haddam Neck Plant l
8707160774 070709 $40 PDR ADOCK 05000213 i i
p PDR l
j .:
Docket No. 50-213 B12590 1
Attachment Haddam Neck Plant j Additional Information Relief Valve and Safety Valve Testing i
i i
i July,1987 i
I Haddam Neck Plant
. Additional Information on SV/RV Testing 1 Question 1:
The submittal (Reference 1) did not include a discussion'of the consideration of the single failures after the initial events that challenge the PORVs and/or safety valves. NUREG 0737 requires selection of single failures that produce.
maximum loads on the PORVs and safety valves. Provide a discussion describing how the single failure considerations are met.
CYAPCO Response:
In accordance with NUREG 0737, test conditions were verified to bound the I worst case fluid conditions assuming the worst case single failure that might. l occur during a design basis accident. Thus, the application of additional failures '
beyond those considered is not necessary.
Question 2:
' The Haddam Neck PORV. block valves were not tested by EPRI. The licensee indicated that they had conducted an independent plant specific evaluation of {
the 2 in.,1500 -ib., Crane gate' valve with the Crane-Teledyne Model No. T4-5 j motor operator (Reference 1, response to Question 8). However, no' details were '
provided of their independent evaluation. Therefore, provide evidence supported l by test to demonstrate that the block valve can be operated,' closed, and opened ;
for fluid conditions expected under operating and accident conditions and that !
the valve o'perator is capable of delivering sufficient thrust to ef fect full closure of the valve within the required stroke time. !
CYAPCO Response:
Reference (1) stated that CYAPCO had conducted an independent plant specific evaluation of the Haddam Neck PORV block valve motor operator arrangement.
This evaluation involved a review of the EPRI block valve information package j for applicability to the Haddam Neck Plant. The applicable results were discussed with the valve / operator vendor (Crane-Teledyne).
Crane-Teledyne recalculated the torque requirements for the Haddam Neck valves. The new calculated torque values verified the adequacy of those values
' originally specified and maintained at Haddam. Neck. Thus, it was concluded that the block valve / motor operator arrangements were adequate to ensure proper valve operation. j However, CYAPCO has since replaced the PORY block valve operators due to
.. environmental equipment qualification (EEQ) cencerns. The new operators are Limitorque SMB-00-10 operators with 10 f t. Ib. motors. The operators develop a seating torque of 50 f t. Ib. and a running torque of 30f t. Ib. The valves remain the same (Crane, 2" 1500 lb., Model 87-1/2U). As part of the motor operator replacement, Limitorque recalculated the torque requirements for the Haddam Neck PORY block valves.
l J
The Limitorque lSMB-00-10 operator was successfully tested by EPRI, however,.
the tests utilized 3". gate valves compared to the Haddam Neck PORY block valves, which are 2". Torque requirements for the 2" valves are less than the valves tested. Based on this information, it was concluded that the Haddam Neck PORV block : valve / motor operator arrangement is adequate to ensure proper valve operation.
To further demonstrate.the operability of the PORV block valves, CYAPCO is including the block valves in the IE Bulletin 85-03 (Reference 3) program. Under j this program, actual valve stem thrusts will be measured and compared to the '
stem thrusts calculated by the vendor. These tests will be performed during the 1987 refueling outage (Reference 4).
CYAPCO believes the above commitment goes beyond what was mutually agreed upon between the participating utilities and the NRC (as detailed in Reference 3). However, CYAPCO is anxious to close out this long standing issue.
Question 3:
In response to the question on the maximum bending moments induced on the
. safety valves and PORVs by pressure and thermal expansion loads during valve discharge (Reference 1, Question 7), the licensee stated that the safety valves were subjected to loads two times higher in the EPRI tests than those predicted l for the effects associated with dead weight, thermal expansion, SSE and valve l discharge for the in-plant valves. But the magnitudes of the predicted moments were not given. Provide a comparison of the predicted maximum moments and 1 the maximum moments sustained during the EPRI tests for the safety valves and j PORVs. !
CYAPCO Response: !
The as-tested valve discharge bending moments for the Crosby Type 3K6 safety valves were measured during the EPRl/CE PWR Safety. Valve Testing. The maximum induced discharge moment was 13,458 ft. Ibf (Reference 5). Induced -
discharge bending moments were not measured during EPRI PORV testing. The bounding expected discharge bending moments for the safety and relief valves are tabulated in Appendix A.
Question 4:
In the EPRI tests on the Copes-Vulcan PORVs, the valve opening and closing 1 times were recorded. The longest opening time was 1.01 sec and the longest closing time was 1.44 sec. The required opening and closing time for the PORVs at the Haddam Neck Plant was not given by the licensee. Give the required PORV opening and closing time for the Haddam Neck Plant so that the valve j
operability evaluation can be completed. '
CYAPCO Response:
The Haddam Neck safety analysis assumes a PORY block valve opening time of 20 sec. and a closing time of 20 sec. The PORY is assumed to open and close l within these time intervals.
e Question 5 The discussion on the thermal hydraulic analysis of the PORV and safety valve piping system presented in Reference (1) (response to Question 9) has been reviewed. Additional information .is still required in order to complete the evaluation of the analysis. Provide the following information:
- a. Explain in detail how the thermal-hydraulic analysis program "STEHAM" was verified to ensure that it was adequate for the safety valve /PORV piping application. Provide a comparison of the calculated results using the STEHAM program for an EPRI test condition with the EPRI test results for the same test.
- b. Discuss the piping model used for the thermal-hydraulic analysis. Identify the important parameters used in the analysis such as node spacing, valve flow area, pressure ramp rate, choked flow locations and discuss the rational for their selection.
CYAPCO Response:
l (To be provided)
Question 6 For piping and support stress analysis discussed in Reference (1) (response to Question 11), the following additionalinformation is required.
- a. Appendix B of Reference (1) lists the cut-off frequency and cut-off mode -
as 1337 Hz/21 modes for time history analysis and 50 Hz/50 modes for pipe stress analysis. However, no description of the time history and pipe stress analysis was provided. It is not clear whether the safety valve and PORV discharge analysis is considered as the time history analysis and loading conditions analyzed in the time history analysis and the loading conditions considered in the pipe stress analysis. Justify the adequacy of the cut-off frequency and cut-off mode number used in each case. Also explain, why a lower number of modes (21) was specified in conjunction with a higher cut-off frequency (1337 Hz) and a high number of modes (50) was specified with a much lower cut-off frequency (50 Hz).
- b. Identify the governing codes used for the piping and support stress analysis and indicate which partions of the piping is considered as Class 1 and Class 2 or 3.
- c. One set of load combination equations is given in Appendix C of Reference (1). Are these load combination equations and stress limits applicable to the entire piping system from the pressurizer to the discharge tank or was
l a distinction rnade between the Class 1 portion and the rest of the piping.
! Also, explain why the. Operating Basis Earthquake (OBE) is excluded from the load combinations.
- d. References (1) and (2) did not provide any evaluation of the stress results of the piping and support analysis. Provide a comparison between the maximum and allowable stresses in the piping upstream and downstream of the safety valves and PORVs and in the piping supports. Identify overstressed locations and describe the structural modification required, if any.
- e. Provide a clear readable sketch of the structural model showing lumped mass locations, pipe size and application points of fluid forces.
- f. Submit a copy of the structural analysis report.
CYAPCO Response:
- a. The time history analysis was performed to evaluate the effects of the fluid dynamic forcing functions, developed in the "STEHAM" thermal hydraulic analysis, on the piping, supports and equipment. The time history forcing functions were applied to the piping structural model and displacements and stresses were generated for the piping, as well as support and equipment loadings. These results were stored on tape and used in the final pipe stress analysis and combined as detailed in Appendix B.
The cutoff frequency and mode for the time history analysis was 256 Hz and 141, respectively. Free vibration analyses were run to form the basis for these values. The integration time step vias then selected to ensure at least 2-1/2 time steps per cycle at the cutoff frequency. The cutoff frequency and mode for the pipe stress analysis, was 50 Hz and 50, respectively. For seismic response spectra analysis NRC Regulatory Guide 1.60 represents the design response spectra by the maximum ground acceleration at frequencies greater than 33 Hz. Consequently, the resulting floor response spectra converges to that of the particular building location rigid range response above 33 Hz and a cutoff frequency of 50 Hz is conservative.
- b. All Pressurizer Safety / Relief Valve Piping from the pressurizer to the pressurizer relief tank was qualified to ASME Section III Subsection NC, 1974 Edition, including addenda through the Summer of 1976, for Class 2 piping. Subse in conjunction with the systematic evaluation program (SEP)for quently, the Haddam Neck Plant and NUREG 0737 all of the pressurizer relief piping was requalified in accordance with the 1973 ANSI B31.1 Power Piping Code. This is consistent with the SEP treatment of the remainder of the Reactor Coolant System (RCS).
The supports for all of the pressurizer relief piping were qualified in accordance with the Seventh Edition of the AISC Code.
- c. The load combination equations and stress limits previously transmitted l and reiterated in Appendix A are applicable to the entire piping system
'from the pressurizer to the relief. tank. ASME Class 1 rules were not applied to any of the pressurizer relief piping. An operational basis earthquake was not included in the load combinations since it was neither postulated in the plant design basis nor included in the SEP.
- d. The pressurizer relief piping was within applicable code stresses allowable in all locations. A comparison of maximum and allowable stresses is provided in Appendix D.
The supports were qualified in accordance with the AISC Code. To assure qualification, minor structural modifications were required. These modifications included the replacement of U-bolts with box frames.
- e. Piping work sketches of the structural model illustrating analytic information and the application of fluid forces is provided in Appendix C.
f.- The Structural Analysis Report is readily available for inspection in our offices upon your request.
i l
J l
Il f
i
References:
~
- 1. W. G. Counsil letter to 3. A'. Zwolinski, "Haddam Neck Plant, Response to Requests for Additional Information on Performance Testin.g of Relief and Safety Valves," dated April 15,1985.
- 2. W. G. Counsil letter to D. W. Eisenhut, "Haddam Neck Plant, Millstone Nuclear Power Station, Unit No. 2, NUREG-0737 Item II.D.1, Performance Testing of PWR Relief and Safety Valves," dated December 15,1982.
- 3. IE Bulletin 85-03, " Motor-Operated Valve Common Mode Failures During Plant Transients Due to Improper Switch Settings", dated November 15, 1985.
- 4. 3. F. Opeka letter to T. E. Murley, "IE Bulletin Common Mode Failures",
dated June 11,1986.
- 5. R. C. Youngdahl (EPRI, RAC) letter to H. Denton, " Status of EPRI PWR RV/SV Test Program," dated July 24,1981.
- 6. EPRI/CE PWR Safety Valve Test Report, Volume 10: Piping Structural Response Results, EPRI NP-2770-LD, March 1983.
l t
s i
l l l i
l l
I
1 APPENDIX "A" Bounding Expected Discharge Bending Moments for Safety Valves and PORVs 1+Y ,
MY()
+r[,, 6) ' , ,
/MZ MX -
l
+X Safety Valves Resultant Bending Moment (ft-lbf)
Normal and Upset 6545 (sustained loadings)*
Faulted 6818 (occasional loadings)
PORVs Normal and Upset 1909 (sustained loadings)*
Faulted 2326 (occasional loadings)
Including safety / relief valve fluid transients.
1 I _________-__a
a,. ,
i
]
1 APPENDIX "B" PIPE STRESS CRITERIA Loading combinations Stress Limits- l Design Pressure + Deadweight S h
Design Pressure + Deadweight + 1.2 S h
SRSS.(SOT R & OTg) !
Operating Pressure + Deadweight + 2.4 S SRSS (Potential Earthquake Loads h (SSE), SOT and SOTg )
R Thermal S A
SA Allowable-stress range-- 1.25 S + 0.25 S h*
c S Material allowable stress at minimum temperature from c ANSI B31.1, 1973 Edition, Summer 1973 Addenda.
S h
Material allowable stress at the maximum operating temperature from ANSI B31.1, 1973 Edition, Summer 1973 Addenda.
I.
SOT System Operating Transient SOT Relief Valve Discharge Transient R
SOT g Safety Valve Discharge Transient SSE Safe Shutdown Earthquake L
L L
__._._--____.________-__-_._-___-__O
APPENDIX "C" Structural Model Illustrating the Application of Fluid Forces i
1 1
l l 1 l
4
. m . eam m, a em sk 4 reo rt . uo t e) - no s. -xs
- c. o Dona zmr (coup) y,e A. Me rwe nsaroes M.ose eb
>= 5*7
\- .
.* O ,
<, . .g a .[
g p .
s - z.a-n ay 1 t
't d
r y
bIpN y gh
.w l;,
I e
ir T3 !
~
'a 5
s
~
if j $..u
~
. M M , . .! ii _
3
.*gs ..... - .
e g
e **
- - s as * '
- s. .
b s
't
.= hb
.s u i l5 A
[ f .h I 4 sf
[ 'E f
t.
3 s.i -
g ? i j' O g .4 I 3 'f \ ! . i g g
8
'] I -
~
~ E olc I r
'A ,{i l n ,, t 11
}I 8
j g.,1y
( i_
i O '.:
il, I
- 'k!y\ g ,
a i
1 s:3 j '). ..
E . .
1 # V.' ~
i ?l
=s a o g
~
3 $ '; I s k "gY #
4 .
. < . , s. a 803 g !g,.
- y , I $ *a Ns Si E
h g , .; ,,
j I 'I e ** -g 4 A g Yg ; '
g I'8
)] ,
Pi!!
fi /T I
_N ., iy* a, sis, e 5 A i ,i
~
b '
58 b Ye 5kg\=.I M;pl!
,'5 ; !
. ir Q ?
I"'f5!p.k# _
, 3 G.' (A , * ,, \
$N\ fi !,ji 5 ,
, , %', i ij i f < i . 4la, 5 Lui j 5
n
~ #
.l t
' { I
\ , $ ' ' *' , , ,.J
- g
[-
7 ' v(m t.; r l
l -
l' l
s I g as : - I 8 I ,
.i 1 I ,I O S a
h e *g
, . ~~
.7 . N ep 3 , #'e'.
d ' ,
? e
+
g ' e e 4 5
,\ -
I
- . 1 ,- - P, ~,i
.e R
w 31 s..
s ii
~
4
.e5
'i
~
1{ . -
lj l I I 8
$$ ,g \. t
?< -
K e
' e
- Y ,- ' ,
It 8 i: ,
k.
et 3E
- 4 g u
,. \
- ' I
.\-
{ 5,,,,,,,,,,,..,
l
}
- 3 '$ !
s
'I.
, 4 e,
+
.. 1!1 . 't 5-l 8- s
=
y
G
.l-1 [E t : .}
- is !gh. hk 5 1 g 5 ., i.* - - -
" \
11 4l d 's- d -
, i
~
h] )" 1 ,
j S
toi j .I- <t 5
g * ,Y n t*l 1 4 i
.V; '
~
5 L i ;g Qtot .! !
i s,. 1'. I I. .$* $ Id $
t- 1 w (. " x. d to-:
3
_ . . - ,, , I ~{ N !
a b n , t0 g Id s 4 :j b'
, ; 4 -
'3 '*
a ,os &
c/ )
y s 14 g i
.eg.,N,ll;1.
s
-I .s
, '{ ' : ~
g w\d' u ,.
g, yg
%, I 3
- !I l
-= \- l s -
., I g
'* II
.g b
. '.e* ,j
-! I 5
-a m .
g I-
=
'I ^
e 1
.1
~
I gg. goo .
(o)dN -d*D I
u,q *s l'_. _ CAu f /4094 = dPlG)- co2 = pS '
. 'eg , 3 i
4
,p g =
9 m;
I ro l lI # g .. t gF' j*
8 "
6
.' I*j 0 ( r
- ^
l ,, 1 d s 8
. o : 5
,3
. E r
- l r [I
_ e l . ,
E 4 * * ' -
' 1 7I I *
- e 4 E
' l =
Ei W.$3
'N j
- s. , g gg
. g E I f
i i
~
s
~
f j ( '
v j!
k l. 5
! <] "s
.! w!
D f :Eg g E I
i' i e
I e
a ;
s ! c i gtE,l g'
h , 8
's t
.y E !
v ,
. e :
',N~.! .. i.gf g,
[ w 2; ,i; i
I I Il k' .':
/ ??.. 2 il
/
3 5l 4
, i , ! !
J'/
>~ J3
- \ s, s' "
y ,y-: : i I
-i l
? * %W E y -. s
s I ,! ; A 13 4 ! !
e -
M* ( l
/ ,
1 't- 1,[y &II a t '8 \I 'I 's_.
I 't< \' '
\ .N , , , -
\t i ' *" 'l td ~
\,\ g j hr p$ '4.' sN N. g E f iv g i
e E
?
n f j g -
,d-E '
a 1 m
$l s s v
< c s $
l f 1 e e- -
a B
Bl APPENDIX "D" MAXIMUM STRESS LEVELS FOR CARBON STEEL PIPING l l
Point- Member Max. Calc. Allowable No. Type Stress Stress (PSI) (PSI)-
Sustained Stress 410 TEE 4631 15000 (Equation 8)
Occasional. Stress 86 TEE 17128 36000 (Equation 9)-
Expansion Stress 410 TEE 25237 22500 (Equation 10)
Sustained Plus 410 TEE 29868 37500 Expansion Stress.
(Equation 11)
Equation 9 71 TEE 14059 18000 S(C) = Basic material allowable stress at minimum (cold) temperature = 15000 (PSI).
S(H) = Basic material allowble stress at maximum ~(hot) temperature = 15000 (PSI).
APPENDIX "D" (Cont)
MAXIMUM STRESS LEVELS i FOR-STAINLESS STEEL PIPING Point Member Max. Calc. Allowable No. Type Stress Stress (PSI) (PSI)
Sustained Stress 335 RUN 8158 16600 (Equation 8)
Occasional Stress 249 TEE 19260 39840 (Equation 9)A Expansion Stress' 560 REDUCER 22117 27525 (Equation 10)
Sustained'Plus 560 REDUCER 29191 44125 Expansion Stress (Equation 11)
Equation 9 682 RUN 18462 19920 i
S(C) = Basic material allowable stress at minimum (cold) temperature = 18700.
S(H) = Basic material allowable stress at maxiuum (hot) temperature = 16600.
O l
___ __ _ _ _ . _ _ _ _ _