Forwards LER 97-032-00 Re Inoperability of HPCI & Rcic. Commitments Made by Util,Encl
ML20198J797
Person / Time
Site: Hope Creek PSEG icon.png
Issue date: 01/02/1998
From: Bezilla M
Public Service Enterprise Group
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
Shared Package
ML20198J801 List:
References
LR-N970822, NUDOCS 9801140215
Download: ML20198J797 (2)


LER-2097-032, Forwards LER 97-032-00 Re Inoperability of HPCI & Rcic. Commitments Made by Util,Encl
Event date:
Report date:
3542097032R00 - NRC Website

text

O PSEG

  • Publicservice Electric and Gas Company P.O. Box 236 Hancocks Bridge, New Jersey 08038-0236 Nuclear Business Unit JAN 21998 LR.N970822 U. S. Nuclear Regulatory Commission Docunient Control Desk Washington,DC 20555

Dear Sir:

IlOPE CREEK GENERATING STATION DOCKET NO. 50-354 UNIT 1 LICENSEE EVENT REPORT 97-032-00 This Licensee Event Repart entitled "IIPCI and RCIC Inoperability and Entry into Technical Specification 3.0.3" is being submitted pursuant to the requirements of 10CFR50.73(a)(2)(i)(A) and 10CFR50.73(a)(2)(v).

Sincerely, es O ae4.=vu4 Mark Bezilla General Manager-Hope Creek Operations CEM , g

/ Q.Y C Distribution LER File J-9901140215 990102 PDR fDOCK 05000354~

The;wtrisin>uur huds.

.s m or,.

Document Control Desk IM N970822 Attachment A The following items represent the commitments that the Public Service Electric and Gas Company is making to the Nuclear Regulatory Commission relative to LER 354/97-032-00:

RCIC Governor Valve Issue ,

i. 110x Creek Maintenance Procedure llc.MD-CM.FC-0001(Q)," Reactor Core Iso ation Cooling (RCIC) Steam Turbine Inspection and P.M.", will be revised to include proper governor valve linkage adjustment directions. This will be completed by April 30,1998.
2. Lessors Learned from this event will be rolled out to Engineering Personnel conducting Equivalent Replacement Evaluations by April 30,1998.
3. Purchase specifications / drawing for the RCIC governor valve dem will be revised to accommodate increased thermal expansion ofInconel 718 versus 410 Stainless Steel by April 30,1998.
4. Maintenance Procedure llc.MD-CM.FC-0002(Q) will be revised to require that the valve be verified to fully close without coil binding the spring. This will be completed by April 30,1998.
5. Lessons learned from this event with respect to improper positioning of the valve stem guide during reassembly of the governor valve will be rolled out to the Salem and 11 ope Creek Maintenance Departmen;s. This will be completed by April 30,1998, llPCI Turbine Trin and Vibration Issue
6. Procedures will be revised and a recurring task developed to require that spring tension be measured every 18 months. This will be completed by May 31,1998.
7. A design change will be evaluated to re-route the seal cavity drain line to allow the line to properly drain the cavity. This evaluation will be completed by June 9, 1998.
8. Procedures covering reassembly of the turbine seal housing will be revised to require inspection for corrosion. This will be completed by May 31,1998.

- - ,