Forwards LER 95-012-00 Re Identification That SRs Associated W/Calibr of Analog Channels Which Input to Ssps May Not Have Been Performed as Required.Procedure Implementing Required Surveillance Incorrect
ML20093N808
Person / Time
Site: Sequoyah Tennessee Valley Authority icon.png
Issue date: 10/23/1995
From: Adney R
TENNESSEE VALLEY AUTHORITY
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
Shared Package
ML20093N811 List:
References
NUDOCS 9510300002
Download: ML20093N808 (2)


LER-2095-012, Forwards LER 95-012-00 Re Identification That SRs Associated W/Calibr of Analog Channels Which Input to Ssps May Not Have Been Performed as Required.Procedure Implementing Required Surveillance Incorrect
Event date:
Report date:
3272095012R00 - NRC Website

text

. .. . .. . .. . . ~ - .. . .. . .-.

Tennessee Valley Authority, Post Office Box 2000, Soddy-Daisy, Tennessee 37379-2000 R.J. Adney Site Vice President Sequoyah Nuclear Plant l

l October 23,1995 U.S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, D.C. 20555 l

Gentlemen:

TENNESSEE VALLEY AUTHORITY - SEQUOYAH NUCLEAR PLANT (SQN)

UNIT 1 - DOCKET NO, 50-327 - FACILITY OPERATING LICENSE DPR LICENSEE EVENT REPORT (LER) 50-327/95012 The enclosed report provides details concerning the identification that surveillance requirements associated with the calibration of analog channels which input to the solid state protection system (SSPS) may not have been performed as required by technical specifications. The procedure implementing the required surveillance was incorrect in that it did not ensure that the alarm and/or trip functions on both trair.s of the solid state protection system were functionally tested. This condition is being reported in accordance with 10 CFR 50.73(a)(2)(i)(B) as an operation prohibited by the plant's technical specifications.

Sincerely, R. J. Adney Enclosure cc: See page 2 e >.1,n v , ,

sb 8 Al U .L h 9510300002 951023 g

{DR ADOCK 05000327 ,r PDR t l

i j

U.S. Nuclear Regulatory Commission Page 2 October 23,1995 Enclosure cc (Enclosure):

INPO Records Center Institute of Nuclear Power Operations 700 Galleria Parkway Atlanta, Georgia 30339-5957 Mr. D. E. LaBarge, Project Manager U.S. Nuclear Regulatory Commission One White Flint, North 11555 Rockville Pike i Rockville, Maryland 20852-2739 1 NRC Resident Inspector Sequoyah Nuclear Plant 2600 Igou Ferry Road Soddy-Daisy, Tennessee 37379-3624 Regional Administrator U.S. Nuclear Regulatory Commission Region II 101 Marietta Street, NW, Suite 2900 Atlanta, Georgia 30323-2711 l