05000281/LER-1975-012, Suppl to LER 75-12/01T:on 750706,reactor Trip Occurred. Caused by Sudden Closure of Trip Valve in Main Steam Line B Followed by Closure of Main Steam Line Valves a & C

From kanterella
Jump to navigation Jump to search
Suppl to LER 75-12/01T:on 750706,reactor Trip Occurred. Caused by Sudden Closure of Trip Valve in Main Steam Line B Followed by Closure of Main Steam Line Valves a & C
ML20087C181
Person / Time
Site: Surry Dominion icon.png
Issue date: 01/20/1976
From: Baucom T, Stallings C
VIRGINIA POWER (VIRGINIA ELECTRIC & POWER CO.)
To: Moseley N
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
Shared Package
ML20087C182 List:
References
598-S, LER-75-12-01T, LER-75-12-1T, NUDOCS 8403120356
Download: ML20087C181 (3)


LER-2075-012, Suppl to LER 75-12/01T:on 750706,reactor Trip Occurred. Caused by Sudden Closure of Trip Valve in Main Steam Line B Followed by Closure of Main Steam Line Valves a & C
Event date:
Report date:
2812075012R00 - NRC Website

text

',

supggep, g UCENSEE EVENT REgRT l1 I I I

_ ,1 casa 8 emmTaunuovesoneoamanOmj CONTnOc SLOCnl I

<- 1 8 PE UCENSE NUMSER 1 lvl Al Sl Pl Sl2 l l 0 l 0 l-l 0l 0l 0l 0 l 0 l-l 0 l 0l 25 l4l1 28 ltltlol30 l0l1l3231 b

u9 14 15 I

EVENT DATE REPORT DATE  !

CATEGORY Pf RC DOCKET NUMSER 01 OON'T l p l o l (y_j [L_j l 0 l S l 0 l-l 01 2l 81 Il l01 7l 01 61 71 5l 101112l 0l 7l 61 80 88 89 74 75 7 8 57 58 59 80 81 EVENT DESCRfPTION l  ;

, 35 I See A0-S2-75-12 80 '

7 89 IH

, 29 i -

7 89 ~

l

,, 20 1 80

7 89 '

l L DE l 80 7 89 l

, Da l 80 7 89 ,,ug MAM#ACTURER VOIATCN DE OE COMPONENT CCOE 35 laisl Lg] I vi Al t. l v l El x1 IA I is lo 17151 LN_I 7 89 10 11 12 17 43 44 47 48 CAUSE DESCRtPTION DG l n/A 'l L 80 7 89

, @l 7 89 00 I

, .' l __

l

% POWER CTMER STATUS O OVE OGCOVERY DESCRWm0N St 1

LcJ lolol ol I N/A 44 l [C_j 45 48 l N/A 80-l 7 8 9 10 12 13 REL 0 E SE AMOUNT OF ACTMTY LOCATON OF RELEASE DE l N/A l l N/A l Lz.I Lz_J 44 45 80 7 8 9 10 11 PERSONNEL EXPOSURES NUMBER TYPE CESCAPTON 35l0l010l,[z] l N/A l 12 13 80 7 89 11 PERSONNEL INJURtES NUMBER DESCRsPTON l_

, H 1010l0 l I N/A ao ,

7 89 11 12 l OFFSITE CONSEQUENCES gg l N/A l

7 89 so LOSS OR OAMAGE TO FACIUTY TYPE DESCRPTON Q[Zj _l N/A l

( 80 7 89 10 ,

PUBUCITY B403120356 760120

, Ql_ N/A DRADOCK05000g g 80 7 89 j

AGOITIONAL FACTORS Q@ l During thel recent 1975 fall outage the following work was accomplished on Unit No.1 lj

, 30 ;

7 89 i

, Q l ' main steam trip valves (TV-MS-101A,B & C) . (con't) ll i

80 7 89-NAME T. L. Baucom PHONE. (804) 357-3184 cm am. ..T j

~

O .

O _

ADDITIONAL FACTORS (con't)

1. Disc swing angles were checked and verified to be correct (80+2-0 degrees).
2. Bottom back edge of discs were ground in accordance with Schutte & Koerting instructions to prevent possible sticking of the disc in the open position.
3. Tail link and bushing total end to end clearances were checked and modified as required to provide a total clearance less than 0.106" but greater than 0.042".
4. All gaskets and "O" rings were inspected for wear and replaced as necessary.

Completion of this work eliminated the problems on Unit No. I trip valves that had been previously identified and corrected on Unit No. 2 (see A0-S2-75-12).

No further work or modifications are considered necessary at this time to insure the proper, safe and reliable operation of the main steam trip valves.

, a.w.

l 4 4 4

6

-1

.2- . . -

r

. m O .

O

.:--fj.. . .' y

. :y -  :

YzRGINIA EI.ECTRIC AND PowzR CoxPANY fy, *

."  ?

s11,1- .fr g

Ricuwoxn.VzmotxrA enest [ [' J. / _'

January 22, 1976 .

?

. $ t,] . i'..' o . . .

. *x . ,# '

    • 'oj ' ,

b -

Ik. Norcan C. 2foseley, Director Serial No. 598-S Office of Inspection and Enforccuent P0&M/AUI:c1w United States Mucicar Regulatory Cc==1ssion Region II - Suite S18 Docket No. 50-281 230 Peachtree Street, Northwest License No. DPR-37 Atlanta, Georgia 30303

Dear Mr. lioseley:

Pursuant to Surry Power Station Technical Specif'ication 6.6.B.1, the Virginia Electric and Power Conpany hereby submits forty (40) copies of Supplementary Abnorual Occurrence Report No. A0-S2-75-12.

The substance of this report has been reviewed by the Station Uuclear Safety and Operating Cor::nittee end will be placed on the agenda for the next necting of the System Nuclear Safety and Operating Conmittee.

Very truly yours,

. . Mb C. H. Stallings Vice President-Power Supply and Production Operations Enclosures 40 copies of AO-S2-75-12 cc: !!r. Robert W. Reid l