IR 05000277/2023402 | 11 January 2024 | Security Baseline Inspection Report 05000277/2023402 and 05000278/2023402 and Independent Spent Fuel Storage Installation Security Inspection 07200029/2023401 | |
IR 05000277/2023003 | 30 October 2023 | Integrated Inspection Report 05000277/2023003 and 05000278/2023003 and Exercise of Enforcement Discretion | High winds Packing leak Stroke time Internal Flooding Enforcement Discretion Functionality Assessment Scram Discharge Volume Operability Determination Fire Protection Program Unidentified leakage |
IR 05000277/2024401 | 5 October 2023 | Information Request for the Cybersecurity Baseline Inspection, Notification to Perform Inspection 05000277/2024401 and 05000278/2024401 | Cyber Security |
IR 05000277/2023010 | 15 September 2023 | Biennial Problem Identification and Resolution Inspection Report 05000277/2023010 and 05000278/2023010 and Notice of Violation | Coatings Cyber Security Condition Adverse to Quality Significance Determination Process Operability Determination |
ML23251A202 | 11 September 2023 | Cover Letter W/Report | Safeguards Contingency Plan |
IR 05000277/2023005 | 31 August 2023 | Updated Inspection Plan for Peach Bottom Atomic Power Station, Units 2 and 3 (Report 05000277/2023005 and 05000278/2023005) | Commercial Grade Dedication Cyber Security |
IR 05000277/2023011 | 15 August 2023 | Comprehensive Engineering Team Inspection Report 05000277/2023011 and 05000278/2023011 | Safe Shutdown Internal Flooding FLEX Aging Management Significance Determination Process Large early release frequency Power Uprate |
IR 05000277/2023002 | 8 August 2023 | Integrated Inspection Report 05000277/2023002 and 05000278/2023002 | Half scram Enforcement Discretion Functionality Assessment Operability Determination Fire Protection Program |
IR 05000277/2023040 | 17 July 2023 | 95001 Inspection Supplemental Report 05000277/2023040 and Follow-Up Assessment Letter | Condition Adverse to Quality Preliminary White Finding |
IR 05000277/2023001 | 8 May 2023 | Integrated Inspection Report 05000277/2023001 and 05000278/2023001 | Enforcement Discretion Temporary Modification Functionality Assessment Condition Adverse to Quality FLEX Significance Determination Process Surveillance Frequency Control Program Operability Determination Spent Fuel Pool Instrumentation Hardened vent Fire Protection Program Power change |
IR 05000277/2022004 | 5 April 2023 | Acknowledgement of Dispute of Green Finding - NRC Inspection Report 05000277/2022004 and 05000278/2022004 | |
IR 05000277/2023401 | 27 March 2023 | Security Baseline Inspection Report 05000277/2023401 and 05000278/2023401 | Fitness for Duty |
IR 05000277/2023012 | 10 March 2023 | Title 10 of the Code of Federal Regulations 50.69 Risk-Informed Categorization and Treatment of Structures, Systems, and Components Inspection Report 05000277/2023012 and 05000278/2023012 | Probabilistic Risk Assessment Significance Determination Process |
IR 05000277/2022006 | 1 March 2023 | Annual Assessment Letter for Peach Bottom Atomic Power Station, Units 2 and 3 (Reports 05000277/2022006 and 05000278/2022006) | Fitness for Duty Commercial Grade Dedication Cyber Security Exemption Request Coronavirus |
ML23033A333 | 2 February 2023 | Integrated Inspection Report 05000277/2022004 and 05000278/2022004 | High Radiation Area Ultimate heat sink Internal Flooding Past operability Nondestructive Examination Temporary Modification Functionality Assessment Locked High Radiation Area Significance Determination Process Large early release frequency Moisture barrier Liquid penetrant Fire Protection Program Dissimilar Metal Weld Downpower |
IR 05000171/2022001 | 4 January 2023 | Constellation Energy Generation, LLC, Peach Bottom Atomic Power Station, Unit 1 - NRC Inspection Report 05000171/2022001 | Process Control Program |
IR 05000277/2022090 | 28 November 2022 | Final Significance Determination of a White Finding with Assessment Follow-Up and Notice of Violation, Inspection Report 05000277/2022090 | Preliminary White Finding |
IR 05000277/2022003 | 27 October 2022 | Integrated Inspection Report 05000277/2022003 and 05000278/2022003 and Preliminary White Finding and Apparent Violation | Time of Discovery Packing leak Half scram Mission time Enforcement Discretion Probabilistic Risk Assessment Squib Functionality Assessment FLEX Significance Determination Process Large early release frequency Operability Determination Severe Accident Management Guideline Through-Wall Leak Preliminary White Finding Fire Protection Program |
IR 05000277/2022401 | 27 September 2022 | Material Control and Accounting Program Inspection Report 05000277/2022401 and 05000278/2022401 (Cover Letter Only) | Affidavit |
IR 05000277/2022005 | 31 August 2022 | Updated Inspection Plan for Peach Bottom Atomic Power Station, Units 2 and 3 (Report 05000277/2022005 and 05000278/2022005) | Fitness for Duty Commercial Grade Dedication Cyber Security Exemption Request Coronavirus |
IR 05000277/1957001 | 19 August 2022 | 631999-Termination License 50-27757-01 for G. Scott Crowther Dba Crowther Associates | |
IR 07200079/2022404 | 4 August 2022 | NRC Security Inspection Report 07200079/2022404 (Cover Letter) | Affidavit |
IR 05000277/2022002 | 28 July 2022 | Integrated Inspection Report 05000277/2022002 and 05000278/2022002 | Safe Shutdown Ultimate heat sink Enforcement Discretion Temporary Modification Functionality Assessment Aging Management Significance Determination Process Operability Determination Tornado Missile Risk Evaluator Fire Protection Program |
IR 05000277/2022301 | 28 July 2022 | Initial Operator Licensing Examination Report 05000277/2022301 and 05000278/2022301 | |
IR 05000277/2022403 | 13 July 2022 | Cyber Security Inspection Report 05000277/2022403 and 05000278/2022403 (Cover Letter Only) | Cyber Security Affidavit |
IR 05000277/2022402 | 15 June 2022 | Security Baseline Inspection Report 05000277/2022402 and 05000278/2022402 and Independent Spent Fuel Storage Installation Security Inspection Report 07200029/2022401 (Cover Letter Only) | Affidavit |
IR 05000277/2022501 | 8 June 2022 | Emergency Preparedness Biennial Exercise Inspection Report 05000277/2022501 and 05000278/2022501 | Reactor Vessel Water Level |
IR 05000277/2022011 | 18 May 2022 | Design Basis Assurance Inspection (Programs) Inspection Report 05000277/2022011 and 05000278/2022011 | Safe Shutdown Scram Discharge Volume Power-Operated Valves Very Low Safety Significance Issue Resolution Scaffolding |
ML22117A036 | 27 April 2022 | Integrated Inspection Report 05000277/2022001 and 05000278/2022001 | Internal Flooding Temporary Modification Functionality Assessment FLEX Frazil ice Fire Protection Program Power change |
IR 05000482/2022001 | 25 April 2022 | Integrated Inspection Report 05000482/2022001 and Independent Spent Fuel Storage Installation Inspection Report 07200079/2022001 | Safe Shutdown Ultimate heat sink Mission time Fire Barrier Commercial Grade Dedication Internal Flooding Temporary Modification Functionality Assessment Significance Determination Process Surveillance Frequency Control Program Operability Determination Maintenance Rule Program Fire Protection Program Hourly Fire Watch Power change Unidentified leak |
IR 05000277/2021006 | 2 March 2022 | Annual Assessment Letter for Peach Bottom Atomic Power Station, Units 2 and 3 (Reports 05000277/2021006 and 05000278/2021006) | Fitness for Duty Cyber Security Exemption Request Power-Operated Valves Power Operated Valves COVID-19 |
IR 05000277/2021004 | 9 February 2022 | Integrated Inspection Report 05000277/2021004 and 05000278/2021004 | High Radiation Area Enforcement Discretion Nondestructive Examination Temporary Modification Functionality Assessment Aging Management Significance Determination Process Operability Determination Fire Protection Program |
IR 05000482/2021004 | 19 January 2022 | Integrated Inspection Report 05000482/2021004 and Independent Spent Fuel Storage Installation Inspection Report 07200079/2021002 | Enforcement Discretion Fire impairment Functionality Assessment Condition Adverse to Quality Significance Determination Process Process Control Program Operability Determination Earthquake Maintenance Rule Program Control of Heavy Loads Fire Protection Program Power change Siren |
IR 05000171/2021001 | 12 January 2022 | Safstor Inspection Report 05000171/2021001 | Annual Radioactive Effluent Release Report Annual Radiological Environmental Operating Report Process Control Program Coronavirus |
IR 05000277/2022302 | 10 January 2022 | Operator Licensing Retake Examination Report 05000277/2022302 and 05000278/2022302 | |
IR 05000277/2021003 | 9 November 2021 | Integrated Inspection Report 05000277/2021003 and 05000278/2021003 | Stroke time Enforcement Discretion Temporary Modification Functionality Assessment FLEX Significance Determination Process Surveillance Frequency Control Program Operability Determination Coronavirus COVID-19 Fire Protection Program Downpower Coast down Unidentified leakage |
IR 05000482/2021003 | 5 November 2021 | Integrated Inspection Report 05000482/2021003 and Independent Spent Fuel Storage Installation Inspection Report 07200079/2021001, WC2021003 IR Ch | Safe Shutdown Internal Flooding Enforcement Discretion Temporary Modification Cyber Security Functionality Assessment Condition Adverse to Quality FLEX Significance Determination Process Operability Determination Earthquake Coronavirus COVID-19 Fire Protection Program |
IR 07200079/2021401 | 21 October 2021 | ISFSI Security Inspection Report 07200079/2021401 | Coronavirus |
IR 05000277/2021012 | 22 September 2021 | Biennial Problem Identification and Resolution Inspection Report 05000277/2021012 and 05000278/2021012 | Coatings Condition Adverse to Quality FLEX Significance Determination Process Foreign Material Exclusion Reasonable doubt of operability Coronavirus COVID-19 |
IR 05000277/2021301 | 1 September 2021 | Initial Operator Licensing Examination Report 05000277/2021301 and 05000278/2021301 | |
IR 05000277/2021005 | 1 September 2021 | Updated Inspection Plan for the Peach Bottom Atomic Power Station, Units 2 and 3 (Report 05000277/2021005 and 05000278/2021005) | Fitness for Duty Cyber Security Exemption Request Power-Operated Valves Power Operated Valves COVID-19 |
IR 05000277/2021002 | 4 August 2021 | Integrated Inspection Report 05000277/2021002 and 05000278/2021002 | Internal Flooding Enforcement Discretion Temporary Modification Functionality Assessment Operability Determination Coronavirus COVID-19 Fire Protection Program Unidentified leak |
IR 05000277/2021010 | 20 July 2021 | Triennial Fire Protection Inspection Report 05000277/2021010 and 05000278/2021010 | Safe Shutdown Coronavirus Fire Protection Program |
IR 05000277/2021001 | 28 April 2021 | Integrated Inspection Report 05000277/2021001 and 05000278/2021001 | Internal Flooding Enforcement Discretion Probabilistic Risk Assessment Functionality Assessment FLEX Significance Determination Process Operability Determination Coronavirus COVID-19 Pressure Boundary Leakage Through-Wall Leak Fire Protection Program Power change |
IR 05000277/2021401 | 27 April 2021 | Security Baseline Inspection Report 05000277/2021401 and 05000278/2021401 | Coronavirus COVID-19 |
IR 05000277/2021011 | 1 April 2021 | Temporary Instruction 2515/194 Inspection Report 05000277/2021011 and 05000278/2021011 | Probabilistic Risk Assessment Open Phase Condition Coronavirus |
IR 05000277/2020006 | 3 March 2021 | Annual Assessment Letter for Peach Bottom Atomic Power Station, Units 2 and 3 (Reports 05000277/2020006 and 05000278/2020006) | Open Phase Condition Exemption Request Power-Operated Valves Power Operated Valves COVID-19 |
IR 05000277/2020004 | 5 February 2021 | Integrated Inspection Report 05000277/2020004 and 05000278/2020004 and Independent Spent Fuel Storage Installation Inspection Report 07200029/2020401 | High Radiation Area Non-Destructive Examination Internal Flooding Enforcement Discretion Nondestructive Examination Temporary Modification VT-2 Cyber Security Functionality Assessment Significance Determination Process Scram Discharge Volume Operability Determination Safeguards Contingency Plan Moisture barrier License Renewal Coronavirus COVID-19 Through-Wall Leak Fire Protection Program Downpower |
IR 07200029/2020001 | 5 January 2021 | Peach Atomic Power Station, Independent Spent Fuel Storage Installation (ISFSI) NRC Inspection Report No. 07200029/2020001 | Non-Destructive Examination Tornado Missile Tornado-Generated Missile Significance Determination Process COVID-19 |
IR 05000277/2020501 | 17 December 2020 | Emergency Preparedness Biennial Exercise Inspection Report 05000277/2020501 and 05000278/2020501 | Coronavirus COVID-19 |