IR 05000277/2024002 | 4 September 2024 | Reissued Integrated Inspection Report 05000277/2024002 and 05000278/2024002 | Hot Short Loop seal Mission time Stroke time Internal Flooding Enforcement Discretion Temporary Modification Functionality Assessment FLEX B.5.b Significance Determination Process Large early release frequency Operability Determination Fire Protection Program Scaffolding Unidentified leakage Loss of condenser vacuum |
IR 05000277/2024005 | 29 August 2024 | Updated Inspection Plan for Peach Bottom Atomic Power Station, Units 2 and 3 (Report 05000277/2024005 and 05000278/2024005) | Commercial Grade Dedication Cyber Security |
IR 05000277/2024010 | 23 August 2024 | Fire Protection Team Inspection Report 05000277/2024010 and 05000278/2024010 | Safe Shutdown Fire Barrier Fire Protection Program |
IR 05000482/2024005 | 14 August 2024 | Updated Inspection Plan for Wolf Creek Generating Station (Report 05000482/2024005) | Commercial Grade Dedication Cyber Security License Renewal |
ML24227A549 | 14 August 2024 | Integrated Inspection Report 05000277/2024002 and 05000278/2024002 | Hot Short Mission time Stroke time Internal Flooding Enforcement Discretion Temporary Modification Functionality Assessment FLEX B.5.b Significance Determination Process Large early release frequency Operability Determination Fire Protection Program Scaffolding Unidentified leakage Loss of condenser vacuum |
IR 05000277/2024301 | 13 June 2024 | Initial Operator Licensing Examination Report 05000277/2024301 and 05000278/2024301 | |
IR 05000277/2024001 | 13 May 2024 | Integrated Inspection Report 05000277/2024001 and 05000278/2024001 | Internal Flooding Enforcement Discretion Functionality Assessment Aging Management Operability Determination Fire Protection Program Power change Operability Assessment |
IR 05000277/2024501 | 8 May 2024 | Emergency Preparedness Biennial Exercise Inspection Report 05000277/2024501 and 05000278/2024501 | |
IR 05000277/2024402 | 12 March 2024 | Cybersecurity Inspection Report 05000277/2024402 and 05000278/2024402 (Cover Letter Only) | Affidavit |
IR 05000277/2023006 | 28 February 2024 | Annual Assessment Letter for Peach Bottom Atomic Power Station, Units 2 and 3 (Reports 05000277/2023006 and 05000278/2023006) | Commercial Grade Dedication Cyber Security |
IR 05000171/2023001 | 20 February 2024 | Constellation Energy Generation, LLC - Peach Bottom Atomic Power Station, Unit 1 - NRC Inspection Report No. 05000171/2023001 | Offsite Dose Calculation Manual Annual Radiological Environmental Operating Report Process Control Program Annual Radiological Effluent Release Report |
IR 05000277/2023004 | 12 February 2024 | Integrated Inspection Report 05000277/2023004 and 05000278/2023004 | High Radiation Area Non-Destructive Examination Internal Flooding Temporary Modification Functionality Assessment Aging Management Significance Determination Process Local Leak Rate Testing Operability Determination Frazil ice Moisture barrier EVT-1 Fire Protection Program Scaffolding Overspeed trip |
IR 05000277/2023402 | 11 January 2024 | Security Baseline Inspection Report 05000277/2023402 and 05000278/2023402 and Independent Spent Fuel Storage Installation Security Inspection 07200029/2023401 | Affidavit |
IR 05000277/2023003 | 30 October 2023 | Integrated Inspection Report 05000277/2023003 and 05000278/2023003 and Exercise of Enforcement Discretion | High winds Packing leak Stroke time Internal Flooding Enforcement Discretion Functionality Assessment Scram Discharge Volume Operability Determination Fire Protection Program Unidentified leakage |
IR 05000277/2024401 | 5 October 2023 | Information Request for the Cybersecurity Baseline Inspection, Notification to Perform Inspection 05000277/2024401 and 05000278/2024401 | Cyber Security |
IR 05000277/2023010 | 15 September 2023 | Biennial Problem Identification and Resolution Inspection Report 05000277/2023010 and 05000278/2023010 and Notice of Violation | Coatings Cyber Security Condition Adverse to Quality Significance Determination Process Feedwater Heater Operability Assessment |
ML23251A202 | 11 September 2023 | Cover Letter W/Report | Safeguards Contingency Plan |
IR 05000277/2023005 | 31 August 2023 | Updated Inspection Plan for Peach Bottom Atomic Power Station, Units 2 and 3 (Report 05000277/2023005 and 05000278/2023005) | Commercial Grade Dedication Cyber Security |
IR 05000277/2023011 | 15 August 2023 | Comprehensive Engineering Team Inspection Report 05000277/2023011 and 05000278/2023011 | Safe Shutdown Internal Flooding FLEX Aging Management Significance Determination Process Large early release frequency Power Uprate |
IR 05000277/2023002 | 8 August 2023 | Integrated Inspection Report 05000277/2023002 and 05000278/2023002 | Half scram Enforcement Discretion Functionality Assessment Fire Protection Program Operability Assessment |
IR 05000277/2023040 | 17 July 2023 | 95001 Inspection Supplemental Report 05000277/2023040 and Follow-Up Assessment Letter | Condition Adverse to Quality Preliminary White Finding Final Significance Determination of a White Finding |
IR 05000277/2023001 | 8 May 2023 | Integrated Inspection Report 05000277/2023001 and 05000278/2023001 | Enforcement Discretion Temporary Modification Functionality Assessment Condition Adverse to Quality FLEX Significance Determination Process Surveillance Frequency Control Program Spent Fuel Pool Instrumentation Containment Hardened Vent Fire Protection Program Power change Operability Assessment |
IR 05000277/2022004 | 5 April 2023 | Acknowledgement of Dispute of Green Finding - NRC Inspection Report 05000277/2022004 and 05000278/2022004 | |
IR 05000277/2023401 | 27 March 2023 | Security Baseline Inspection Report 05000277/2023401 and 05000278/2023401 | Fitness for Duty |
IR 05000277/2023012 | 10 March 2023 | Title 10 of the Code of Federal Regulations 50.69 Risk-Informed Categorization and Treatment of Structures, Systems, and Components Inspection Report 05000277/2023012 and 05000278/2023012 | Probabilistic Risk Assessment Significance Determination Process |
IR 05000277/2022006 | 1 March 2023 | Annual Assessment Letter for Peach Bottom Atomic Power Station, Units 2 and 3 (Reports 05000277/2022006 and 05000278/2022006) | Fitness for Duty Commercial Grade Dedication Cyber Security Exemption Request COVID-19 |
ML23033A333 | 2 February 2023 | Integrated Inspection Report 05000277/2022004 and 05000278/2022004 | High Radiation Area Ultimate heat sink Internal Flooding Past operability Nondestructive Examination Temporary Modification Functionality Assessment Locked High Radiation Area Significance Determination Process Large early release frequency Moisture barrier Liquid penetrant Fire Protection Program Dissimilar Metal Weld Power change Operability Assessment |
IR 05000171/2022001 | 4 January 2023 | Constellation Energy Generation, LLC, Peach Bottom Atomic Power Station, Unit 1 - NRC Inspection Report 05000171/2022001 | Process Control Program |
IR 05000277/2022090 | 28 November 2022 | Final Significance Determination of a White Finding with Assessment Follow-Up and Notice of Violation, Inspection Report 05000277/2022090 | Preliminary White Finding Final Significance Determination of a White Finding Regulatory Conference |
IR 05000277/2022003 | 27 October 2022 | Integrated Inspection Report 05000277/2022003 and 05000278/2022003 and Preliminary White Finding and Apparent Violation | Time of Discovery Packing leak Half scram Mission time Enforcement Discretion Probabilistic Risk Assessment Squib Functionality Assessment FLEX Significance Determination Process Large early release frequency Severe Accident Management Guideline Through-Wall Leak Preliminary White Finding Fire Protection Program Operability Assessment Regulatory Conference |
IR 05000277/2022401 | 27 September 2022 | Material Control and Accounting Program Inspection Report 05000277/2022401 and 05000278/2022401 (Cover Letter Only) | Affidavit |
IR 05000277/2022005 | 31 August 2022 | Updated Inspection Plan for Peach Bottom Atomic Power Station, Units 2 and 3 (Report 05000277/2022005 and 05000278/2022005) | Fitness for Duty Commercial Grade Dedication Cyber Security Exemption Request Coronavirus |
IR 05000277/1957001 | 19 August 2022 | 631999-Termination License 50-27757-01 for G. Scott Crowther Dba Crowther Associates | |
IR 07200079/2022404 | 4 August 2022 | NRC Security Inspection Report 07200079/2022404 (Cover Letter) | Affidavit |
IR 05000277/2022301 | 28 July 2022 | Initial Operator Licensing Examination Report 05000277/2022301 and 05000278/2022301 | |
IR 05000277/2022002 | 28 July 2022 | Integrated Inspection Report 05000277/2022002 and 05000278/2022002 | Safe Shutdown Ultimate heat sink Enforcement Discretion Temporary Modification Functionality Assessment Aging Management Significance Determination Process Tornado Missile Risk Evaluator Fire Protection Program Operability Assessment GNF3 |
IR 05000277/2022403 | 13 July 2022 | Cyber Security Inspection Report 05000277/2022403 and 05000278/2022403 (Cover Letter Only) | Cyber Security Affidavit |
IR 05000277/2022402 | 15 June 2022 | Security Baseline Inspection Report 05000277/2022402 and 05000278/2022402 and Independent Spent Fuel Storage Installation Security Inspection Report 07200029/2022401 (Cover Letter Only) | Affidavit |
IR 05000277/2022501 | 8 June 2022 | Emergency Preparedness Biennial Exercise Inspection Report 05000277/2022501 and 05000278/2022501 | Reactor Vessel Water Level |
IR 05000277/2022011 | 18 May 2022 | Design Basis Assurance Inspection (Programs) Inspection Report 05000277/2022011 and 05000278/2022011 | Safe Shutdown Scram Discharge Volume Power-Operated Valves Very Low Safety Significance Issue Resolution Scaffolding |
ML22117A036 | 27 April 2022 | Integrated Inspection Report 05000277/2022001 and 05000278/2022001 | Internal Flooding Temporary Modification Functionality Assessment FLEX Local Leak Rate Testing Eddy Current Testing Frazil ice Fire Protection Program Power change Operability Assessment Unidentified leakage |
IR 05000482/2022001 | 25 April 2022 | Integrated Inspection Report 05000482/2022001 and Independent Spent Fuel Storage Installation Inspection Report 07200079/2022001 | Safe Shutdown Ultimate heat sink Mission time Fire Barrier Commercial Grade Dedication Internal Flooding Temporary Modification Functionality Assessment Significance Determination Process Surveillance Frequency Control Program Eddy Current Testing Commercial Grade Maintenance Rule Program Fire Protection Program Hourly Fire Watch Power change Operability Assessment Unidentified leak |
IR 05000277/2021006 | 2 March 2022 | Annual Assessment Letter for Peach Bottom Atomic Power Station, Units 2 and 3 (Reports 05000277/2021006 and 05000278/2021006) | Fitness for Duty Cyber Security Exemption Request Power-Operated Valves Power Operated Valves COVID-19 |
IR 05000277/2021004 | 9 February 2022 | Integrated Inspection Report 05000277/2021004 and 05000278/2021004 | High Radiation Area Enforcement Discretion Nondestructive Examination Temporary Modification Functionality Assessment Aging Management Significance Determination Process Fire Protection Program Operability Assessment Overspeed trip Overspeed |
IR 05000482/2021004 | 19 January 2022 | Integrated Inspection Report 05000482/2021004 and Independent Spent Fuel Storage Installation Inspection Report 07200079/2021002 | Enforcement Discretion Fire impairment Functionality Assessment Condition Adverse to Quality Significance Determination Process Process Control Program Eddy Current Testing Earthquake Maintenance Rule Program Control of Heavy Loads Fire Protection Program Power change Operability Assessment Siren |
IR 05000171/2021001 | 12 January 2022 | Safstor Inspection Report 05000171/2021001 | Annual Radioactive Effluent Release Report Annual Radiological Environmental Operating Report Process Control Program Coronavirus |
IR 05000277/2022302 | 10 January 2022 | Operator Licensing Retake Examination Report 05000277/2022302 and 05000278/2022302 | |
IR 05000277/2021003 | 9 November 2021 | Integrated Inspection Report 05000277/2021003 and 05000278/2021003 | Stroke time Enforcement Discretion Temporary Modification Functionality Assessment FLEX Significance Determination Process Surveillance Frequency Control Program Feedwater Heater Coronavirus Fire Protection Program Power change Coast down Operability Assessment Unidentified leakage |
IR 05000482/2021003 | 5 November 2021 | Integrated Inspection Report 05000482/2021003 and Independent Spent Fuel Storage Installation Inspection Report 07200079/2021001, WC2021003 IR Ch | Safe Shutdown Internal Flooding Enforcement Discretion Temporary Modification Cyber Security Functionality Assessment Condition Adverse to Quality FLEX Significance Determination Process Earthquake Coronavirus COVID-19 Fire Protection Program Core Exit Thermocouple Operability Assessment Manual Operator Action |
IR 07200079/2021401 | 21 October 2021 | ISFSI Security Inspection Report 07200079/2021401 | Coronavirus |